Title 49

Volume 3 CHAPTER I SUBCHAP D

Subchapter D - Pipeline Safety

49:3.1.1.2.5PART 186-189
PARTS 186-189 [RESERVED]
49:3.1.1.2.6PART 190
PART 190 - PIPELINE SAFETY ENFORCEMENT AND REGULATORY PROCEDURES
49:3.1.1.2.6.1SUBPART A
Subpart A - General
49:3.1.1.2.6.1.5.1SECTION 190.1
     190.1 Purpose and scope.
49:3.1.1.2.6.1.5.2SECTION 190.3
     190.3 Definitions.
49:3.1.1.2.6.1.5.3SECTION 190.5
     190.5 Service.
49:3.1.1.2.6.1.5.4SECTION 190.7
     190.7 Subpoenas; witness fees.
49:3.1.1.2.6.1.5.5SECTION 190.9
     190.9 Petitions for finding or approval.
49:3.1.1.2.6.1.5.6SECTION 190.11
     190.11 Availability of informal guidance and interpretive assistance.
49:3.1.1.2.6.2SUBPART B
Subpart B - Enforcement
49:3.1.1.2.6.2.5SUBJGRP 5
  Compliance Orders
49:3.1.1.2.6.2.5.1SECTION 190.201
     190.201 Purpose and scope.
49:3.1.1.2.6.2.5.2SECTION 190.203
     190.203 Inspections and investigations.
49:3.1.1.2.6.2.5.3SECTION 190.205
     190.205 Warnings.
49:3.1.1.2.6.2.5.4SECTION 190.206
     190.206 Amendment of plans or procedures.
49:3.1.1.2.6.2.5.5SECTION 190.207
     190.207 Notice of probable violation.
49:3.1.1.2.6.2.5.6SECTION 190.208
     190.208 Response options.
49:3.1.1.2.6.2.5.7SECTION 190.209
     190.209 Case file.
49:3.1.1.2.6.2.5.8SECTION 190.210
     190.210 Separation of functions.
49:3.1.1.2.6.2.5.9SECTION 190.211
     190.211 Hearing.
49:3.1.1.2.6.2.5.10SECTION 190.212
     190.212 Presiding official, powers, and duties.
49:3.1.1.2.6.2.5.11SECTION 190.213
     190.213 Final order.
49:3.1.1.2.6.2.5.12SECTION 190.215
     190.215 [Reserved]
49:3.1.1.2.6.2.5.13SECTION 190.217
     190.217 Compliance orders generally.
49:3.1.1.2.6.2.5.14SECTION 190.219
     190.219 Consent order.
49:3.1.1.2.6.2.6SUBJGRP 6
  Civil Penalties
49:3.1.1.2.6.2.6.15SECTION 190.221
     190.221 Civil penalties generally.
49:3.1.1.2.6.2.6.16SECTION 190.223
     190.223 Maximum penalties.
49:3.1.1.2.6.2.6.17SECTION 190.225
     190.225 Assessment considerations.
49:3.1.1.2.6.2.6.18SECTION 190.227
     190.227 Payment of penalty.
49:3.1.1.2.6.2.6.19SECTION 190.229-190.231
     190.229-190.231 [Reserved]
49:3.1.1.2.6.2.7SUBJGRP 7
  Specific Relief
49:3.1.1.2.6.2.7.20SECTION 190.233
     190.233 Corrective action orders.
49:3.1.1.2.6.2.7.21SECTION 190.235
     190.235 Civil actions generally.
49:3.1.1.2.6.2.7.22SECTION 190.236
     190.236 Emergency orders: Procedures for issuance and rescision.
49:3.1.1.2.6.2.7.23SECTION 190.237
     190.237 Emergency orders: Petitions for review.
49:3.1.1.2.6.2.7.24SECTION 190.239
     190.239 Safety orders.
49:3.1.1.2.6.2.7.25SECTION 190.241
     190.241 Finality.
49:3.1.1.2.6.2.7.26SECTION 190.243
     190.243 Petitions for reconsideration.
49:3.1.1.2.6.3SUBPART C
Subpart C - Criminal Enforcement
49:3.1.1.2.6.3.8.1SECTION 190.291
     190.291 Criminal penalties generally.
49:3.1.1.2.6.3.8.2SECTION 190.293
     190.293 Referral for prosecution.
49:3.1.1.2.6.4SUBPART D
Subpart D - Procedures for Adoption of Rules
49:3.1.1.2.6.4.8.1SECTION 190.301
     190.301 Scope.
49:3.1.1.2.6.4.8.2SECTION 190.303
     190.303 Delegations.
49:3.1.1.2.6.4.8.3SECTION 190.305
     190.305 Regulatory dockets.
49:3.1.1.2.6.4.8.4SECTION 190.307
     190.307 Records.
49:3.1.1.2.6.4.8.5SECTION 190.309
     190.309 Where to file petitions.
49:3.1.1.2.6.4.8.6SECTION 190.311
     190.311 General.
49:3.1.1.2.6.4.8.7SECTION 190.313
     190.313 Initiation of rulemaking.
49:3.1.1.2.6.4.8.8SECTION 190.315
     190.315 Contents of notices of proposed rulemaking.
49:3.1.1.2.6.4.8.9SECTION 190.317
     190.317 Participation by interested persons.
49:3.1.1.2.6.4.8.10SECTION 190.319
     190.319 Petitions for extension of time to comment.
49:3.1.1.2.6.4.8.11SECTION 190.321
     190.321 Contents of written comments.
49:3.1.1.2.6.4.8.12SECTION 190.323
     190.323 Consideration of comments received.
49:3.1.1.2.6.4.8.13SECTION 190.325
     190.325 Additional rulemaking proceedings.
49:3.1.1.2.6.4.8.14SECTION 190.327
     190.327 Hearings.
49:3.1.1.2.6.4.8.15SECTION 190.329
     190.329 Adoption of final rules.
49:3.1.1.2.6.4.8.16SECTION 190.331
     190.331 Petitions for rulemaking.
49:3.1.1.2.6.4.8.17SECTION 190.333
     190.333 Processing of petition.
49:3.1.1.2.6.4.8.18SECTION 190.335
     190.335 Petitions for reconsideration.
49:3.1.1.2.6.4.8.19SECTION 190.337
     190.337 Proceedings on petitions for reconsideration.
49:3.1.1.2.6.4.8.20SECTION 190.338
     190.338 Appeals.
49:3.1.1.2.6.4.8.21SECTION 190.339
     190.339 Direct final rulemaking.
49:3.1.1.2.6.4.8.22SECTION 190.341
     190.341 Special permits.
49:3.1.1.2.6.4.8.23SECTION 190.343
     190.343 Information made available to the public and request for protection of confidential commercial information.
49:3.1.1.2.6.5SUBPART E
Subpart E - Cost Recovery for Design Reviews
49:3.1.1.2.6.5.8.1SECTION 190.401
     190.401 Scope.
49:3.1.1.2.6.5.8.2SECTION 190.403
     190.403 Applicability.
49:3.1.1.2.6.5.8.3SECTION 190.405
     190.405 Notification.
49:3.1.1.2.6.5.8.4SECTION 190.407
     190.407 Master Agreement.
49:3.1.1.2.6.5.8.5SECTION 190.409
     190.409 Fee structure.
49:3.1.1.2.6.5.8.6SECTION 190.411
     190.411 Procedures for billing and payment of fee.
49:3.1.1.2.7PART 191
PART 191 - TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE; ANNUAL REPORTS, INCIDENT REPORTS, AND SAFETY-RELATED CONDITION REPORTS
49:3.1.1.2.7.0.8.1SECTION 191.1
     191.1 Scope.
49:3.1.1.2.7.0.8.2SECTION 191.3
     191.3 Definitions.
49:3.1.1.2.7.0.8.3SECTION 191.5
     191.5 Immediate notice of certain incidents.
49:3.1.1.2.7.0.8.4SECTION 191.7
     191.7 Report submission requirements.
49:3.1.1.2.7.0.8.5SECTION 191.9
     191.9 Distribution system: Incident report.
49:3.1.1.2.7.0.8.6SECTION 191.11
     191.11 Distribution system: Annual report.
49:3.1.1.2.7.0.8.7SECTION 191.12
     191.12 Distribution Systems: Mechanical Fitting Failure Reports
49:3.1.1.2.7.0.8.8SECTION 191.13
     191.13 Distribution systems reporting transmission pipelines; transmission or gathering systems reporting distribution pipelines.
49:3.1.1.2.7.0.8.9SECTION 191.15
     191.15 Transmission systems; gathering systems; liquefied natural gas facilities; and underground natural gas storage facilities: Incident report.
49:3.1.1.2.7.0.8.10SECTION 191.17
     191.17 Transmission systems; gathering systems; liquefied natural gas facilities; and underground natural gas storage facilities: Annual report.
