49:3.1.1.2.5 | PART 186-189
| PARTS 186-189 [RESERVED] | |
49:3.1.1.2.6 | PART 190
| PART 190 - PIPELINE SAFETY ENFORCEMENT AND REGULATORY PROCEDURES | |
49:3.1.1.2.6.1 | SUBPART A
| Subpart A - General | |
49:3.1.1.2.6.1.5.1 | SECTION 190.1
| 190.1 Purpose and scope. | |
49:3.1.1.2.6.1.5.2 | SECTION 190.3
| 190.3 Definitions. | |
49:3.1.1.2.6.1.5.3 | SECTION 190.5
| 190.5 Service. | |
49:3.1.1.2.6.1.5.4 | SECTION 190.7
| 190.7 Subpoenas; witness fees. | |
49:3.1.1.2.6.1.5.5 | SECTION 190.9
| 190.9 Petitions for finding or approval. | |
49:3.1.1.2.6.1.5.6 | SECTION 190.11
| 190.11 Availability of informal guidance and interpretive assistance. | |
49:3.1.1.2.6.2 | SUBPART B
| Subpart B - Enforcement | |
49:3.1.1.2.6.2.5 | SUBJGRP 5
| Compliance Orders | |
49:3.1.1.2.6.2.5.1 | SECTION 190.201
| 190.201 Purpose and scope. | |
49:3.1.1.2.6.2.5.2 | SECTION 190.203
| 190.203 Inspections and investigations. | |
49:3.1.1.2.6.2.5.3 | SECTION 190.205
| 190.205 Warnings. | |
49:3.1.1.2.6.2.5.4 | SECTION 190.206
| 190.206 Amendment of plans or procedures. | |
49:3.1.1.2.6.2.5.5 | SECTION 190.207
| 190.207 Notice of probable violation. | |
49:3.1.1.2.6.2.5.6 | SECTION 190.208
| 190.208 Response options. | |
49:3.1.1.2.6.2.5.7 | SECTION 190.209
| 190.209 Case file. | |
49:3.1.1.2.6.2.5.8 | SECTION 190.210
| 190.210 Separation of functions. | |
49:3.1.1.2.6.2.5.9 | SECTION 190.211
| 190.211 Hearing. | |
49:3.1.1.2.6.2.5.10 | SECTION 190.212
| 190.212 Presiding official, powers, and duties. | |
49:3.1.1.2.6.2.5.11 | SECTION 190.213
| 190.213 Final order. | |
49:3.1.1.2.6.2.5.12 | SECTION 190.215
| 190.215 [Reserved] | |
49:3.1.1.2.6.2.5.13 | SECTION 190.217
| 190.217 Compliance orders generally. | |
49:3.1.1.2.6.2.5.14 | SECTION 190.219
| 190.219 Consent order. | |
49:3.1.1.2.6.2.6 | SUBJGRP 6
| Civil Penalties | |
49:3.1.1.2.6.2.6.15 | SECTION 190.221
| 190.221 Civil penalties generally. | |
49:3.1.1.2.6.2.6.16 | SECTION 190.223
| 190.223 Maximum penalties. | |
49:3.1.1.2.6.2.6.17 | SECTION 190.225
| 190.225 Assessment considerations. | |
49:3.1.1.2.6.2.6.18 | SECTION 190.227
| 190.227 Payment of penalty. | |
49:3.1.1.2.6.2.6.19 | SECTION 190.229-190.231
| 190.229-190.231 [Reserved] | |
49:3.1.1.2.6.2.7 | SUBJGRP 7
| Specific Relief | |
49:3.1.1.2.6.2.7.20 | SECTION 190.233
| 190.233 Corrective action orders. | |
49:3.1.1.2.6.2.7.21 | SECTION 190.235
| 190.235 Civil actions generally. | |
49:3.1.1.2.6.2.7.22 | SECTION 190.236
| 190.236 Emergency orders: Procedures for issuance and rescision. | |
49:3.1.1.2.6.2.7.23 | SECTION 190.237
| 190.237 Emergency orders: Petitions for review. | |
49:3.1.1.2.6.2.7.24 | SECTION 190.239
| 190.239 Safety orders. | |
49:3.1.1.2.6.2.7.25 | SECTION 190.241
| 190.241 Finality. | |
49:3.1.1.2.6.2.7.26 | SECTION 190.243
| 190.243 Petitions for reconsideration. | |
49:3.1.1.2.6.3 | SUBPART C
| Subpart C - Criminal Enforcement | |
49:3.1.1.2.6.3.8.1 | SECTION 190.291
| 190.291 Criminal penalties generally. | |
49:3.1.1.2.6.3.8.2 | SECTION 190.293
| 190.293 Referral for prosecution. | |
49:3.1.1.2.6.4 | SUBPART D
| Subpart D - Procedures for Adoption of Rules | |
49:3.1.1.2.6.4.8.1 | SECTION 190.301
| 190.301 Scope. | |
49:3.1.1.2.6.4.8.2 | SECTION 190.303
| 190.303 Delegations. | |
49:3.1.1.2.6.4.8.3 | SECTION 190.305
| 190.305 Regulatory dockets. | |
49:3.1.1.2.6.4.8.4 | SECTION 190.307
| 190.307 Records. | |
49:3.1.1.2.6.4.8.5 | SECTION 190.309
| 190.309 Where to file petitions. | |
49:3.1.1.2.6.4.8.6 | SECTION 190.311
| 190.311 General. | |
49:3.1.1.2.6.4.8.7 | SECTION 190.313
| 190.313 Initiation of rulemaking. | |
49:3.1.1.2.6.4.8.8 | SECTION 190.315
| 190.315 Contents of notices of proposed rulemaking. | |
49:3.1.1.2.6.4.8.9 | SECTION 190.317
| 190.317 Participation by interested persons. | |
49:3.1.1.2.6.4.8.10 | SECTION 190.319
| 190.319 Petitions for extension of time to comment. | |
49:3.1.1.2.6.4.8.11 | SECTION 190.321
| 190.321 Contents of written comments. | |
49:3.1.1.2.6.4.8.12 | SECTION 190.323
| 190.323 Consideration of comments received. | |
49:3.1.1.2.6.4.8.13 | SECTION 190.325
| 190.325 Additional rulemaking proceedings. | |
49:3.1.1.2.6.4.8.14 | SECTION 190.327
| 190.327 Hearings. | |
49:3.1.1.2.6.4.8.15 | SECTION 190.329
| 190.329 Adoption of final rules. | |
49:3.1.1.2.6.4.8.16 | SECTION 190.331
| 190.331 Petitions for rulemaking. | |
49:3.1.1.2.6.4.8.17 | SECTION 190.333
| 190.333 Processing of petition. | |
49:3.1.1.2.6.4.8.18 | SECTION 190.335
| 190.335 Petitions for reconsideration. | |
49:3.1.1.2.6.4.8.19 | SECTION 190.337
| 190.337 Proceedings on petitions for reconsideration. | |
49:3.1.1.2.6.4.8.20 | SECTION 190.338
| 190.338 Appeals. | |
49:3.1.1.2.6.4.8.21 | SECTION 190.339
| 190.339 Direct final rulemaking. | |
49:3.1.1.2.6.4.8.22 | SECTION 190.341
| 190.341 Special permits. | |
49:3.1.1.2.6.4.8.23 | SECTION 190.343
| 190.343 Information made available to the public and request for protection of confidential commercial information. | |
49:3.1.1.2.6.5 | SUBPART E
| Subpart E - Cost Recovery for Design Reviews | |
49:3.1.1.2.6.5.8.1 | SECTION 190.401
| 190.401 Scope. | |
49:3.1.1.2.6.5.8.2 | SECTION 190.403
| 190.403 Applicability. | |
49:3.1.1.2.6.5.8.3 | SECTION 190.405
| 190.405 Notification. | |
49:3.1.1.2.6.5.8.4 | SECTION 190.407
| 190.407 Master Agreement. | |
49:3.1.1.2.6.5.8.5 | SECTION 190.409
| 190.409 Fee structure. | |
49:3.1.1.2.6.5.8.6 | SECTION 190.411
| 190.411 Procedures for billing and payment of fee. | |
49:3.1.1.2.7 | PART 191
| PART 191 - TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE; ANNUAL REPORTS, INCIDENT REPORTS, AND SAFETY-RELATED CONDITION REPORTS | |
49:3.1.1.2.7.0.8.1 | SECTION 191.1
| 191.1 Scope. | |
49:3.1.1.2.7.0.8.2 | SECTION 191.3
| 191.3 Definitions. | |
49:3.1.1.2.7.0.8.3 | SECTION 191.5
| 191.5 Immediate notice of certain incidents. | |
49:3.1.1.2.7.0.8.4 | SECTION 191.7
| 191.7 Report submission requirements. | |
49:3.1.1.2.7.0.8.5 | SECTION 191.9
| 191.9 Distribution system: Incident report. | |
49:3.1.1.2.7.0.8.6 | SECTION 191.11
| 191.11 Distribution system: Annual report. | |
49:3.1.1.2.7.0.8.7 | SECTION 191.12
| 191.12 Distribution Systems: Mechanical Fitting Failure Reports | |
49:3.1.1.2.7.0.8.8 | SECTION 191.13
| 191.13 Distribution systems reporting transmission pipelines; transmission or gathering systems reporting distribution pipelines. | |
49:3.1.1.2.7.0.8.9 | SECTION 191.15
| 191.15 Transmission systems; gathering systems; liquefied natural gas facilities; and underground natural gas storage facilities: Incident report. | |
49:3.1.1.2.7.0.8.10 | SECTION 191.17
| 191.17 Transmission systems; gathering systems; liquefied natural gas facilities; and underground natural gas storage facilities: Annual report. | |
49:3.1.1.2.7.0.8.11 | SECTION 191.21
| 191.21 OMB control number assigned to information collection. | |
49:3.1.1.2.7.0.8.12 | SECTION 191.22
| 191.22 National Registry of Operators. | |
49:3.1.1.2.7.0.8.13 | SECTION 191.23
| 191.23 Reporting safety-related conditions. | |
49:3.1.1.2.7.0.8.14 | SECTION 191.25
| 191.25 Filing safety-related condition reports. | |
49:3.1.1.2.7.0.8.15 | SECTION 191.29
| 191.29 National Pipeline Mapping System. | |
49:3.1.1.2.7.0.8.16.13 | APPENDIX Appendix A
| Appendix A to Part 191 - Procedure for Determining Reporting Threshold | |
49:3.1.1.2.8 | PART 192
| PART 192 - TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS | |
49:3.1.1.2.8.1 | SUBPART A
| Subpart A - General | |
49:3.1.1.2.8.1.8.1 | SECTION 192.1
| 192.1 What is the scope of this part | |
49:3.1.1.2.8.1.8.2 | SECTION 192.3
| 192.3 Definitions. | |
49:3.1.1.2.8.1.8.3 | SECTION 192.5
| 192.5 Class locations. | |
49:3.1.1.2.8.1.8.4 | SECTION 192.7
| 192.7 What documents are incorporated by reference partly or wholly in this part | |
49:3.1.1.2.8.1.8.5 | SECTION 192.8
| 192.8 How are onshore gathering lines and regulated onshore gathering lines determined | |
49:3.1.1.2.8.1.8.6 | SECTION 192.9
| 192.9 What requirements apply to gathering lines | |
49:3.1.1.2.8.1.8.7 | SECTION 192.10
| 192.10 Outer continental shelf pipelines. | |
49:3.1.1.2.8.1.8.8 | SECTION 192.11
| 192.11 Petroleum gas systems. | |
49:3.1.1.2.8.1.8.9 | SECTION 192.12
| 192.12 Underground natural gas storage facilities. | |
