eCFR.io
Daily eCFR

§ 195.9 Outer continental shelf pipelines.

49 CFR 195.9

Citation49 CFR 195.9
CorpusDaily eCFR
Displayed edition2026-06-26
Last updated2026-06-26

§ 195.9 Outer continental shelf pipelines.

Link to an amendment published at 91 FR 22060, Apr. 24, 2026.

Operators of transportation pipelines on the Outer Continental Shelf must identify on all their respective pipelines the specific points at which operating responsibility transfers to a producing operator. For those instances in which the transfer points are not identifiable by a durable marking, each operator will have until September 15, 1998 to identify the transfer points. If it is not practicable to durably mark a transfer point and the transfer point is located above water, the operator must depict the transfer point on a schematic maintained near the transfer point. If a transfer point is located subsea, the operator must identify the transfer point on a schematic which must be maintained at the nearest upstream facility and provided to PHMSA upon request. For those cases in which adjoining operators have not agreed on a transfer point by September 15, 1998 the Regional Director and the MMS Regional Supervisor will make a joint determination of the transfer point.

[Amdt. 195-59, 62 FR 61695, Nov. 19, 1997, as amended at 70 FR 11140, Mar. 8, 2005]