49:3.1.1.2.7.0.8.11SECTION 191.21
     191.21 OMB control number assigned to information collection.
49:3.1.1.2.7.0.8.12SECTION 191.22
     191.22 National Registry of Operators.
49:3.1.1.2.7.0.8.13SECTION 191.23
     191.23 Reporting safety-related conditions.
49:3.1.1.2.7.0.8.14SECTION 191.25
     191.25 Filing safety-related condition reports.
49:3.1.1.2.7.0.8.15SECTION 191.29
     191.29 National Pipeline Mapping System.
49:3.1.1.2.7.0.8.16.13APPENDIX Appendix A
  Appendix A to Part 191 - Procedure for Determining Reporting Threshold
49:3.1.1.2.8PART 192
PART 192 - TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS
49:3.1.1.2.8.1SUBPART A
Subpart A - General
49:3.1.1.2.8.1.8.1SECTION 192.1
     192.1 What is the scope of this part
49:3.1.1.2.8.1.8.2SECTION 192.3
     192.3 Definitions.
49:3.1.1.2.8.1.8.3SECTION 192.5
     192.5 Class locations.
49:3.1.1.2.8.1.8.4SECTION 192.7
     192.7 What documents are incorporated by reference partly or wholly in this part
49:3.1.1.2.8.1.8.5SECTION 192.8
     192.8 How are onshore gathering lines and regulated onshore gathering lines determined
49:3.1.1.2.8.1.8.6SECTION 192.9
     192.9 What requirements apply to gathering lines
49:3.1.1.2.8.1.8.7SECTION 192.10
     192.10 Outer continental shelf pipelines.
49:3.1.1.2.8.1.8.8SECTION 192.11
     192.11 Petroleum gas systems.
49:3.1.1.2.8.1.8.9SECTION 192.12
     192.12 Underground natural gas storage facilities.
49:3.1.1.2.8.1.8.10SECTION 192.13
     192.13 What general requirements apply to pipelines regulated under this part
49:3.1.1.2.8.1.8.11SECTION 192.14
     192.14 Conversion to service subject to this part.
49:3.1.1.2.8.1.8.12SECTION 192.15
     192.15 Rules of regulatory construction.
49:3.1.1.2.8.1.8.13SECTION 192.16
     192.16 Customer notification.
49:3.1.1.2.8.1.8.14SECTION 192.18
     192.18 How to notify PHMSA.
49:3.1.1.2.8.2SUBPART B
Subpart B - Materials
49:3.1.1.2.8.2.8.1SECTION 192.51
     192.51 Scope.
49:3.1.1.2.8.2.8.2SECTION 192.53
     192.53 General.
49:3.1.1.2.8.2.8.3SECTION 192.55
     192.55 Steel pipe.
49:3.1.1.2.8.2.8.4SECTION 192.57
     192.57 [Reserved]
49:3.1.1.2.8.2.8.5SECTION 192.59
     192.59 Plastic pipe.
49:3.1.1.2.8.2.8.6SECTION 192.61
     192.61 [Reserved]
49:3.1.1.2.8.2.8.7SECTION 192.63
     192.63 Marking of materials.
49:3.1.1.2.8.2.8.8SECTION 192.65
     192.65 Transportation of pipe.
49:3.1.1.2.8.2.8.9SECTION 192.67
     192.67 Records: Material properties.
49:3.1.1.2.8.2.8.10SECTION 192.69
     192.69 Storage and handling of plastic pipe and associated components.
49:3.1.1.2.8.3SUBPART C
Subpart C - Pipe Design
49:3.1.1.2.8.3.8.1SECTION 192.101
     192.101 Scope.
49:3.1.1.2.8.3.8.2SECTION 192.103
     192.103 General.
49:3.1.1.2.8.3.8.3SECTION 192.105
     192.105 Design formula for steel pipe.
49:3.1.1.2.8.3.8.4SECTION 192.107
     192.107 Yield strength (S) for steel pipe.
49:3.1.1.2.8.3.8.5SECTION 192.109
     192.109 Nominal wall thickness (t) for steel pipe.
49:3.1.1.2.8.3.8.6SECTION 192.111
     192.111 Design factor (F) for steel pipe.
49:3.1.1.2.8.3.8.7SECTION 192.112
     192.112 Additional design requirements for steel pipe using alternative maximum allowable operating pressure.
49:3.1.1.2.8.3.8.8SECTION 192.113
     192.113 Longitudinal joint factor (E) for steel pipe.
49:3.1.1.2.8.3.8.9SECTION 192.115
     192.115 Temperature derating factor (T) for steel pipe.
49:3.1.1.2.8.3.8.10SECTION 192.117-192.119
     192.117-192.119 [Reserved]
49:3.1.1.2.8.3.8.11SECTION 192.121
     192.121 Design of plastic pipe.
49:3.1.1.2.8.3.8.12SECTION 192.123
     192.123 [Reserved]
49:3.1.1.2.8.3.8.13SECTION 192.125
     192.125 Design of copper pipe.
49:3.1.1.2.8.3.8.14SECTION 192.127
     192.127 Records: Pipe design.
49:3.1.1.2.8.4SUBPART D
Subpart D - Design of Pipeline Components
49:3.1.1.2.8.4.8.1SECTION 192.141
     192.141 Scope.
49:3.1.1.2.8.4.8.2SECTION 192.143
     192.143 General requirements.
49:3.1.1.2.8.4.8.3SECTION 192.144
     192.144 Qualifying metallic components.
49:3.1.1.2.8.4.8.4SECTION 192.145
     192.145 Valves.
49:3.1.1.2.8.4.8.5SECTION 192.147
     192.147 Flanges and flange accessories.
49:3.1.1.2.8.4.8.6SECTION 192.149
     192.149 Standard fittings.
49:3.1.1.2.8.4.8.7SECTION 192.150
     192.150 Passage of internal inspection devices.
49:3.1.1.2.8.4.8.8SECTION 192.151
     192.151 Tapping.
49:3.1.1.2.8.4.8.9SECTION 192.153
     192.153 Components fabricated by welding.
49:3.1.1.2.8.4.8.10SECTION 192.155
     192.155 Welded branch connections.
49:3.1.1.2.8.4.8.11SECTION 192.157
     192.157 Extruded outlets.
49:3.1.1.2.8.4.8.12SECTION 192.159
     192.159 Flexibility.
49:3.1.1.2.8.4.8.13SECTION 192.161
     192.161 Supports and anchors.
49:3.1.1.2.8.4.8.14SECTION 192.163
     192.163 Compressor stations: Design and construction.
49:3.1.1.2.8.4.8.15SECTION 192.165
     192.165 Compressor stations: Liquid removal.
49:3.1.1.2.8.4.8.16SECTION 192.167
     192.167 Compressor stations: Emergency shutdown.
49:3.1.1.2.8.4.8.17SECTION 192.169
     192.169 Compressor stations: Pressure limiting devices.
49:3.1.1.2.8.4.8.18SECTION 192.171
     192.171 Compressor stations: Additional safety equipment.
49:3.1.1.2.8.4.8.19SECTION 192.173
     192.173 Compressor stations: Ventilation.
49:3.1.1.2.8.4.8.20SECTION 192.175
     192.175 Pipe-type and bottle-type holders.
49:3.1.1.2.8.4.8.21SECTION 192.177
     192.177 Additional provisions for bottle-type holders.
49:3.1.1.2.8.4.8.22SECTION 192.179
     192.179 Transmission line valves.
49:3.1.1.2.8.4.8.23SECTION 192.181
     192.181 Distribution line valves.
49:3.1.1.2.8.4.8.24SECTION 192.183
     192.183 Vaults: Structural design requirements.
49:3.1.1.2.8.4.8.25SECTION 192.185
     192.185 Vaults: Accessibility.
49:3.1.1.2.8.4.8.26SECTION 192.187
     192.187 Vaults: Sealing, venting, and ventilation.
49:3.1.1.2.8.4.8.27SECTION 192.189
     192.189 Vaults: Drainage and waterproofing.
49:3.1.1.2.8.4.8.28SECTION 192.191
     192.191 [Reserved]