49:3.1.1.2.8.1.8.10 | SECTION 192.13
| 192.13 What general requirements apply to pipelines regulated under this part | |
49:3.1.1.2.8.1.8.11 | SECTION 192.14
| 192.14 Conversion to service subject to this part. | |
49:3.1.1.2.8.1.8.12 | SECTION 192.15
| 192.15 Rules of regulatory construction. | |
49:3.1.1.2.8.1.8.13 | SECTION 192.16
| 192.16 Customer notification. | |
49:3.1.1.2.8.1.8.14 | SECTION 192.18
| 192.18 How to notify PHMSA. | |
49:3.1.1.2.8.2 | SUBPART B
| Subpart B - Materials | |
49:3.1.1.2.8.2.8.1 | SECTION 192.51
| 192.51 Scope. | |
49:3.1.1.2.8.2.8.2 | SECTION 192.53
| 192.53 General. | |
49:3.1.1.2.8.2.8.3 | SECTION 192.55
| 192.55 Steel pipe. | |
49:3.1.1.2.8.2.8.4 | SECTION 192.57
| 192.57 [Reserved] | |
49:3.1.1.2.8.2.8.5 | SECTION 192.59
| 192.59 Plastic pipe. | |
49:3.1.1.2.8.2.8.6 | SECTION 192.61
| 192.61 [Reserved] | |
49:3.1.1.2.8.2.8.7 | SECTION 192.63
| 192.63 Marking of materials. | |
49:3.1.1.2.8.2.8.8 | SECTION 192.65
| 192.65 Transportation of pipe. | |
49:3.1.1.2.8.2.8.9 | SECTION 192.67
| 192.67 Records: Material properties. | |
49:3.1.1.2.8.2.8.10 | SECTION 192.69
| 192.69 Storage and handling of plastic pipe and associated components. | |
49:3.1.1.2.8.3 | SUBPART C
| Subpart C - Pipe Design | |
49:3.1.1.2.8.3.8.1 | SECTION 192.101
| 192.101 Scope. | |
49:3.1.1.2.8.3.8.2 | SECTION 192.103
| 192.103 General. | |
49:3.1.1.2.8.3.8.3 | SECTION 192.105
| 192.105 Design formula for steel pipe. | |
49:3.1.1.2.8.3.8.4 | SECTION 192.107
| 192.107 Yield strength (S) for steel pipe. | |
49:3.1.1.2.8.3.8.5 | SECTION 192.109
| 192.109 Nominal wall thickness (t) for steel pipe. | |
49:3.1.1.2.8.3.8.6 | SECTION 192.111
| 192.111 Design factor (F) for steel pipe. | |
49:3.1.1.2.8.3.8.7 | SECTION 192.112
| 192.112 Additional design requirements for steel pipe using alternative maximum allowable operating pressure. | |
49:3.1.1.2.8.3.8.8 | SECTION 192.113
| 192.113 Longitudinal joint factor (E) for steel pipe. | |
49:3.1.1.2.8.3.8.9 | SECTION 192.115
| 192.115 Temperature derating factor (T) for steel pipe. | |
49:3.1.1.2.8.3.8.10 | SECTION 192.117-192.119
| 192.117-192.119 [Reserved] | |
49:3.1.1.2.8.3.8.11 | SECTION 192.121
| 192.121 Design of plastic pipe. | |
49:3.1.1.2.8.3.8.12 | SECTION 192.123
| 192.123 [Reserved] | |
49:3.1.1.2.8.3.8.13 | SECTION 192.125
| 192.125 Design of copper pipe. | |
49:3.1.1.2.8.3.8.14 | SECTION 192.127
| 192.127 Records: Pipe design. | |
49:3.1.1.2.8.4 | SUBPART D
| Subpart D - Design of Pipeline Components | |
49:3.1.1.2.8.4.8.1 | SECTION 192.141
| 192.141 Scope. | |
49:3.1.1.2.8.4.8.2 | SECTION 192.143
| 192.143 General requirements. | |
49:3.1.1.2.8.4.8.3 | SECTION 192.144
| 192.144 Qualifying metallic components. | |
49:3.1.1.2.8.4.8.4 | SECTION 192.145
| 192.145 Valves. | |
49:3.1.1.2.8.4.8.5 | SECTION 192.147
| 192.147 Flanges and flange accessories. | |
49:3.1.1.2.8.4.8.6 | SECTION 192.149
| 192.149 Standard fittings. | |
49:3.1.1.2.8.4.8.7 | SECTION 192.150
| 192.150 Passage of internal inspection devices. | |
49:3.1.1.2.8.4.8.8 | SECTION 192.151
| 192.151 Tapping. | |
49:3.1.1.2.8.4.8.9 | SECTION 192.153
| 192.153 Components fabricated by welding. | |
49:3.1.1.2.8.4.8.10 | SECTION 192.155
| 192.155 Welded branch connections. | |
49:3.1.1.2.8.4.8.11 | SECTION 192.157
| 192.157 Extruded outlets. | |
49:3.1.1.2.8.4.8.12 | SECTION 192.159
| 192.159 Flexibility. | |
49:3.1.1.2.8.4.8.13 | SECTION 192.161
| 192.161 Supports and anchors. | |
49:3.1.1.2.8.4.8.14 | SECTION 192.163
| 192.163 Compressor stations: Design and construction. | |
49:3.1.1.2.8.4.8.15 | SECTION 192.165
| 192.165 Compressor stations: Liquid removal. | |
49:3.1.1.2.8.4.8.16 | SECTION 192.167
| 192.167 Compressor stations: Emergency shutdown. | |
49:3.1.1.2.8.4.8.17 | SECTION 192.169
| 192.169 Compressor stations: Pressure limiting devices. | |
49:3.1.1.2.8.4.8.18 | SECTION 192.171
| 192.171 Compressor stations: Additional safety equipment. | |
49:3.1.1.2.8.4.8.19 | SECTION 192.173
| 192.173 Compressor stations: Ventilation. | |
49:3.1.1.2.8.4.8.20 | SECTION 192.175
| 192.175 Pipe-type and bottle-type holders. | |
49:3.1.1.2.8.4.8.21 | SECTION 192.177
| 192.177 Additional provisions for bottle-type holders. | |
49:3.1.1.2.8.4.8.22 | SECTION 192.179
| 192.179 Transmission line valves. | |
49:3.1.1.2.8.4.8.23 | SECTION 192.181
| 192.181 Distribution line valves. | |
49:3.1.1.2.8.4.8.24 | SECTION 192.183
| 192.183 Vaults: Structural design requirements. | |
49:3.1.1.2.8.4.8.25 | SECTION 192.185
| 192.185 Vaults: Accessibility. | |
49:3.1.1.2.8.4.8.26 | SECTION 192.187
| 192.187 Vaults: Sealing, venting, and ventilation. | |
49:3.1.1.2.8.4.8.27 | SECTION 192.189
| 192.189 Vaults: Drainage and waterproofing. | |
49:3.1.1.2.8.4.8.28 | SECTION 192.191
| 192.191 [Reserved] | |
49:3.1.1.2.8.4.8.29 | SECTION 192.193
| 192.193 Valve installation in plastic pipe. | |
49:3.1.1.2.8.4.8.30 | SECTION 192.195
| 192.195 Protection against accidental overpressuring. | |
49:3.1.1.2.8.4.8.31 | SECTION 192.197
| 192.197 Control of the pressure of gas delivered from high-pressure distribution systems. | |
49:3.1.1.2.8.4.8.32 | SECTION 192.199
| 192.199 Requirements for design of pressure relief and limiting devices. | |
49:3.1.1.2.8.4.8.33 | SECTION 192.201
| 192.201 Required capacity of pressure relieving and limiting stations. | |
49:3.1.1.2.8.4.8.34 | SECTION 192.203
| 192.203 Instrument, control, and sampling pipe and components. | |
49:3.1.1.2.8.4.8.35 | SECTION 192.204
| 192.204 Risers installed after January 22, 2019. | |
49:3.1.1.2.8.4.8.36 | SECTION 192.205
| 192.205 Records: Pipeline components. | |
49:3.1.1.2.8.5 | SUBPART E
| Subpart E - Welding of Steel in Pipelines | |
49:3.1.1.2.8.5.8.1 | SECTION 192.221
| 192.221 Scope. | |
49:3.1.1.2.8.5.8.2 | SECTION 192.225
| 192.225 Welding procedures. | |
49:3.1.1.2.8.5.8.3 | SECTION 192.227
| 192.227 Qualification of welders and welding operators. | |
49:3.1.1.2.8.5.8.4 | SECTION 192.229
| 192.229 Limitations on welders and welding operators. | |
49:3.1.1.2.8.5.8.5 | SECTION 192.231
| 192.231 Protection from weather. | |
49:3.1.1.2.8.5.8.6 | SECTION 192.233
| 192.233 Miter joints. | |
49:3.1.1.2.8.5.8.7 | SECTION 192.235
| 192.235 Preparation for welding. | |
49:3.1.1.2.8.5.8.8 | SECTION 192.241
| 192.241 Inspection and test of welds. | |
49:3.1.1.2.8.5.8.9 | SECTION 192.243
| 192.243 Nondestructive testing. | |
49:3.1.1.2.8.5.8.10 | SECTION 192.245
| 192.245 Repair or removal of defects. | |
49:3.1.1.2.8.6 | SUBPART F
| Subpart F - Joining of Materials Other Than by Welding | |
49:3.1.1.2.8.6.8.1 | SECTION 192.271
| 192.271 Scope. | |
49:3.1.1.2.8.6.8.2 | SECTION 192.273
| 192.273 General. | |
49:3.1.1.2.8.6.8.3 | SECTION 192.275
| 192.275 Cast iron pipe. | |
49:3.1.1.2.8.6.8.4 | SECTION 192.277
| 192.277 Ductile iron pipe. | |
49:3.1.1.2.8.6.8.5 | SECTION 192.279
| 192.279 Copper pipe. | |
49:3.1.1.2.8.6.8.6 | SECTION 192.281
| 192.281 Plastic pipe. | |
49:3.1.1.2.8.6.8.7 | SECTION 192.283
| 192.283 Plastic pipe: Qualifying joining procedures. | |
49:3.1.1.2.8.6.8.8 | SECTION 192.285
| 192.285 Plastic pipe: Qualifying persons to make joints. | |
49:3.1.1.2.8.6.8.9 | SECTION 192.287
| 192.287 Plastic pipe: Inspection of joints. | |
49:3.1.1.2.8.7 | SUBPART G
| Subpart G - General Construction Requirements for Transmission Lines and Mains | |
49:3.1.1.2.8.7.8.1 | SECTION 192.301
| 192.301 Scope. | |
49:3.1.1.2.8.7.8.2 | SECTION 192.303
| 192.303 Compliance with specifications or standards. | |
49:3.1.1.2.8.7.8.3 | SECTION 192.305
| 192.305 Inspection: General. | |
49:3.1.1.2.8.7.8.5 | SECTION 192.307
| 192.307 Inspection of materials. | |
49:3.1.1.2.8.7.8.6 | SECTION 192.309
| 192.309 Repair of steel pipe. | |
49:3.1.1.2.8.7.8.7 | SECTION 192.311
| 192.311 Repair of plastic pipe. | |
49:3.1.1.2.8.7.8.8 | SECTION 192.313
| 192.313 Bends and elbows. | |
49:3.1.1.2.8.7.8.9 | SECTION 192.315
| 192.315 Wrinkle bends in steel pipe. | |
49:3.1.1.2.8.7.8.10 | SECTION 192.317
| 192.317 Protection from hazards. | |
49:3.1.1.2.8.7.8.11 | SECTION 192.319
| 192.319 Installation of pipe in a ditch. | |
49:3.1.1.2.8.7.8.12 | SECTION 192.321
| 192.321 Installation of plastic pipe. | |
49:3.1.1.2.8.7.8.13 | SECTION 192.323
