Title 49

PART 195

Part 195 - Transportation Of Hazardous Liquids By Pipeline

PART 195 - TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Authority:30 U.S.C. 185(w)(3), 49 U.S.C. 5103, 60101 et seq., and 49 CFR 1.97. Source:Amdt. 195-22, 46 FR 38360, July 27, 1981, unless otherwise noted. Editorial Note:Nomenclature changes to part 195 appear at 71 FR 33409, June 9, 2006.

49:3.1.1.2.11.1SUBPART A
Subpart A - General
49:3.1.1.2.11.1.20.1SECTION 195.0
   195.0 Scope.
49:3.1.1.2.11.1.20.2SECTION 195.1
   195.1 Which pipelines are covered by this Part
49:3.1.1.2.11.1.20.3SECTION 195.2
   195.2 Definitions.
49:3.1.1.2.11.1.20.4SECTION 195.3
   195.3 What documents are incorporated by reference partly or wholly in this part
49:3.1.1.2.11.1.20.5SECTION 195.4
   195.4 Compatibility necessary for transportation of hazardous liquids or carbon dioxide.
49:3.1.1.2.11.1.20.6SECTION 195.5
   195.5 Conversion to service subject to this part.
49:3.1.1.2.11.1.20.7SECTION 195.6
   195.6 Unusually Sensitive Areas (USAs).
49:3.1.1.2.11.1.20.8SECTION 195.8
   195.8 Transportation of hazardous liquid or carbon dioxide in pipelines constructed with other than steel pipe.
49:3.1.1.2.11.1.20.9SECTION 195.9
   195.9 Outer continental shelf pipelines.
49:3.1.1.2.11.1.20.10SECTION 195.10
   195.10 Responsibility of operator for compliance with this part.
49:3.1.1.2.11.1.20.11SECTION 195.11
   195.11 What is a regulated rural gathering line and what requirements apply
49:3.1.1.2.11.1.20.12SECTION 195.12
   195.12 What requirements apply to low-stress pipelines in rural areas
49:3.1.1.2.11.1.20.13SECTION 195.13
   195.13 What requirements apply to pipelines transporting hazardous liquids by gravity
49:3.1.1.2.11.1.20.14SECTION 195.15
   195.15 What requirements apply to reporting-regulated-only gathering lines
49:3.1.1.2.11.2SUBPART B
Subpart B - Annual, Accident, and Safety-Related Condition Reporting
49:3.1.1.2.11.2.20.1SECTION 195.48
   195.48 Scope.
49:3.1.1.2.11.2.20.2SECTION 195.49
   195.49 Annual report.
49:3.1.1.2.11.2.20.3SECTION 195.50
   195.50 Reporting accidents.
49:3.1.1.2.11.2.20.4SECTION 195.52
   195.52 Immediate notice of certain accidents.
49:3.1.1.2.11.2.20.5SECTION 195.54
   195.54 Accident reports.
49:3.1.1.2.11.2.20.6SECTION 195.55
   195.55 Reporting safety-related conditions.
49:3.1.1.2.11.2.20.7SECTION 195.56
   195.56 Filing safety-related condition reports.
49:3.1.1.2.11.2.20.8SECTION 195.58
   195.58 Report submission requirements.
49:3.1.1.2.11.2.20.9SECTION 195.59
   195.59 Abandonment or deactivation of facilities.
49:3.1.1.2.11.2.20.10SECTION 195.60
   195.60 Operator assistance in investigation.
49:3.1.1.2.11.2.20.11SECTION 195.61
   195.61 National Pipeline Mapping System.
49:3.1.1.2.11.2.20.12SECTION 195.63
   195.63 OMB control number assigned to information collection.
49:3.1.1.2.11.2.20.13SECTION 195.64
   195.64 National Registry of Operators.
49:3.1.1.2.11.2.20.14SECTION 195.65
   195.65 Safety data sheets.
49:3.1.1.2.11.3SUBPART C
Subpart C - Design Requirements
49:3.1.1.2.11.3.20.1SECTION 195.100
   195.100 Scope.
49:3.1.1.2.11.3.20.2SECTION 195.101
   195.101 Qualifying metallic components other than pipe.
49:3.1.1.2.11.3.20.3SECTION 195.102
   195.102 Design temperature.
49:3.1.1.2.11.3.20.4SECTION 195.104
   195.104 Variations in pressure.
49:3.1.1.2.11.3.20.5SECTION 195.106
   195.106 Internal design pressure.