49:3.1.1.2.8.4.8.29SECTION 192.193
     192.193 Valve installation in plastic pipe.
49:3.1.1.2.8.4.8.30SECTION 192.195
     192.195 Protection against accidental overpressuring.
49:3.1.1.2.8.4.8.31SECTION 192.197
     192.197 Control of the pressure of gas delivered from high-pressure distribution systems.
49:3.1.1.2.8.4.8.32SECTION 192.199
     192.199 Requirements for design of pressure relief and limiting devices.
49:3.1.1.2.8.4.8.33SECTION 192.201
     192.201 Required capacity of pressure relieving and limiting stations.
49:3.1.1.2.8.4.8.34SECTION 192.203
     192.203 Instrument, control, and sampling pipe and components.
49:3.1.1.2.8.4.8.35SECTION 192.204
     192.204 Risers installed after January 22, 2019.
49:3.1.1.2.8.4.8.36SECTION 192.205
     192.205 Records: Pipeline components.
49:3.1.1.2.8.5SUBPART E
Subpart E - Welding of Steel in Pipelines
49:3.1.1.2.8.5.8.1SECTION 192.221
     192.221 Scope.
49:3.1.1.2.8.5.8.2SECTION 192.225
     192.225 Welding procedures.
49:3.1.1.2.8.5.8.3SECTION 192.227
     192.227 Qualification of welders and welding operators.
49:3.1.1.2.8.5.8.4SECTION 192.229
     192.229 Limitations on welders and welding operators.
49:3.1.1.2.8.5.8.5SECTION 192.231
     192.231 Protection from weather.
49:3.1.1.2.8.5.8.6SECTION 192.233
     192.233 Miter joints.
49:3.1.1.2.8.5.8.7SECTION 192.235
     192.235 Preparation for welding.
49:3.1.1.2.8.5.8.8SECTION 192.241
     192.241 Inspection and test of welds.
49:3.1.1.2.8.5.8.9SECTION 192.243
     192.243 Nondestructive testing.
49:3.1.1.2.8.5.8.10SECTION 192.245
     192.245 Repair or removal of defects.
49:3.1.1.2.8.6SUBPART F
Subpart F - Joining of Materials Other Than by Welding
49:3.1.1.2.8.6.8.1SECTION 192.271
     192.271 Scope.
49:3.1.1.2.8.6.8.2SECTION 192.273
     192.273 General.
49:3.1.1.2.8.6.8.3SECTION 192.275
     192.275 Cast iron pipe.
49:3.1.1.2.8.6.8.4SECTION 192.277
     192.277 Ductile iron pipe.
49:3.1.1.2.8.6.8.5SECTION 192.279
     192.279 Copper pipe.
49:3.1.1.2.8.6.8.6SECTION 192.281
     192.281 Plastic pipe.
49:3.1.1.2.8.6.8.7SECTION 192.283
     192.283 Plastic pipe: Qualifying joining procedures.
49:3.1.1.2.8.6.8.8SECTION 192.285
     192.285 Plastic pipe: Qualifying persons to make joints.
49:3.1.1.2.8.6.8.9SECTION 192.287
     192.287 Plastic pipe: Inspection of joints.
49:3.1.1.2.8.7SUBPART G
Subpart G - General Construction Requirements for Transmission Lines and Mains
49:3.1.1.2.8.7.8.1SECTION 192.301
     192.301 Scope.
49:3.1.1.2.8.7.8.2SECTION 192.303
     192.303 Compliance with specifications or standards.
49:3.1.1.2.8.7.8.3SECTION 192.305
     192.305 Inspection: General.
49:3.1.1.2.8.7.8.5SECTION 192.307
     192.307 Inspection of materials.
49:3.1.1.2.8.7.8.6SECTION 192.309
     192.309 Repair of steel pipe.
49:3.1.1.2.8.7.8.7SECTION 192.311
     192.311 Repair of plastic pipe.
49:3.1.1.2.8.7.8.8SECTION 192.313
     192.313 Bends and elbows.
49:3.1.1.2.8.7.8.9SECTION 192.315
     192.315 Wrinkle bends in steel pipe.
49:3.1.1.2.8.7.8.10SECTION 192.317
     192.317 Protection from hazards.
49:3.1.1.2.8.7.8.11SECTION 192.319
     192.319 Installation of pipe in a ditch.
49:3.1.1.2.8.7.8.12SECTION 192.321
     192.321 Installation of plastic pipe.
49:3.1.1.2.8.7.8.13SECTION 192.323
     192.323 Casing.
49:3.1.1.2.8.7.8.14SECTION 192.325
     192.325 Underground clearance.
49:3.1.1.2.8.7.8.15SECTION 192.327
     192.327 Cover.
49:3.1.1.2.8.7.8.16SECTION 192.328
     192.328 Additional construction requirements for steel pipe using alternative maximum allowable operating pressure.
49:3.1.1.2.8.7.8.17SECTION 192.329
     192.329 Installation of plastic pipelines by trenchless excavation.
49:3.1.1.2.8.8SUBPART H
Subpart H - Customer Meters, Service Regulators, and Service Lines
49:3.1.1.2.8.8.8.1SECTION 192.351
     192.351 Scope.
49:3.1.1.2.8.8.8.2SECTION 192.353
     192.353 Customer meters and regulators: Location.
49:3.1.1.2.8.8.8.3SECTION 192.355
     192.355 Customer meters and regulators: Protection from damage.
49:3.1.1.2.8.8.8.4SECTION 192.357
     192.357 Customer meters and regulators: Installation.
49:3.1.1.2.8.8.8.5SECTION 192.359
     192.359 Customer meter installations: Operating pressure.
49:3.1.1.2.8.8.8.6SECTION 192.361
     192.361 Service lines: Installation.
49:3.1.1.2.8.8.8.7SECTION 192.363
     192.363 Service lines: Valve requirements.
49:3.1.1.2.8.8.8.8SECTION 192.365
     192.365 Service lines: Location of valves.
49:3.1.1.2.8.8.8.9SECTION 192.367
     192.367 Service lines: General requirements for connections to main piping.
49:3.1.1.2.8.8.8.10SECTION 192.369
     192.369 Service lines: Connections to cast iron or ductile iron mains.
49:3.1.1.2.8.8.8.11SECTION 192.371
     192.371 Service lines: Steel.
49:3.1.1.2.8.8.8.12SECTION 192.373
     192.373 Service lines: Cast iron and ductile iron.
49:3.1.1.2.8.8.8.13SECTION 192.375
     192.375 Service lines: Plastic.
49:3.1.1.2.8.8.8.14SECTION 192.376
     192.376 Installation of plastic service lines by trenchless excavation.
49:3.1.1.2.8.8.8.15SECTION 192.377
     192.377 Service lines: Copper.
49:3.1.1.2.8.8.8.16SECTION 192.379
     192.379 New service lines not in use.
49:3.1.1.2.8.8.8.17SECTION 192.381
     192.381 Service lines: Excess flow valve performance standards.
49:3.1.1.2.8.8.8.18SECTION 192.383
     192.383 Excess flow valve installation.
49:3.1.1.2.8.8.8.19SECTION 192.385
     192.385 Manual service line shut-off valve installation.
49:3.1.1.2.8.9SUBPART I
Subpart I - Requirements for Corrosion Control
49:3.1.1.2.8.9.8.1SECTION 192.451
     192.451 Scope.
49:3.1.1.2.8.9.8.2SECTION 192.452
     192.452 How does this subpart apply to converted pipelines and regulated onshore gathering lines
49:3.1.1.2.8.9.8.3SECTION 192.453
     192.453 General.
49:3.1.1.2.8.9.8.4SECTION 192.455
     192.455 External corrosion control: Buried or submerged pipelines installed after July 31, 1971.
49:3.1.1.2.8.9.8.5SECTION 192.457
     192.457 External corrosion control: Buried or submerged pipelines installed before August 1, 1971.
49:3.1.1.2.8.9.8.6SECTION 192.459
     192.459 External corrosion control: Examination of buried pipeline when exposed.
49:3.1.1.2.8.9.8.7SECTION 192.461
     192.461 External corrosion control: Protective coating.
49:3.1.1.2.8.9.8.8SECTION 192.463
     192.463 External corrosion control: Cathodic protection.
49:3.1.1.2.8.9.8.9SECTION 192.465
     192.465 External corrosion control: Monitoring.
49:3.1.1.2.8.9.8.10SECTION 192.467
     192.467 External corrosion control: Electrical isolation.
49:3.1.1.2.8.9.8.11SECTION 192.469
     192.469 External corrosion control: Test stations.
49:3.1.1.2.8.9.8.12SECTION 192.471
     192.471 External corrosion control: Test leads.
49:3.1.1.2.8.9.8.13SECTION 192.473
     192.473 External corrosion control: Interference currents.
49:3.1.1.2.8.9.8.14SECTION 192.475
     192.475 Internal corrosion control: General.
49:3.1.1.2.8.9.8.15SECTION 192.476
     192.476 Internal corrosion control: Design and construction of transmission line.
49:3.1.1.2.8.9.8.16SECTION 192.477
     192.477 Internal corrosion control: Monitoring.
49:3.1.1.2.8.9.8.17SECTION 192.479
     192.479 Atmospheric corrosion control: General.
49:3.1.1.2.8.9.8.18SECTION 192.481
     192.481 Atmospheric corrosion control: Monitoring.
49:3.1.1.2.8.9.8.19SECTION 192.483
     192.483 Remedial measures: General.
49:3.1.1.2.8.9.8.20SECTION 192.485
     192.485 Remedial measures: Transmission lines.
49:3.1.1.2.8.9.8.21SECTION 192.487
     192.487 Remedial measures: Distribution lines other than cast iron or ductile iron lines.
49:3.1.1.2.8.9.8.22SECTION 192.489
     192.489 Remedial measures: Cast iron and ductile iron pipelines.
49:3.1.1.2.8.9.8.23SECTION 192.490
     192.490 Direct assessment.
49:3.1.1.2.8.9.8.24SECTION 192.491
     192.491 Corrosion control records.
49:3.1.1.2.8.9.8.25SECTION 192.493
     192.493 In-line inspection of pipelines.
49:3.1.1.2.8.10SUBPART J
Subpart J - Test Requirements
49:3.1.1.2.8.10.8.1SECTION 192.501
     192.501 Scope.
49:3.1.1.2.8.10.8.2SECTION 192.503
     192.503 General requirements.
49:3.1.1.2.8.10.8.3SECTION 192.505
     192.505 Strength test requirements for steel pipeline to operate at a hoop stress of 30 percent or more of SMYS.
49:3.1.1.2.8.10.8.4SECTION 192.506
     192.506 Transmission lines: Spike hydrostatic pressure test.
49:3.1.1.2.8.10.8.5SECTION 192.507
     192.507 Test requirements for pipelines to operate at a hoop stress less than 30 percent of SMYS and at or above 100 p.s.i. (689 kPa) gage.
49:3.1.1.2.8.10.8.6SECTION 192.509
     192.509 Test requirements for pipelines to operate below 100 p.s.i. (689 kPa) gage.
49:3.1.1.2.8.10.8.7SECTION 192.511
     192.511 Test requirements for service lines.
49:3.1.1.2.8.10.8.8SECTION 192.513
     192.513 Test requirements for plastic pipelines.
49:3.1.1.2.8.10.8.9SECTION 192.515
     192.515 Environmental protection and safety requirements.
49:3.1.1.2.8.10.8.10SECTION 192.517
     192.517 Records.
49:3.1.1.2.8.11SUBPART K
Subpart K - Uprating
49:3.1.1.2.8.11.8.1SECTION 192.551
     192.551 Scope.
49:3.1.1.2.8.11.8.2SECTION 192.553
     192.553 General requirements.
49:3.1.1.2.8.11.8.3SECTION 192.555
     192.555 Uprating to a pressure that will produce a hoop stress of 30 percent or more of SMYS in steel pipelines.
49:3.1.1.2.8.11.8.4SECTION 192.557
     192.557 Uprating: Steel pipelines to a pressure that will produce a hoop stress less than 30 percent of SMYS: plastic, cast iron, and ductile iron pipelines.
49:3.1.1.2.8.12SUBPART L
Subpart L - Operations
49:3.1.1.2.8.12.8.1SECTION 192.601
     192.601 Scope.
49:3.1.1.2.8.12.8.2SECTION 192.603
     192.603 General provisions.
49:3.1.1.2.8.12.8.3SECTION 192.605
     192.605 Procedural manual for operations, maintenance, and emergencies.
49:3.1.1.2.8.12.8.4SECTION 192.607
     192.607 Verification of Pipeline Material Properties and Attributes: Onshore steel transmission pipelines.
49:3.1.1.2.8.12.8.5SECTION 192.609
     192.609 Change in class location: Required study.
49:3.1.1.2.8.12.8.6SECTION 192.611
     192.611 Change in class location: Confirmation or revision of maximum allowable operating pressure.
49:3.1.1.2.8.12.8.7SECTION 192.612
     192.612 Underwater inspection and reburial of pipelines in the Gulf of Mexico and its inlets.
49:3.1.1.2.8.12.8.8SECTION 192.613
     192.613 Continuing surveillance.
49:3.1.1.2.8.12.8.9SECTION 192.614
     192.614 Damage prevention program.
49:3.1.1.2.8.12.8.10SECTION 192.615
     192.615 Emergency plans.
49:3.1.1.2.8.12.8.11SECTION 192.616
     192.616 Public awareness.
49:3.1.1.2.8.12.8.12SECTION 192.617
     192.617 Investigation of failures.
49:3.1.1.2.8.12.8.13SECTION 192.619
     192.619 Maximum allowable operating pressure: Steel or plastic pipelines.
49:3.1.1.2.8.12.8.14SECTION 192.620
     192.620 Alternative maximum allowable operating pressure for certain steel pipelines.
49:3.1.1.2.8.12.8.15SECTION 192.621
     192.621 Maximum allowable operating pressure: High-pressure distribution systems.
49:3.1.1.2.8.12.8.16SECTION 192.623
     192.623 Maximum and minimum allowable operating pressure; Low-pressure distribution systems.
49:3.1.1.2.8.12.8.17SECTION 192.624
     192.624 Maximum allowable operating pressure reconfirmation: Onshore steel transmission pipelines.
49:3.1.1.2.8.12.8.18SECTION 192.625
     192.625 Odorization of gas.
49:3.1.1.2.8.12.8.19SECTION 192.627
     192.627 Tapping pipelines under pressure.
49:3.1.1.2.8.12.8.20SECTION 192.629
     192.629 Purging of pipelines.
49:3.1.1.2.8.12.8.21SECTION 192.631
     192.631 Control room management.
49:3.1.1.2.8.12.8.22SECTION 192.632
     192.632 Engineering Critical Assessment for Maximum Allowable Operating Pressure Reconfirmation: Onshore steel transmission pipelines.