| 192.323 Casing. | |
49:3.1.1.2.8.7.8.14 | SECTION 192.325
| 192.325 Underground clearance. | |
49:3.1.1.2.8.7.8.15 | SECTION 192.327
| 192.327 Cover. | |
49:3.1.1.2.8.7.8.16 | SECTION 192.328
| 192.328 Additional construction requirements for steel pipe using alternative maximum allowable operating pressure. | |
49:3.1.1.2.8.7.8.17 | SECTION 192.329
| 192.329 Installation of plastic pipelines by trenchless excavation. | |
49:3.1.1.2.8.8 | SUBPART H
| Subpart H - Customer Meters, Service Regulators, and Service Lines | |
49:3.1.1.2.8.8.8.1 | SECTION 192.351
| 192.351 Scope. | |
49:3.1.1.2.8.8.8.2 | SECTION 192.353
| 192.353 Customer meters and regulators: Location. | |
49:3.1.1.2.8.8.8.3 | SECTION 192.355
| 192.355 Customer meters and regulators: Protection from damage. | |
49:3.1.1.2.8.8.8.4 | SECTION 192.357
| 192.357 Customer meters and regulators: Installation. | |
49:3.1.1.2.8.8.8.5 | SECTION 192.359
| 192.359 Customer meter installations: Operating pressure. | |
49:3.1.1.2.8.8.8.6 | SECTION 192.361
| 192.361 Service lines: Installation. | |
49:3.1.1.2.8.8.8.7 | SECTION 192.363
| 192.363 Service lines: Valve requirements. | |
49:3.1.1.2.8.8.8.8 | SECTION 192.365
| 192.365 Service lines: Location of valves. | |
49:3.1.1.2.8.8.8.9 | SECTION 192.367
| 192.367 Service lines: General requirements for connections to main piping. | |
49:3.1.1.2.8.8.8.10 | SECTION 192.369
| 192.369 Service lines: Connections to cast iron or ductile iron mains. | |
49:3.1.1.2.8.8.8.11 | SECTION 192.371
| 192.371 Service lines: Steel. | |
49:3.1.1.2.8.8.8.12 | SECTION 192.373
| 192.373 Service lines: Cast iron and ductile iron. | |
49:3.1.1.2.8.8.8.13 | SECTION 192.375
| 192.375 Service lines: Plastic. | |
49:3.1.1.2.8.8.8.14 | SECTION 192.376
| 192.376 Installation of plastic service lines by trenchless excavation. | |
49:3.1.1.2.8.8.8.15 | SECTION 192.377
| 192.377 Service lines: Copper. | |
49:3.1.1.2.8.8.8.16 | SECTION 192.379
| 192.379 New service lines not in use. | |
49:3.1.1.2.8.8.8.17 | SECTION 192.381
| 192.381 Service lines: Excess flow valve performance standards. | |
49:3.1.1.2.8.8.8.18 | SECTION 192.383
| 192.383 Excess flow valve installation. | |
49:3.1.1.2.8.8.8.19 | SECTION 192.385
| 192.385 Manual service line shut-off valve installation. | |
49:3.1.1.2.8.9 | SUBPART I
| Subpart I - Requirements for Corrosion Control | |
49:3.1.1.2.8.9.8.1 | SECTION 192.451
| 192.451 Scope. | |
49:3.1.1.2.8.9.8.2 | SECTION 192.452
| 192.452 How does this subpart apply to converted pipelines and regulated onshore gathering lines | |
49:3.1.1.2.8.9.8.3 | SECTION 192.453
| 192.453 General. | |
49:3.1.1.2.8.9.8.4 | SECTION 192.455
| 192.455 External corrosion control: Buried or submerged pipelines installed after July 31, 1971. | |
49:3.1.1.2.8.9.8.5 | SECTION 192.457
| 192.457 External corrosion control: Buried or submerged pipelines installed before August 1, 1971. | |
49:3.1.1.2.8.9.8.6 | SECTION 192.459
| 192.459 External corrosion control: Examination of buried pipeline when exposed. | |
49:3.1.1.2.8.9.8.7 | SECTION 192.461
| 192.461 External corrosion control: Protective coating. | |
49:3.1.1.2.8.9.8.8 | SECTION 192.463
| 192.463 External corrosion control: Cathodic protection. | |
49:3.1.1.2.8.9.8.9 | SECTION 192.465
| 192.465 External corrosion control: Monitoring. | |
49:3.1.1.2.8.9.8.10 | SECTION 192.467
| 192.467 External corrosion control: Electrical isolation. | |
49:3.1.1.2.8.9.8.11 | SECTION 192.469
| 192.469 External corrosion control: Test stations. | |
49:3.1.1.2.8.9.8.12 | SECTION 192.471
| 192.471 External corrosion control: Test leads. | |
49:3.1.1.2.8.9.8.13 | SECTION 192.473
| 192.473 External corrosion control: Interference currents. | |
49:3.1.1.2.8.9.8.14 | SECTION 192.475
| 192.475 Internal corrosion control: General. | |
49:3.1.1.2.8.9.8.15 | SECTION 192.476
| 192.476 Internal corrosion control: Design and construction of transmission line. | |
49:3.1.1.2.8.9.8.16 | SECTION 192.477
| 192.477 Internal corrosion control: Monitoring. | |
49:3.1.1.2.8.9.8.17 | SECTION 192.479
| 192.479 Atmospheric corrosion control: General. | |
49:3.1.1.2.8.9.8.18 | SECTION 192.481
| 192.481 Atmospheric corrosion control: Monitoring. | |
49:3.1.1.2.8.9.8.19 | SECTION 192.483
| 192.483 Remedial measures: General. | |
49:3.1.1.2.8.9.8.20 | SECTION 192.485
| 192.485 Remedial measures: Transmission lines. | |
49:3.1.1.2.8.9.8.21 | SECTION 192.487
| 192.487 Remedial measures: Distribution lines other than cast iron or ductile iron lines. | |
49:3.1.1.2.8.9.8.22 | SECTION 192.489
| 192.489 Remedial measures: Cast iron and ductile iron pipelines. | |
49:3.1.1.2.8.9.8.23 | SECTION 192.490
| 192.490 Direct assessment. | |
49:3.1.1.2.8.9.8.24 | SECTION 192.491
| 192.491 Corrosion control records. | |
49:3.1.1.2.8.9.8.25 | SECTION 192.493
| 192.493 In-line inspection of pipelines. | |
49:3.1.1.2.8.10 | SUBPART J
| Subpart J - Test Requirements | |
49:3.1.1.2.8.10.8.1 | SECTION 192.501
| 192.501 Scope. | |
49:3.1.1.2.8.10.8.2 | SECTION 192.503
| 192.503 General requirements. | |
49:3.1.1.2.8.10.8.3 | SECTION 192.505
| 192.505 Strength test requirements for steel pipeline to operate at a hoop stress of 30 percent or more of SMYS. | |
49:3.1.1.2.8.10.8.4 | SECTION 192.506
| 192.506 Transmission lines: Spike hydrostatic pressure test. | |
49:3.1.1.2.8.10.8.5 | SECTION 192.507
| 192.507 Test requirements for pipelines to operate at a hoop stress less than 30 percent of SMYS and at or above 100 p.s.i. (689 kPa) gage. | |
49:3.1.1.2.8.10.8.6 | SECTION 192.509
| 192.509 Test requirements for pipelines to operate below 100 p.s.i. (689 kPa) gage. | |
49:3.1.1.2.8.10.8.7 | SECTION 192.511
| 192.511 Test requirements for service lines. | |
49:3.1.1.2.8.10.8.8 | SECTION 192.513
| 192.513 Test requirements for plastic pipelines. | |
49:3.1.1.2.8.10.8.9 | SECTION 192.515
| 192.515 Environmental protection and safety requirements. | |
49:3.1.1.2.8.10.8.10 | SECTION 192.517
| 192.517 Records. | |
49:3.1.1.2.8.11 | SUBPART K
| Subpart K - Uprating | |
49:3.1.1.2.8.11.8.1 | SECTION 192.551
| 192.551 Scope. | |
49:3.1.1.2.8.11.8.2 | SECTION 192.553
| 192.553 General requirements. | |
49:3.1.1.2.8.11.8.3 | SECTION 192.555
| 192.555 Uprating to a pressure that will produce a hoop stress of 30 percent or more of SMYS in steel pipelines. | |
49:3.1.1.2.8.11.8.4 | SECTION 192.557
| 192.557 Uprating: Steel pipelines to a pressure that will produce a hoop stress less than 30 percent of SMYS: plastic, cast iron, and ductile iron pipelines. | |
49:3.1.1.2.8.12 | SUBPART L
| Subpart L - Operations | |
49:3.1.1.2.8.12.8.1 | SECTION 192.601
| 192.601 Scope. | |
49:3.1.1.2.8.12.8.2 | SECTION 192.603
| 192.603 General provisions. | |
49:3.1.1.2.8.12.8.3 | SECTION 192.605
| 192.605 Procedural manual for operations, maintenance, and emergencies. | |
49:3.1.1.2.8.12.8.4 | SECTION 192.607
| 192.607 Verification of Pipeline Material Properties and Attributes: Onshore steel transmission pipelines. | |
49:3.1.1.2.8.12.8.5 | SECTION 192.609
| 192.609 Change in class location: Required study. | |
49:3.1.1.2.8.12.8.6 | SECTION 192.611
| 192.611 Change in class location: Confirmation or revision of maximum allowable operating pressure. | |
49:3.1.1.2.8.12.8.7 | SECTION 192.612
| 192.612 Underwater inspection and reburial of pipelines in the Gulf of Mexico and its inlets. | |
49:3.1.1.2.8.12.8.8 | SECTION 192.613
| 192.613 Continuing surveillance. | |
49:3.1.1.2.8.12.8.9 | SECTION 192.614
| 192.614 Damage prevention program. | |
49:3.1.1.2.8.12.8.10 | SECTION 192.615
| 192.615 Emergency plans. | |
49:3.1.1.2.8.12.8.11 | SECTION 192.616
| 192.616 Public awareness. | |
49:3.1.1.2.8.12.8.12 | SECTION 192.617
| 192.617 Investigation of failures. | |
49:3.1.1.2.8.12.8.13 | SECTION 192.619
| 192.619 Maximum allowable operating pressure: Steel or plastic pipelines. | |
49:3.1.1.2.8.12.8.14 | SECTION 192.620
| 192.620 Alternative maximum allowable operating pressure for certain steel pipelines. | |
49:3.1.1.2.8.12.8.15 | SECTION 192.621
| 192.621 Maximum allowable operating pressure: High-pressure distribution systems. | |
49:3.1.1.2.8.12.8.16 | SECTION 192.623
| 192.623 Maximum and minimum allowable operating pressure; Low-pressure distribution systems. | |
