Title 49
SECTION 193.2621
193.2621 Testing transfer hoses.
§ 193.2621 Testing transfer hoses.Hoses used in LNG or flammable refrigerant transfer systems must be:
(a) Tested once each calendar year, but with intervals not exceeding 15 months, to the maximum pump pressure or relief valve setting; and
(b) Visually inspected for damage or defects before each use.