49:3.1.1.2.8.13SUBPART M
Subpart M - Maintenance
49:3.1.1.2.8.13.8.1SECTION 192.701
     192.701 Scope.
49:3.1.1.2.8.13.8.2SECTION 192.703
     192.703 General.
49:3.1.1.2.8.13.8.3SECTION 192.705
     192.705 Transmission lines: Patrolling.
49:3.1.1.2.8.13.8.4SECTION 192.706
     192.706 Transmission lines: Leakage surveys.
49:3.1.1.2.8.13.8.5SECTION 192.707
     192.707 Line markers for mains and transmission lines.
49:3.1.1.2.8.13.8.6SECTION 192.709
     192.709 Transmission lines: Record keeping.
49:3.1.1.2.8.13.8.7SECTION 192.710
     192.710 Transmission lines: Assessments outside of high consequence areas.
49:3.1.1.2.8.13.8.8SECTION 192.711
     192.711 Transmission lines: General requirements for repair procedures.
49:3.1.1.2.8.13.8.9SECTION 192.712
     192.712 Analysis of predicted failure pressure.
49:3.1.1.2.8.13.8.10SECTION 192.713
     192.713 Transmission lines: Permanent field repair of imperfections and damages.
49:3.1.1.2.8.13.8.11SECTION 192.715
     192.715 Transmission lines: Permanent field repair of welds.
49:3.1.1.2.8.13.8.12SECTION 192.717
     192.717 Transmission lines: Permanent field repair of leaks.
49:3.1.1.2.8.13.8.13SECTION 192.719
     192.719 Transmission lines: Testing of repairs.
49:3.1.1.2.8.13.8.14SECTION 192.720
     192.720 Distribution systems: Leak repair.
49:3.1.1.2.8.13.8.15SECTION 192.721
     192.721 Distribution systems: Patrolling.
49:3.1.1.2.8.13.8.16SECTION 192.723
     192.723 Distribution systems: Leakage surveys.
49:3.1.1.2.8.13.8.17SECTION 192.725
     192.725 Test requirements for reinstating service lines.
49:3.1.1.2.8.13.8.18SECTION 192.727
     192.727 Abandonment or deactivation of facilities.
49:3.1.1.2.8.13.8.19SECTION 192.731
     192.731 Compressor stations: Inspection and testing of relief devices.
49:3.1.1.2.8.13.8.20SECTION 192.735
     192.735 Compressor stations: Storage of combustible materials.
49:3.1.1.2.8.13.8.21SECTION 192.736
     192.736 Compressor stations: Gas detection.
49:3.1.1.2.8.13.8.22SECTION 192.739
     192.739 Pressure limiting and regulating stations: Inspection and testing.
49:3.1.1.2.8.13.8.23SECTION 192.740
     192.740 Pressure regulating, limiting, and overpressure protection - Individual service lines directly connected to production, gathering, or transmission pipelines.
49:3.1.1.2.8.13.8.24SECTION 192.741
     192.741 Pressure limiting and regulating stations: Telemetering or recording gauges.
49:3.1.1.2.8.13.8.25SECTION 192.743
     192.743 Pressure limiting and regulating stations: Capacity of relief devices.
49:3.1.1.2.8.13.8.26SECTION 192.745
     192.745 Valve maintenance: Transmission lines.
49:3.1.1.2.8.13.8.27SECTION 192.747
     192.747 Valve maintenance: Distribution systems.
49:3.1.1.2.8.13.8.28SECTION 192.749
     192.749 Vault maintenance.
49:3.1.1.2.8.13.8.29SECTION 192.750
     192.750 Launcher and receiver safety.
49:3.1.1.2.8.13.8.30SECTION 192.751
     192.751 Prevention of accidental ignition.
49:3.1.1.2.8.13.8.31SECTION 192.753
     192.753 Caulked bell and spigot joints.
49:3.1.1.2.8.13.8.32SECTION 192.755
     192.755 Protecting cast-iron pipelines.
49:3.1.1.2.8.13.8.33SECTION 192.756
     192.756 Joining plastic pipe by heat fusion; equipment maintenance and calibration.
49:3.1.1.2.8.14SUBPART N
Subpart N - Qualification of Pipeline Personnel
49:3.1.1.2.8.14.8.1SECTION 192.801
     192.801 Scope.
49:3.1.1.2.8.14.8.2SECTION 192.803
     192.803 Definitions.
49:3.1.1.2.8.14.8.3SECTION 192.805
     192.805 Qualification program.
49:3.1.1.2.8.14.8.4SECTION 192.807
     192.807 Recordkeeping.
49:3.1.1.2.8.14.8.5SECTION 192.809
     192.809 General.
49:3.1.1.2.8.15SUBPART O
Subpart O - Gas Transmission Pipeline Integrity Management
49:3.1.1.2.8.15.8.1SECTION 192.901
     192.901 What do the regulations in this subpart cover
49:3.1.1.2.8.15.8.2SECTION 192.903
     192.903 What definitions apply to this subpart
49:3.1.1.2.8.15.8.3SECTION 192.905
     192.905 How does an operator identify a high consequence area
49:3.1.1.2.8.15.8.4SECTION 192.907
     192.907 What must an operator do to implement this subpart
49:3.1.1.2.8.15.8.5SECTION 192.909
     192.909 How can an operator change its integrity management program
49:3.1.1.2.8.15.8.6SECTION 192.911
     192.911 What are the elements of an integrity management program
49:3.1.1.2.8.15.8.7SECTION 192.913
     192.913 When may an operator deviate its program from certain requirements of this subpart
49:3.1.1.2.8.15.8.8SECTION 192.915
     192.915 What knowledge and training must personnel have to carry out an integrity management program
49:3.1.1.2.8.15.8.9SECTION 192.917
     192.917 How does an operator identify potential threats to pipeline integrity and use the threat identification in its integrity program
49:3.1.1.2.8.15.8.10SECTION 192.919
     192.919 What must be in the baseline assessment plan
49:3.1.1.2.8.15.8.11SECTION 192.921
     192.921 How is the baseline assessment to be conducted
49:3.1.1.2.8.15.8.12SECTION 192.923
     192.923 How is direct assessment used and for what threats
49:3.1.1.2.8.15.8.13SECTION 192.925
     192.925 What are the requirements for using External Corrosion Direct Assessment (ECDA)
49:3.1.1.2.8.15.8.14SECTION 192.927
     192.927 What are the requirements for using Internal Corrosion Direct Assessment (ICDA)
49:3.1.1.2.8.15.8.15SECTION 192.929
     192.929 What are the requirements for using Direct Assessment for Stress Corrosion Cracking (SCCDA)
49:3.1.1.2.8.15.8.16SECTION 192.931
     192.931 How may Confirmatory Direct Assessment (CDA) be used
49:3.1.1.2.8.15.8.17SECTION 192.933
     192.933 What actions must be taken to address integrity issues
49:3.1.1.2.8.15.8.18SECTION 192.935
     192.935 What additional preventive and mitigative measures must an operator take
49:3.1.1.2.8.15.8.19SECTION 192.937
     192.937 What is a continual process of evaluation and assessment to maintain a pipeline's integrity
49:3.1.1.2.8.15.8.20SECTION 192.939
     192.939 What are the required reassessment intervals
49:3.1.1.2.8.15.8.21SECTION 192.941
     192.941 What is a low stress reassessment
49:3.1.1.2.8.15.8.22SECTION 192.943
     192.943 When can an operator deviate from these reassessment intervals
49:3.1.1.2.8.15.8.23SECTION 192.945
     192.945 What methods must an operator use to measure program effectiveness
49:3.1.1.2.8.15.8.24SECTION 192.947
     192.947 What records must an operator keep
49:3.1.1.2.8.15.8.25SECTION 192.949
     192.949 [Reserved]
49:3.1.1.2.8.15.8.26SECTION 192.951
     192.951 Where does an operator file a report
49:3.1.1.2.8.16SUBPART P
Subpart P - Gas Distribution Pipeline Integrity Management (IM)
49:3.1.1.2.8.16.8.1SECTION 192.1001
     192.1001 What definitions apply to this subpart
49:3.1.1.2.8.16.8.2SECTION 192.1003
     192.1003 What do the regulations in this subpart cover
49:3.1.1.2.8.16.8.3SECTION 192.1005
     192.1005 What must a gas distribution operator (other than a master meter or small LPG operator) do to implement this subpart
49:3.1.1.2.8.16.8.4SECTION 192.1007
     192.1007 What are the required elements of an integrity management plan
49:3.1.1.2.8.16.8.5SECTION 192.1009
     192.1009 What must an operator report when a mechanical fitting fails
49:3.1.1.2.8.16.8.6SECTION 192.1011
     192.1011 What records must an operator keep
49:3.1.1.2.8.16.8.7SECTION 192.1013
     192.1013 When may an operator deviate from required periodic inspections under this part
49:3.1.1.2.8.16.8.8SECTION 192.1015
     192.1015 What must a master meter or small liquefied petroleum gas (LPG) operator do to implement this subpart
49:3.1.1.2.8.17SUBPART 0
49:3.1.1.2.8.18.8.1.14APPENDIX Appendix A
  Appendix A to Part 192 [Reserved]
49:3.1.1.2.8.18.8.1.15APPENDIX Appendix B
  Appendix B to Part 192 - Qualification of Pipe and Components
49:3.1.1.2.8.18.8.1.16APPENDIX Appendix C
  Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe
49:3.1.1.2.8.18.8.1.17APPENDIX Appendix D
  Appendix D to Part 192 - Criteria for Cathodic Protection and Determination of Measurements
49:3.1.1.2.8.18.8.1.18APPENDIX Appendix E
  Appendix E to Part 192 - Guidance on Determining High Consequence Areas and on Carrying out Requirements in the Integrity Management Rule
49:3.1.1.2.8.18.8.1.19APPENDIX Appendix F
  Appendix F to Part 192 - Criteria for Conducting Integrity Assessments Using Guided Wave Ultrasonic Testing (GWUT)