49:3.1.1.2.8.12.8.17 | SECTION 192.624
| 192.624 Maximum allowable operating pressure reconfirmation: Onshore steel transmission pipelines. | |
49:3.1.1.2.8.12.8.18 | SECTION 192.625
| 192.625 Odorization of gas. | |
49:3.1.1.2.8.12.8.19 | SECTION 192.627
| 192.627 Tapping pipelines under pressure. | |
49:3.1.1.2.8.12.8.20 | SECTION 192.629
| 192.629 Purging of pipelines. | |
49:3.1.1.2.8.12.8.21 | SECTION 192.631
| 192.631 Control room management. | |
49:3.1.1.2.8.12.8.22 | SECTION 192.632
| 192.632 Engineering Critical Assessment for Maximum Allowable Operating Pressure Reconfirmation: Onshore steel transmission pipelines. | |
49:3.1.1.2.8.13 | SUBPART M
| Subpart M - Maintenance | |
49:3.1.1.2.8.13.8.1 | SECTION 192.701
| 192.701 Scope. | |
49:3.1.1.2.8.13.8.2 | SECTION 192.703
| 192.703 General. | |
49:3.1.1.2.8.13.8.3 | SECTION 192.705
| 192.705 Transmission lines: Patrolling. | |
49:3.1.1.2.8.13.8.4 | SECTION 192.706
| 192.706 Transmission lines: Leakage surveys. | |
49:3.1.1.2.8.13.8.5 | SECTION 192.707
| 192.707 Line markers for mains and transmission lines. | |
49:3.1.1.2.8.13.8.6 | SECTION 192.709
| 192.709 Transmission lines: Record keeping. | |
49:3.1.1.2.8.13.8.7 | SECTION 192.710
| 192.710 Transmission lines: Assessments outside of high consequence areas. | |
49:3.1.1.2.8.13.8.8 | SECTION 192.711
| 192.711 Transmission lines: General requirements for repair procedures. | |
49:3.1.1.2.8.13.8.9 | SECTION 192.712
| 192.712 Analysis of predicted failure pressure. | |
49:3.1.1.2.8.13.8.10 | SECTION 192.713
| 192.713 Transmission lines: Permanent field repair of imperfections and damages. | |
49:3.1.1.2.8.13.8.11 | SECTION 192.715
| 192.715 Transmission lines: Permanent field repair of welds. | |
49:3.1.1.2.8.13.8.12 | SECTION 192.717
| 192.717 Transmission lines: Permanent field repair of leaks. | |
49:3.1.1.2.8.13.8.13 | SECTION 192.719
| 192.719 Transmission lines: Testing of repairs. | |
49:3.1.1.2.8.13.8.14 | SECTION 192.720
| 192.720 Distribution systems: Leak repair. | |
49:3.1.1.2.8.13.8.15 | SECTION 192.721
| 192.721 Distribution systems: Patrolling. | |
49:3.1.1.2.8.13.8.16 | SECTION 192.723
| 192.723 Distribution systems: Leakage surveys. | |
49:3.1.1.2.8.13.8.17 | SECTION 192.725
| 192.725 Test requirements for reinstating service lines. | |
49:3.1.1.2.8.13.8.18 | SECTION 192.727
| 192.727 Abandonment or deactivation of facilities. | |
49:3.1.1.2.8.13.8.19 | SECTION 192.731
| 192.731 Compressor stations: Inspection and testing of relief devices. | |
49:3.1.1.2.8.13.8.20 | SECTION 192.735
| 192.735 Compressor stations: Storage of combustible materials. | |
49:3.1.1.2.8.13.8.21 | SECTION 192.736
| 192.736 Compressor stations: Gas detection. | |
49:3.1.1.2.8.13.8.22 | SECTION 192.739
| 192.739 Pressure limiting and regulating stations: Inspection and testing. | |
49:3.1.1.2.8.13.8.23 | SECTION 192.740
| 192.740 Pressure regulating, limiting, and overpressure protection - Individual service lines directly connected to production, gathering, or transmission pipelines. | |
49:3.1.1.2.8.13.8.24 | SECTION 192.741
| 192.741 Pressure limiting and regulating stations: Telemetering or recording gauges. | |
49:3.1.1.2.8.13.8.25 | SECTION 192.743
| 192.743 Pressure limiting and regulating stations: Capacity of relief devices. | |
49:3.1.1.2.8.13.8.26 | SECTION 192.745
| 192.745 Valve maintenance: Transmission lines. | |
49:3.1.1.2.8.13.8.27 | SECTION 192.747
| 192.747 Valve maintenance: Distribution systems. | |
49:3.1.1.2.8.13.8.28 | SECTION 192.749
| 192.749 Vault maintenance. | |
49:3.1.1.2.8.13.8.29 | SECTION 192.750
| 192.750 Launcher and receiver safety. | |
49:3.1.1.2.8.13.8.30 | SECTION 192.751
| 192.751 Prevention of accidental ignition. | |
49:3.1.1.2.8.13.8.31 | SECTION 192.753
| 192.753 Caulked bell and spigot joints. | |
49:3.1.1.2.8.13.8.32 | SECTION 192.755
| 192.755 Protecting cast-iron pipelines. | |
49:3.1.1.2.8.13.8.33 | SECTION 192.756
| 192.756 Joining plastic pipe by heat fusion; equipment maintenance and calibration. | |
49:3.1.1.2.8.14 | SUBPART N
| Subpart N - Qualification of Pipeline Personnel | |
49:3.1.1.2.8.14.8.1 | SECTION 192.801
| 192.801 Scope. | |
49:3.1.1.2.8.14.8.2 | SECTION 192.803
| 192.803 Definitions. | |
49:3.1.1.2.8.14.8.3 | SECTION 192.805
| 192.805 Qualification program. | |
49:3.1.1.2.8.14.8.4 | SECTION 192.807
| 192.807 Recordkeeping. | |
49:3.1.1.2.8.14.8.5 | SECTION 192.809
| 192.809 General. | |
49:3.1.1.2.8.15 | SUBPART O
| Subpart O - Gas Transmission Pipeline Integrity Management | |
49:3.1.1.2.8.15.8.1 | SECTION 192.901
| 192.901 What do the regulations in this subpart cover | |
49:3.1.1.2.8.15.8.2 | SECTION 192.903
| 192.903 What definitions apply to this subpart | |
49:3.1.1.2.8.15.8.3 | SECTION 192.905
| 192.905 How does an operator identify a high consequence area | |
49:3.1.1.2.8.15.8.4 | SECTION 192.907
| 192.907 What must an operator do to implement this subpart | |
49:3.1.1.2.8.15.8.5 | SECTION 192.909
| 192.909 How can an operator change its integrity management program | |
49:3.1.1.2.8.15.8.6 | SECTION 192.911
| 192.911 What are the elements of an integrity management program | |
49:3.1.1.2.8.15.8.7 | SECTION 192.913
| 192.913 When may an operator deviate its program from certain requirements of this subpart | |
49:3.1.1.2.8.15.8.8 | SECTION 192.915
| 192.915 What knowledge and training must personnel have to carry out an integrity management program | |
49:3.1.1.2.8.15.8.9 | SECTION 192.917
| 192.917 How does an operator identify potential threats to pipeline integrity and use the threat identification in its integrity program | |
49:3.1.1.2.8.15.8.10 | SECTION 192.919
| 192.919 What must be in the baseline assessment plan | |
49:3.1.1.2.8.15.8.11 | SECTION 192.921
| 192.921 How is the baseline assessment to be conducted | |
49:3.1.1.2.8.15.8.12 | SECTION 192.923
| 192.923 How is direct assessment used and for what threats | |
49:3.1.1.2.8.15.8.13 | SECTION 192.925
| 192.925 What are the requirements for using External Corrosion Direct Assessment (ECDA) | |
49:3.1.1.2.8.15.8.14 | SECTION 192.927
| 192.927 What are the requirements for using Internal Corrosion Direct Assessment (ICDA) | |
49:3.1.1.2.8.15.8.15 | SECTION 192.929
| 192.929 What are the requirements for using Direct Assessment for Stress Corrosion Cracking (SCCDA) | |
49:3.1.1.2.8.15.8.16 | SECTION 192.931
| 192.931 How may Confirmatory Direct Assessment (CDA) be used | |
49:3.1.1.2.8.15.8.17 | SECTION 192.933
| 192.933 What actions must be taken to address integrity issues | |
49:3.1.1.2.8.15.8.18 | SECTION 192.935
| 192.935 What additional preventive and mitigative measures must an operator take | |
49:3.1.1.2.8.15.8.19 | SECTION 192.937
| 192.937 What is a continual process of evaluation and assessment to maintain a pipeline's integrity | |
49:3.1.1.2.8.15.8.20 | SECTION 192.939
| 192.939 What are the required reassessment intervals | |
49:3.1.1.2.8.15.8.21 | SECTION 192.941
| 192.941 What is a low stress reassessment | |
49:3.1.1.2.8.15.8.22 | SECTION 192.943
| 192.943 When can an operator deviate from these reassessment intervals | |
49:3.1.1.2.8.15.8.23 | SECTION 192.945
| 192.945 What methods must an operator use to measure program effectiveness | |
49:3.1.1.2.8.15.8.24 | SECTION 192.947
| 192.947 What records must an operator keep | |
49:3.1.1.2.8.15.8.25 | SECTION 192.949
| 192.949 [Reserved] | |
49:3.1.1.2.8.15.8.26 | SECTION 192.951
| 192.951 Where does an operator file a report | |
49:3.1.1.2.8.16 | SUBPART P
| Subpart P - Gas Distribution Pipeline Integrity Management (IM) | |
49:3.1.1.2.8.16.8.1 | SECTION 192.1001
| 192.1001 What definitions apply to this subpart | |
49:3.1.1.2.8.16.8.2 | SECTION 192.1003
| 192.1003 What do the regulations in this subpart cover | |
49:3.1.1.2.8.16.8.3 | SECTION 192.1005
| 192.1005 What must a gas distribution operator (other than a master meter or small LPG operator) do to implement this subpart | |
49:3.1.1.2.8.16.8.4 | SECTION 192.1007
| 192.1007 What are the required elements of an integrity management plan | |
49:3.1.1.2.8.16.8.5 | SECTION 192.1009
| 192.1009 What must an operator report when a mechanical fitting fails | |
49:3.1.1.2.8.16.8.6 | SECTION 192.1011
| 192.1011 What records must an operator keep | |
