Title 30

Volume 2 CHAPTER V SUBCHAP B

Subchapter B - Offshore

30:2.0.3.5.2PART 550
PART 550 - OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
30:2.0.3.5.2.1SUBPART A
Subpart A - General
30:2.0.3.5.2.1.158SUBJGRP 158
  Authority and Definition of Terms
30:2.0.3.5.2.1.158.1SECTION 550.101
     550.101 Authority and applicability.
30:2.0.3.5.2.1.158.2SECTION 550.102
     550.102 What does this part do
30:2.0.3.5.2.1.158.3SECTION 550.103
     550.103 Where can I find more information about the requirements in this part
30:2.0.3.5.2.1.158.4SECTION 550.104
     550.104 How may I appeal a decision made under BOEM regulations
30:2.0.3.5.2.1.158.5SECTION 550.105
     550.105 Definitions.
30:2.0.3.5.2.1.159SUBJGRP 159
  Performance Standards
30:2.0.3.5.2.1.159.6SECTION 550.115
     550.115 How do I determine well producibility
30:2.0.3.5.2.1.159.7SECTION 550.116
     550.116 How do I determine producibility if my well is in the Gulf of Mexico
30:2.0.3.5.2.1.159.8SECTION 550.117
     550.117 How does a determination of well producibility affect royalty status
30:2.0.3.5.2.1.159.9SECTION 550.118
     550.118 [Reserved]
30:2.0.3.5.2.1.159.10SECTION 550.119
     550.119 Will BOEM approve subsurface gas storage
30:2.0.3.5.2.1.159.11SECTION 550.120
     550.120 What standards will BOEM use to regulate leases, rights-of-use and easement, and rights-of-way
30:2.0.3.5.2.1.159.12SECTION 550.121
     550.121 What must I do to protect health, safety, property, and the environment
30:2.0.3.5.2.1.159.13SECTION 550.122
     550.122 What effect does subsurface storage have on the lease term
30:2.0.3.5.2.1.159.14SECTION 550.123
     550.123 Will BOEM allow gas storage on unleased lands
30:2.0.3.5.2.1.160SUBJGRP 160
  Fees
30:2.0.3.5.2.1.160.15SECTION 550.125
     550.125 Service fees.
30:2.0.3.5.2.1.160.16SECTION 550.126
     550.126 Electronic payment instructions.
30:2.0.3.5.2.1.161SUBJGRP 161
  Inspection of Operations
30:2.0.3.5.2.1.161.17SECTION 550.130
     550.130 [Reserved]
30:2.0.3.5.2.1.162SUBJGRP 162
  Disqualification
30:2.0.3.5.2.1.162.18SECTION 550.135
     550.135 What will BOEM do if my operating performance is unacceptable
30:2.0.3.5.2.1.162.19SECTION 550.136
     550.136 How will BOEM determine if my performance is unacceptable
30:2.0.3.5.2.1.163SUBJGRP 163
  Special Types of Approvals
30:2.0.3.5.2.1.163.20SECTION 550.140
     550.140 When will I receive an oral approval
30:2.0.3.5.2.1.163.21SECTION 550.141
     550.141 May I ever use alternate procedures or equipment
30:2.0.3.5.2.1.163.22SECTION 550.142
     550.142 How do I receive approval for departures
30:2.0.3.5.2.1.163.23SECTION 550.143
     550.143 How do I designate an operator
30:2.0.3.5.2.1.163.24SECTION 550.144
     550.144 How do I designate a new operator when a designation of operator terminates
30:2.0.3.5.2.1.163.25SECTION 550.146
     550.146 How do I designate an agent or a local agent
30:2.0.3.5.2.1.163.26SECTION 550.147
     550.147 Who is responsible for fulfilling leasehold obligations
30:2.0.3.5.2.1.164SUBJGRP 164
  Right-of-Use and Easement
30:2.0.3.5.2.1.164.27SECTION 550.160
     550.160 When will BOEM grant me a right-of-use and easement, and what requirements must I meet
30:2.0.3.5.2.1.164.28SECTION 550.161
     550.161 What else must I submit with my application
30:2.0.3.5.2.1.164.29SECTION 550.162
     550.162 May I continue my right-of-use and easement after the termination of any lease on which it is situated
30:2.0.3.5.2.1.164.30SECTION 550.163
     550.163 If I have a State lease, will BOEM grant me a right-of-use and easement
30:2.0.3.5.2.1.164.31SECTION 550.164
     550.164 If I have a State lease, what conditions apply for a right-of-use and easement
30:2.0.3.5.2.1.164.32SECTION 550.165
     550.165 If I have a State lease, what fees do I have to pay for a right-of-use and easement
30:2.0.3.5.2.1.164.33SECTION 550.166
     550.166 If I have a State lease, what surety bond must I have for a right-of-use and easement
30:2.0.3.5.2.1.165SUBJGRP 165
  Primary Lease Requirements, Lease Term Extensions, and Lease Cancellations
30:2.0.3.5.2.1.165.34SECTION 550.181
     550.181 When may the Secretary cancel my lease and when am I compensated for cancellation
30:2.0.3.5.2.1.165.35SECTION 550.182
     550.182 When may the Secretary cancel a lease at the exploration stage
30:2.0.3.5.2.1.165.36SECTION 550.183
     550.183 When may BOEM or the Secretary extend or cancel a lease at the development and production stage
30:2.0.3.5.2.1.165.37SECTION 550.184
     550.184 What is the amount of compensation for lease cancellation
30:2.0.3.5.2.1.165.38SECTION 550.185
     550.185 When is there no compensation for a lease cancellation
30:2.0.3.5.2.1.166SUBJGRP 166
  Information and Reporting Requirements
30:2.0.3.5.2.1.166.39SECTION 550.186
     550.186 What reporting information and report forms must I submit
30:2.0.3.5.2.1.166.40SECTION 550.187-550.193
     550.187-550.193 [Reserved]
30:2.0.3.5.2.1.166.41SECTION 550.194
     550.194 How must I protect archaeological resources
30:2.0.3.5.2.1.166.42SECTION 550.195
     550.195 [Reserved]
30:2.0.3.5.2.1.166.43SECTION 550.196
     550.196 Reimbursements for reproduction and processing costs.
30:2.0.3.5.2.1.166.44SECTION 550.197
     550.197 Data and information to be made available to the public or for limited inspection.
30:2.0.3.5.2.1.167SUBJGRP 167
  References
30:2.0.3.5.2.1.167.45SECTION 550.198
     550.198 [Reserved]
30:2.0.3.5.2.1.167.46SECTION 550.199
     550.199 Paperwork Reduction Act statements - information collection.
30:2.0.3.5.2.2SUBPART B
Subpart B - Plans and Information
30:2.0.3.5.2.2.168SUBJGRP 168
  General Information
30:2.0.3.5.2.2.168.1SECTION 550.200
     550.200 Definitions.
30:2.0.3.5.2.2.168.2SECTION 550.201
     550.201 What plans and information must I submit before I conduct any activities on my lease or unit
30:2.0.3.5.2.2.168.3SECTION 550.202
     550.202 What criteria must the Exploration Plan (EP), Development and Production Plan (DPP), or Development Operations Coordination Document (DOCD) meet
30:2.0.3.5.2.2.168.4SECTION 550.203
     550.203 Where can wells be located under an EP, DPP, or DOCD
30:2.0.3.5.2.2.168.5SECTION 550.204
     550.204 When must I submit my IOP for proposed Arctic exploratory drilling operations and what must the IOP include
30:2.0.3.5.2.2.168.6SECTION 550.205
     550.205 [Reserved]
30:2.0.3.5.2.2.168.7SECTION 550.206
     550.206 How do I submit the IOP, EP, DPP, or DOCD
30:2.0.3.5.2.2.169SUBJGRP 169
  Ancillary Activities
30:2.0.3.5.2.2.169.8SECTION 550.207
     550.207 What ancillary activities may I conduct
30:2.0.3.5.2.2.169.9SECTION 550.208
     550.208 If I conduct ancillary activities, what notices must I provide
30:2.0.3.5.2.2.169.10SECTION 550.209
     550.209 What is the BOEM review process for the notice
30:2.0.3.5.2.2.169.11SECTION 550.210
     550.210 If I conduct ancillary activities, what reporting and data/information retention requirements must I satisfy
30:2.0.3.5.2.2.170SUBJGRP 170
  Contents of Exploration Plans (EP)
30:2.0.3.5.2.2.170.12SECTION 550.211
     550.211 What must the EP include
30:2.0.3.5.2.2.170.13SECTION 550.212
     550.212 What information must accompany the EP
30:2.0.3.5.2.2.170.14SECTION 550.213
     550.213 What general information must accompany the EP
30:2.0.3.5.2.2.170.15SECTION 550.214
     550.214 What geological and geophysical (G&G) information must accompany the EP
30:2.0.3.5.2.2.170.16SECTION 550.215
     550.215 What hydrogen sulfide (H2S) information must accompany the EP
30:2.0.3.5.2.2.170.17SECTION 550.216
     550.216 What biological, physical, and socioeconomic information must accompany the EP
30:2.0.3.5.2.2.170.18SECTION 550.217
     550.217 What solid and liquid wastes and discharges information and cooling water intake information must accompany the EP
30:2.0.3.5.2.2.170.19SECTION 550.218
     550.218 What air emissions information must accompany the EP
30:2.0.3.5.2.2.170.20SECTION 550.219
     550.219 What oil and hazardous substance spills information must accompany the EP
30:2.0.3.5.2.2.170.21SECTION 550.220
     550.220 If I propose activities in the Alaska OCS Region, what planning information must accompany the EP
30:2.0.3.5.2.2.170.22SECTION 550.221
     550.221 What environmental monitoring information must accompany the EP
30:2.0.3.5.2.2.170.23SECTION 550.222
     550.222 What lease stipulations information must accompany the EP
30:2.0.3.5.2.2.170.24SECTION 550.223
     550.223 What mitigation measures information must accompany the EP
30:2.0.3.5.2.2.170.25SECTION 550.224
     550.224 What information on support vessels, offshore vehicles, and aircraft you will use must accompany the EP
30:2.0.3.5.2.2.170.26SECTION 550.225
     550.225 What information on the onshore support facilities you will use must accompany the EP
30:2.0.3.5.2.2.170.27SECTION 550.226
     550.226 What Coastal Zone Management Act (CZMA) information must accompany the EP
30:2.0.3.5.2.2.170.28SECTION 550.227
     550.227 What environmental impact analysis (EIA) information must accompany the EP
30:2.0.3.5.2.2.170.29SECTION 550.228
     550.228 What administrative information must accompany the EP
30:2.0.3.5.2.2.171SUBJGRP 171
  Review and Decision Process for the EP
30:2.0.3.5.2.2.171.30SECTION 550.231
     550.231 After receiving the EP, what will BOEM do
30:2.0.3.5.2.2.171.31SECTION 550.232
     550.232 What actions will BOEM take after the EP is deemed submitted
30:2.0.3.5.2.2.171.32SECTION 550.233
     550.233 What decisions will BOEM make on the EP and within what timeframe
30:2.0.3.5.2.2.171.33SECTION 550.234
     550.234 How do I submit a modified EP or resubmit a disapproved EP, and when will BOEM make a decision
30:2.0.3.5.2.2.171.34SECTION 550.235
     550.235 If a State objects to the EP's coastal zone consistency certification, what can I do
30:2.0.3.5.2.2.172SUBJGRP 172
  Contents of Development and Production Plans (DPP) and Development Operations Coordination Documents (DOCD)
30:2.0.3.5.2.2.172.35SECTION 550.241
     550.241 What must the DPP or DOCD include
30:2.0.3.5.2.2.172.36SECTION 550.242
     550.242 What information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.37SECTION 550.243
     550.243 What general information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.38SECTION 550.244
     550.244 What geological and geophysical (G&G) information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.39SECTION 550.245
     550.245 What hydrogen sulfide (H2S) information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.40SECTION 550.246
     550.246 What mineral resource conservation information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.41SECTION 550.247
     550.247 What biological, physical, and socioeconomic information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.42SECTION 550.248
     550.248 What solid and liquid wastes and discharges information and cooling water intake information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.43SECTION 550.249
     550.249 What air emissions information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.44SECTION 550.250
     550.250 What oil and hazardous substance spills information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.45SECTION 550.251
     550.251 If I propose activities in the Alaska OCS Region, what planning information must accompany the DPP