49:3.1.1.2.9PART 193
PART 193 - LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS
49:3.1.1.2.9.1SUBPART A
Subpart A - General
49:3.1.1.2.9.1.13.1SECTION 193.2001
     193.2001 Scope of part.
49:3.1.1.2.9.1.13.2SECTION 193.2003
     193.2003 [Reserved]
49:3.1.1.2.9.1.13.3SECTION 193.2005
     193.2005 Applicability.
49:3.1.1.2.9.1.13.4SECTION 193.2007
     193.2007 Definitions.
49:3.1.1.2.9.1.13.5SECTION 193.2009
     193.2009 Rules of regulatory construction.
49:3.1.1.2.9.1.13.6SECTION 193.2011
     193.2011 Reporting.
49:3.1.1.2.9.1.13.7SECTION 193.2013
     193.2013 What documents are incorporated by reference partly or wholly in this part
49:3.1.1.2.9.1.13.8SECTION 193.2015
     193.2015 [Reserved]
49:3.1.1.2.9.1.13.9SECTION 193.2017
     193.2017 Plans and procedures.
49:3.1.1.2.9.1.13.10SECTION 193.2019
     193.2019 Mobile and temporary LNG facilities.
49:3.1.1.2.9.2SUBPART B
Subpart B - Siting Requirements
49:3.1.1.2.9.2.13.1SECTION 193.2051
     193.2051 Scope.
49:3.1.1.2.9.2.13.2SECTION 193.2055
     193.2055 [Reserved]
49:3.1.1.2.9.2.13.3SECTION 193.2057
     193.2057 Thermal radiation protection.
49:3.1.1.2.9.2.13.4SECTION 193.2059
     193.2059 Flammable vapor-gas dispersion protection.
49:3.1.1.2.9.2.13.5SECTION 193.2061-193.2065
     193.2061-193.2065 [Reserved]
49:3.1.1.2.9.2.13.6SECTION 193.2067
     193.2067 Wind forces.
49:3.1.1.2.9.2.13.7SECTION 193.2069-193.2073
     193.2069-193.2073 [Reserved]
49:3.1.1.2.9.3SUBPART C
Subpart C - Design
49:3.1.1.2.9.3.13SUBJGRP 13
  Materials
49:3.1.1.2.9.3.13.1SECTION 193.2101
     193.2101 Scope.
49:3.1.1.2.9.3.13.2SECTION 193.2103-193.2117
     193.2103-193.2117 [Reserved]
49:3.1.1.2.9.3.13.3SECTION 193.2119
     193.2119 Records
49:3.1.1.2.9.3.14SUBJGRP 14
  Design of Components and Buildings
49:3.1.1.2.9.3.14.4SECTION 193.2121-193.2153
     193.2121-193.2153 [Reserved]
49:3.1.1.2.9.3.15SUBJGRP 15
  Impoundment Design and Capacity
49:3.1.1.2.9.3.15.5SECTION 193.2155
     193.2155 Structural requirements.
49:3.1.1.2.9.3.15.6SECTION 193.2157-193.2159
     193.2157-193.2159 [Reserved]
49:3.1.1.2.9.3.15.7SECTION 193.2161
     193.2161 Dikes, general.
49:3.1.1.2.9.3.15.8SECTION 193.2163-193.2165
     193.2163-193.2165 [Reserved]
49:3.1.1.2.9.3.15.9SECTION 193.2167
     193.2167 Covered systems.
49:3.1.1.2.9.3.15.10SECTION 193.2169-193.2171
     193.2169-193.2171 [Reserved]
49:3.1.1.2.9.3.15.11SECTION 193.2173
     193.2173 Water removal.
49:3.1.1.2.9.3.15.12SECTION 193.2175-193.2179
     193.2175-193.2179 [Reserved]
49:3.1.1.2.9.3.15.13SECTION 193.2181
     193.2181 Impoundment capacity: LNG storage tanks.
49:3.1.1.2.9.3.15.14SECTION 193.2183-193.2185
     193.2183-193.2185 [Reserved]
49:3.1.1.2.9.3.16SUBJGRP 16
  LNG Storage Tanks
49:3.1.1.2.9.3.16.15SECTION 193.2187
     193.2187 Nonmetallic membrane liner.
49:3.1.1.2.9.3.16.16SECTION 193.2189-193.2233
     193.2189-193.2233 [Reserved]
49:3.1.1.2.9.4SUBPART D
Subpart D - Construction
49:3.1.1.2.9.4.17.1SECTION 193.2301
     193.2301 Scope.
49:3.1.1.2.9.4.17.2SECTION 193.2303
     193.2303 Construction acceptance.
49:3.1.1.2.9.4.17.3SECTION 193.2304
     193.2304 Corrosion control overview.
49:3.1.1.2.9.4.17.4SECTION 193.2305-193.2319
     193.2305-193.2319 [Reserved]
49:3.1.1.2.9.4.17.5SECTION 193.2321
     193.2321 Nondestructive tests.
49:3.1.1.2.9.4.17.6SECTION 193.2323-193.2329
     193.2323-193.2329 [Reserved]
49:3.1.1.2.9.5SUBPART E
Subpart E - Equipment
49:3.1.1.2.9.5.17SUBJGRP 17
  Vaporization Equipment
49:3.1.1.2.9.5.17.1SECTION 193.2401
     193.2401 Scope.
49:3.1.1.2.9.5.17.2SECTION 193.2403-193.2439
     193.2403-193.2439 [Reserved]
49:3.1.1.2.9.5.17.3SECTION 193.2441
     193.2441 Control center.
49:3.1.1.2.9.5.17.4SECTION 193.2443
     193.2443 [Reserved]