49:3.1.1.2.8.16.8.7 | SECTION 192.1013
| 192.1013 When may an operator deviate from required periodic inspections under this part | |
49:3.1.1.2.8.16.8.8 | SECTION 192.1015
| 192.1015 What must a master meter or small liquefied petroleum gas (LPG) operator do to implement this subpart | |
49:3.1.1.2.8.17 | SUBPART 0
| | |
49:3.1.1.2.8.18.8.1.14 | APPENDIX Appendix A
| Appendix A to Part 192 [Reserved] | |
49:3.1.1.2.8.18.8.1.15 | APPENDIX Appendix B
| Appendix B to Part 192 - Qualification of Pipe and Components | |
49:3.1.1.2.8.18.8.1.16 | APPENDIX Appendix C
| Appendix C to Part 192 - Qualification of Welders for Low Stress Level Pipe | |
49:3.1.1.2.8.18.8.1.17 | APPENDIX Appendix D
| Appendix D to Part 192 - Criteria for Cathodic Protection and Determination of Measurements | |
49:3.1.1.2.8.18.8.1.18 | APPENDIX Appendix E
| Appendix E to Part 192 - Guidance on Determining High Consequence Areas and on Carrying out Requirements in the Integrity Management Rule | |
49:3.1.1.2.8.18.8.1.19 | APPENDIX Appendix F
| Appendix F to Part 192 - Criteria for Conducting Integrity Assessments Using Guided Wave Ultrasonic Testing (GWUT) | |
49:3.1.1.2.9 | PART 193
| PART 193 - LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS | |
49:3.1.1.2.9.1 | SUBPART A
| Subpart A - General | |
49:3.1.1.2.9.1.13.1 | SECTION 193.2001
| 193.2001 Scope of part. | |
49:3.1.1.2.9.1.13.2 | SECTION 193.2003
| 193.2003 [Reserved] | |
49:3.1.1.2.9.1.13.3 | SECTION 193.2005
| 193.2005 Applicability. | |
49:3.1.1.2.9.1.13.4 | SECTION 193.2007
| 193.2007 Definitions. | |
49:3.1.1.2.9.1.13.5 | SECTION 193.2009
| 193.2009 Rules of regulatory construction. | |
49:3.1.1.2.9.1.13.6 | SECTION 193.2011
| 193.2011 Reporting. | |
49:3.1.1.2.9.1.13.7 | SECTION 193.2013
| 193.2013 What documents are incorporated by reference partly or wholly in this part | |
49:3.1.1.2.9.1.13.8 | SECTION 193.2015
| 193.2015 [Reserved] | |
49:3.1.1.2.9.1.13.9 | SECTION 193.2017
| 193.2017 Plans and procedures. | |
49:3.1.1.2.9.1.13.10 | SECTION 193.2019
| 193.2019 Mobile and temporary LNG facilities. | |
49:3.1.1.2.9.2 | SUBPART B
| Subpart B - Siting Requirements | |
49:3.1.1.2.9.2.13.1 | SECTION 193.2051
| 193.2051 Scope. | |
49:3.1.1.2.9.2.13.2 | SECTION 193.2055
| 193.2055 [Reserved] | |
49:3.1.1.2.9.2.13.3 | SECTION 193.2057
| 193.2057 Thermal radiation protection. | |
49:3.1.1.2.9.2.13.4 | SECTION 193.2059
| 193.2059 Flammable vapor-gas dispersion protection. | |
49:3.1.1.2.9.2.13.5 | SECTION 193.2061-193.2065
| 193.2061-193.2065 [Reserved] | |
49:3.1.1.2.9.2.13.6 | SECTION 193.2067
| 193.2067 Wind forces. | |
49:3.1.1.2.9.2.13.7 | SECTION 193.2069-193.2073
| 193.2069-193.2073 [Reserved] | |
49:3.1.1.2.9.3 | SUBPART C
| Subpart C - Design | |
49:3.1.1.2.9.3.13 | SUBJGRP 13
| Materials | |
49:3.1.1.2.9.3.13.1 | SECTION 193.2101
| 193.2101 Scope. | |
49:3.1.1.2.9.3.13.2 | SECTION 193.2103-193.2117
| 193.2103-193.2117 [Reserved] | |
49:3.1.1.2.9.3.13.3 | SECTION 193.2119
| 193.2119 Records | |
49:3.1.1.2.9.3.14 | SUBJGRP 14
| Design of Components and Buildings | |
49:3.1.1.2.9.3.14.4 | SECTION 193.2121-193.2153
| 193.2121-193.2153 [Reserved] | |
49:3.1.1.2.9.3.15 | SUBJGRP 15
| Impoundment Design and Capacity | |
49:3.1.1.2.9.3.15.5 | SECTION 193.2155
| 193.2155 Structural requirements. | |
49:3.1.1.2.9.3.15.6 | SECTION 193.2157-193.2159
| 193.2157-193.2159 [Reserved] | |
49:3.1.1.2.9.3.15.7 | SECTION 193.2161
| 193.2161 Dikes, general. | |
49:3.1.1.2.9.3.15.8 | SECTION 193.2163-193.2165
| 193.2163-193.2165 [Reserved] | |
49:3.1.1.2.9.3.15.9 | SECTION 193.2167
| 193.2167 Covered systems. | |
49:3.1.1.2.9.3.15.10 | SECTION 193.2169-193.2171
| 193.2169-193.2171 [Reserved] | |
49:3.1.1.2.9.3.15.11 | SECTION 193.2173
| 193.2173 Water removal. | |
49:3.1.1.2.9.3.15.12 | SECTION 193.2175-193.2179
| 193.2175-193.2179 [Reserved] | |
49:3.1.1.2.9.3.15.13 | SECTION 193.2181
| 193.2181 Impoundment capacity: LNG storage tanks. | |
49:3.1.1.2.9.3.15.14 | SECTION 193.2183-193.2185
| 193.2183-193.2185 [Reserved] | |
49:3.1.1.2.9.3.16 | SUBJGRP 16
| LNG Storage Tanks | |
49:3.1.1.2.9.3.16.15 | SECTION 193.2187
| 193.2187 Nonmetallic membrane liner. | |
49:3.1.1.2.9.3.16.16 | SECTION 193.2189-193.2233
| 193.2189-193.2233 [Reserved] | |
49:3.1.1.2.9.4 | SUBPART D
| Subpart D - Construction | |
49:3.1.1.2.9.4.17.1 | SECTION 193.2301
| 193.2301 Scope. | |
49:3.1.1.2.9.4.17.2 | SECTION 193.2303
| 193.2303 Construction acceptance. | |
49:3.1.1.2.9.4.17.3 | SECTION 193.2304
| 193.2304 Corrosion control overview. | |
49:3.1.1.2.9.4.17.4 | SECTION 193.2305-193.2319
| 193.2305-193.2319 [Reserved] | |
49:3.1.1.2.9.4.17.5 | SECTION 193.2321
| 193.2321 Nondestructive tests. | |
49:3.1.1.2.9.4.17.6 | SECTION 193.2323-193.2329
| 193.2323-193.2329 [Reserved] | |
49:3.1.1.2.9.5 | SUBPART E
| Subpart E - Equipment | |
49:3.1.1.2.9.5.17 | SUBJGRP 17
| Vaporization Equipment | |
49:3.1.1.2.9.5.17.1 | SECTION 193.2401
| 193.2401 Scope. | |
49:3.1.1.2.9.5.17.2 | SECTION 193.2403-193.2439
| 193.2403-193.2439 [Reserved] | |
49:3.1.1.2.9.5.17.3 | SECTION 193.2441
| 193.2441 Control center. | |
49:3.1.1.2.9.5.17.4 | SECTION 193.2443
| 193.2443 [Reserved] | |
49:3.1.1.2.9.5.17.5 | SECTION 193.2445
| 193.2445 Sources of power. | |
49:3.1.1.2.9.6 | SUBPART F
| Subpart F - Operations | |
49:3.1.1.2.9.6.18.1 | SECTION 193.2501
| 193.2501 Scope. | |
49:3.1.1.2.9.6.18.2 | SECTION 193.2503
| 193.2503 Operating procedures. | |
49:3.1.1.2.9.6.18.3 | SECTION 193.2505
| 193.2505 Cooldown. | |
49:3.1.1.2.9.6.18.4 | SECTION 193.2507
| 193.2507 Monitoring operations. | |
49:3.1.1.2.9.6.18.5 | SECTION 193.2509
| 193.2509 Emergency procedures. | |
49:3.1.1.2.9.6.18.6 | SECTION 193.2511
| 193.2511 Personnel safety. | |
49:3.1.1.2.9.6.18.7 | SECTION 193.2513
| 193.2513 Transfer procedures. | |
49:3.1.1.2.9.6.18.8 | SECTION 193.2515
| 193.2515 Investigations of failures. | |
49:3.1.1.2.9.6.18.9 | SECTION 193.2517
| 193.2517 Purging. | |
49:3.1.1.2.9.6.18.10 | SECTION 193.2519
| 193.2519 Communication systems. | |
49:3.1.1.2.9.6.18.11 | SECTION 193.2521
| 193.2521 Operating records. | |
49:3.1.1.2.9.7 | SUBPART G
| Subpart G - Maintenance | |
49:3.1.1.2.9.7.18.1 | SECTION 193.2601
| 193.2601 Scope. | |
49:3.1.1.2.9.7.18.2 | SECTION 193.2603
| 193.2603 General. | |
49:3.1.1.2.9.7.18.3 | SECTION 193.2605
| 193.2605 Maintenance procedures. | |
49:3.1.1.2.9.7.18.4 | SECTION 193.2607
| 193.2607 Foreign material. | |
49:3.1.1.2.9.7.18.5 | SECTION 193.2609
| 193.2609 Support systems. | |
49:3.1.1.2.9.7.18.6 | SECTION 193.2611
| 193.2611 Fire protection. | |
49:3.1.1.2.9.7.18.7 | SECTION 193.2613
| 193.2613 Auxiliary power sources. | |
49:3.1.1.2.9.7.18.8 | SECTION 193.2615
| 193.2615 Isolating and purging. | |
49:3.1.1.2.9.7.18.9 | SECTION 193.2617
| 193.2617 Repairs. | |
49:3.1.1.2.9.7.18.10 | SECTION 193.2619
| 193.2619 Control systems. | |
49:3.1.1.2.9.7.18.11 | SECTION 193.2621
| 193.2621 Testing transfer hoses. | |
49:3.1.1.2.9.7.18.12 | SECTION 193.2623
| 193.2623 Inspecting LNG storage tanks. | |
49:3.1.1.2.9.7.18.13 | SECTION 193.2625
| 193.2625 Corrosion protection. | |
49:3.1.1.2.9.7.18.14 | SECTION 193.2627
| 193.2627 Atmospheric corrosion control. | |
49:3.1.1.2.9.7.18.15 | SECTION 193.2629
| 193.2629 External corrosion control: buried or submerged components. | |
49:3.1.1.2.9.7.18.16 | SECTION 193.2631
| 193.2631 Internal corrosion control. | |
49:3.1.1.2.9.7.18.17 | SECTION 193.2633
| 193.2633 Interference currents. | |
49:3.1.1.2.9.7.18.18 | SECTION 193.2635
| 193.2635 Monitoring corrosion control. | |
49:3.1.1.2.9.7.18.19 | SECTION 193.2637
| 193.2637 Remedial measures. | |
49:3.1.1.2.9.7.18.20 | SECTION 193.2639
| 193.2639 Maintenance records. | |
49:3.1.1.2.9.8 | SUBPART H
| Subpart H - Personnel Qualifications and Training | |
49:3.1.1.2.9.8.18.1 | SECTION 193.2701
| 193.2701 Scope. | |
49:3.1.1.2.9.8.18.2 | SECTION 193.2703
| 193.2703 Design and fabrication. | |
49:3.1.1.2.9.8.18.3 | SECTION 193.2705
| 193.2705 Construction, installation, inspection, and testing. | |
49:3.1.1.2.9.8.18.4 | SECTION 193.2707
| 193.2707 Operations and maintenance. | |
49:3.1.1.2.9.8.18.5 | SECTION 193.2709
| 193.2709 Security. | |
49:3.1.1.2.9.8.18.6 | SECTION 193.2711
| 193.2711 Personnel health. | |