30:2.0.3.5.2.2.172.46SECTION 550.252
     550.252 What environmental monitoring information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.47SECTION 550.253
     550.253 What lease stipulations information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.48SECTION 550.254
     550.254 What mitigation measures information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.49SECTION 550.255
     550.255 What decommissioning information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.50SECTION 550.256
     550.256 What related facilities and operations information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.51SECTION 550.257
     550.257 What information on the support vessels, offshore vehicles, and aircraft you will use must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.52SECTION 550.258
     550.258 What information on the onshore support facilities you will use must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.53SECTION 550.259
     550.259 What sulphur operations information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.54SECTION 550.260
     550.260 What Coastal Zone Management Act (CZMA) information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.55SECTION 550.261
     550.261 What environmental impact analysis (EIA) information must accompany the DPP or DOCD
30:2.0.3.5.2.2.172.56SECTION 550.262
     550.262 What administrative information must accompany the DPP or DOCD
30:2.0.3.5.2.2.173SUBJGRP 173
  Review and Decision Process for the DPP or DOCD
30:2.0.3.5.2.2.173.57SECTION 550.266
     550.266 After receiving the DPP or DOCD, what will BOEM do
30:2.0.3.5.2.2.173.58SECTION 550.267
     550.267 What actions will BOEM take after the DPP or DOCD is deemed submitted
30:2.0.3.5.2.2.173.59SECTION 550.268
     550.268 How does BOEM respond to recommendations
30:2.0.3.5.2.2.173.60SECTION 550.269
     550.269 How will BOEM evaluate the environmental impacts of the DPP or DOCD
30:2.0.3.5.2.2.173.61SECTION 550.270
     550.270 What decisions will BOEM make on the DPP or DOCD and within what timeframe
30:2.0.3.5.2.2.173.62SECTION 550.271
     550.271 For what reasons will BOEM disapprove the DPP or DOCD
30:2.0.3.5.2.2.173.63SECTION 550.272
     550.272 If a State objects to the DPP's or DOCD's coastal zone consistency certification, what can I do
30:2.0.3.5.2.2.173.64SECTION 550.273
     550.273 How do I submit a modified DPP or DOCD or resubmit a disapproved DPP or DOCD
30:2.0.3.5.2.2.174SUBJGRP 174
  Post-Approval Requirements for the EP, DPP, and DOCD
30:2.0.3.5.2.2.174.65SECTION 550.280
     550.280 How must I conduct activities under the approved EP, DPP, or DOCD
30:2.0.3.5.2.2.174.66SECTION 550.281
     550.281 What must I do to conduct activities under the approved EP, DPP, or DOCD
30:2.0.3.5.2.2.174.67SECTION 550.282
     550.282 Do I have to conduct post-approval monitoring
30:2.0.3.5.2.2.174.68SECTION 550.283
     550.283 When must I revise or supplement the approved EP, DPP, or DOCD
30:2.0.3.5.2.2.174.69SECTION 550.284
     550.284 How will BOEM require revisions to the approved EP, DPP, or DOCD
30:2.0.3.5.2.2.174.70SECTION 550.285
     550.285 How do I submit revised and supplemental EPs, DPPs, and DOCDs
30:2.0.3.5.2.2.174.71SECTION 550.286-550.295
     550.286-550.295 [Reserved]
30:2.0.3.5.2.2.175SUBJGRP 175
  Conservation Information Documents (CID)
30:2.0.3.5.2.2.175.72SECTION 550.296
     550.296 When and how must I submit a CID or a revision to a CID
30:2.0.3.5.2.2.175.73SECTION 550.297
     550.297 What information must a CID contain
30:2.0.3.5.2.2.175.74SECTION 550.298
     550.298 How long will BOEM take to evaluate and make a decision on the CID
30:2.0.3.5.2.2.175.75SECTION 550.299
     550.299 What operations require approval of the CID
30:2.0.3.5.2.3SUBPART C
Subpart C - Pollution Prevention and Control
30:2.0.3.5.2.3.176.1SECTION 550.300-550.301
     550.300-550.301 [Reserved]
30:2.0.3.5.2.3.176.2SECTION 550.302
     550.302 Definitions concerning air quality.
30:2.0.3.5.2.3.176.3SECTION 550.303
     550.303 Facilities described in a new or revised Exploration Plan, Development and Production Plan, or Development Operations Coordination Document.
30:2.0.3.5.2.3.176.4SECTION 550.304
     550.304 Existing facilities.
30:2.0.3.5.2.4SUBPART D
Subpart D - Leasing Maps and Diagrams
30:2.0.3.5.2.4.176.1SECTION 550.400
     550.400 Leasing maps and diagrams.
30:2.0.3.5.2.5SUBPART E
Subparts E-I [Reserved]
30:2.0.3.5.2.6SUBPART J
Subpart J - Pipelines and Pipeline Rights-of-Way
30:2.0.3.5.2.6.176.1SECTION 550.1011
     550.1011 Bond requirements for pipeline right-of-way holders.
30:2.0.3.5.2.7SUBPART K
Subpart K - Oil and Gas Production Requirements.
30:2.0.3.5.2.7.176SUBJGRP 176
  Well Tests and Surveys
30:2.0.3.5.2.7.176.1SECTION 550.1153
     550.1153 When must I conduct a static bottomhole pressure survey
30:2.0.3.5.2.7.177SUBJGRP 177
  Classifying Reservoirs
30:2.0.3.5.2.7.177.2SECTION 550.1154
     550.1154 How do I determine if my reservoir is sensitive
30:2.0.3.5.2.7.177.3SECTION 550.1155
     550.1155 What information must I submit for sensitive reservoirs
30:2.0.3.5.2.7.178SUBJGRP 178
  Other Requirements
30:2.0.3.5.2.7.178.4SECTION 550.1165
     550.1165 What must I do for enhanced recovery operations
30:2.0.3.5.2.7.178.5SECTION 550.1166
     550.1166 What additional reporting is required for developments in the Alaska OCS Region
30:2.0.3.5.2.7.178.6SECTION 550.1167
     550.1167 What information must I submit with forms and for approvals
30:2.0.3.5.2.8SUBPART L
Subparts L-M [Reserved]
30:2.0.3.5.2.9SUBPART N
Subpart N - Outer Continental Shelf Civil Penalties
30:2.0.3.5.2.9.179SUBJGRP 179
  Outer Continental Shelf Lands Act Civil Penalties
30:2.0.3.5.2.9.179.1SECTION 550.1400
     550.1400 How does BOEM begin the civil penalty process
30:2.0.3.5.2.9.179.2SECTION 550.1401
     550.1401 Index table.
30:2.0.3.5.2.9.179.3SECTION 550.1402
     550.1402 Definitions.
30:2.0.3.5.2.9.179.4SECTION 550.1403
     550.1403 What is the maximum civil penalty
30:2.0.3.5.2.9.179.5SECTION 550.1404
     550.1404 Which violations will BOEM review for potential civil penalties
30:2.0.3.5.2.9.179.6SECTION 550.1405
     550.1405 When is a case file developed
30:2.0.3.5.2.9.179.7SECTION 550.1406
     550.1406 When will BOEM notify me and provide penalty information
30:2.0.3.5.2.9.179.8SECTION 550.1407
     550.1407 How do I respond to the letter of notification
30:2.0.3.5.2.9.179.9SECTION 550.1408
     550.1408 When will I be notified of the Reviewing Officer's decision
30:2.0.3.5.2.9.179.10SECTION 550.1409
     550.1409 What are my appeal rights
30:2.0.3.5.2.9.180SUBJGRP 180
  Federal Oil and Gas Royalty Management Act Civil Penalties Definitions
30:2.0.3.5.2.9.180.11SECTION 550.1450
     550.1450 What definitions apply to this subpart
30:2.0.3.5.2.9.181SUBJGRP 181
  Penalties After a Period to Correct
30:2.0.3.5.2.9.181.12SECTION 550.1451
     550.1451 What may BOEM do if I violate a statute, regulation, order, or lease term relating to a Federal oil and gas lease
30:2.0.3.5.2.9.181.13SECTION 550.1452
     550.1452 What if I correct the violation
30:2.0.3.5.2.9.181.14SECTION 550.1453
     550.1453 What if I do not correct the violation
30:2.0.3.5.2.9.181.15SECTION 550.1454
     550.1454 How may I request a hearing on the record on a Notice of Noncompliance
30:2.0.3.5.2.9.181.16SECTION 550.1455
     550.1455 Does my request for a hearing on the record affect the penalties
30:2.0.3.5.2.9.181.17SECTION 550.1456
     550.1456 May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance
30:2.0.3.5.2.9.182SUBJGRP 182
  Penalties Without a Period to Correct
30:2.0.3.5.2.9.182.18SECTION 550.1460
     550.1460 May I be subject to penalties without prior notice and an opportunity to correct
30:2.0.3.5.2.9.182.19SECTION 550.1461
     550.1461 How will BOEM inform me of violations without a period to correct
30:2.0.3.5.2.9.182.20SECTION 550.1462
     550.1462 How may I request a hearing on the record on a Notice of Noncompliance regarding violations without a period to correct
30:2.0.3.5.2.9.182.21SECTION 550.1463
     550.1463 Does my request for a hearing on the record affect the penalties
30:2.0.3.5.2.9.182.22SECTION 550.1464
     550.1464 May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance
30:2.0.3.5.2.9.183SUBJGRP 183
  General Provisions
30:2.0.3.5.2.9.183.23SECTION 550.1470
     550.1470 How does BOEM decide what the amount of the penalty should be
30:2.0.3.5.2.9.183.24SECTION 550.1471
     550.1471 Does the penalty affect whether I owe interest
30:2.0.3.5.2.9.183.25SECTION 550.1472
     550.1472 How will the Office of Hearings and Appeals conduct the hearing on the record
30:2.0.3.5.2.9.183.26SECTION 550.1473
     550.1473 How may I appeal the Administrative Law Judge's decision
30:2.0.3.5.2.9.183.27SECTION 550.1474
     550.1474 May I seek judicial review of the decision of the Interior Board of Land Appeals
30:2.0.3.5.2.9.183.28SECTION 550.1475
     550.1475 When must I pay the penalty
30:2.0.3.5.2.9.183.29SECTION 550.1476
     550.1476 Can BOEM reduce my penalty once it is assessed
30:2.0.3.5.2.9.183.30SECTION 550.1477
     550.1477 How may BOEM collect the penalty
30:2.0.3.5.2.9.184SUBJGRP 184
  Criminal Penalties
30:2.0.3.5.2.9.184.31SECTION 550.1480
     550.1480 May the United States criminally prosecute me for violations under Federal oil and gas leases
30:2.0.3.5.2.9.185SUBJGRP 185
  Bonding Requirements
30:2.0.3.5.2.9.185.32SECTION 550.1490
     550.1490 What standards must my BOEM-specified surety instrument meet
30:2.0.3.5.2.9.185.33SECTION 550.1491
     550.1491 How will BOEM determine the amount of my bond or other surety instrument
30:2.0.3.5.2.9.186SUBJGRP 186
  Financial Solvency Requirements
30:2.0.3.5.2.9.186.34SECTION 550.1495
     550.1495 How do I demonstrate financial solvency
30:2.0.3.5.2.9.186.35SECTION 550.1496
     550.1496 How will BOEM determine if I am financially solvent
30:2.0.3.5.2.9.186.36SECTION 550.1497
     550.1497 When will BOEM monitor my financial solvency
30:2.0.3.5.2.10SUBPART O
Subparts O-S [Reserved]
30:2.0.3.5.3PART 551
PART 551 - GEOLOGICAL AND GEOPHYSICAL (G&G) EXPLORATIONS OF THE OUTER CONTINENTAL SHELF
30:2.0.3.5.3.0.187.1SECTION 551.1
     551.1 Definitions.
30:2.0.3.5.3.0.187.2SECTION 551.2
     551.2 Purpose of this part.
30:2.0.3.5.3.0.187.3SECTION 551.3
     551.3 Authority and applicability of this part.
30:2.0.3.5.3.0.187.4SECTION 551.4
     551.4 Types of G&G activities that require permits or Notices.
30:2.0.3.5.3.0.187.5SECTION 551.5
     551.5 Applying for permits or filing Notices.
30:2.0.3.5.3.0.187.6SECTION 551.6
     551.6 Obligations and rights under a permit or a Notice.
30:2.0.3.5.3.0.187.7SECTION 551.7
     551.7 Test drilling activities under a permit.
30:2.0.3.5.3.0.187.8SECTION 551.8
     551.8 Inspection and reporting requirements for activities under a permit.
30:2.0.3.5.3.0.187.9SECTION 551.9
     551.9 Temporarily stopping, canceling, or relinquishing activities approved under a permit.
30:2.0.3.5.3.0.187.10SECTION 551.10
     551.10 Penalties and appeals.
30:2.0.3.5.3.0.187.11SECTION 551.11
     551.11 Submission, inspection, and selection of geological data and information collected under a permit and processed by permittees or third parties.