49:3.1.1.2.9.5.17.5SECTION 193.2445
     193.2445 Sources of power.
49:3.1.1.2.9.6SUBPART F
Subpart F - Operations
49:3.1.1.2.9.6.18.1SECTION 193.2501
     193.2501 Scope.
49:3.1.1.2.9.6.18.2SECTION 193.2503
     193.2503 Operating procedures.
49:3.1.1.2.9.6.18.3SECTION 193.2505
     193.2505 Cooldown.
49:3.1.1.2.9.6.18.4SECTION 193.2507
     193.2507 Monitoring operations.
49:3.1.1.2.9.6.18.5SECTION 193.2509
     193.2509 Emergency procedures.
49:3.1.1.2.9.6.18.6SECTION 193.2511
     193.2511 Personnel safety.
49:3.1.1.2.9.6.18.7SECTION 193.2513
     193.2513 Transfer procedures.
49:3.1.1.2.9.6.18.8SECTION 193.2515
     193.2515 Investigations of failures.
49:3.1.1.2.9.6.18.9SECTION 193.2517
     193.2517 Purging.
49:3.1.1.2.9.6.18.10SECTION 193.2519
     193.2519 Communication systems.
49:3.1.1.2.9.6.18.11SECTION 193.2521
     193.2521 Operating records.
49:3.1.1.2.9.7SUBPART G
Subpart G - Maintenance
49:3.1.1.2.9.7.18.1SECTION 193.2601
     193.2601 Scope.
49:3.1.1.2.9.7.18.2SECTION 193.2603
     193.2603 General.
49:3.1.1.2.9.7.18.3SECTION 193.2605
     193.2605 Maintenance procedures.
49:3.1.1.2.9.7.18.4SECTION 193.2607
     193.2607 Foreign material.
49:3.1.1.2.9.7.18.5SECTION 193.2609
     193.2609 Support systems.
49:3.1.1.2.9.7.18.6SECTION 193.2611
     193.2611 Fire protection.
49:3.1.1.2.9.7.18.7SECTION 193.2613
     193.2613 Auxiliary power sources.
49:3.1.1.2.9.7.18.8SECTION 193.2615
     193.2615 Isolating and purging.
49:3.1.1.2.9.7.18.9SECTION 193.2617
     193.2617 Repairs.
49:3.1.1.2.9.7.18.10SECTION 193.2619
     193.2619 Control systems.
49:3.1.1.2.9.7.18.11SECTION 193.2621
     193.2621 Testing transfer hoses.
49:3.1.1.2.9.7.18.12SECTION 193.2623
     193.2623 Inspecting LNG storage tanks.
49:3.1.1.2.9.7.18.13SECTION 193.2625
     193.2625 Corrosion protection.
49:3.1.1.2.9.7.18.14SECTION 193.2627
     193.2627 Atmospheric corrosion control.
49:3.1.1.2.9.7.18.15SECTION 193.2629
     193.2629 External corrosion control: buried or submerged components.
49:3.1.1.2.9.7.18.16SECTION 193.2631
     193.2631 Internal corrosion control.
49:3.1.1.2.9.7.18.17SECTION 193.2633
     193.2633 Interference currents.
49:3.1.1.2.9.7.18.18SECTION 193.2635
     193.2635 Monitoring corrosion control.
49:3.1.1.2.9.7.18.19SECTION 193.2637
     193.2637 Remedial measures.
49:3.1.1.2.9.7.18.20SECTION 193.2639
     193.2639 Maintenance records.
49:3.1.1.2.9.8SUBPART H
Subpart H - Personnel Qualifications and Training
49:3.1.1.2.9.8.18.1SECTION 193.2701
     193.2701 Scope.
49:3.1.1.2.9.8.18.2SECTION 193.2703
     193.2703 Design and fabrication.
49:3.1.1.2.9.8.18.3SECTION 193.2705
     193.2705 Construction, installation, inspection, and testing.
49:3.1.1.2.9.8.18.4SECTION 193.2707
     193.2707 Operations and maintenance.
49:3.1.1.2.9.8.18.5SECTION 193.2709
     193.2709 Security.
49:3.1.1.2.9.8.18.6SECTION 193.2711
     193.2711 Personnel health.
49:3.1.1.2.9.8.18.7SECTION 193.2713
     193.2713 Training: operations and maintenance.
49:3.1.1.2.9.8.18.8SECTION 193.2715
     193.2715 Training: security.
49:3.1.1.2.9.8.18.9SECTION 193.2717
     193.2717 Training: fire protection.
49:3.1.1.2.9.8.18.10SECTION 193.2719
     193.2719 Training: records.
49:3.1.1.2.9.9SUBPART I
Subpart I - Fire Protection
49:3.1.1.2.9.9.18.1SECTION 193.2801
     193.2801 Fire protection.
49:3.1.1.2.9.9.18.2SECTION 193.2803-193.2821
     193.2803-193.2821 [Reserved]