49:3.1.1.2.9.8.18.7 | SECTION 193.2713
| 193.2713 Training: operations and maintenance. | |
49:3.1.1.2.9.8.18.8 | SECTION 193.2715
| 193.2715 Training: security. | |
49:3.1.1.2.9.8.18.9 | SECTION 193.2717
| 193.2717 Training: fire protection. | |
49:3.1.1.2.9.8.18.10 | SECTION 193.2719
| 193.2719 Training: records. | |
49:3.1.1.2.9.9 | SUBPART I
| Subpart I - Fire Protection | |
49:3.1.1.2.9.9.18.1 | SECTION 193.2801
| 193.2801 Fire protection. | |
49:3.1.1.2.9.9.18.2 | SECTION 193.2803-193.2821
| 193.2803-193.2821 [Reserved] | |
49:3.1.1.2.9.10 | SUBPART J
| Subpart J - Security | |
49:3.1.1.2.9.10.18.1 | SECTION 193.2901
| 193.2901 Scope. | |
49:3.1.1.2.9.10.18.2 | SECTION 193.2903
| 193.2903 Security procedures. | |
49:3.1.1.2.9.10.18.3 | SECTION 193.2905
| 193.2905 Protective enclosures. | |
49:3.1.1.2.9.10.18.4 | SECTION 193.2907
| 193.2907 Protective enclosure construction. | |
49:3.1.1.2.9.10.18.5 | SECTION 193.2909
| 193.2909 Security communications. | |
49:3.1.1.2.9.10.18.6 | SECTION 193.2911
| 193.2911 Security lighting. | |
49:3.1.1.2.9.10.18.7 | SECTION 193.2913
| 193.2913 Security monitoring. | |
49:3.1.1.2.9.10.18.8 | SECTION 193.2915
| 193.2915 Alternative power sources. | |
49:3.1.1.2.9.10.18.9 | SECTION 193.2917
| 193.2917 Warning signs. | |
49:3.1.1.2.10 | PART 194
| PART 194 - RESPONSE PLANS FOR ONSHORE OIL PIPELINES | |
49:3.1.1.2.10.1 | SUBPART A
| Subpart A - General | |
49:3.1.1.2.10.1.18.1 | SECTION 194.1
| 194.1 Purpose. | |
49:3.1.1.2.10.1.18.2 | SECTION 194.3
| 194.3 Applicability. | |
49:3.1.1.2.10.1.18.3 | SECTION 194.5
| 194.5 Definitions. | |
49:3.1.1.2.10.1.18.4 | SECTION 194.7
| 194.7 Operating restrictions and interim operating authorization. | |
49:3.1.1.2.10.2 | SUBPART B
| Subpart B - Response Plans | |
49:3.1.1.2.10.2.18.1 | SECTION 194.101
| 194.101 Operators required to submit plans. | |
49:3.1.1.2.10.2.18.2 | SECTION 194.103
| 194.103 Significant and substantial harm; operator's statement. | |
49:3.1.1.2.10.2.18.3 | SECTION 194.105
| 194.105 Worst case discharge. | |
49:3.1.1.2.10.2.18.4 | SECTION 194.107
| 194.107 General response plan requirements. | |
49:3.1.1.2.10.2.18.5 | SECTION 194.109
| 194.109 Submission of state response plans. | |
49:3.1.1.2.10.2.18.6 | SECTION 194.111
| 194.111 Response plan retention. | |
49:3.1.1.2.10.2.18.7 | SECTION 194.113
| 194.113 Information summary. | |
49:3.1.1.2.10.2.18.8 | SECTION 194.115
| 194.115 Response resources. | |
49:3.1.1.2.10.2.18.9 | SECTION 194.117
| 194.117 Training. | |
49:3.1.1.2.10.2.18.10 | SECTION 194.119
| 194.119 Submission and approval procedures. | |
49:3.1.1.2.10.2.18.11 | SECTION 194.121
| 194.121 Response plan review and update procedures. | |
49:3.1.1.2.10.3 | SUBPART 0
| | |
49:3.1.1.2.10.4.18.1.20 | APPENDIX Appendix A
| Appendix A to Part 194 - Guidelines for the Preparation of Response Plans | |
49:3.1.1.2.10.4.18.1.21 | APPENDIX Appendix B
| Appendix B to Part 194 - High Volume Areas | |
49:3.1.1.2.11 | PART 195
| PART 195 - TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE | |
49:3.1.1.2.11.1 | SUBPART A
| Subpart A - General | |
49:3.1.1.2.11.1.20.1 | SECTION 195.0
| 195.0 Scope. | |
49:3.1.1.2.11.1.20.2 | SECTION 195.1
| 195.1 Which pipelines are covered by this Part | |
49:3.1.1.2.11.1.20.3 | SECTION 195.2
| 195.2 Definitions. | |
49:3.1.1.2.11.1.20.4 | SECTION 195.3
| 195.3 What documents are incorporated by reference partly or wholly in this part | |
49:3.1.1.2.11.1.20.5 | SECTION 195.4
| 195.4 Compatibility necessary for transportation of hazardous liquids or carbon dioxide. | |
49:3.1.1.2.11.1.20.6 | SECTION 195.5
| 195.5 Conversion to service subject to this part. | |
49:3.1.1.2.11.1.20.7 | SECTION 195.6
| 195.6 Unusually Sensitive Areas (USAs). | |
49:3.1.1.2.11.1.20.8 | SECTION 195.8
| 195.8 Transportation of hazardous liquid or carbon dioxide in pipelines constructed with other than steel pipe. | |
49:3.1.1.2.11.1.20.9 | SECTION 195.9
| 195.9 Outer continental shelf pipelines. | |
49:3.1.1.2.11.1.20.10 | SECTION 195.10
| 195.10 Responsibility of operator for compliance with this part. | |
49:3.1.1.2.11.1.20.11 | SECTION 195.11
| 195.11 What is a regulated rural gathering line and what requirements apply | |
49:3.1.1.2.11.1.20.12 | SECTION 195.12
| 195.12 What requirements apply to low-stress pipelines in rural areas | |
49:3.1.1.2.11.1.20.13 | SECTION 195.13
| 195.13 What requirements apply to pipelines transporting hazardous liquids by gravity | |
49:3.1.1.2.11.1.20.14 | SECTION 195.15
| 195.15 What requirements apply to reporting-regulated-only gathering lines | |
49:3.1.1.2.11.2 | SUBPART B
| Subpart B - Annual, Accident, and Safety-Related Condition Reporting | |
49:3.1.1.2.11.2.20.1 | SECTION 195.48
| 195.48 Scope. | |
49:3.1.1.2.11.2.20.2 | SECTION 195.49
| 195.49 Annual report. | |
49:3.1.1.2.11.2.20.3 | SECTION 195.50
| 195.50 Reporting accidents. | |
49:3.1.1.2.11.2.20.4 | SECTION 195.52
| 195.52 Immediate notice of certain accidents. | |
49:3.1.1.2.11.2.20.5 | SECTION 195.54
| 195.54 Accident reports. | |
49:3.1.1.2.11.2.20.6 | SECTION 195.55
| 195.55 Reporting safety-related conditions. | |
49:3.1.1.2.11.2.20.7 | SECTION 195.56
| 195.56 Filing safety-related condition reports. | |
49:3.1.1.2.11.2.20.8 | SECTION 195.58
| 195.58 Report submission requirements. | |
49:3.1.1.2.11.2.20.9 | SECTION 195.59
| 195.59 Abandonment or deactivation of facilities. | |
49:3.1.1.2.11.2.20.10 | SECTION 195.60
| 195.60 Operator assistance in investigation. | |
49:3.1.1.2.11.2.20.11 | SECTION 195.61
| 195.61 National Pipeline Mapping System. | |
49:3.1.1.2.11.2.20.12 | SECTION 195.63
| 195.63 OMB control number assigned to information collection. | |
49:3.1.1.2.11.2.20.13 | SECTION 195.64
| 195.64 National Registry of Operators. | |
49:3.1.1.2.11.2.20.14 | SECTION 195.65
| 195.65 Safety data sheets. | |
49:3.1.1.2.11.3 | SUBPART C
| Subpart C - Design Requirements | |
49:3.1.1.2.11.3.20.1 | SECTION 195.100
| 195.100 Scope. | |
49:3.1.1.2.11.3.20.2 | SECTION 195.101
| 195.101 Qualifying metallic components other than pipe. | |
49:3.1.1.2.11.3.20.3 | SECTION 195.102
| 195.102 Design temperature. | |
49:3.1.1.2.11.3.20.4 | SECTION 195.104
| 195.104 Variations in pressure. | |
49:3.1.1.2.11.3.20.5 | SECTION 195.106
| 195.106 Internal design pressure. | |
49:3.1.1.2.11.3.20.6 | SECTION 195.108
| 195.108 External pressure. | |
49:3.1.1.2.11.3.20.7 | SECTION 195.110
| 195.110 External loads. | |
49:3.1.1.2.11.3.20.8 | SECTION 195.111
| 195.111 Fracture propagation. | |
49:3.1.1.2.11.3.20.9 | SECTION 195.112
| 195.112 New pipe. | |
49:3.1.1.2.11.3.20.10 | SECTION 195.114
| 195.114 Used pipe. | |
49:3.1.1.2.11.3.20.11 | SECTION 195.116
| 195.116 Valves. | |
49:3.1.1.2.11.3.20.12 | SECTION 195.118
| 195.118 Fittings. | |
49:3.1.1.2.11.3.20.13 | SECTION 195.120
| 195.120 Passage of internal inspection devices. | |
49:3.1.1.2.11.3.20.14 | SECTION 195.122
| 195.122 Fabricated branch connections. | |
49:3.1.1.2.11.3.20.15 | SECTION 195.124
| 195.124 Closures. | |
49:3.1.1.2.11.3.20.16 | SECTION 195.126
| 195.126 Flange connection. | |
49:3.1.1.2.11.3.20.17 | SECTION 195.128
| 195.128 Station piping. | |
49:3.1.1.2.11.3.20.18 | SECTION 195.130
| 195.130 Fabricated assemblies. | |
49:3.1.1.2.11.3.20.19 | SECTION 195.132
| 195.132 Design and construction of aboveground breakout tanks. | |
49:3.1.1.2.11.3.20.20 | SECTION 195.134
| 195.134 Leak detection. | |
49:3.1.1.2.11.4 | SUBPART D
| Subpart D - Construction | |
49:3.1.1.2.11.4.20.1 | SECTION 195.200
| 195.200 Scope. | |
49:3.1.1.2.11.4.20.2 | SECTION 195.202
| 195.202 Compliance with specifications or standards. | |
49:3.1.1.2.11.4.20.3 | SECTION 195.204
| 195.204 Inspection - general. | |
49:3.1.1.2.11.4.20.4 | SECTION 195.205
| 195.205 Repair, alteration and reconstruction of aboveground breakout tanks that have been in service. | |
49:3.1.1.2.11.4.20.5 | SECTION 195.206
| 195.206 Material inspection. | |
49:3.1.1.2.11.4.20.6 | SECTION 195.207
| 195.207 Transportation of pipe. | |
49:3.1.1.2.11.4.20.7 | SECTION 195.208
| 195.208 Welding of supports and braces. | |
49:3.1.1.2.11.4.20.8 | SECTION 195.210
| 195.210 Pipeline location. | |
49:3.1.1.2.11.4.20.9 | SECTION 195.212
| 195.212 Bending of pipe. | |
49:3.1.1.2.11.4.20.10 | SECTION 195.214