30:2.0.3.5.3.0.187.12SECTION 551.12
     551.12 Submission, inspection, and selection of geophysical data and information collected under a permit and processed by permittees or third parties.
30:2.0.3.5.3.0.187.13SECTION 551.13
     551.13 Reimbursement for the costs of reproducing data and information and certain processing costs.
30:2.0.3.5.3.0.187.14SECTION 551.14
     551.14 Protecting and disclosing data and information submitted to BOEM under a permit.
30:2.0.3.5.3.0.187.15SECTION 551.15
     551.15 Authority for information collection.
30:2.0.3.5.4PART 552
PART 552 - OUTER CONTINENTAL SHELF (OCS) OIL AND GAS INFORMATION PROGRAM
30:2.0.3.5.4.0.187.1SECTION 552.1
     552.1 Purpose.
30:2.0.3.5.4.0.187.2SECTION 552.2
     552.2 Definitions.
30:2.0.3.5.4.0.187.3SECTION 552.3
     552.3 Oil and gas data and information to be provided for use in the OCS Oil and Gas Information Program.
30:2.0.3.5.4.0.187.4SECTION 552.4
     552.4 Summary Report to affected States.
30:2.0.3.5.4.0.187.5SECTION 552.5
     552.5 Information to be made available to affected States.
30:2.0.3.5.4.0.187.6SECTION 552.6
     552.6 Freedom of Information Act requirements.
30:2.0.3.5.4.0.187.7SECTION 552.7
     552.7 Privileged and proprietary data and information to be made available to affected States.
30:2.0.3.5.5PART 553
PART 553 - OIL SPILL FINANCIAL RESPONSIBILITY FOR OFFSHORE FACILITIES
30:2.0.3.5.5.1SUBPART A
Subpart A - General
30:2.0.3.5.5.1.187.1SECTION 553.1
     553.1 What is the purpose of this part
30:2.0.3.5.5.1.187.2SECTION 553.3
     553.3 How are the terms used in this regulation defined
30:2.0.3.5.5.1.187.3SECTION 553.5
     553.5 What is the authority for collecting Oil Spill Financial Responsibility (OSFR) information
30:2.0.3.5.5.2SUBPART B
Subpart B - Applicability and Amount of OSFR
30:2.0.3.5.5.2.187.1SECTION 553.10
     553.10 What facilities does this part cover
30:2.0.3.5.5.2.187.2SECTION 553.11
     553.11 Who must demonstrate OSFR
30:2.0.3.5.5.2.187.3SECTION 553.12
     553.12 May I ask BOEM for a determination of whether I must demonstrate OSFR
30:2.0.3.5.5.2.187.4SECTION 553.13
     553.13 How much OSFR must I demonstrate
30:2.0.3.5.5.2.187.5SECTION 553.14
     553.14 How do I determine the worst case oil-spill discharge volume
30:2.0.3.5.5.2.187.6SECTION 553.15
     553.15 What are my general OSFR compliance responsibilities
30:2.0.3.5.5.3SUBPART C
Subpart C - Methods for Demonstrating OSFR
30:2.0.3.5.5.3.187.1SECTION 553.20
     553.20 What methods may I use to demonstrate OSFR
30:2.0.3.5.5.3.187.2SECTION 553.21
     553.21 How can I use self-insurance as OSFR evidence
30:2.0.3.5.5.3.187.3SECTION 553.22
     553.22 How do I apply to use self-insurance as OSFR evidence
30:2.0.3.5.5.3.187.4SECTION 553.23
     553.23 What information must I submit to support my net worth demonstration
30:2.0.3.5.5.3.187.5SECTION 553.24
     553.24 When I submit audited annual financial statements to verify my net worth, what standards must they meet
30:2.0.3.5.5.3.187.6SECTION 553.25
     553.25 What financial test procedures must I use to determine the amount of self-insurance allowed as OSFR evidence based on net worth
30:2.0.3.5.5.3.187.7SECTION 553.26
     553.26 What information must I submit to support my unencumbered assets demonstration
30:2.0.3.5.5.3.187.8SECTION 553.27
     553.27 When I submit audited annual financial statements to verify my unencumbered assets, what standards must they meet
30:2.0.3.5.5.3.187.9SECTION 553.28
     553.28 What financial test procedures must I use to evaluate the amount of self-insurance allowed as OSFR evidence based on unencumbered assets
30:2.0.3.5.5.3.187.10SECTION 553.29
     553.29 How can I use insurance as OSFR evidence
30:2.0.3.5.5.3.187.11SECTION 553.30
     553.30 How can I use an indemnity as OSFR evidence
30:2.0.3.5.5.3.187.12SECTION 553.31
     553.31 How can I use a surety bond as OSFR evidence
30:2.0.3.5.5.3.187.13SECTION 553.32
     553.32 Are there alternative methods to demonstrate OSFR
30:2.0.3.5.5.4SUBPART D
Subpart D - Requirements for Submitting OSFR Information
30:2.0.3.5.5.4.187.1SECTION 553.40
     553.40 What OSFR evidence must I submit to BOEM
30:2.0.3.5.5.4.187.2SECTION 553.41
     553.41 What terms must I include in my OSFR evidence
30:2.0.3.5.5.4.187.3SECTION 553.42
     553.42 How can I amend my list of COFs
30:2.0.3.5.5.4.187.4SECTION 553.43
     553.43 When is my OSFR demonstration or the amendment to my OSFR demonstration effective
30:2.0.3.5.5.4.187.5SECTION 553.44
     553.44 [Reserved]
30:2.0.3.5.5.4.187.6SECTION 553.45
     553.45 Where do I send my OSFR evidence
30:2.0.3.5.5.5SUBPART E
Subpart E - Revocation and Penalties
30:2.0.3.5.5.5.187.1SECTION 553.50
     553.50 How can BOEM refuse or invalidate my OSFR evidence
30:2.0.3.5.5.5.187.2SECTION 553.51
     553.51 What are the penalties for not complying with this part
30:2.0.3.5.5.6SUBPART F
Subpart F - Claims for Oil-Spill Removal Costs and Damages
30:2.0.3.5.5.6.187.1SECTION 553.60
     553.60 To whom may I present a claim
30:2.0.3.5.5.6.187.2SECTION 553.61
     553.61 When is a guarantor subject to direct action for claims
30:2.0.3.5.5.6.187.3SECTION 553.62
     553.62 What are the designated applicant's notification obligations regarding a claim
30:2.0.3.5.5.7SUBPART G
Subpart G - Limit of Liability for Offshore Facilities
30:2.0.3.5.5.7.187.1SECTION 553.700
     553.700 What is the scope of this subpart
30:2.0.3.5.5.7.187.2SECTION 553.701
     553.701 To which entities does this subpart apply
30:2.0.3.5.5.7.187.3SECTION 553.702
     553.702 What limit of liability applies to my offshore facility
30:2.0.3.5.5.7.187.4SECTION 553.703
     553.703 What is the procedure for calculating the limit of liability adjustment for inflation
30:2.0.3.5.5.7.187.5SECTION 553.704
     553.704 How will BOEM publish the offshore facility limit of liability adjustment
30:2.0.3.5.5.7.187.6.1APPENDIX
  Appendix to Part 553 - List of U.S. Geological Survey Topographic Maps
30:2.0.3.5.6PART 556
PART 556 - LEASING OF SULFUR OR OIL AND GAS AND BONDING REQUIREMENTS IN THE OUTER CONTINENTAL SHELF
30:2.0.3.5.6.1SUBPART A
Subpart A - General Provisions
30:2.0.3.5.6.1.194.1SECTION 556.100
     556.100 Statement of policy.
30:2.0.3.5.6.1.194.2SECTION 556.101
     556.101 Purpose.
30:2.0.3.5.6.1.194.3SECTION 556.102
     556.102 Authority.
30:2.0.3.5.6.1.194.4SECTION 556.103
     556.103 Cross references.
30:2.0.3.5.6.1.194.5SECTION 556.104
     556.104 Information collection and proprietary information.
30:2.0.3.5.6.1.194.6SECTION 556.105
     556.105 Acronyms and definitions.
30:2.0.3.5.6.1.194.7SECTION 556.106
     556.106 Service fees.
30:2.0.3.5.6.1.194.8SECTION 556.107
     556.107 Corporate seal requirements.
30:2.0.3.5.6.2SUBPART B
Subpart B - Oil and Gas Five Year Leasing Program
30:2.0.3.5.6.2.194.1SECTION 556.200
     556.200 What is the Five Year leasing program
30:2.0.3.5.6.2.194.2SECTION 556.201
     556.201 Does BOEM consider multiple uses of the OCS
30:2.0.3.5.6.2.194.3SECTION 556.202
     556.202 How does BOEM start the Five Year program preparation process
30:2.0.3.5.6.2.194.4SECTION 556.203
     556.203 What does BOEM do before publishing a proposed Five Year program
30:2.0.3.5.6.2.194.5SECTION 556.204
     556.204 How do governments and citizens comment on a proposed Five Year program
30:2.0.3.5.6.2.194.6SECTION 556.205
     556.205 What does BOEM do before approving a proposed final Five Year program or a significant revision of a previously-approved Five Year program
30:2.0.3.5.6.3SUBPART C
Subpart C - Planning and Holding a Lease Sale
30:2.0.3.5.6.3.194.1SECTION 556.300
     556.300 What reports may BOEM and other Federal agencies prepare before a lease sale
30:2.0.3.5.6.3.194.2SECTION 556.301
     556.301 What is a Call for Information and Nominations
30:2.0.3.5.6.3.194.3SECTION 556.302
     556.302 What does BOEM do with the information from the Call
30:2.0.3.5.6.3.194.4SECTION 556.303
     556.303 What does BOEM do if an area proposed for leasing is within three nautical miles of the seaward boundary of a coastal State
30:2.0.3.5.6.3.194.5SECTION 556.304
     556.304 How is a proposed notice of sale prepared
30:2.0.3.5.6.3.194.6SECTION 556.305
     556.305 How does BOEM coordinate and consult with States regarding a proposed notice of sale
30:2.0.3.5.6.3.194.7SECTION 556.306
     556.306 What if a potentially oil- or gas-bearing area underlies both the OCS and lands subject to State jurisdiction
30:2.0.3.5.6.3.194.8SECTION 556.307
     556.307 What does BOEM do with comments and recommendations received on the proposed notice of sale
30:2.0.3.5.6.3.194.9SECTION 556.308
     556.308 How does BOEM conduct a lease sale
30:2.0.3.5.6.3.194.10SECTION 556.309
     556.309 Does BOEM offer blocks in a sale that is not on the Five Year program schedule (called a Supplemental Sale)
30:2.0.3.5.6.4SUBPART D
Subpart D - Qualifications
30:2.0.3.5.6.4.194.1SECTION 556.400
     556.400 When must I demonstrate that I am qualified to hold a lease on the OCS
30:2.0.3.5.6.4.194.2SECTION 556.401
     556.401 What do I need to show to become qualified to hold a lease on the OCS and obtain a qualification number
30:2.0.3.5.6.4.194.3SECTION 556.402
     556.402 How do I make the necessary showing to qualify and obtain a qualification number
30:2.0.3.5.6.4.194.4SECTION 556.403
     556.403 Under what circumstances may I be disqualified from acquiring a lease or an interest in a lease on the OCS
30:2.0.3.5.6.4.194.5SECTION 556.404
     556.404 What do the non-procurement debarment rules require that I do
30:2.0.3.5.6.4.194.6SECTION 556.405
     556.405 When must I notify BOEM of mergers, name changes, or changes of business form
30:2.0.3.5.6.5SUBPART E
Subpart E - Issuance of a Lease
30:2.0.3.5.6.5.194SUBJGRP 194
  How To Bid
30:2.0.3.5.6.5.194.1SECTION 556.500
     556.500 Once qualified, how do I submit a bid
30:2.0.3.5.6.5.194.2SECTION 556.501
     556.501 What information do I need to submit with my bid
30:2.0.3.5.6.5.195SUBJGRP 195
  Restrictions on Joint Bidding
30:2.0.3.5.6.5.195.3SECTION 556.511
     556.511 Are there restrictions on bidding with others and do those restrictions affect my ability to bid
30:2.0.3.5.6.5.195.4SECTION 556.512
     556.512 What bids may be disqualified
30:2.0.3.5.6.5.195.5SECTION 556.513
     556.513 When must I file a statement of production
30:2.0.3.5.6.5.195.6SECTION 556.514
