49:3.1.1.2.8.13.8.1 | SECTION 192.701
| 192.701 Scope. | |
49:3.1.1.2.8.13.8.2 | SECTION 192.703
| 192.703 General. | |
49:3.1.1.2.8.13.8.3 | SECTION 192.705
| 192.705 Transmission lines: Patrolling. | |
49:3.1.1.2.8.13.8.4 | SECTION 192.706
| 192.706 Transmission lines: Leakage surveys. | |
49:3.1.1.2.8.13.8.5 | SECTION 192.707
| 192.707 Line markers for mains and transmission lines. | |
49:3.1.1.2.8.13.8.6 | SECTION 192.709
| 192.709 Transmission lines: Record keeping. | |
49:3.1.1.2.8.13.8.7 | SECTION 192.710
| 192.710 Transmission lines: Assessments outside of high consequence areas. | |
49:3.1.1.2.8.13.8.8 | SECTION 192.711
| 192.711 Transmission lines: General requirements for repair procedures. | |
49:3.1.1.2.8.13.8.9 | SECTION 192.712
| 192.712 Analysis of predicted failure pressure. | |
49:3.1.1.2.8.13.8.10 | SECTION 192.713
| 192.713 Transmission lines: Permanent field repair of imperfections and damages. | |
49:3.1.1.2.8.13.8.11 | SECTION 192.715
| 192.715 Transmission lines: Permanent field repair of welds. | |
49:3.1.1.2.8.13.8.12 | SECTION 192.717
| 192.717 Transmission lines: Permanent field repair of leaks. | |
49:3.1.1.2.8.13.8.13 | SECTION 192.719
| 192.719 Transmission lines: Testing of repairs. | |
49:3.1.1.2.8.13.8.14 | SECTION 192.720
| 192.720 Distribution systems: Leak repair. | |
49:3.1.1.2.8.13.8.15 | SECTION 192.721
| 192.721 Distribution systems: Patrolling. | |
49:3.1.1.2.8.13.8.16 | SECTION 192.723
| 192.723 Distribution systems: Leakage surveys. | |
49:3.1.1.2.8.13.8.17 | SECTION 192.725
| 192.725 Test requirements for reinstating service lines. | |
49:3.1.1.2.8.13.8.18 | SECTION 192.727
| 192.727 Abandonment or deactivation of facilities. | |
49:3.1.1.2.8.13.8.19 | SECTION 192.731
| 192.731 Compressor stations: Inspection and testing of relief devices. | |
49:3.1.1.2.8.13.8.20 | SECTION 192.735
| 192.735 Compressor stations: Storage of combustible materials. | |
49:3.1.1.2.8.13.8.21 | SECTION 192.736
| 192.736 Compressor stations: Gas detection. | |
49:3.1.1.2.8.13.8.22 | SECTION 192.739
| 192.739 Pressure limiting and regulating stations: Inspection and testing. | |
49:3.1.1.2.8.13.8.23 | SECTION 192.740
| 192.740 Pressure regulating, limiting, and overpressure protection - Individual service lines directly connected to production, gathering, or transmission pipelines. | |
49:3.1.1.2.8.13.8.24 | SECTION 192.741
| 192.741 Pressure limiting and regulating stations: Telemetering or recording gauges. | |
49:3.1.1.2.8.13.8.25 | SECTION 192.743
| 192.743 Pressure limiting and regulating stations: Capacity of relief devices. | |
49:3.1.1.2.8.13.8.26 | SECTION 192.745
| 192.745 Valve maintenance: Transmission lines. | |
49:3.1.1.2.8.13.8.27 | SECTION 192.747
| 192.747 Valve maintenance: Distribution systems. | |
49:3.1.1.2.8.13.8.28 | SECTION 192.749
| 192.749 Vault maintenance. | |
49:3.1.1.2.8.13.8.29 | SECTION 192.750
| 192.750 Launcher and receiver safety. | |
49:3.1.1.2.8.13.8.30 | SECTION 192.751
| 192.751 Prevention of accidental ignition. | |
49:3.1.1.2.8.13.8.31 | SECTION 192.753
| 192.753 Caulked bell and spigot joints. | |
49:3.1.1.2.8.13.8.32 | SECTION 192.755
| 192.755 Protecting cast-iron pipelines. | |
49:3.1.1.2.8.13.8.33 | SECTION 192.756
| 192.756 Joining plastic pipe by heat fusion; equipment maintenance and calibration. | |