| 195.214 Welding procedures. | |
49:3.1.1.2.11.4.20.11 | SECTION 195.216
| 195.216 Welding: Miter joints. | |
49:3.1.1.2.11.4.20.12 | SECTION 195.222
| 195.222 Welders and welding operators: Qualification of welders and welding operators. | |
49:3.1.1.2.11.4.20.13 | SECTION 195.224
| 195.224 Welding: Weather. | |
49:3.1.1.2.11.4.20.14 | SECTION 195.226
| 195.226 Welding: Arc burns. | |
49:3.1.1.2.11.4.20.15 | SECTION 195.228
| 195.228 Welds and welding inspection: Standards of acceptability. | |
49:3.1.1.2.11.4.20.16 | SECTION 195.230
| 195.230 Welds: Repair or removal of defects. | |
49:3.1.1.2.11.4.20.17 | SECTION 195.234
| 195.234 Welds: Nondestructive testing. | |
49:3.1.1.2.11.4.20.18 | SECTION 195.236-195.244
| 195.236-195.244 [Reserved] | |
49:3.1.1.2.11.4.20.19 | SECTION 195.246
| 195.246 Installation of pipe in a ditch. | |
49:3.1.1.2.11.4.20.20 | SECTION 195.248
| 195.248 Cover over buried pipeline. | |
49:3.1.1.2.11.4.20.21 | SECTION 195.250
| 195.250 Clearance between pipe and underground structures. | |
49:3.1.1.2.11.4.20.22 | SECTION 195.252
| 195.252 Backfilling. | |
49:3.1.1.2.11.4.20.23 | SECTION 195.254
| 195.254 Above ground components. | |
49:3.1.1.2.11.4.20.24 | SECTION 195.256
| 195.256 Crossing of railroads and highways. | |
49:3.1.1.2.11.4.20.25 | SECTION 195.258
| 195.258 Valves: General. | |
49:3.1.1.2.11.4.20.26 | SECTION 195.260
| 195.260 Valves: Location. | |
49:3.1.1.2.11.4.20.27 | SECTION 195.262
| 195.262 Pumping equipment. | |
49:3.1.1.2.11.4.20.28 | SECTION 195.264
| 195.264 Impoundment, protection against entry, normal/emergency venting or pressure/vacuum relief for aboveground breakout tanks. | |
49:3.1.1.2.11.4.20.29 | SECTION 195.266
| 195.266 Construction records. | |
49:3.1.1.2.11.5 | SUBPART E
| Subpart E - Pressure Testing | |
49:3.1.1.2.11.5.20.1 | SECTION 195.300
| 195.300 Scope. | |
49:3.1.1.2.11.5.20.2 | SECTION 195.302
| 195.302 General requirements. | |
49:3.1.1.2.11.5.20.3 | SECTION 195.303
| 195.303 Risk-based alternative to pressure testing older hazardous liquid and carbon dioxide pipelines. | |
49:3.1.1.2.11.5.20.4 | SECTION 195.304
| 195.304 Test pressure. | |
49:3.1.1.2.11.5.20.5 | SECTION 195.305
| 195.305 Testing of components. | |
49:3.1.1.2.11.5.20.6 | SECTION 195.306
| 195.306 Test medium. | |
49:3.1.1.2.11.5.20.7 | SECTION 195.307
| 195.307 Pressure testing aboveground breakout tanks. | |
49:3.1.1.2.11.5.20.8 | SECTION 195.308
| 195.308 Testing of tie-ins. | |
49:3.1.1.2.11.5.20.9 | SECTION 195.310
| 195.310 Records. | |
49:3.1.1.2.11.6 | SUBPART F
| Subpart F - Operation and Maintenance | |
49:3.1.1.2.11.6.20 | SUBJGRP 20
| High Consequence Areas | |
49:3.1.1.2.11.6.20.1 | SECTION 195.400
| 195.400 Scope. | |
49:3.1.1.2.11.6.20.2 | SECTION 195.401
| 195.401 General requirements. | |
49:3.1.1.2.11.6.20.3 | SECTION 195.402
| 195.402 Procedural manual for operations, maintenance, and emergencies. | |
49:3.1.1.2.11.6.20.4 | SECTION 195.403
| 195.403 Emergency response training. | |
49:3.1.1.2.11.6.20.5 | SECTION 195.404
| 195.404 Maps and records. | |
49:3.1.1.2.11.6.20.6 | SECTION 195.405
| 195.405 Protection against ignitions and safe access/egress involving floating roofs. | |
49:3.1.1.2.11.6.20.7 | SECTION 195.406
| 195.406 Maximum operating pressure. | |
49:3.1.1.2.11.6.20.8 | SECTION 195.408
| 195.408 Communications. | |
49:3.1.1.2.11.6.20.9 | SECTION 195.410
| 195.410 Line markers. | |
49:3.1.1.2.11.6.20.10 | SECTION 195.412
| 195.412 Inspection of rights-of-way and crossings under navigable waters. | |
49:3.1.1.2.11.6.20.11 | SECTION 195.413
| 195.413 Underwater inspection and reburial of pipelines in the Gulf of Mexico and its inlets. | |
49:3.1.1.2.11.6.20.12 | SECTION 195.414
| 195.414 Inspections of pipelines in areas affected by extreme weather and natural disasters. | |
49:3.1.1.2.11.6.20.13 | SECTION 195.415
| 195.415 [Reserved] | |
49:3.1.1.2.11.6.20.14 | SECTION 195.416
| 195.416 Pipeline assessments. | |
49:3.1.1.2.11.6.20.15 | SECTION 195.417-419
| 195.417-419 [Reserved] | |
49:3.1.1.2.11.6.20.16 | SECTION 195.420
| 195.420 Valve maintenance. | |
49:3.1.1.2.11.6.20.17 | SECTION 195.422
| 195.422 Pipeline repairs. | |
49:3.1.1.2.11.6.20.18 | SECTION 195.424
| 195.424 Pipe movement. | |
49:3.1.1.2.11.6.20.19 | SECTION 195.426
| 195.426 Scraper and sphere facilities. | |
49:3.1.1.2.11.6.20.20 | SECTION 195.428
| 195.428 Overpressure safety devices and overfill protection systems. | |
49:3.1.1.2.11.6.20.21 | SECTION 195.430
| 195.430 Firefighting equipment. | |
49:3.1.1.2.11.6.20.22 | SECTION 195.432
| 195.432 Inspection of in-service breakout tanks. | |
49:3.1.1.2.11.6.20.23 | SECTION 195.434
| 195.434 Signs. | |
49:3.1.1.2.11.6.20.24 | SECTION 195.436
| 195.436 Security of facilities. | |
49:3.1.1.2.11.6.20.25 | SECTION 195.438
| 195.438 Smoking or open flames. | |
49:3.1.1.2.11.6.20.26 | SECTION 195.440
| 195.440 Public awareness. | |
49:3.1.1.2.11.6.20.27 | SECTION 195.442
| 195.442 Damage prevention program. | |
49:3.1.1.2.11.6.20.28 | SECTION 195.444
| 195.444 Leak detection. | |
49:3.1.1.2.11.6.20.29 | SECTION 195.446
| 195.446 Control room management. | |
49:3.1.1.2.11.6.20.30 | SECTION 195.450
| 195.450 Definitions. | |
49:3.1.1.2.11.6.21 | SUBJGRP 21
| Pipeline Integrity Management | |
49:3.1.1.2.11.6.21.31 | SECTION 195.452
| 195.452 Pipeline integrity management in high consequence areas. | |
49:3.1.1.2.11.6.21.32 | SECTION 195.454
| 195.454 Integrity assessments for certain underwater hazardous liquid pipeline facilities located in high consequence areas. | |
49:3.1.1.2.11.7 | SUBPART G
| Subpart G - Qualification of Pipeline Personnel | |
49:3.1.1.2.11.7.22.1 | SECTION 195.501
| 195.501 Scope. | |
49:3.1.1.2.11.7.22.2 | SECTION 195.503
| 195.503 Definitions. | |
49:3.1.1.2.11.7.22.3 | SECTION 195.505
| 195.505 Qualification program. | |
49:3.1.1.2.11.7.22.4 | SECTION 195.507
| 195.507 Recordkeeping. | |
49:3.1.1.2.11.7.22.5 | SECTION 195.509
| 195.509 General. | |
49:3.1.1.2.11.8 | SUBPART H
| Subpart H - Corrosion Control | |
49:3.1.1.2.11.8.22.1 | SECTION 195.551
| 195.551 What do the regulations in this subpart cover | |
49:3.1.1.2.11.8.22.2 | SECTION 195.553
| 195.553 What special definitions apply to this subpart | |
49:3.1.1.2.11.8.22.3 | SECTION 195.555
| 195.555 What are the qualifications for supervisors | |
49:3.1.1.2.11.8.22.4 | SECTION 195.557
| 195.557 Which pipelines must have coating for external corrosion control | |
49:3.1.1.2.11.8.22.5 | SECTION 195.559
| 195.559 What coating material may I use for external corrosion control | |
49:3.1.1.2.11.8.22.6 | SECTION 195.561
| 195.561 When must I inspect pipe coating used for external corrosion control | |
49:3.1.1.2.11.8.22.7 | SECTION 195.563
| 195.563 Which pipelines must have cathodic protection | |
49:3.1.1.2.11.8.22.8 | SECTION 195.565
| 195.565 How do I install cathodic protection on breakout tanks | |
49:3.1.1.2.11.8.22.9 | SECTION 195.567
| 195.567 Which pipelines must have test leads and what must I do to install and maintain the leads | |
49:3.1.1.2.11.8.22.10 | SECTION 195.569
| 195.569 Do I have to examine exposed portions of buried pipelines | |
49:3.1.1.2.11.8.22.11 | SECTION 195.571
| 195.571 What criteria must I use to determine the adequacy of cathodic protection | |
49:3.1.1.2.11.8.22.12 | SECTION 195.573
| 195.573 What must I do to monitor external corrosion control | |
49:3.1.1.2.11.8.22.13 | SECTION 195.575
| 195.575 Which facilities must I electrically isolate and what inspections, tests, and safeguards are required | |
49:3.1.1.2.11.8.22.14 | SECTION 195.577
| 195.577 What must I do to alleviate interference currents | |
49:3.1.1.2.11.8.22.15 | SECTION 195.579
| 195.579 What must I do to mitigate internal corrosion | |
49:3.1.1.2.11.8.22.16 | SECTION 195.581
| 195.581 Which pipelines must I protect against atmospheric corrosion and what coating material may I use | |
49:3.1.1.2.11.8.22.17 | SECTION 195.583
| 195.583 What must I do to monitor atmospheric corrosion control | |
49:3.1.1.2.11.8.22.18 | SECTION 195.585
| 195.585 What must I do to correct corroded pipe | |
49:3.1.1.2.11.8.22.19 | SECTION 195.587
| 195.587 What methods are available to determine the strength of corroded pipe | |
49:3.1.1.2.11.8.22.20 | SECTION 195.588