     556.514 How do I determine my production for purposes of the restricted joint bidders list
30:2.0.3.5.6.5.195.7SECTION 556.515
     556.515 May a person be exempted from joint bidding restrictions
30:2.0.3.5.6.5.196SUBJGRP 196
  How Does BOEM Act on Bids
30:2.0.3.5.6.5.196.8SECTION 556.516
     556.516 What does BOEM do with my bid
30:2.0.3.5.6.5.196.9SECTION 556.517
     556.517 What may I do if my high bid is rejected
30:2.0.3.5.6.5.197SUBJGRP 197
  Awarding the Lease
30:2.0.3.5.6.5.197.10SECTION 556.520
     556.520 What happens if I am the successful high bidder and BOEM accepts my bid
30:2.0.3.5.6.5.197.11SECTION 556.521
     556.521 When is my lease effective
30:2.0.3.5.6.5.197.12SECTION 556.522
     556.522 What are the terms and conditions of the lease and when are they published
30:2.0.3.5.6.6SUBPART F
Subpart F - Lease Term and Obligations
30:2.0.3.5.6.6.198SUBJGRP 198
  Length of Lease
30:2.0.3.5.6.6.198.1SECTION 556.600
     556.600 What is the primary term of my oil and gas lease
30:2.0.3.5.6.6.198.2SECTION 556.601
     556.601 How may I maintain my oil and gas lease beyond the primary term
30:2.0.3.5.6.6.198.3SECTION 556.602
     556.602 What is the primary term of my sulfur lease
30:2.0.3.5.6.6.198.4SECTION 556.603
     556.603 How may I maintain my sulfur lease beyond the primary term
30:2.0.3.5.6.6.199SUBJGRP 199
  Lease Obligations
30:2.0.3.5.6.6.199.5SECTION 556.604
     556.604 What are my rights and obligations as a record title owner
30:2.0.3.5.6.6.199.6SECTION 556.605
     556.605 What are my rights and obligations as an operating rights owner
30:2.0.3.5.6.6.200SUBJGRP 200
  Helium
30:2.0.3.5.6.6.200.7SECTION 556.606
     556.606 What must a lessee do if BOEM elects to extract helium from a lease
30:2.0.3.5.6.7SUBPART G
Subpart G - Transferring All or Part of the Record Title Interest in a Lease
30:2.0.3.5.6.7.201.1SECTION 556.700
     556.700 May I assign or sublease all or any part of the record title interest in my lease
30:2.0.3.5.6.7.201.2SECTION 556.701
     556.701 How do I seek approval of an assignment of the record title interest in my lease, or a severance of operating rights from that record title interest
30:2.0.3.5.6.7.201.3SECTION 556.702
     556.702 When will my assignment result in a segregated lease
30:2.0.3.5.6.7.201.4SECTION 556.703
     556.703 What is the effect of the approval of the assignment of 100 percent of the record title in a particular aliquot(s) of my lease and of the resulting lease segregation
30:2.0.3.5.6.7.201.5SECTION 556.704
     556.704 When would BOEM disapprove an assignment or sublease of an interest in my lease
30:2.0.3.5.6.7.201.6SECTION 556.705
     556.705 How do I transfer the interest of a deceased natural person who was a lessee
30:2.0.3.5.6.7.201.7SECTION 556.706
     556.706 What if I want to transfer record title interests in more than one lease at the same time, but to different parties
30:2.0.3.5.6.7.201.8SECTION 556.707
     556.707 What if I want to transfer different types of lease interests (not only record title interests) in the same lease to different parties
30:2.0.3.5.6.7.201.9SECTION 556.708
     556.708 What if I want to transfer my record title interests in more than one lease to the same party
30:2.0.3.5.6.7.201.10SECTION 556.709
     556.709 What if I want to transfer my record title interest in one lease to multiple parties
30:2.0.3.5.6.7.201.11SECTION 556.710
     556.710 What is the effect of an assignment of a lease on an assignor's liability under the lease
30:2.0.3.5.6.7.201.12SECTION 556.711
     556.711 What is the effect of a record title holder's sublease of operating rights on the record title holder's liability
30:2.0.3.5.6.7.201.13SECTION 556.712
     556.712 What is the effective date of a transfer
30:2.0.3.5.6.7.201.14SECTION 556.713
     556.713 What is the effect of an assignment of a lease on an assignee's liability under the lease
30:2.0.3.5.6.7.201.15SECTION 556.714
     556.714 As a restricted joint bidder, may I transfer an interest to another restricted joint bidder
30:2.0.3.5.6.7.201.16SECTION 556.715
     556.715 Are there any interests I may transfer or record without BOEM approval
30:2.0.3.5.6.7.201.17SECTION 556.716
     556.716 What must I do with respect to the designation of operator on a lease when a transfer of record title is submitted
30:2.0.3.5.6.8SUBPART H
Subpart H - Transferring All or Part of the Operating Rights in a Lease
30:2.0.3.5.6.8.201.1SECTION 556.800
     556.800 As an operating rights owner, may I assign all or part of my operating rights interest
30:2.0.3.5.6.8.201.2SECTION 556.801
     556.801 How do I seek approval of an assignment of my operating rights
30:2.0.3.5.6.8.201.3SECTION 556.802
     556.802 When would BOEM disapprove the assignment of all or part of my operating rights interest
30:2.0.3.5.6.8.201.4SECTION 556.803
     556.803 What if I want to assign operating rights interests in more than one lease at the same time, but to different parties
30:2.0.3.5.6.8.201.5SECTION 556.804
     556.804 What if I want to assign my operating rights interest in a lease to multiple parties
30:2.0.3.5.6.8.201.6SECTION 556.805
     556.805 What is the effect of an operating rights owner's assignment of operating rights on the assignor's liability
30:2.0.3.5.6.8.201.7SECTION 556.806
     556.806 What is the effective date of an assignment of operating rights
30:2.0.3.5.6.8.201.8SECTION 556.807
     556.807 What is the effect of an assignment of operating rights on an assignee's liability
30:2.0.3.5.6.8.201.9SECTION 556.808
     556.808 As an operating rights owner, are there any interests I may assign without BOEM approval
30:2.0.3.5.6.8.201.10SECTION 556.809
     556.809 [Reserved]
30:2.0.3.5.6.8.201.11SECTION 556.810
     556.810 What must I do with respect to the designation of operator on a lease when a transfer of operating rights ownership is submitted
30:2.0.3.5.6.9SUBPART I
Subpart I - Bonding or Other Financial Assurance
30:2.0.3.5.6.9.201.1SECTION 556.900
     556.900 Bond requirements for an oil and gas or sulfur lease.
30:2.0.3.5.6.9.201.2SECTION 556.901
     556.901 Additional bonds.
30:2.0.3.5.6.9.201.3SECTION 556.902
     556.902 General requirements for bonds.
30:2.0.3.5.6.9.201.4SECTION 556.903
     556.903 Lapse of bond.
30:2.0.3.5.6.9.201.5SECTION 556.904
     556.904 Lease-specific abandonment accounts.
30:2.0.3.5.6.9.201.6SECTION 556.905
     556.905 Using a third-party guarantee instead of a bond.
30:2.0.3.5.6.9.201.7SECTION 556.906
     556.906 Termination of the period of liability and cancellation of a bond.
30:2.0.3.5.6.9.201.8SECTION 556.907
     556.907 Forfeiture of bonds and/or other securities.
30:2.0.3.5.6.10SUBPART J
Subpart J - Bonus or Royalty Credits for Exchange of Certain Leases
30:2.0.3.5.6.10.201.1SECTION 556.1000
     556.1000 Leases formerly eligible for a bonus or royalty credit.
30:2.0.3.5.6.11SUBPART K
Subpart K - Ending a Lease
30:2.0.3.5.6.11.201.1SECTION 556.1100
     556.1100 How does a lease expire
30:2.0.3.5.6.11.201.2SECTION 556.1101
     556.1101 May I relinquish my lease or an aliquot part thereof
30:2.0.3.5.6.11.201.3SECTION 556.1102
     556.1102 Under what circumstances will BOEM cancel my lease
30:2.0.3.5.6.12SUBPART L
Subpart L - Leases Maintained Under Section 6 of OCSLA
30:2.0.3.5.6.12.201.1SECTION 556.1200
     556.1200 Effect of regulations on lease.
30:2.0.3.5.6.12.201.2SECTION 556.1201
     556.1201 Section 6(a) leases and leases other than those for oil, gas, or sulfur.
30:2.0.3.5.6.13SUBPART M
Subpart M - Environmental Studies
30:2.0.3.5.6.13.201.1SECTION 556.1300
     556.1300 Environmental studies.
30:2.0.3.5.7PART 560
PART 560 - OUTER CONTINENTAL SHELF OIL AND GAS LEASING
30:2.0.3.5.7.1SUBPART A
Subpart A - General Provisions
30:2.0.3.5.7.1.205.1SECTION 560.100
     560.100 Authority.
30:2.0.3.5.7.1.205.2SECTION 560.101
     560.101 What is the purpose of this part
30:2.0.3.5.7.1.205.3SECTION 560.102
     560.102 What definitions apply to this part
30:2.0.3.5.7.1.205.4SECTION 560.103
     560.103 What is BOEM's authority to collect information
30:2.0.3.5.7.2SUBPART B
Subpart B - Bidding Systems
30:2.0.3.5.7.2.205SUBJGRP 205
  General Provisions
30:2.0.3.5.7.2.205.1SECTION 560.200
     560.200 What is the purpose of this subpart
30:2.0.3.5.7.2.205.2SECTION 560.201
     560.201 What definitions apply to this subpart
30:2.0.3.5.7.2.205.3SECTION 560.202
     560.202 What bidding systems may BOEM use
30:2.0.3.5.7.2.205.4SECTION 560.203
     560.203 What conditions apply to the bidding systems that BOEM uses
30:2.0.3.5.7.2.206SUBJGRP 206
  Eligible Leases
30:2.0.3.5.7.2.206.5SECTION 560.210
     560.210 How do royalty suspension volumes apply to eligible leases
30:2.0.3.5.7.2.206.6SECTION 560.211
     560.211 When does an eligible lease qualify for a royalty suspension volume
30:2.0.3.5.7.2.206.7SECTION 560.212
     560.212 How does BOEM assign and monitor royalty suspension volumes for eligible leases
30:2.0.3.5.7.2.206.8SECTION 560.213
     560.213 How long will a royalty suspension volume for an eligible lease be effective
30:2.0.3.5.7.2.206.9SECTION 560.214
     560.214 How do I measure natural gas production on my eligible lease
30:2.0.3.5.7.2.207SUBJGRP 207
  Royalty Suspension (RS) Leases
30:2.0.3.5.7.2.207.10SECTION 560.220
     560.220 How does royalty suspension apply to leases issued in a sale held after November 2000
30:2.0.3.5.7.2.207.11SECTION 560.221
     560.221 When does a lease issued in a sale held after November 2000 get a royalty suspension
30:2.0.3.5.7.2.207.12SECTION 560.222
     560.222 How long will a royalty suspension volume be effective for a lease issued in a sale held after November 2000
30:2.0.3.5.7.2.207.13SECTION 560.223
     560.223 How do I measure natural gas production for a lease issued in a sale held after November 2000
30:2.0.3.5.7.2.207.14SECTION 560.224
     560.224 How will royalty suspension apply if BOEM assigns a lease issued in a sale held after November 2000 to a field that has a pre-Act lease
30:2.0.3.5.7.2.208SUBJGRP 208
  Bidding System Selection Criteria
30:2.0.3.5.7.2.208.15SECTION 560.230
     560.230 What criteria does BOEM use for selecting bidding systems and bidding system components
30:2.0.3.5.7.3SUBPART C
Subpart C - Operating Allowances
30:2.0.3.5.7.3.209.1SECTION 560.300
     560.300 Operating allowances.
30:2.0.3.5.7.4SUBPART D
Subpart D [Reserved]