49:3.1.1.2.11.3.20.6SECTION 195.108
   195.108 External pressure.
49:3.1.1.2.11.3.20.7SECTION 195.110
   195.110 External loads.
49:3.1.1.2.11.3.20.8SECTION 195.111
   195.111 Fracture propagation.
49:3.1.1.2.11.3.20.9SECTION 195.112
   195.112 New pipe.
49:3.1.1.2.11.3.20.10SECTION 195.114
   195.114 Used pipe.
49:3.1.1.2.11.3.20.11SECTION 195.116
   195.116 Valves.
49:3.1.1.2.11.3.20.12SECTION 195.118
   195.118 Fittings.
49:3.1.1.2.11.3.20.13SECTION 195.120
   195.120 Passage of internal inspection devices.
49:3.1.1.2.11.3.20.14SECTION 195.122
   195.122 Fabricated branch connections.
49:3.1.1.2.11.3.20.15SECTION 195.124
   195.124 Closures.
49:3.1.1.2.11.3.20.16SECTION 195.126
   195.126 Flange connection.
49:3.1.1.2.11.3.20.17SECTION 195.128
   195.128 Station piping.
49:3.1.1.2.11.3.20.18SECTION 195.130
   195.130 Fabricated assemblies.
49:3.1.1.2.11.3.20.19SECTION 195.132
   195.132 Design and construction of aboveground breakout tanks.
49:3.1.1.2.11.3.20.20SECTION 195.134
   195.134 Leak detection.
49:3.1.1.2.11.4SUBPART D
Subpart D - Construction
49:3.1.1.2.11.4.20.1SECTION 195.200
   195.200 Scope.
49:3.1.1.2.11.4.20.2SECTION 195.202
   195.202 Compliance with specifications or standards.
49:3.1.1.2.11.4.20.3SECTION 195.204
   195.204 Inspection - general.
49:3.1.1.2.11.4.20.4SECTION 195.205
   195.205 Repair, alteration and reconstruction of aboveground breakout tanks that have been in service.
49:3.1.1.2.11.4.20.5SECTION 195.206
   195.206 Material inspection.
49:3.1.1.2.11.4.20.6SECTION 195.207
   195.207 Transportation of pipe.
49:3.1.1.2.11.4.20.7SECTION 195.208
   195.208 Welding of supports and braces.
49:3.1.1.2.11.4.20.8SECTION 195.210
   195.210 Pipeline location.
49:3.1.1.2.11.4.20.9SECTION 195.212
   195.212 Bending of pipe.
49:3.1.1.2.11.4.20.10SECTION 195.214
   195.214 Welding procedures.
49:3.1.1.2.11.4.20.11SECTION 195.216
   195.216 Welding: Miter joints.
49:3.1.1.2.11.4.20.12SECTION 195.222
   195.222 Welders and welding operators: Qualification of welders and welding operators.
49:3.1.1.2.11.4.20.13SECTION 195.224
   195.224 Welding: Weather.
49:3.1.1.2.11.4.20.14SECTION 195.226
   195.226 Welding: Arc burns.
49:3.1.1.2.11.4.20.15SECTION 195.228
   195.228 Welds and welding inspection: Standards of acceptability.
49:3.1.1.2.11.4.20.16SECTION 195.230
   195.230 Welds: Repair or removal of defects.
49:3.1.1.2.11.4.20.17SECTION 195.234
   195.234 Welds: Nondestructive testing.
49:3.1.1.2.11.4.20.18SECTION 195.236-195.244
   195.236-195.244 [Reserved]
49:3.1.1.2.11.4.20.19SECTION 195.246
   195.246 Installation of pipe in a ditch.
49:3.1.1.2.11.4.20.20SECTION 195.248
   195.248 Cover over buried pipeline.
49:3.1.1.2.11.4.20.21SECTION 195.250
   195.250 Clearance between pipe and underground structures.
49:3.1.1.2.11.4.20.22SECTION 195.252
   195.252 Backfilling.
49:3.1.1.2.11.4.20.23SECTION 195.254
   195.254 Above ground components.
49:3.1.1.2.11.4.20.24SECTION 195.256
   195.256 Crossing of railroads and highways.
49:3.1.1.2.11.4.20.25SECTION 195.258
   195.258 Valves: General.
49:3.1.1.2.11.4.20.26SECTION 195.260
   195.260 Valves: Location.
49:3.1.1.2.11.4.20.27SECTION 195.262
   195.262 Pumping equipment.
49:3.1.1.2.11.4.20.28SECTION 195.264
   195.264 Impoundment, protection against entry, normal/emergency venting or pressure/vacuum relief for aboveground breakout tanks.