| 195.588 What standards apply to direct assessment | |
49:3.1.1.2.11.8.22.21 | SECTION 195.589
| 195.589 What corrosion control information do I have to maintain | |
49:3.1.1.2.11.8.22.22 | SECTION 195.591
| 195.591 In-Line inspection of pipelines. | |
49:3.1.1.2.11.9 | SUBPART 0
| | |
49:3.1.1.2.11.10.22.1.22 | APPENDIX Appendix A
| Appendix A to Part 195 - Delineation Between Federal and State Jurisdiction - Statement of Agency Policy and Interpretation | |
49:3.1.1.2.11.10.22.1.23 | APPENDIX Appendix B
| Appendix B to Part 195 - Risk-Based Alternative to Pressure Testing Older Hazardous Liquid and Carbon Dioxide Pipelines | |
49:3.1.1.2.11.10.22.1.24 | APPENDIX Appendix C
| Appendix C to Part 195 - Guidance for Implementation of an Integrity Management Program | |
49:3.1.1.2.12 | PART 196
| PART 196 - PROTECTION OF UNDERGROUND PIPELINES FROM EXCAVATION ACTIVITY | |
49:3.1.1.2.12.1 | SUBPART A
| Subpart A - General | |
49:3.1.1.2.12.1.22.1 | SECTION 196.1
| 196.1 What is the purpose and scope of this part | |
49:3.1.1.2.12.1.22.2 | SECTION 196.3
| 196.3 Definitions. | |
49:3.1.1.2.12.2 | SUBPART B
| Subpart B - Damage Prevention Requirements | |
49:3.1.1.2.12.2.22.1 | SECTION 196.101
| 196.101 What is the purpose and scope of this subpart | |
49:3.1.1.2.12.2.22.2 | SECTION 196.103
| 196.103 What must an excavator do to protect underground pipelines from excavation-related damage | |
49:3.1.1.2.12.2.22.3 | SECTION 196.105
| 196.105 [Reserved] | |
49:3.1.1.2.12.2.22.4 | SECTION 196.107
| 196.107 What must an excavator do if a pipeline is damaged by excavation activity | |
49:3.1.1.2.12.2.22.5 | SECTION 196.109
| 196.109 What must an excavator do if damage to a pipeline from excavation activity causes a leak where product is released from the pipeline | |
49:3.1.1.2.12.2.22.6 | SECTION 196.111
| 196.111 What if a pipeline operator fails to respond to a locate request or fails to accurately locate and mark its pipeline | |
49:3.1.1.2.12.3 | SUBPART C
| Subpart C - Administrative Enforcement Process | |
49:3.1.1.2.12.3.22.1 | SECTION 196.201
| 196.201 What is the purpose and scope of this subpart | |
49:3.1.1.2.12.3.22.2 | SECTION 196.203
| 196.203 What is the administrative process PHMSA will use to conduct enforcement proceedings for alleged violations of excavation damage prevention requirements | |
49:3.1.1.2.12.3.22.3 | SECTION 196.205
| 196.205 Can PHMSA assess administrative civil penalties for violations | |
49:3.1.1.2.12.3.22.4 | SECTION 196.207
| 196.207 What are the maximum administrative civil penalties for violations | |
49:3.1.1.2.12.3.22.5 | SECTION 196.209
| 196.209 May other civil enforcement actions be taken | |
49:3.1.1.2.12.3.22.6 | SECTION 196.211
| 196.211 May criminal penalties be imposed | |
49:3.1.1.2.13 | PART 197
| PART 197 [RESERVED] | |
49:3.1.1.2.14 | PART 198
| PART 198 - REGULATIONS FOR GRANTS TO AID STATE PIPELINE SAFETY PROGRAMS | |
49:3.1.1.2.14.1 | SUBPART A
| Subpart A - General | |
49:3.1.1.2.14.1.22.1 | SECTION 198.1
| 198.1 Scope. | |
49:3.1.1.2.14.1.22.2 | SECTION 198.3
| 198.3 Definitions. | |
49:3.1.1.2.14.2 | SUBPART B
| Subpart B - Grant Allocation | |
49:3.1.1.2.14.2.22.1 | SECTION 198.11
| 198.11 Grant authority. | |
49:3.1.1.2.14.2.22.2 | SECTION 198.13
| 198.13 Grant allocation formula. | |
49:3.1.1.2.14.3 | SUBPART C
| Subpart C - Adoption of One-Call Damage Prevention Program | |
49:3.1.1.2.14.3.22.1 | SECTION 198.31
| 198.31 Scope. | |
49:3.1.1.2.14.3.22.2 | SECTION 198.33
| 198.33 [Reserved] | |
49:3.1.1.2.14.3.22.3 | SECTION 198.35
| 198.35 Grants conditioned on adoption of one-call damage prevention program. | |
49:3.1.1.2.14.3.22.4 | SECTION 198.37
| 198.37 State one-call damage prevention program. | |
49:3.1.1.2.14.3.22.5 | SECTION 198.39
| 198.39 Qualifications for operation of one-call notification system. | |
49:3.1.1.2.14.4 | SUBPART D
| Subpart D - State Damage Prevention Enforcement Programs | |
49:3.1.1.2.14.4.22.1 | SECTION 198.51
| 198.51 What is the purpose and scope of this subpart | |
49:3.1.1.2.14.4.22.2 | SECTION 198.53
| 198.53 When and how will PHMSA evaluate State damage prevention enforcement programs | |
49:3.1.1.2.14.4.22.3 | SECTION 198.55
| 198.55 What criteria will PHMSA use in evaluating the effectiveness of State damage prevention enforcement programs | |
49:3.1.1.2.14.4.22.4 | SECTION 198.57
| 198.57 What is the process PHMSA will use to notify a State that its damage prevention enforcement program appears to be inadequate | |
49:3.1.1.2.14.4.22.5 | SECTION 198.59
| 198.59 How may a State respond to a notice of inadequacy | |
49:3.1.1.2.14.4.22.6 | SECTION 198.61
| 198.61 How is a State notified of PHMSA's final decision | |
49:3.1.1.2.14.4.22.7 | SECTION 198.63
| 198.63 How may a State with an inadequate damage prevention enforcement program seek reconsideration by PHMSA | |
49:3.1.1.2.15 | PART 199
| PART 199 - DRUG AND ALCOHOL TESTING | |
49:3.1.1.2.15.1 | SUBPART A
| Subpart A - General | |
49:3.1.1.2.15.1.22.1 | SECTION 199.1
| 199.1 Scope. | |
49:3.1.1.2.15.1.22.2 | SECTION 199.2
| 199.2 Applicability. | |
49:3.1.1.2.15.1.22.3 | SECTION 199.3
| 199.3 Definitions. | |
49:3.1.1.2.15.1.22.4 | SECTION 199.5
| 199.5 DOT procedures. | |
49:3.1.1.2.15.1.22.5 | SECTION 199.7
| 199.7 Stand-down waivers. | |
49:3.1.1.2.15.1.22.6 | SECTION 199.9
| 199.9 Preemption of State and local laws. | |
49:3.1.1.2.15.2 | SUBPART B
| Subpart B - Drug Testing | |
49:3.1.1.2.15.2.22.1 | SECTION 199.100
| 199.100 Purpose. | |
49:3.1.1.2.15.2.22.2 | SECTION 199.101
| 199.101 Anti-drug plan. | |
49:3.1.1.2.15.2.22.3 | SECTION 199.103
| 199.103 Use of persons who fail or refuse a drug test. | |
49:3.1.1.2.15.2.22.4 | SECTION 199.105
| 199.105 Drug tests required. | |
49:3.1.1.2.15.2.22.5 | SECTION 199.107
| 199.107 Drug testing laboratory. | |
49:3.1.1.2.15.2.22.6 | SECTION 199.109
| 199.109 Review of drug testing results. | |
49:3.1.1.2.15.2.22.7 | SECTION 199.111
| 199.111 [Reserved] | |
49:3.1.1.2.15.2.22.8 | SECTION 199.113
| 199.113 Employee assistance program. | |
49:3.1.1.2.15.2.22.9 | SECTION 199.115
| 199.115 Contractor employees. | |
49:3.1.1.2.15.2.22.10 | SECTION 199.117
| 199.117 Recordkeeping. | |
49:3.1.1.2.15.2.22.11 | SECTION 199.119
| 199.119 Reporting of anti-drug testing results. | |
49:3.1.1.2.15.3 | SUBPART C
| Subpart C - Alcohol Misuse Prevention Program | |
49:3.1.1.2.15.3.22.1 | SECTION 199.200
| 199.200 Purpose. | |
49:3.1.1.2.15.3.22.2 | SECTION 199.201
| 199.201 [Reserved] | |
49:3.1.1.2.15.3.22.3 | SECTION 199.202
| 199.202 Alcohol misuse plan. | |
49:3.1.1.2.15.3.22.4 | SECTION 199.203-199.205
| 199.203-199.205 [Reserved] | |
49:3.1.1.2.15.3.22.5 | SECTION 199.209
| 199.209 Other requirements imposed by operators. | |
49:3.1.1.2.15.3.22.6 | SECTION 199.211
| 199.211 Requirement for notice. | |
49:3.1.1.2.15.3.22.7 | SECTION 199.213
| 199.213 [Reserved] | |
49:3.1.1.2.15.3.22.8 | SECTION 199.215
| 199.215 Alcohol concentration. | |
49:3.1.1.2.15.3.22.9 | SECTION 199.217
| 199.217 On-duty use. | |
49:3.1.1.2.15.3.22.10 | SECTION 199.219
| 199.219 Pre-duty use. | |
49:3.1.1.2.15.3.22.11 | SECTION 199.221
| 199.221 Use following an accident. | |
49:3.1.1.2.15.3.22.12 | SECTION 199.223
| 199.223 Refusal to submit to a required alcohol test. | |
49:3.1.1.2.15.3.22.13 | SECTION 199.225
| 199.225 Alcohol tests required. | |
49:3.1.1.2.15.3.22.14 | SECTION 199.227
| 199.227 Retention of records. | |
49:3.1.1.2.15.3.22.15 | SECTION 199.229
| 199.229 Reporting of alcohol testing results. | |
49:3.1.1.2.15.3.22.16 | SECTION 199.231
| 199.231 Access to facilities and records. | |
49:3.1.1.2.15.3.22.17 | SECTION 199.233
| 199.233 Removal from covered function. | |
49:3.1.1.2.15.3.22.18 | SECTION 199.235
| 199.235 Required evaluation and testing. | |
49:3.1.1.2.15.3.22.19 | SECTION 199.237
| 199.237 Other alcohol-related conduct. | |
49:3.1.1.2.15.3.22.20 | SECTION 199.239
| 199.239 Operator obligation to promulgate a policy on the misuse of alcohol. | |
49:3.1.1.2.15.3.22.21 | SECTION 199.241
| 199.241 Training for supervisors. | |
49:3.1.1.2.15.3.22.22 | SECTION 199.243
| 199.243 Referral, evaluation, and treatment. | |
49:3.1.1.2.15.3.22.23 | SECTION 199.245
| 199.245 Contractor employees. | |