30:2.0.3.5.7.5SUBPART E
Subpart E - Electronic Filings
30:2.0.3.5.7.5.209.1SECTION 560.500
     560.500 Electronic document and data transmissions.
30:2.0.3.5.7.5.209.2SECTION 560.501
     560.501 How long will the confidentiality of electronic document and data transmissions be maintained
30:2.0.3.5.7.5.209.3SECTION 560.502
     560.502 Are electronically filed document transmissions legally binding
30:2.0.3.5.8PART 570
PART 570 - NONDISCRIMINATION IN THE OUTER CONTINENTAL SHELF
30:2.0.3.5.8.0.209.1SECTION 570.1
     570.1 Purpose.
30:2.0.3.5.8.0.209.2SECTION 570.2
     570.2 Application of this part.
30:2.0.3.5.8.0.209.3SECTION 570.3
     570.3 Definitions.
30:2.0.3.5.8.0.209.4SECTION 570.4
     570.4 Discrimination prohibited.
30:2.0.3.5.8.0.209.5SECTION 570.5
     570.5 Complaint.
30:2.0.3.5.8.0.209.6SECTION 570.6
     570.6 Process.
30:2.0.3.5.8.0.209.7SECTION 570.7
     570.7 Remedies.
30:2.0.3.5.9PART 580
PART 580 - PROSPECTING FOR MINERALS OTHER THAN OIL, GAS, AND SULPHUR ON THE OUTER CONTINENTAL SHELF
30:2.0.3.5.9.1SUBPART A
Subpart A - General Information
30:2.0.3.5.9.1.217.1SECTION 580.1
     580.1 What definitions apply to this part
30:2.0.3.5.9.1.217.2SECTION 580.2
     580.2 What is the purpose of this part
30:2.0.3.5.9.1.217.3SECTION 580.3
     580.3 What requirements must I follow when I conduct prospecting or research activities
30:2.0.3.5.9.1.217.4SECTION 580.4
     580.4 What activities are not covered by this part
30:2.0.3.5.9.2SUBPART B
Subpart B - How To Apply for a Permit or File a Notice
30:2.0.3.5.9.2.217.1SECTION 580.10
     580.10 What must I do before I may conduct prospecting activities
30:2.0.3.5.9.2.217.2SECTION 580.11
     580.11 What must I do before I may conduct scientific research
30:2.0.3.5.9.2.217.3SECTION 580.12
     580.12 What must I include in my application or notification
30:2.0.3.5.9.2.217.4SECTION 580.13
     580.13 Where must I send my application or notification
30:2.0.3.5.9.3SUBPART C
Subpart C - Obligations Under This Part
30:2.0.3.5.9.3.217SUBJGRP 217
  Prohibitions and Requirements
30:2.0.3.5.9.3.217.1SECTION 580.20
     580.20 What must I not do in conducting Geological and Geophysical (G&G) prospecting or scientific research
30:2.0.3.5.9.3.217.2SECTION 580.21
     580.21 What must I do in conducting G&G prospecting or scientific research
30:2.0.3.5.9.3.217.3SECTION 580.22
     580.22 What must I do when seeking approval for modifications
30:2.0.3.5.9.3.217.4SECTION 580.23
     580.23 How must I cooperate with inspection activities
30:2.0.3.5.9.3.217.5SECTION 580.24
     580.24 What reports must I file
30:2.0.3.5.9.3.218SUBJGRP 218
  Interrupted Activities
30:2.0.3.5.9.3.218.6SECTION 580.25
     580.25 When may BOEM require me to stop activities under this part
30:2.0.3.5.9.3.218.7SECTION 580.26
     580.26 When may I resume activities
30:2.0.3.5.9.3.218.8SECTION 580.27
     580.27 When may BOEM cancel my permit
30:2.0.3.5.9.3.218.9SECTION 580.28
     580.28 May I relinquish my permit
30:2.0.3.5.9.3.219SUBJGRP 219
  Environmental Issues
30:2.0.3.5.9.3.219.10SECTION 580.29
     580.29 Will BOEM monitor the environmental effects of my activity
30:2.0.3.5.9.3.219.11SECTION 580.30
     580.30 What activities will not require environmental analysis
30:2.0.3.5.9.3.219.12SECTION 580.31
     580.31 Whom will BOEM notify about environmental issues
30:2.0.3.5.9.3.220SUBJGRP 220
  Penalties and Appeals
30:2.0.3.5.9.3.220.13SECTION 580.32
     580.32 What penalties may I be subject to
30:2.0.3.5.9.3.220.14SECTION 580.33
     580.33 How can I appeal a penalty
30:2.0.3.5.9.3.220.15SECTION 580.34
     580.34 How can I appeal an order or decision
30:2.0.3.5.9.4SUBPART D
Subpart D - Data Requirements
30:2.0.3.5.9.4.221SUBJGRP 221
  Geological Data and Information
30:2.0.3.5.9.4.221.1SECTION 580.40
     580.40 When do I notify BOEM that geological data and information are available for submission, inspection, and selection
30:2.0.3.5.9.4.221.2SECTION 580.41
     580.41 What types of geological data and information must I submit to BOEM
30:2.0.3.5.9.4.221.3SECTION 580.42
     580.42 When geological data and information are obtained by a third party, what must we both do
30:2.0.3.5.9.4.222SUBJGRP 222
  Geophysical Data and Information
30:2.0.3.5.9.4.222.4SECTION 580.50
     580.50 When do I notify BOEM that geophysical data and information are available for submission, inspection, and selection
30:2.0.3.5.9.4.222.5SECTION 580.51
     580.51 What types of geophysical data and information must I submit to BOEM
30:2.0.3.5.9.4.222.6SECTION 580.52
     580.52 When geophysical data and information are obtained by a third party, what must we both do
30:2.0.3.5.9.4.223SUBJGRP 223
  Reimbursement
30:2.0.3.5.9.4.223.7SECTION 580.60
     580.60 Which of my costs will be reimbursed
30:2.0.3.5.9.4.223.8SECTION 580.61
     580.61 Which of my costs will not be reimbursed
30:2.0.3.5.9.4.224SUBJGRP 224
  Protections
30:2.0.3.5.9.4.224.9SECTION 580.70
     580.70 What data and information will be protected from public disclosure
30:2.0.3.5.9.4.224.10SECTION 580.71
     580.71 What is the timetable for release of data and information
30:2.0.3.5.9.4.224.11SECTION 580.72
     580.72 What procedure will BOEM follow to disclose acquired data and information to a contractor for reproduction, processing, and interpretation
30:2.0.3.5.9.4.224.12SECTION 580.73
     580.73 Will BOEM share data and information with coastal States
30:2.0.3.5.9.5SUBPART E
Subpart E - Information Collection
30:2.0.3.5.9.5.225.1SECTION 580.80
     580.80 Paperwork Reduction Act statement - information collection.
30:2.0.3.5.10PART 581
PART 581 - LEASING OF MINERALS OTHER THAN OIL, GAS, AND SULPHUR IN THE OUTER CONTINENTAL SHELF
30:2.0.3.5.10.1SUBPART A
Subpart A - General
30:2.0.3.5.10.1.225.1SECTION 581.0
     581.0 Authority for information collection.
30:2.0.3.5.10.1.225.2SECTION 581.1
     581.1 Purpose and applicability.
30:2.0.3.5.10.1.225.3SECTION 581.2
     581.2 Authority.
30:2.0.3.5.10.1.225.4SECTION 581.3
     581.3 Definitions.
30:2.0.3.5.10.1.225.5SECTION 581.4
     581.4 Qualifications of lessees.
30:2.0.3.5.10.1.225.6SECTION 581.5
     581.5 False statements.
30:2.0.3.5.10.1.225.7SECTION 581.6
     581.6 Appeals.
30:2.0.3.5.10.1.225.8SECTION 581.7
     581.7 Disclosure of information to the public.
30:2.0.3.5.10.1.225.9SECTION 581.8
     581.8 Rights to minerals.
30:2.0.3.5.10.1.225.10SECTION 581.9
     581.9 Jurisdictional controversies.
30:2.0.3.5.10.2SUBPART B
Subpart B - Leasing Procedures
30:2.0.3.5.10.2.225.1SECTION 581.11
     581.11 Unsolicited request for a lease sale.
30:2.0.3.5.10.2.225.2SECTION 581.12
     581.12 Request for OCS mineral information and interest.
30:2.0.3.5.10.2.225.3SECTION 581.13
     581.13 Joint State/Federal coordination.
30:2.0.3.5.10.2.225.4SECTION 581.14
     581.14 OCS mining area identification.
30:2.0.3.5.10.2.225.5SECTION 581.15
     581.15 Tract size.
30:2.0.3.5.10.2.225.6SECTION 581.16
     581.16 Proposed leasing notice.
30:2.0.3.5.10.2.225.7SECTION 581.17
     581.17 Leasing notice.
30:2.0.3.5.10.2.225.8SECTION 581.18
     581.18 Bidding system.
30:2.0.3.5.10.2.225.9SECTION 581.19
     581.19 Lease term.
30:2.0.3.5.10.2.225.10SECTION 581.20
     581.20 Submission of bids.
30:2.0.3.5.10.2.225.11SECTION 581.21
     581.21 Award of leases.
30:2.0.3.5.10.2.225.12SECTION 581.22
     581.22 Lease form.
30:2.0.3.5.10.2.225.13SECTION 581.23
     581.23 Effective date of leases.
30:2.0.3.5.10.3SUBPART C
Subpart C - Financial Considerations
30:2.0.3.5.10.3.225.1SECTION 581.26
     581.26 Payments.
30:2.0.3.5.10.3.225.2SECTION 581.27
     581.27 Annual rental.
30:2.0.3.5.10.3.225.3SECTION 581.28
     581.28 Royalty.
30:2.0.3.5.10.3.225.4SECTION 581.29
     581.29 Royalty valuation.
30:2.0.3.5.10.3.225.5SECTION 581.30
     581.30 Minimum royalty.
30:2.0.3.5.10.3.225.6SECTION 581.31
     581.31 Overriding royalties.
30:2.0.3.5.10.3.225.7SECTION 581.32
     581.32 Waiver, suspension, or reduction of rental, minimum royalty, or production royalty.
30:2.0.3.5.10.3.225.8SECTION 581.33
     581.33 Bonds and bonding requirements.
30:2.0.3.5.10.4SUBPART D
Subpart D - Assignments and Lease Extensions
30:2.0.3.5.10.4.225.1SECTION 581.40
     581.40 Assignment of leases or interests therein.
30:2.0.3.5.10.4.225.2SECTION 581.41
     581.41 Requirements for filing for transfers.
30:2.0.3.5.10.4.225.3SECTION 581.42
     581.42 Effect of assignment on particular lease.
30:2.0.3.5.10.4.225.4SECTION 581.43
     581.43 Effect of suspensions on lease term.
30:2.0.3.5.10.5SUBPART E
Subpart E - Termination of Leases
30:2.0.3.5.10.5.225.1SECTION 581.46
     581.46 Relinquishment of leases or parts of leases.
30:2.0.3.5.10.5.225.2SECTION 581.47
     581.47 Cancellation of leases.
30:2.0.3.5.11PART 582
PART 582 - OPERATIONS IN THE OUTER CONTINENTAL SHELF FOR MINERALS OTHER THAN OIL, GAS, AND SULPHUR
30:2.0.3.5.11.1SUBPART A
Subpart A - General
30:2.0.3.5.11.1.225.1SECTION 582.0
     582.0 Authority for information collection.
30:2.0.3.5.11.1.225.2SECTION 582.1
     582.1 Purpose and authority.
30:2.0.3.5.11.1.225.3SECTION 582.2
     582.2 Scope.
30:2.0.3.5.11.1.225.4SECTION 582.3
     582.3 Definitions.
30:2.0.3.5.11.1.225.5SECTION 582.4
     582.4 Opportunities for review and comment.
30:2.0.3.5.11.1.225.6SECTION 582.5
     582.5 Disclosure of data and information to the public.
30:2.0.3.5.11.1.225.7SECTION 582.6
     582.6 Disclosure of data and information to an adjacent State.
30:2.0.3.5.11.1.225.8SECTION 582.7
     582.7 Jurisdictional controversies.
30:2.0.3.5.11.2SUBPART B
Subpart B - Jurisdiction and Responsibilities of Director
30:2.0.3.5.11.2.225.1SECTION 582.10
     582.10 Jurisdiction and responsibilities of Director.
30:2.0.3.5.11.2.225.2SECTION 582.11
     582.11 Director's authority.
30:2.0.3.5.11.2.225.3SECTION 582.12
     582.12 Director's responsibilities.
30:2.0.3.5.11.2.225.4SECTION 582.13
     582.13 [Reserved]
