eCFR.io
Daily eCFR

§ 190.401 Scope.

49 CFR 190.401

Citation49 CFR 190.401
CorpusDaily eCFR
Displayed edition2026-10-01
Last updated2026-10-01

§ 190.401 Scope.

If PHMSA conducts a facility design and/or construction safety review or inspection in connection with a proposal to construct, expand, or operate a gas, hazardous liquid or carbon dioxide pipeline facility, or a liquefied natural gas facility that meets the applicability requirements in § 190.403, PHMSA may require the applicant proposing the project to pay the costs incurred by PHMSA relating to such review, including the cost of design and construction safety reviews or inspections.