49:3.1.1.2.9.10SUBPART J
Subpart J - Security
49:3.1.1.2.9.10.18.1SECTION 193.2901
     193.2901 Scope.
49:3.1.1.2.9.10.18.2SECTION 193.2903
     193.2903 Security procedures.
49:3.1.1.2.9.10.18.3SECTION 193.2905
     193.2905 Protective enclosures.
49:3.1.1.2.9.10.18.4SECTION 193.2907
     193.2907 Protective enclosure construction.
49:3.1.1.2.9.10.18.5SECTION 193.2909
     193.2909 Security communications.
49:3.1.1.2.9.10.18.6SECTION 193.2911
     193.2911 Security lighting.
49:3.1.1.2.9.10.18.7SECTION 193.2913
     193.2913 Security monitoring.
49:3.1.1.2.9.10.18.8SECTION 193.2915
     193.2915 Alternative power sources.
49:3.1.1.2.9.10.18.9SECTION 193.2917
     193.2917 Warning signs.
49:3.1.1.2.10PART 194
PART 194 - RESPONSE PLANS FOR ONSHORE OIL PIPELINES
49:3.1.1.2.10.1SUBPART A
Subpart A - General
49:3.1.1.2.10.1.18.1SECTION 194.1
     194.1 Purpose.
49:3.1.1.2.10.1.18.2SECTION 194.3
     194.3 Applicability.
49:3.1.1.2.10.1.18.3SECTION 194.5
     194.5 Definitions.
49:3.1.1.2.10.1.18.4SECTION 194.7
     194.7 Operating restrictions and interim operating authorization.
49:3.1.1.2.10.2SUBPART B
Subpart B - Response Plans
49:3.1.1.2.10.2.18.1SECTION 194.101
     194.101 Operators required to submit plans.
49:3.1.1.2.10.2.18.2SECTION 194.103
     194.103 Significant and substantial harm; operator's statement.
49:3.1.1.2.10.2.18.3SECTION 194.105
     194.105 Worst case discharge.
49:3.1.1.2.10.2.18.4SECTION 194.107
     194.107 General response plan requirements.
49:3.1.1.2.10.2.18.5SECTION 194.109
     194.109 Submission of state response plans.
49:3.1.1.2.10.2.18.6SECTION 194.111
     194.111 Response plan retention.
49:3.1.1.2.10.2.18.7SECTION 194.113
     194.113 Information summary.
49:3.1.1.2.10.2.18.8SECTION 194.115
     194.115 Response resources.
49:3.1.1.2.10.2.18.9SECTION 194.117
     194.117 Training.
49:3.1.1.2.10.2.18.10SECTION 194.119
     194.119 Submission and approval procedures.
49:3.1.1.2.10.2.18.11SECTION 194.121
     194.121 Response plan review and update procedures.
49:3.1.1.2.10.3SUBPART 0
49:3.1.1.2.10.4.18.1.20APPENDIX Appendix A
  Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
49:3.1.1.2.10.4.18.1.21APPENDIX Appendix B
  Appendix B to Part 194 - High Volume Areas
49:3.1.1.2.11PART 195
PART 195 - TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE
49:3.1.1.2.11.1SUBPART A
Subpart A - General
49:3.1.1.2.11.1.20.1SECTION 195.0
     195.0 Scope.
49:3.1.1.2.11.1.20.2SECTION 195.1
     195.1 Which pipelines are covered by this Part
49:3.1.1.2.11.1.20.3SECTION 195.2
     195.2 Definitions.
49:3.1.1.2.11.1.20.4SECTION 195.3
     195.3 What documents are incorporated by reference partly or wholly in this part
49:3.1.1.2.11.1.20.5SECTION 195.4
     195.4 Compatibility necessary for transportation of hazardous liquids or carbon dioxide.
49:3.1.1.2.11.1.20.6SECTION 195.5
     195.5 Conversion to service subject to this part.
49:3.1.1.2.11.1.20.7SECTION 195.6
     195.6 Unusually Sensitive Areas (USAs).
49:3.1.1.2.11.1.20.8SECTION 195.8
     195.8 Transportation of hazardous liquid or carbon dioxide in pipelines constructed with other than steel pipe.
49:3.1.1.2.11.1.20.9SECTION 195.9
     195.9 Outer continental shelf pipelines.
49:3.1.1.2.11.1.20.10SECTION 195.10
     195.10 Responsibility of operator for compliance with this part.
49:3.1.1.2.11.1.20.11SECTION 195.11
     195.11 What is a regulated rural gathering line and what requirements apply
49:3.1.1.2.11.1.20.12SECTION 195.12
     195.12 What requirements apply to low-stress pipelines in rural areas
49:3.1.1.2.11.1.20.13SECTION 195.13
     195.13 What requirements apply to pipelines transporting hazardous liquids by gravity
49:3.1.1.2.11.1.20.14SECTION 195.15
     195.15 What requirements apply to reporting-regulated-only gathering lines
49:3.1.1.2.11.2SUBPART B
Subpart B - Annual, Accident, and Safety-Related Condition Reporting
49:3.1.1.2.11.2.20.1SECTION 195.48
     195.48 Scope.
49:3.1.1.2.11.2.20.2SECTION 195.49
     195.49 Annual report.
49:3.1.1.2.11.2.20.3SECTION 195.50
     195.50 Reporting accidents.
49:3.1.1.2.11.2.20.4SECTION 195.52
     195.52 Immediate notice of certain accidents.
49:3.1.1.2.11.2.20.5SECTION 195.54
     195.54 Accident reports.
49:3.1.1.2.11.2.20.6SECTION 195.55
     195.55 Reporting safety-related conditions.
49:3.1.1.2.11.2.20.7SECTION 195.56
     195.56 Filing safety-related condition reports.
49:3.1.1.2.11.2.20.8SECTION 195.58
     195.58 Report submission requirements.
49:3.1.1.2.11.2.20.9SECTION 195.59
     195.59 Abandonment or deactivation of facilities.
49:3.1.1.2.11.2.20.10SECTION 195.60
     195.60 Operator assistance in investigation.
49:3.1.1.2.11.2.20.11SECTION 195.61
     195.61 National Pipeline Mapping System.
49:3.1.1.2.11.2.20.12SECTION 195.63
     195.63 OMB control number assigned to information collection.
49:3.1.1.2.11.2.20.13SECTION 195.64
     195.64 National Registry of Operators.
49:3.1.1.2.11.2.20.14SECTION 195.65
     195.65 Safety data sheets.
49:3.1.1.2.11.3SUBPART C
Subpart C - Design Requirements
49:3.1.1.2.11.3.20.1SECTION 195.100
     195.100 Scope.
49:3.1.1.2.11.3.20.2SECTION 195.101
     195.101 Qualifying metallic components other than pipe.
49:3.1.1.2.11.3.20.3SECTION 195.102
     195.102 Design temperature.
49:3.1.1.2.11.3.20.4SECTION 195.104
     195.104 Variations in pressure.
49:3.1.1.2.11.3.20.5SECTION 195.106
     195.106 Internal design pressure.
49:3.1.1.2.11.3.20.6SECTION 195.108
     195.108 External pressure.
49:3.1.1.2.11.3.20.7SECTION 195.110
     195.110 External loads.
49:3.1.1.2.11.3.20.8SECTION 195.111
     195.111 Fracture propagation.
49:3.1.1.2.11.3.20.9SECTION 195.112
     195.112 New pipe.
49:3.1.1.2.11.3.20.10SECTION 195.114
     195.114 Used pipe.
49:3.1.1.2.11.3.20.11SECTION 195.116
     195.116 Valves.
49:3.1.1.2.11.3.20.12SECTION 195.118
     195.118 Fittings.
49:3.1.1.2.11.3.20.13SECTION 195.120
     195.120 Passage of internal inspection devices.
49:3.1.1.2.11.3.20.14SECTION 195.122
     195.122 Fabricated branch connections.
49:3.1.1.2.11.3.20.15SECTION 195.124
     195.124 Closures.
49:3.1.1.2.11.3.20.16SECTION 195.126
     195.126 Flange connection.
49:3.1.1.2.11.3.20.17SECTION 195.128
     195.128 Station piping.
49:3.1.1.2.11.3.20.18SECTION 195.130
     195.130 Fabricated assemblies.
49:3.1.1.2.11.3.20.19SECTION 195.132
     195.132 Design and construction of aboveground breakout tanks.
49:3.1.1.2.11.3.20.20SECTION 195.134
     195.134 Leak detection.
49:3.1.1.2.11.4SUBPART D
Subpart D - Construction
49:3.1.1.2.11.4.20.1SECTION 195.200
     195.200 Scope.
49:3.1.1.2.11.4.20.2SECTION 195.202
     195.202 Compliance with specifications or standards.
49:3.1.1.2.11.4.20.3SECTION 195.204
     195.204 Inspection - general.
49:3.1.1.2.11.4.20.4SECTION 195.205
     195.205 Repair, alteration and reconstruction of aboveground breakout tanks that have been in service.
49:3.1.1.2.11.4.20.5SECTION 195.206
     195.206 Material inspection.
49:3.1.1.2.11.4.20.6SECTION 195.207
     195.207 Transportation of pipe.
49:3.1.1.2.11.4.20.7SECTION 195.208
     195.208 Welding of supports and braces.
49:3.1.1.2.11.4.20.8SECTION 195.210
     195.210 Pipeline location.
49:3.1.1.2.11.4.20.9SECTION 195.212
     195.212 Bending of pipe.
49:3.1.1.2.11.4.20.10SECTION 195.214
     195.214 Welding procedures.
49:3.1.1.2.11.4.20.11SECTION 195.216
     195.216 Welding: Miter joints.
49:3.1.1.2.11.4.20.12SECTION 195.222
     195.222 Welders and welding operators: Qualification of welders and welding operators.
49:3.1.1.2.11.4.20.13SECTION 195.224
     195.224 Welding: Weather.
49:3.1.1.2.11.4.20.14SECTION 195.226
     195.226 Welding: Arc burns.
49:3.1.1.2.11.4.20.15SECTION 195.228
     195.228 Welds and welding inspection: Standards of acceptability.
49:3.1.1.2.11.4.20.16SECTION 195.230
     195.230 Welds: Repair or removal of defects.
49:3.1.1.2.11.4.20.17SECTION 195.234
     195.234 Welds: Nondestructive testing.
49:3.1.1.2.11.4.20.18SECTION 195.236-195.244
     195.236-195.244 [Reserved]
49:3.1.1.2.11.4.20.19SECTION 195.246
     195.246 Installation of pipe in a ditch.
49:3.1.1.2.11.4.20.20SECTION 195.248
     195.248 Cover over buried pipeline.
49:3.1.1.2.11.4.20.21SECTION 195.250
     195.250 Clearance between pipe and underground structures.
49:3.1.1.2.11.4.20.22SECTION 195.252
     195.252 Backfilling.
49:3.1.1.2.11.4.20.23SECTION 195.254
     195.254 Above ground components.
49:3.1.1.2.11.4.20.24SECTION 195.256
     195.256 Crossing of railroads and highways.
49:3.1.1.2.11.4.20.25SECTION 195.258
     195.258 Valves: General.
49:3.1.1.2.11.4.20.26SECTION 195.260
     195.260 Valves: Location.
49:3.1.1.2.11.4.20.27SECTION 195.262
     195.262 Pumping equipment.
49:3.1.1.2.11.4.20.28SECTION 195.264
     195.264 Impoundment, protection against entry, normal/emergency venting or pressure/vacuum relief for aboveground breakout tanks.
49:3.1.1.2.11.4.20.29SECTION 195.266
     195.266 Construction records.
49:3.1.1.2.11.5SUBPART E
Subpart E - Pressure Testing
49:3.1.1.2.11.5.20.1SECTION 195.300
     195.300 Scope.
49:3.1.1.2.11.5.20.2SECTION 195.302
     195.302 General requirements.
49:3.1.1.2.11.5.20.3SECTION 195.303
     195.303 Risk-based alternative to pressure testing older hazardous liquid and carbon dioxide pipelines.
49:3.1.1.2.11.5.20.4SECTION 195.304
     195.304 Test pressure.
49:3.1.1.2.11.5.20.5SECTION 195.305
     195.305 Testing of components.
49:3.1.1.2.11.5.20.6SECTION 195.306
     195.306 Test medium.
49:3.1.1.2.11.5.20.7SECTION 195.307
     195.307 Pressure testing aboveground breakout tanks.
49:3.1.1.2.11.5.20.8SECTION 195.308
     195.308 Testing of tie-ins.
49:3.1.1.2.11.5.20.9SECTION 195.310
     195.310 Records.
49:3.1.1.2.11.6SUBPART F
Subpart F - Operation and Maintenance
49:3.1.1.2.11.6.20SUBJGRP 20
  High Consequence Areas
49:3.1.1.2.11.6.20.1SECTION 195.400
     195.400 Scope.
49:3.1.1.2.11.6.20.2SECTION 195.401
     195.401 General requirements.
49:3.1.1.2.11.6.20.3SECTION 195.402
     195.402 Procedural manual for operations, maintenance, and emergencies.
49:3.1.1.2.11.6.20.4SECTION 195.403
     195.403 Emergency response training.
49:3.1.1.2.11.6.20.5SECTION 195.404
     195.404 Maps and records.
49:3.1.1.2.11.6.20.6SECTION 195.405
     195.405 Protection against ignitions and safe access/egress involving floating roofs.
49:3.1.1.2.11.6.20.7SECTION 195.406
     195.406 Maximum operating pressure.
49:3.1.1.2.11.6.20.8SECTION 195.408
     195.408 Communications.
49:3.1.1.2.11.6.20.9SECTION 195.410
     195.410 Line markers.
49:3.1.1.2.11.6.20.10SECTION 195.412
     195.412 Inspection of rights-of-way and crossings under navigable waters.
49:3.1.1.2.11.6.20.11SECTION 195.413
     195.413 Underwater inspection and reburial of pipelines in the Gulf of Mexico and its inlets.
49:3.1.1.2.11.6.20.12SECTION 195.414
     195.414 Inspections of pipelines in areas affected by extreme weather and natural disasters.
49:3.1.1.2.11.6.20.13SECTION 195.415
     195.415 [Reserved]
49:3.1.1.2.11.6.20.14SECTION 195.416
     195.416 Pipeline assessments.
49:3.1.1.2.11.6.20.15SECTION 195.417-419
     195.417-419 [Reserved]
49:3.1.1.2.11.6.20.16SECTION 195.420
     195.420 Valve maintenance.
49:3.1.1.2.11.6.20.17SECTION 195.422
     195.422 Pipeline repairs.
49:3.1.1.2.11.6.20.18SECTION 195.424
     195.424 Pipe movement.
49:3.1.1.2.11.6.20.19SECTION 195.426
     195.426 Scraper and sphere facilities.
49:3.1.1.2.11.6.20.20SECTION 195.428
     195.428 Overpressure safety devices and overfill protection systems.
49:3.1.1.2.11.6.20.21SECTION 195.430
     195.430 Firefighting equipment.
49:3.1.1.2.11.6.20.22SECTION 195.432
     195.432 Inspection of in-service breakout tanks.
49:3.1.1.2.11.6.20.23SECTION 195.434
     195.434 Signs.
49:3.1.1.2.11.6.20.24SECTION 195.436
     195.436 Security of facilities.
49:3.1.1.2.11.6.20.25SECTION 195.438
     195.438 Smoking or open flames.
49:3.1.1.2.11.6.20.26SECTION 195.440
     195.440 Public awareness.
49:3.1.1.2.11.6.20.27SECTION 195.442
     195.442 Damage prevention program.
49:3.1.1.2.11.6.20.28SECTION 195.444
     195.444 Leak detection.
49:3.1.1.2.11.6.20.29SECTION 195.446
     195.446 Control room management.
49:3.1.1.2.11.6.20.30SECTION 195.450
     195.450 Definitions.
49:3.1.1.2.11.6.21SUBJGRP 21
  Pipeline Integrity Management
49:3.1.1.2.11.6.21.31SECTION 195.452
     195.452 Pipeline integrity management in high consequence areas.
49:3.1.1.2.11.6.21.32SECTION 195.454
     195.454 Integrity assessments for certain underwater hazardous liquid pipeline facilities located in high consequence areas.