30:2.0.3.5.11.2.225.5SECTION 582.14
     582.14 Noncompliance, remedies, and penalties.
30:2.0.3.5.11.2.225.6SECTION 582.15
     582.15 Cancellation of leases.
30:2.0.3.5.11.3SUBPART C
Subpart C - Obligations and Responsibilities of Lessees
30:2.0.3.5.11.3.225.1SECTION 582.20
     582.20 Obligations and responsibilities of lessees.
30:2.0.3.5.11.3.225.2SECTION 582.21
     582.21 Plans, general.
30:2.0.3.5.11.3.225.3SECTION 582.22
     582.22 Delineation Plan.
30:2.0.3.5.11.3.225.4SECTION 582.23
     582.23 Testing Plan.
30:2.0.3.5.11.3.225.5SECTION 582.24
     582.24 Mining Plan.
30:2.0.3.5.11.3.225.6SECTION 582.25
     582.25 Plan modification.
30:2.0.3.5.11.3.225.7SECTION 582.26
     582.26 Contingency Plan.
30:2.0.3.5.11.3.225.8SECTION 582.27
     582.27 Conduct of operations.
30:2.0.3.5.11.3.225.9SECTION 582.28
     582.28 Environmental protection measures.
30:2.0.3.5.11.3.225.10SECTION 582.29
     582.29 Reports and records.
30:2.0.3.5.11.3.225.11SECTION 582.30
     582.30 Right of use and easement.
30:2.0.3.5.11.3.225.12SECTION 582.31
     582.31 [Reserved]
30:2.0.3.5.11.4SUBPART D
Subpart D - Payments
30:2.0.3.5.11.4.225.1SECTION 582.40
     582.40 Bonds.
30:2.0.3.5.11.4.225.2SECTION 582.41
     582.41 Method of royalty calculation.
30:2.0.3.5.11.4.225.3SECTION 582.42
     582.42 Payments.
30:2.0.3.5.11.5SUBPART E
Subpart E - Appeals
30:2.0.3.5.11.5.225.1SECTION 582.50
     582.50 Appeals.
30:2.0.3.5.12PART 583
PART 583 - NEGOTIATED NONCOMPETITIVE AGREEMENTS FOR THE USE OF OUTER CONTINENTAL SHELF SAND, GRAVEL, AND/OR SHELL RESOURCES
30:2.0.3.5.12.1SUBPART A
Subpart A - General
30:2.0.3.5.12.1.225.1SECTION 583.100
     583.100 What is BOEM's authority for information collection (IC)
30:2.0.3.5.12.1.225.2SECTION 583.105
     583.105 What is the purpose of this part and to whom does it apply
30:2.0.3.5.12.1.225.3SECTION 583.110
     583.110 What is BOEM's authority for this part
30:2.0.3.5.12.1.225.4SECTION 583.115
     583.115 What definitions do I need to know
30:2.0.3.5.12.1.225.5SECTION 583.120
     583.120 Who is qualified for a project
30:2.0.3.5.12.1.225.6SECTION 583.125
     583.125 What are my rights to seek reconsideration of an unfavorable decision by BOEM
30:2.0.3.5.12.1.225.7SECTION 583.130
     583.130 What are the minimum contents of an agreement to use OCS sand, gravel, and/or shell resources
30:2.0.3.5.12.2SUBPART B
Subpart B - [Reserved]
30:2.0.3.5.12.3SUBPART C
Subpart C - Outer Continental Shelf Sand, Gravel, and/or Shell Resources Negotiated Agreements
30:2.0.3.5.12.3.225.1SECTION 583.300
     583.300 How do I submit a request for an agreement
30:2.0.3.5.12.3.225.2SECTION 583.305
     583.305 How will BOEM determine if a project qualifies
30:2.0.3.5.12.3.225.3SECTION 583.310
     583.310 What process does BOEM use to technically and environmentally evaluate a qualified project
30:2.0.3.5.12.3.225.4SECTION 583.315
     583.315 What is the process for negotiating and executing an agreement
30:2.0.3.5.12.3.225.5SECTION 583.320
     583.320 What kinds of information must be included in an agreement
30:2.0.3.5.12.3.225.6SECTION 583.325
     583.325 What is the effective date of an agreement
30:2.0.3.5.12.3.225.7SECTION 583.330
     583.330 How will BOEM enforce the agreement
30:2.0.3.5.12.3.225.8SECTION 583.335
     583.335 What is the term of the agreement
30:2.0.3.5.12.3.225.9SECTION 583.340
     583.340 What debarment or suspension obligations apply to transactions and contracts related to a project
30:2.0.3.5.12.3.225.10SECTION 583.345
     583.345 What is the process for extending or modifying an agreement
30:2.0.3.5.12.3.225.11SECTION 583.350
     583.350 When can an agreement be terminated
30:2.0.3.5.13PART 585
PART 585 - RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF
30:2.0.3.5.13.1SUBPART A
Subpart A - General Provisions
30:2.0.3.5.13.1.274.1SECTION 585.100
     585.100 Authority.
30:2.0.3.5.13.1.274.2SECTION 585.101
     585.101 What is the purpose of this part
30:2.0.3.5.13.1.274.3SECTION 585.102
     585.102 What are BOEM's responsibilities under this part
30:2.0.3.5.13.1.274.4SECTION 585.103
     585.103 When may BOEM prescribe or approve departures from these regulations
30:2.0.3.5.13.1.274.5SECTION 585.104
     585.104 Do I need a BOEM lease or other authorization to produce or support the production of electricity or other energy product from a renewable energy resource on the OCS
30:2.0.3.5.13.1.274.6SECTION 585.105
     585.105 What are my responsibilities under this part
30:2.0.3.5.13.1.274.7SECTION 585.106
     585.106 Who can hold a lease or grant under this part
30:2.0.3.5.13.1.274.8SECTION 585.107
     585.107 How do I show that I am qualified to be a lessee or grant holder
30:2.0.3.5.13.1.274.9SECTION 585.108
     585.108 When must I notify BOEM if an action has been filed alleging that I am insolvent or bankrupt
30:2.0.3.5.13.1.274.10SECTION 585.109
     585.109 When must I notify BOEM of mergers, name changes, or changes of business form
30:2.0.3.5.13.1.274.11SECTION 585.110
     585.110 How do I submit plans, applications, reports, or notices required by this part
30:2.0.3.5.13.1.274.12SECTION 585.111
     585.111 When and how does BOEM charge me processing fees on a case-by-case basis
30:2.0.3.5.13.1.274.13SECTION 585.112
     585.112 Definitions.
30:2.0.3.5.13.1.274.14SECTION 585.113
     585.113 How will data and information obtained by BOEM under this part be disclosed to the public
30:2.0.3.5.13.1.274.15SECTION 585.114
     585.114 Paperwork Reduction Act statements - information collection.
30:2.0.3.5.13.1.274.16SECTION 585.115
     585.115 Documents incorporated by reference.
30:2.0.3.5.13.1.274.17SECTION 585.116
     585.116 Requests for information on the state of the offshore renewable energy industry.
30:2.0.3.5.13.1.274.18SECTION 585.117
     585.117 [Reserved]
30:2.0.3.5.13.1.274.19SECTION 585.118
     585.118 What are my appeal rights
30:2.0.3.5.13.2SUBPART B
Subpart B - Issuance of OCS Renewable Energy Leases
30:2.0.3.5.13.2.274SUBJGRP 274
  General Lease Information
30:2.0.3.5.13.2.274.1SECTION 585.200
     585.200 What rights are granted with a lease issued under this part
30:2.0.3.5.13.2.274.2SECTION 585.201
     585.201 How will BOEM issue leases
30:2.0.3.5.13.2.274.3SECTION 585.202
     585.202 What types of leases will BOEM issue
30:2.0.3.5.13.2.274.4SECTION 585.203
     585.203 With whom will BOEM consult before issuance of a lease
30:2.0.3.5.13.2.274.5SECTION 585.204
     585.204 What areas are available for leasing consideration
30:2.0.3.5.13.2.274.6SECTION 585.205
     585.205 How will leases be mapped
30:2.0.3.5.13.2.274.7SECTION 585.206
     585.206 What is the lease size
30:2.0.3.5.13.2.274.8SECTION 585.207-585.209
     585.207-585.209 [Reserved]
30:2.0.3.5.13.2.275SUBJGRP 275
  Competitive Lease Process
30:2.0.3.5.13.2.275.9SECTION 585.210
     585.210 How does BOEM initiate the competitive leasing process
30:2.0.3.5.13.2.275.10SECTION 585.211
     585.211 What is the process for competitive issuance of leases
30:2.0.3.5.13.2.275.11SECTION 585.212
     585.212 What is the process BOEM will follow if there is reason to believe that competitors have withdrawn before the Final Sale Notice is issued
30:2.0.3.5.13.2.275.12SECTION 585.213
     585.213 What must I submit in response to a Request for Interest or a Call for Information and Nominations
30:2.0.3.5.13.2.275.13SECTION 585.214
     585.214 What will BOEM do with information from the Requests for Information or Calls for Information and Nominations
30:2.0.3.5.13.2.275.14SECTION 585.215
     585.215 What areas will BOEM offer in a lease sale
30:2.0.3.5.13.2.275.15SECTION 585.216
     585.216 What information will BOEM publish in the Proposed Sale Notice and Final Sale Notice
30:2.0.3.5.13.2.275.16SECTION 585.217-585.219
     585.217-585.219 [Reserved]
30:2.0.3.5.13.2.276SUBJGRP 276
  Competitive Lease Award Process
30:2.0.3.5.13.2.276.17SECTION 585.220
     585.220 What auction format may BOEM use in a lease sale
30:2.0.3.5.13.2.276.18SECTION 585.221
     585.221 What bidding systems may BOEM use for commercial leases and limited leases
30:2.0.3.5.13.2.276.19SECTION 585.222
     585.222 What does BOEM do with my bid
30:2.0.3.5.13.2.276.20SECTION 585.223
     585.223 What does BOEM do if there is a tie for the highest bid
30:2.0.3.5.13.2.276.21SECTION 585.224
     585.224 What happens if BOEM accepts my bid
30:2.0.3.5.13.2.276.22SECTION 585.225
     585.225 What happens if my bid is rejected, and what are my appeal rights
30:2.0.3.5.13.2.276.23SECTION 585.226-585.229
     585.226-585.229 [Reserved]
30:2.0.3.5.13.2.277SUBJGRP 277
  Noncompetitive Lease Award Process
30:2.0.3.5.13.2.277.24SECTION 585.230
     585.230 May I request a lease if there is no Call
30:2.0.3.5.13.2.277.25SECTION 585.231
     585.231 How will BOEM process my unsolicited request for a noncompetitive lease
30:2.0.3.5.13.2.277.26SECTION 585.232
     585.232 May I acquire a lease noncompetitively after responding to a Request for Interest or Call for Information and Nominations
30:2.0.3.5.13.2.277.27SECTION 585.233-585.234
     585.233-585.234 [Reserved]
30:2.0.3.5.13.2.278SUBJGRP 278
  Commercial and Limited Lease Terms
30:2.0.3.5.13.2.278.28SECTION 585.235
     585.235 If I have a commercial lease, how long will my lease remain in effect
30:2.0.3.5.13.2.278.29SECTION 585.236
     585.236 If I have a limited lease, how long will my lease remain in effect
30:2.0.3.5.13.2.278.30SECTION 585.237
     585.237 What is the effective date of a lease
30:2.0.3.5.13.2.278.31SECTION 585.238
     585.238 Are there any other renewable energy research activities that will be allowed on the OCS
30:2.0.3.5.13.3SUBPART C
Subpart C - Rights-of-Way Grants and Rights-of-Use and Easement Grants for Renewable Energy Activities