49:3.1.1.2.11.4.20.29SECTION 195.266
   195.266 Construction records.
49:3.1.1.2.11.5SUBPART E
Subpart E - Pressure Testing
49:3.1.1.2.11.5.20.1SECTION 195.300
   195.300 Scope.
49:3.1.1.2.11.5.20.2SECTION 195.302
   195.302 General requirements.
49:3.1.1.2.11.5.20.3SECTION 195.303
   195.303 Risk-based alternative to pressure testing older hazardous liquid and carbon dioxide pipelines.
49:3.1.1.2.11.5.20.4SECTION 195.304
   195.304 Test pressure.
49:3.1.1.2.11.5.20.5SECTION 195.305
   195.305 Testing of components.
49:3.1.1.2.11.5.20.6SECTION 195.306
   195.306 Test medium.
49:3.1.1.2.11.5.20.7SECTION 195.307
   195.307 Pressure testing aboveground breakout tanks.
49:3.1.1.2.11.5.20.8SECTION 195.308
   195.308 Testing of tie-ins.
49:3.1.1.2.11.5.20.9SECTION 195.310
   195.310 Records.
49:3.1.1.2.11.6SUBPART F
Subpart F - Operation and Maintenance
49:3.1.1.2.11.6.20SUBJGRP 20
   High Consequence Areas
49:3.1.1.2.11.6.20.1SECTION 195.400
   195.400 Scope.
49:3.1.1.2.11.6.20.2SECTION 195.401
   195.401 General requirements.
49:3.1.1.2.11.6.20.3SECTION 195.402
   195.402 Procedural manual for operations, maintenance, and emergencies.
49:3.1.1.2.11.6.20.4SECTION 195.403
   195.403 Emergency response training.
49:3.1.1.2.11.6.20.5SECTION 195.404
   195.404 Maps and records.
49:3.1.1.2.11.6.20.6SECTION 195.405
   195.405 Protection against ignitions and safe access/egress involving floating roofs.
49:3.1.1.2.11.6.20.7SECTION 195.406
   195.406 Maximum operating pressure.
49:3.1.1.2.11.6.20.8SECTION 195.408
   195.408 Communications.
49:3.1.1.2.11.6.20.9SECTION 195.410
   195.410 Line markers.
49:3.1.1.2.11.6.20.10SECTION 195.412
   195.412 Inspection of rights-of-way and crossings under navigable waters.
49:3.1.1.2.11.6.20.11SECTION 195.413
   195.413 Underwater inspection and reburial of pipelines in the Gulf of Mexico and its inlets.
49:3.1.1.2.11.6.20.12SECTION 195.414
   195.414 Inspections of pipelines in areas affected by extreme weather and natural disasters.
49:3.1.1.2.11.6.20.13SECTION 195.415
   195.415 [Reserved]
49:3.1.1.2.11.6.20.14SECTION 195.416
   195.416 Pipeline assessments.
49:3.1.1.2.11.6.20.15SECTION 195.417-419
   195.417-419 [Reserved]
49:3.1.1.2.11.6.20.16SECTION 195.420
   195.420 Valve maintenance.
49:3.1.1.2.11.6.20.17SECTION 195.422
   195.422 Pipeline repairs.
49:3.1.1.2.11.6.20.18SECTION 195.424
   195.424 Pipe movement.
49:3.1.1.2.11.6.20.19SECTION 195.426
   195.426 Scraper and sphere facilities.
49:3.1.1.2.11.6.20.20SECTION 195.428
   195.428 Overpressure safety devices and overfill protection systems.
49:3.1.1.2.11.6.20.21SECTION 195.430
   195.430 Firefighting equipment.
49:3.1.1.2.11.6.20.22SECTION 195.432
   195.432 Inspection of in-service breakout tanks.
49:3.1.1.2.11.6.20.23SECTION 195.434
   195.434 Signs.
49:3.1.1.2.11.6.20.24SECTION 195.436
   195.436 Security of facilities.
49:3.1.1.2.11.6.20.25SECTION 195.438
   195.438 Smoking or open flames.
49:3.1.1.2.11.6.20.26SECTION 195.440
   195.440 Public awareness.
49:3.1.1.2.11.6.20.27SECTION 195.442
   195.442 Damage prevention program.
49:3.1.1.2.11.6.20.28SECTION 195.444
   195.444 Leak detection.
49:3.1.1.2.11.6.20.29SECTION 195.446
   195.446 Control room management.
49:3.1.1.2.11.6.20.30SECTION 195.450
   195.450 Definitions.
49:3.1.1.2.11.6.21SUBJGRP 21
   Pipeline Integrity Management
49:3.1.1.2.11.6.21.31SECTION 195.452
   195.452 Pipeline integrity management in high consequence areas.
49:3.1.1.2.11.6.21.32SECTION 195.454
   195.454 Integrity assessments for certain underwater hazardous liquid pipeline facilities located in high consequence areas.