49:3.1.1.2.11.7SUBPART G
Subpart G - Qualification of Pipeline Personnel
49:3.1.1.2.11.7.22.1SECTION 195.501
     195.501 Scope.
49:3.1.1.2.11.7.22.2SECTION 195.503
     195.503 Definitions.
49:3.1.1.2.11.7.22.3SECTION 195.505
     195.505 Qualification program.
49:3.1.1.2.11.7.22.4SECTION 195.507
     195.507 Recordkeeping.
49:3.1.1.2.11.7.22.5SECTION 195.509
     195.509 General.
49:3.1.1.2.11.8SUBPART H
Subpart H - Corrosion Control
49:3.1.1.2.11.8.22.1SECTION 195.551
     195.551 What do the regulations in this subpart cover
49:3.1.1.2.11.8.22.2SECTION 195.553
     195.553 What special definitions apply to this subpart
49:3.1.1.2.11.8.22.3SECTION 195.555
     195.555 What are the qualifications for supervisors
49:3.1.1.2.11.8.22.4SECTION 195.557
     195.557 Which pipelines must have coating for external corrosion control
49:3.1.1.2.11.8.22.5SECTION 195.559
     195.559 What coating material may I use for external corrosion control
49:3.1.1.2.11.8.22.6SECTION 195.561
     195.561 When must I inspect pipe coating used for external corrosion control
49:3.1.1.2.11.8.22.7SECTION 195.563
     195.563 Which pipelines must have cathodic protection
49:3.1.1.2.11.8.22.8SECTION 195.565
     195.565 How do I install cathodic protection on breakout tanks
49:3.1.1.2.11.8.22.9SECTION 195.567
     195.567 Which pipelines must have test leads and what must I do to install and maintain the leads
49:3.1.1.2.11.8.22.10SECTION 195.569
     195.569 Do I have to examine exposed portions of buried pipelines
49:3.1.1.2.11.8.22.11SECTION 195.571
     195.571 What criteria must I use to determine the adequacy of cathodic protection
49:3.1.1.2.11.8.22.12SECTION 195.573
     195.573 What must I do to monitor external corrosion control
49:3.1.1.2.11.8.22.13SECTION 195.575
     195.575 Which facilities must I electrically isolate and what inspections, tests, and safeguards are required
49:3.1.1.2.11.8.22.14SECTION 195.577
     195.577 What must I do to alleviate interference currents
49:3.1.1.2.11.8.22.15SECTION 195.579
     195.579 What must I do to mitigate internal corrosion
49:3.1.1.2.11.8.22.16SECTION 195.581
     195.581 Which pipelines must I protect against atmospheric corrosion and what coating material may I use
49:3.1.1.2.11.8.22.17SECTION 195.583
     195.583 What must I do to monitor atmospheric corrosion control
49:3.1.1.2.11.8.22.18SECTION 195.585
     195.585 What must I do to correct corroded pipe
49:3.1.1.2.11.8.22.19SECTION 195.587
     195.587 What methods are available to determine the strength of corroded pipe
49:3.1.1.2.11.8.22.20SECTION 195.588
     195.588 What standards apply to direct assessment
49:3.1.1.2.11.8.22.21SECTION 195.589
     195.589 What corrosion control information do I have to maintain
49:3.1.1.2.11.8.22.22SECTION 195.591
     195.591 In-Line inspection of pipelines.
49:3.1.1.2.11.9SUBPART 0
49:3.1.1.2.11.10.22.1.22APPENDIX Appendix A
  Appendix A to Part 195 - Delineation Between Federal and State Jurisdiction - Statement of Agency Policy and Interpretation
49:3.1.1.2.11.10.22.1.23APPENDIX Appendix B
  Appendix B to Part 195 - Risk-Based Alternative to Pressure Testing Older Hazardous Liquid and Carbon Dioxide Pipelines
49:3.1.1.2.11.10.22.1.24APPENDIX Appendix C
  Appendix C to Part 195 - Guidance for Implementation of an Integrity Management Program
49:3.1.1.2.12PART 196
PART 196 - PROTECTION OF UNDERGROUND PIPELINES FROM EXCAVATION ACTIVITY
49:3.1.1.2.12.1SUBPART A
Subpart A - General
49:3.1.1.2.12.1.22.1SECTION 196.1
     196.1 What is the purpose and scope of this part
49:3.1.1.2.12.1.22.2SECTION 196.3
     196.3 Definitions.
49:3.1.1.2.12.2SUBPART B
Subpart B - Damage Prevention Requirements
49:3.1.1.2.12.2.22.1SECTION 196.101
     196.101 What is the purpose and scope of this subpart
49:3.1.1.2.12.2.22.2SECTION 196.103
     196.103 What must an excavator do to protect underground pipelines from excavation-related damage
49:3.1.1.2.12.2.22.3SECTION 196.105
     196.105 [Reserved]
49:3.1.1.2.12.2.22.4SECTION 196.107
     196.107 What must an excavator do if a pipeline is damaged by excavation activity
49:3.1.1.2.12.2.22.5SECTION 196.109
     196.109 What must an excavator do if damage to a pipeline from excavation activity causes a leak where product is released from the pipeline
49:3.1.1.2.12.2.22.6SECTION 196.111
     196.111 What if a pipeline operator fails to respond to a locate request or fails to accurately locate and mark its pipeline
49:3.1.1.2.12.3SUBPART C
Subpart C - Administrative Enforcement Process
49:3.1.1.2.12.3.22.1SECTION 196.201
     196.201 What is the purpose and scope of this subpart
49:3.1.1.2.12.3.22.2SECTION 196.203
     196.203 What is the administrative process PHMSA will use to conduct enforcement proceedings for alleged violations of excavation damage prevention requirements
49:3.1.1.2.12.3.22.3SECTION 196.205
     196.205 Can PHMSA assess administrative civil penalties for violations
49:3.1.1.2.12.3.22.4SECTION 196.207
     196.207 What are the maximum administrative civil penalties for violations
49:3.1.1.2.12.3.22.5SECTION 196.209
     196.209 May other civil enforcement actions be taken
49:3.1.1.2.12.3.22.6SECTION 196.211
     196.211 May criminal penalties be imposed
49:3.1.1.2.13PART 197
PART 197 [RESERVED]
49:3.1.1.2.14PART 198
PART 198 - REGULATIONS FOR GRANTS TO AID STATE PIPELINE SAFETY PROGRAMS
49:3.1.1.2.14.1SUBPART A
Subpart A - General
49:3.1.1.2.14.1.22.1SECTION 198.1
     198.1 Scope.
49:3.1.1.2.14.1.22.2SECTION 198.3
     198.3 Definitions.
49:3.1.1.2.14.2SUBPART B
Subpart B - Grant Allocation
49:3.1.1.2.14.2.22.1SECTION 198.11
     198.11 Grant authority.
49:3.1.1.2.14.2.22.2SECTION 198.13
     198.13 Grant allocation formula.
49:3.1.1.2.14.3SUBPART C
Subpart C - Adoption of One-Call Damage Prevention Program
49:3.1.1.2.14.3.22.1SECTION 198.31
     198.31 Scope.
49:3.1.1.2.14.3.22.2SECTION 198.33
     198.33 [Reserved]
49:3.1.1.2.14.3.22.3SECTION 198.35
     198.35 Grants conditioned on adoption of one-call damage prevention program.
49:3.1.1.2.14.3.22.4SECTION 198.37
     198.37 State one-call damage prevention program.
49:3.1.1.2.14.3.22.5SECTION 198.39
     198.39 Qualifications for operation of one-call notification system.
49:3.1.1.2.14.4SUBPART D
Subpart D - State Damage Prevention Enforcement Programs
49:3.1.1.2.14.4.22.1SECTION 198.51
     198.51 What is the purpose and scope of this subpart
49:3.1.1.2.14.4.22.2SECTION 198.53
     198.53 When and how will PHMSA evaluate State damage prevention enforcement programs
49:3.1.1.2.14.4.22.3SECTION 198.55
     198.55 What criteria will PHMSA use in evaluating the effectiveness of State damage prevention enforcement programs
49:3.1.1.2.14.4.22.4SECTION 198.57
     198.57 What is the process PHMSA will use to notify a State that its damage prevention enforcement program appears to be inadequate
49:3.1.1.2.14.4.22.5SECTION 198.59
     198.59 How may a State respond to a notice of inadequacy
49:3.1.1.2.14.4.22.6SECTION 198.61
     198.61 How is a State notified of PHMSA's final decision
49:3.1.1.2.14.4.22.7SECTION 198.63
     198.63 How may a State with an inadequate damage prevention enforcement program seek reconsideration by PHMSA
49:3.1.1.2.15PART 199
PART 199 - DRUG AND ALCOHOL TESTING
49:3.1.1.2.15.1SUBPART A
Subpart A - General
49:3.1.1.2.15.1.22.1SECTION 199.1
     199.1 Scope.
49:3.1.1.2.15.1.22.2SECTION 199.2
     199.2 Applicability.
49:3.1.1.2.15.1.22.3SECTION 199.3
     199.3 Definitions.
49:3.1.1.2.15.1.22.4SECTION 199.5
     199.5 DOT procedures.
49:3.1.1.2.15.1.22.5SECTION 199.7
     199.7 Stand-down waivers.
49:3.1.1.2.15.1.22.6SECTION 199.9
     199.9 Preemption of State and local laws.
49:3.1.1.2.15.2SUBPART B
Subpart B - Drug Testing
49:3.1.1.2.15.2.22.1SECTION 199.100
     199.100 Purpose.
49:3.1.1.2.15.2.22.2SECTION 199.101
     199.101 Anti-drug plan.
49:3.1.1.2.15.2.22.3SECTION 199.103
     199.103 Use of persons who fail or refuse a drug test.
49:3.1.1.2.15.2.22.4SECTION 199.105
     199.105 Drug tests required.
49:3.1.1.2.15.2.22.5SECTION 199.107
     199.107 Drug testing laboratory.
49:3.1.1.2.15.2.22.6SECTION 199.109
     199.109 Review of drug testing results.
49:3.1.1.2.15.2.22.7SECTION 199.111
     199.111 [Reserved]
49:3.1.1.2.15.2.22.8SECTION 199.113
     199.113 Employee assistance program.
49:3.1.1.2.15.2.22.9SECTION 199.115
     199.115 Contractor employees.
49:3.1.1.2.15.2.22.10SECTION 199.117
     199.117 Recordkeeping.
49:3.1.1.2.15.2.22.11SECTION 199.119
     199.119 Reporting of anti-drug testing results.
49:3.1.1.2.15.3SUBPART C
Subpart C - Alcohol Misuse Prevention Program
49:3.1.1.2.15.3.22.1SECTION 199.200
     199.200 Purpose.
49:3.1.1.2.15.3.22.2SECTION 199.201
     199.201 [Reserved]
49:3.1.1.2.15.3.22.3SECTION 199.202
     199.202 Alcohol misuse plan.
49:3.1.1.2.15.3.22.4SECTION 199.203-199.205
     199.203-199.205 [Reserved]
49:3.1.1.2.15.3.22.5SECTION 199.209
     199.209 Other requirements imposed by operators.
49:3.1.1.2.15.3.22.6SECTION 199.211
     199.211 Requirement for notice.
49:3.1.1.2.15.3.22.7SECTION 199.213
     199.213 [Reserved]
49:3.1.1.2.15.3.22.8SECTION 199.215
     199.215 Alcohol concentration.
49:3.1.1.2.15.3.22.9SECTION 199.217
     199.217 On-duty use.
49:3.1.1.2.15.3.22.10SECTION 199.219
     199.219 Pre-duty use.
49:3.1.1.2.15.3.22.11SECTION 199.221
     199.221 Use following an accident.
49:3.1.1.2.15.3.22.12SECTION 199.223
     199.223 Refusal to submit to a required alcohol test.
49:3.1.1.2.15.3.22.13SECTION 199.225
     199.225 Alcohol tests required.
49:3.1.1.2.15.3.22.14SECTION 199.227
     199.227 Retention of records.
49:3.1.1.2.15.3.22.15SECTION 199.229
     199.229 Reporting of alcohol testing results.
49:3.1.1.2.15.3.22.16SECTION 199.231
     199.231 Access to facilities and records.
49:3.1.1.2.15.3.22.17SECTION 199.233
     199.233 Removal from covered function.
49:3.1.1.2.15.3.22.18SECTION 199.235
     199.235 Required evaluation and testing.
49:3.1.1.2.15.3.22.19SECTION 199.237
     199.237 Other alcohol-related conduct.
49:3.1.1.2.15.3.22.20SECTION 199.239
     199.239 Operator obligation to promulgate a policy on the misuse of alcohol.
49:3.1.1.2.15.3.22.21SECTION 199.241
     199.241 Training for supervisors.
49:3.1.1.2.15.3.22.22SECTION 199.243
     199.243 Referral, evaluation, and treatment.
49:3.1.1.2.15.3.22.23SECTION 199.245
     199.245 Contractor employees.