30:2.0.3.5.13.3.279SUBJGRP 279
  ROW Grants and RUE Grants
30:2.0.3.5.13.3.279.1SECTION 585.300
     585.300 What types of activities are authorized by ROW grants and RUE grants issued under this part
30:2.0.3.5.13.3.279.2SECTION 585.301
     585.301 What do ROW grants and RUE grants include
30:2.0.3.5.13.3.279.3SECTION 585.302
     585.302 What are the general requirements for ROW grant and RUE grant holders
30:2.0.3.5.13.3.279.4SECTION 585.303
     585.303 How long will my ROW grant or RUE grant remain in effect
30:2.0.3.5.13.3.279.5SECTION 585.304
     585.304 [Reserved]
30:2.0.3.5.13.3.280SUBJGRP 280
  Obtaining ROW Grants and RUE Grants
30:2.0.3.5.13.3.280.6SECTION 585.305
     585.305 How do I request an ROW grant or RUE grant
30:2.0.3.5.13.3.280.7SECTION 585.306
     585.306 What action will BOEM take on my request
30:2.0.3.5.13.3.280.8SECTION 585.307
     585.307 How will BOEM determine whether competitive interest exists for ROW grants and RUE grants
30:2.0.3.5.13.3.280.9SECTION 585.308
     585.308 How will BOEM conduct an auction for ROW grants and RUE grants
30:2.0.3.5.13.3.280.10SECTION 585.309
     585.309 When will BOEM issue a noncompetitive ROW grant or RUE grant
30:2.0.3.5.13.3.280.11SECTION 585.310
     585.310 What is the effective date of an ROW grant or RUE grant
30:2.0.3.5.13.3.280.12SECTION 585.311-585.314
     585.311-585.314 [Reserved]
30:2.0.3.5.13.3.281SUBJGRP 281
  Financial Requirements for ROW Grants and RUE Grants
30:2.0.3.5.13.3.281.13SECTION 585.315
     585.315 What deposits are required for a competitive ROW grant or RUE grant
30:2.0.3.5.13.3.281.14SECTION 585.316
     585.316 What payments are required for ROW grants or RUE grants
30:2.0.3.5.13.4SUBPART D
Subpart D - Lease and Grant Administration
30:2.0.3.5.13.4.282SUBJGRP 282
  Noncompliance and Cessation Orders
30:2.0.3.5.13.4.282.1SECTION 585.400
     585.400 What happens if I fail to comply with this part
30:2.0.3.5.13.4.282.2SECTION 585.401
     585.401 When may BOEM issue a cessation order
30:2.0.3.5.13.4.282.3SECTION 585.402
     585.402 What is the effect of a cessation order
30:2.0.3.5.13.4.282.4SECTION 585.403-585.404
     585.403-585.404 [Reserved]
30:2.0.3.5.13.4.283SUBJGRP 283
  Designation of Operator
30:2.0.3.5.13.4.283.5SECTION 585.405
     585.405 How do I designate an operator
30:2.0.3.5.13.4.283.6SECTION 585.406
     585.406 Who is responsible for fulfilling lease and grant obligations
30:2.0.3.5.13.4.283.7SECTION 585.407
     585.407 [Reserved]
30:2.0.3.5.13.4.284SUBJGRP 284
  Lease or Grant Assignment
30:2.0.3.5.13.4.284.8SECTION 585.408
     585.408 May I assign my lease or grant interest
30:2.0.3.5.13.4.284.9SECTION 585.409
     585.409 How do I request approval of a lease or grant assignment
30:2.0.3.5.13.4.284.10SECTION 585.410
     585.410 How does an assignment affect the assignor's liability
30:2.0.3.5.13.4.284.11SECTION 585.411
     585.411 How does an assignment affect the assignee's liability
30:2.0.3.5.13.4.284.12SECTION 585.412-585.414
     585.412-585.414 [Reserved]
30:2.0.3.5.13.4.285SUBJGRP 285
  Lease or Grant Suspension
30:2.0.3.5.13.4.285.13SECTION 585.415
     585.415 What is a lease or grant suspension
30:2.0.3.5.13.4.285.14SECTION 585.416
     585.416 How do I request a lease or grant suspension
30:2.0.3.5.13.4.285.15SECTION 585.417
     585.417 When may BOEM order a suspension
30:2.0.3.5.13.4.285.16SECTION 585.418
     585.418 How will BOEM issue a suspension
30:2.0.3.5.13.4.285.17SECTION 585.419
     585.419 What are my immediate responsibilities if I receive a suspension order
30:2.0.3.5.13.4.285.18SECTION 585.420
     585.420 What effect does a suspension order have on my payments
30:2.0.3.5.13.4.285.19SECTION 585.421
     585.421 How long will a suspension be in effect
30:2.0.3.5.13.4.285.20SECTION 585.422-585.424
     585.422-585.424 [Reserved]
30:2.0.3.5.13.4.286SUBJGRP 286
  Lease or Grant Renewal
30:2.0.3.5.13.4.286.21SECTION 585.425
     585.425 May I obtain a renewal of my lease or grant before it terminates
30:2.0.3.5.13.4.286.22SECTION 585.426
     585.426 When must I submit my request for renewal
30:2.0.3.5.13.4.286.23SECTION 585.427
     585.427 How long is a renewal
30:2.0.3.5.13.4.286.24SECTION 585.428
     585.428 What effect does applying for a renewal have on my activities and payments
30:2.0.3.5.13.4.286.25SECTION 585.429
     585.429 What criteria will BOEM consider in deciding whether to renew a lease or grant
30:2.0.3.5.13.4.286.26SECTION 585.430-585.431
     585.430-585.431 [Reserved]
30:2.0.3.5.13.4.287SUBJGRP 287
  Lease or Grant Termination
30:2.0.3.5.13.4.287.27SECTION 585.432
     585.432 When does my lease or grant terminate
30:2.0.3.5.13.4.287.28SECTION 585.433
     585.433 What must I do after my lease or grant terminates
30:2.0.3.5.13.4.287.29SECTION 585.434
     585.434 [Reserved]
30:2.0.3.5.13.4.288SUBJGRP 288
  Lease or Grant Relinquishment
30:2.0.3.5.13.4.288.30SECTION 585.435
     585.435 How can I relinquish a lease or a grant or parts of a lease or grant
30:2.0.3.5.13.4.289SUBJGRP 289
  Lease or Grant Contraction
30:2.0.3.5.13.4.289.31SECTION 585.436
     585.436 Can BOEM require lease or grant contraction
30:2.0.3.5.13.4.290SUBJGRP 290
  Lease or Grant Cancellation
30:2.0.3.5.13.4.290.32SECTION 585.437
     585.437 When can my lease or grant be canceled
30:2.0.3.5.13.5SUBPART E
Subpart E - Payments and Financial Assurance Requirements
30:2.0.3.5.13.5.291SUBJGRP 291
  Payments
30:2.0.3.5.13.5.291.1SECTION 585.500
     585.500 How do I make payments under this part
30:2.0.3.5.13.5.291.2SECTION 585.501
     585.501 What deposits must I submit for a competitively issued lease, ROW grant, or RUE grant
30:2.0.3.5.13.5.291.3SECTION 585.502
     585.502 What initial payment requirements must I meet to obtain a noncompetitive lease, ROW grant, or RUE grant
30:2.0.3.5.13.5.291.4SECTION 585.503
     585.503 What are the rent and operating fee requirements for a commercial lease
30:2.0.3.5.13.5.291.5SECTION 585.504
     585.504 How are my payments affected if I develop my lease in phases
30:2.0.3.5.13.5.291.6SECTION 585.505
     585.505 What are the rent and operating fee requirements for a limited lease
30:2.0.3.5.13.5.291.7SECTION 585.506
     585.506 What operating fees must I pay on a commercial lease
30:2.0.3.5.13.5.291.8SECTION 585.507
     585.507 What rent payments must I pay on a project easement
30:2.0.3.5.13.5.291.9SECTION 585.508
     585.508 What rent payments must I pay on ROW grants or RUE grants associated with renewable energy projects
30:2.0.3.5.13.5.291.10SECTION 585.509
     585.509 Who is responsible for submitting lease or grant payments to BOEM
30:2.0.3.5.13.5.291.11SECTION 585.510
     585.510 May BOEM reduce or waive my lease or grant payments
30:2.0.3.5.13.5.291.12SECTION 585.511-585.514
     585.511-585.514 [Reserved]
30:2.0.3.5.13.5.292SUBJGRP 292
  Financial Assurance Requirements for Commercial Leases
30:2.0.3.5.13.5.292.13SECTION 585.515
     585.515 What financial assurance must I provide when I obtain my commercial lease
30:2.0.3.5.13.5.292.14SECTION 585.516
     585.516 What are the financial assurance requirements for each stage of my commercial lease
30:2.0.3.5.13.5.292.15SECTION 585.517
     585.517 How will BOEM determine the amounts of the supplemental and decommissioning financial assurance requirements associated with commercial leases
30:2.0.3.5.13.5.292.16SECTION 585.518-585.519
     585.518-585.519 [Reserved]
30:2.0.3.5.13.5.293SUBJGRP 293
  Financial Assurance for Limited Leases, ROW Grants, and RUE Grants
30:2.0.3.5.13.5.293.17SECTION 585.520
     585.520 What financial assurance must I provide when I obtain my limited lease, ROW grant, or RUE grant
30:2.0.3.5.13.5.293.18SECTION 585.521
     585.521 Do my financial assurance requirements change as activities progress on my limited lease or grant
30:2.0.3.5.13.5.293.19SECTION 585.522-585.524
     585.522-585.524 [Reserved]
30:2.0.3.5.13.5.294SUBJGRP 294
  Requirements for Financial Assurance Instruments
30:2.0.3.5.13.5.294.20SECTION 585.525
     585.525 What general requirements must a financial assurance instrument meet
30:2.0.3.5.13.5.294.21SECTION 585.526
     585.526 What instruments other than a surety bond may I use to meet the financial assurance requirement
30:2.0.3.5.13.5.294.22SECTION 585.527
     585.527 May I demonstrate financial strength and reliability to meet the financial assurance requirement for lease or grant activities
30:2.0.3.5.13.5.294.23SECTION 585.528
     585.528 May I use a third-party guaranty to meet the financial assurance requirement for lease or grant activities
30:2.0.3.5.13.5.294.24SECTION 585.529
     585.529 Can I use a lease- or grant-specific decommissioning account to meet the financial assurance requirements related to decommissioning
30:2.0.3.5.13.5.295SUBJGRP 295
  Changes in Financial Assurance
30:2.0.3.5.13.5.295.25SECTION 585.530
     585.530 What must I do if my financial assurance lapses
30:2.0.3.5.13.5.295.26SECTION 585.531
     585.531 What happens if the value of my financial assurance is reduced
30:2.0.3.5.13.5.295.27SECTION 585.532
     585.532 What happens if my surety wants to terminate the period of liability of my bond
30:2.0.3.5.13.5.295.28SECTION 585.533
     585.533 How does my surety obtain cancellation of my bond
30:2.0.3.5.13.5.295.29SECTION 585.534
     585.534 When may BOEM cancel my bond
30:2.0.3.5.13.5.295.30SECTION 585.535
     585.535 Why might BOEM call for forfeiture of my bond
30:2.0.3.5.13.5.295.31SECTION 585.536
     585.536 How will I be notified of a call for forfeiture
30:2.0.3.5.13.5.295.32SECTION 585.537
     585.537 How will BOEM proceed once my bond or other security is forfeited
30:2.0.3.5.13.5.295.33SECTION 585.538-585.539
     585.538-585.539 [Reserved]