49:3.1.1.2.11.7SUBPART G
Subpart G - Qualification of Pipeline Personnel
49:3.1.1.2.11.7.22.1SECTION 195.501
   195.501 Scope.
49:3.1.1.2.11.7.22.2SECTION 195.503
   195.503 Definitions.
49:3.1.1.2.11.7.22.3SECTION 195.505
   195.505 Qualification program.
49:3.1.1.2.11.7.22.4SECTION 195.507
   195.507 Recordkeeping.
49:3.1.1.2.11.7.22.5SECTION 195.509
   195.509 General.
49:3.1.1.2.11.8SUBPART H
Subpart H - Corrosion Control
49:3.1.1.2.11.8.22.1SECTION 195.551
   195.551 What do the regulations in this subpart cover
49:3.1.1.2.11.8.22.2SECTION 195.553
   195.553 What special definitions apply to this subpart
49:3.1.1.2.11.8.22.3SECTION 195.555
   195.555 What are the qualifications for supervisors
49:3.1.1.2.11.8.22.4SECTION 195.557
   195.557 Which pipelines must have coating for external corrosion control
49:3.1.1.2.11.8.22.5SECTION 195.559
   195.559 What coating material may I use for external corrosion control
49:3.1.1.2.11.8.22.6SECTION 195.561
   195.561 When must I inspect pipe coating used for external corrosion control
49:3.1.1.2.11.8.22.7SECTION 195.563
   195.563 Which pipelines must have cathodic protection
49:3.1.1.2.11.8.22.8SECTION 195.565
   195.565 How do I install cathodic protection on breakout tanks
49:3.1.1.2.11.8.22.9SECTION 195.567
   195.567 Which pipelines must have test leads and what must I do to install and maintain the leads
49:3.1.1.2.11.8.22.10SECTION 195.569
   195.569 Do I have to examine exposed portions of buried pipelines
49:3.1.1.2.11.8.22.11SECTION 195.571
   195.571 What criteria must I use to determine the adequacy of cathodic protection
49:3.1.1.2.11.8.22.12SECTION 195.573
   195.573 What must I do to monitor external corrosion control
49:3.1.1.2.11.8.22.13SECTION 195.575
   195.575 Which facilities must I electrically isolate and what inspections, tests, and safeguards are required
49:3.1.1.2.11.8.22.14SECTION 195.577
   195.577 What must I do to alleviate interference currents
49:3.1.1.2.11.8.22.15SECTION 195.579
   195.579 What must I do to mitigate internal corrosion
49:3.1.1.2.11.8.22.16SECTION 195.581
   195.581 Which pipelines must I protect against atmospheric corrosion and what coating material may I use
49:3.1.1.2.11.8.22.17SECTION 195.583
   195.583 What must I do to monitor atmospheric corrosion control
49:3.1.1.2.11.8.22.18SECTION 195.585
   195.585 What must I do to correct corroded pipe
49:3.1.1.2.11.8.22.19SECTION 195.587
   195.587 What methods are available to determine the strength of corroded pipe
49:3.1.1.2.11.8.22.20SECTION 195.588
   195.588 What standards apply to direct assessment
49:3.1.1.2.11.8.22.21SECTION 195.589
   195.589 What corrosion control information do I have to maintain
49:3.1.1.2.11.8.22.22SECTION 195.591
   195.591 In-Line inspection of pipelines.
49:3.1.1.2.11.9SUBPART 0
49:3.1.1.2.11.10.22.1.22APPENDIX Appendix A
   Appendix A to Part 195 - Delineation Between Federal and State Jurisdiction - Statement of Agency Policy and Interpretation
49:3.1.1.2.11.10.22.1.23APPENDIX Appendix B
   Appendix B to Part 195 - Risk-Based Alternative to Pressure Testing Older Hazardous Liquid and Carbon Dioxide Pipelines
49:3.1.1.2.11.10.22.1.24APPENDIX Appendix C
   Appendix C to Part 195 - Guidance for Implementation of an Integrity Management Program