Title 49
PART 192 SUBPART P
Subpart P - Gas Distribution Pipeline Integrity Management (IM)
- 30 U.S.C. 185(w)(3), 49 U.S.C. 5103, 60101 et. seq., and 49 CFR 1.97.
- Source: 35 FR 13257, Aug. 19, 1970, unless otherwise noted.
49:3.1.1.2.8.16.8.1 | SECTION 192.1001 | 192.1001 What definitions apply to this subpart | |
49:3.1.1.2.8.16.8.2 | SECTION 192.1003 | 192.1003 What do the regulations in this subpart cover | |
49:3.1.1.2.8.16.8.3 | SECTION 192.1005 | 192.1005 What must a gas distribution operator (other than a master meter or small LPG operator) do to implement this subpart | |
49:3.1.1.2.8.16.8.4 | SECTION 192.1007 | 192.1007 What are the required elements of an integrity management plan | |
49:3.1.1.2.8.16.8.5 | SECTION 192.1009 | 192.1009 What must an operator report when a mechanical fitting fails | |
49:3.1.1.2.8.16.8.6 | SECTION 192.1011 | 192.1011 What records must an operator keep | |
49:3.1.1.2.8.16.8.7 | SECTION 192.1013 | 192.1013 When may an operator deviate from required periodic inspections under this part | |
49:3.1.1.2.8.16.8.8 | SECTION 192.1015 | 192.1015 What must a master meter or small liquefied petroleum gas (LPG) operator do to implement this subpart |