30:2.0.3.5.13.5.296SUBJGRP 296
  Revenue Sharing With States
30:2.0.3.5.13.5.296.34SECTION 585.540
     585.540 How will BOEM equitably distribute revenues to States
30:2.0.3.5.13.5.296.35SECTION 585.541
     585.541 What is a qualified project for revenue sharing purposes
30:2.0.3.5.13.5.296.36SECTION 585.542
     585.542 What makes a State eligible for payment of revenues
30:2.0.3.5.13.5.296.37SECTION 585.543
     585.543 Example of how the inverse distance formula works.
30:2.0.3.5.13.6SUBPART F
Subpart F - Plans and Information Requirements
30:2.0.3.5.13.6.297SUBJGRP 297
  Site Assessment Plan and Information Requirements for Commercial Leases
30:2.0.3.5.13.6.297.1SECTION 585.600
     585.600 What plans and information must I submit to BOEM before I conduct activities on my lease or grant
30:2.0.3.5.13.6.297.2SECTION 585.601
     585.601 When am I required to submit my plans to BOEM
30:2.0.3.5.13.6.297.3SECTION 585.602
     585.602 What records must I maintain
30:2.0.3.5.13.6.297.4SECTION 585.603-585.604
     585.603-585.604 [Reserved]
30:2.0.3.5.13.6.297.5SECTION 585.605
     585.605 What is a Site Assessment Plan (SAP)
30:2.0.3.5.13.6.297.6SECTION 585.606
     585.606 What must I demonstrate in my SAP
30:2.0.3.5.13.6.297.7SECTION 585.607
     585.607 How do I submit my SAP
30:2.0.3.5.13.6.297.8SECTION 585.608-585.609
     585.608-585.609 [Reserved]
30:2.0.3.5.13.6.298SUBJGRP 298
  Contents of the Site Assessment Plan
30:2.0.3.5.13.6.298.9SECTION 585.610
     585.610 What must I include in my SAP
30:2.0.3.5.13.6.298.10SECTION 585.611
     585.611 What information and certifications must I submit with my SAP to assist BOEM in complying with NEPA and other relevant laws
30:2.0.3.5.13.6.298.11SECTION 585.612
     585.612 How will my SAP be processed for Federal consistency under the Coastal Zone Management Act
30:2.0.3.5.13.6.298.12SECTION 585.613
     585.613 How will BOEM process my SAP
30:2.0.3.5.13.6.299SUBJGRP 299
  Activities Under an Approved SAP
30:2.0.3.5.13.6.299.13SECTION 585.614
     585.614 When may I begin conducting activities under my approved SAP
30:2.0.3.5.13.6.299.14SECTION 585.615
     585.615 What other reports or notices must I submit to BOEM under my approved SAP
30:2.0.3.5.13.6.299.15SECTION 585.616
     585.616 [Reserved]
30:2.0.3.5.13.6.299.16SECTION 585.617
     585.617 What activities require a revision to my SAP, and when will BOEM approve the revision
30:2.0.3.5.13.6.299.17SECTION 585.618
     585.618 What must I do upon completion of approved site assessment activities
30:2.0.3.5.13.6.299.18SECTION 585.619
     585.619 [Reserved]
30:2.0.3.5.13.6.300SUBJGRP 300
  Construction and Operations Plan for Commercial Leases
30:2.0.3.5.13.6.300.19SECTION 585.620
     585.620 What is a Construction and Operations Plan (COP)
30:2.0.3.5.13.6.300.20SECTION 585.621
     585.621 What must I demonstrate in my COP
30:2.0.3.5.13.6.300.21SECTION 585.622
     585.622 How do I submit my COP
30:2.0.3.5.13.6.300.22SECTION 585.623-585.625
     585.623-585.625 [Reserved]
30:2.0.3.5.13.6.301SUBJGRP 301
  Contents of the Construction and Operations Plan
30:2.0.3.5.13.6.301.23SECTION 585.626
     585.626 What must I include in my COP
30:2.0.3.5.13.6.301.24SECTION 585.627
     585.627 What information and certifications must I submit with my COP to assist the BOEM in complying with NEPA and other relevant laws
30:2.0.3.5.13.6.301.25SECTION 585.628
     585.628 How will BOEM process my COP
30:2.0.3.5.13.6.301.26SECTION 585.629
     585.629 May I develop my lease in phases
30:2.0.3.5.13.6.301.27SECTION 585.630
     585.630 [Reserved]
30:2.0.3.5.13.6.302SUBJGRP 302
  Activities Under an Approved COP
30:2.0.3.5.13.6.302.28SECTION 585.631
     585.631 When must I initiate activities under an approved COP
30:2.0.3.5.13.6.302.29SECTION 585.632
     585.632 What documents must I submit before I may construct and install facilities under my approved COP
30:2.0.3.5.13.6.302.30SECTION 585.633
     585.633 How do I comply with my COP
30:2.0.3.5.13.6.302.31SECTION 585.634
     585.634 What activities require a revision to my COP, and when will BOEM approve the revision
30:2.0.3.5.13.6.302.32SECTION 585.635
     585.635 What must I do if I cease activities approved in my COP before the end of my commercial lease
30:2.0.3.5.13.6.302.33SECTION 585.636
     585.636 What notices must I provide BOEM following approval of my COP
30:2.0.3.5.13.6.302.34SECTION 585.637
     585.637 When may I commence commercial operations on my commercial lease
30:2.0.3.5.13.6.302.35SECTION 585.638
     585.638 What must I do upon completion of my commercial operations as approved in my COP or FERC license
30:2.0.3.5.13.6.302.36SECTION 585.639
     585.639 [Reserved]
30:2.0.3.5.13.6.303SUBJGRP 303
  General Activities Plan Requirements For Limited Leases, ROW Grants, and RUE Grants
30:2.0.3.5.13.6.303.37SECTION 585.640
     585.640 What is a General Activities Plan (GAP)
30:2.0.3.5.13.6.303.38SECTION 585.641
     585.641 What must I demonstrate in my GAP
30:2.0.3.5.13.6.303.39SECTION 585.642
     585.642 How do I submit my GAP
30:2.0.3.5.13.6.303.40SECTION 585.643-585.644
     585.643-585.644 [Reserved]
30:2.0.3.5.13.6.304SUBJGRP 304
  Contents of the General Activities Plan
30:2.0.3.5.13.6.304.41SECTION 585.645
     585.645 What must I include in my GAP
30:2.0.3.5.13.6.304.42SECTION 585.646
     585.646 What information and certifications must I submit with my GAP to assist BOEM in complying with NEPA and other relevant laws
30:2.0.3.5.13.6.304.43SECTION 585.647
     585.647 How will my GAP be processed for Federal consistency under the Coastal Zone Management Act
30:2.0.3.5.13.6.304.44SECTION 585.648
     585.648 How will BOEM process my GAP
30:2.0.3.5.13.6.304.45SECTION 585.649
     585.649 [Reserved]
30:2.0.3.5.13.6.305SUBJGRP 305
  Activities Under an Approved GAP
30:2.0.3.5.13.6.305.46SECTION 585.650
     585.650 When may I begin conducting activities under my GAP
30:2.0.3.5.13.6.305.47SECTION 585.651
     585.651 When may I construct complex or significant OCS facilities on my limited lease or any facilities on my project easement proposed under my GAP
30:2.0.3.5.13.6.305.48SECTION 585.652
     585.652 How long do I have to conduct activities under an approved GAP
30:2.0.3.5.13.6.305.49SECTION 585.653
     585.653 What other reports or notices must I submit to BOEM under my approved GAP
30:2.0.3.5.13.6.305.50SECTION 585.654
     585.654 [Reserved]
30:2.0.3.5.13.6.305.51SECTION 585.655
     585.655 What activities require a revision to my GAP, and when will BOEM approve the revision
30:2.0.3.5.13.6.305.52SECTION 585.656
     585.656 What must I do if I cease activities approved in my GAP before the end of my term
30:2.0.3.5.13.6.305.53SECTION 585.657
     585.657 What must I do upon completion of approved activities under my GAP
30:2.0.3.5.13.6.306SUBJGRP 306
  Cable and Pipeline Deviations
30:2.0.3.5.13.6.306.54SECTION 585.658
     585.658 Can my cable or pipeline construction deviate from my approved COP or GAP
30:2.0.3.5.13.6.306.55SECTION 585.659
     585.659 What requirements must I include in my SAP, COP, or GAP regarding air quality
30:2.0.3.5.13.7SUBPART G
Subpart G - Facility Design, Fabrication, and Installation
30:2.0.3.5.13.7.307SUBJGRP 307
  Reports
30:2.0.3.5.13.7.307.1SECTION 585.700
     585.700 What reports must I submit to BOEM before installing facilities described in my approved SAP, COP, or GAP
30:2.0.3.5.13.7.307.2SECTION 585.701
     585.701 What must I include in my Facility Design Report
30:2.0.3.5.13.7.307.3SECTION 585.702
     585.702 What must I include in my Fabrication and Installation Report
30:2.0.3.5.13.7.307.4SECTION 585.703
     585.703 What reports must I submit for project modifications and repairs
30:2.0.3.5.13.7.307.5SECTION 585.704
     585.704 [Reserved]
30:2.0.3.5.13.7.308SUBJGRP 308
  Certified Verification Agent
30:2.0.3.5.13.7.308.6SECTION 585.705
     585.705 When must I use a Certified Verification Agent (CVA)
30:2.0.3.5.13.7.308.7SECTION 585.706
     585.706 How do I nominate a CVA for BOEM approval
30:2.0.3.5.13.7.308.8SECTION 585.707
     585.707 What are the CVA's primary duties for facility design review
30:2.0.3.5.13.7.308.9SECTION 585.708
     585.708 What are the CVA's or project engineer's primary duties for fabrication and installation review
30:2.0.3.5.13.7.308.10SECTION 585.709
     585.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify
30:2.0.3.5.13.7.308.11SECTION 585.710
     585.710 When conducting onsite installation inspections, what must the CVA or project engineer do
30:2.0.3.5.13.7.308.12SECTION 585.711
     585.711 [Reserved]
30:2.0.3.5.13.7.308.13SECTION 585.712
     585.712 What are the CVA's or project engineer's reporting requirements
30:2.0.3.5.13.7.308.14SECTION 585.713
     585.713 What must I do after the CVA or project engineer confirms conformance with the Fabrication and Installation Report on my commercial lease
30:2.0.3.5.13.7.308.15SECTION 585.714
     585.714 What records relating to SAPs, COPs, and GAPs must I keep
30:2.0.3.5.13.8SUBPART H
Subpart H - Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs, COPs and GAPs
30:2.0.3.5.13.8.309SUBJGRP 309
  Safety Management Systems
30:2.0.3.5.13.8.309.1SECTION 585.800
     585.800 How must I conduct my activities to comply with safety and environmental requirements
30:2.0.3.5.13.8.309.2SECTION 585.801
     585.801 How must I conduct my approved activities to protect marine mammals, threatened and endangered species, and designated critical habitat
30:2.0.3.5.13.8.309.3SECTION 585.802
     585.802 What must I do if I discover a potential archaeological resource while conducting my approved activities
30:2.0.3.5.13.8.309.4SECTION 585.803
     585.803 How must I conduct my approved activities to protect essential fish habitats identified and described under the Magnuson-Stevens Fishery Conservation and Management Act
30:2.0.3.5.13.8.309.5SECTION 585.804-585.809
     585.804-585.809 [Reserved]
30:2.0.3.5.13.8.309.6SECTION 585.810
     585.810 What must I include in my Safety Management System
30:2.0.3.5.13.8.309.7SECTION 585.811
     585.811 When must I follow my Safety Management System
30:2.0.3.5.13.8.309.8SECTION 585.812
     585.812 [Reserved]
30:2.0.3.5.13.8.310SUBJGRP 310
  Maintenance and Shutdowns
30:2.0.3.5.13.8.310.9SECTION 585.813
     585.813 When do I have to report removing equipment from service
30:2.0.3.5.13.8.310.10SECTION 585.814
     585.814 [Reserved]
30:2.0.3.5.13.8.311SUBJGRP 311
  Equipment Failure and Adverse Environmental Effects
30:2.0.3.5.13.8.311.11SECTION 585.815
     585.815 What must I do if I have facility damage or an equipment failure
30:2.0.3.5.13.8.311.12SECTION 585.816
     585.816 What must I do if environmental or other conditions adversely affect a cable, pipeline, or facility
30:2.0.3.5.13.8.311.13SECTION 585.817-585.819
     585.817-585.819 [Reserved]
30:2.0.3.5.13.8.312SUBJGRP 312
  Inspections and Assessment
30:2.0.3.5.13.8.312.14SECTION 585.820
     585.820 Will BOEM conduct inspections
30:2.0.3.5.13.8.312.15SECTION 585.821
     585.821 Will BOEM conduct scheduled and unscheduled inspections
30:2.0.3.5.13.8.312.16SECTION 585.822
     585.822 What must I do when BOEM conducts an inspection
30:2.0.3.5.13.8.312.17SECTION 585.823
     585.823 Will BOEM reimburse me for my expenses related to inspections
30:2.0.3.5.13.8.312.18SECTION 585.824
     585.824 How must I conduct self-inspections
30:2.0.3.5.13.8.312.19SECTION 585.825
     585.825 When must I assess my facilities
30:2.0.3.5.13.8.312.20SECTION 585.826-585.829
     585.826-585.829 [Reserved]
30:2.0.3.5.13.8.313SUBJGRP 313
  Incident Reporting and Investigation
30:2.0.3.5.13.8.313.21SECTION 585.830
     585.830 What are my incident reporting requirements
30:2.0.3.5.13.8.313.22SECTION 585.831
     585.831 What incidents must I report, and when must I report them
30:2.0.3.5.13.8.313.23SECTION 585.832
     585.832 How do I report incidents requiring immediate notification
30:2.0.3.5.13.8.313.24SECTION 585.833
     585.833 What are the reporting requirements for incidents requiring written notification
30:2.0.3.5.13.9SUBPART I
Subpart I - Decommissioning
30:2.0.3.5.13.9.314SUBJGRP 314
  Decommissioning Obligations and Requirements
30:2.0.3.5.13.9.314.1SECTION 585.900
     585.900 Who must meet the decommissioning obligations in this subpart
30:2.0.3.5.13.9.314.2SECTION 585.901
     585.901 When do I accrue decommissioning obligations
30:2.0.3.5.13.9.314.3SECTION 585.902
     585.902 What are the general requirements for decommissioning for facilities authorized under my SAP, COP, or GAP
30:2.0.3.5.13.9.314.4SECTION 585.903
     585.903 What are the requirements for decommissioning FERC-licensed hydrokinetic facilities
30:2.0.3.5.13.9.314.5SECTION 585.904
     585.904 Can I request a departure from the decommissioning requirements
30:2.0.3.5.13.9.315SUBJGRP 315
  Decommissioning Applications
30:2.0.3.5.13.9.315.6SECTION 585.905
     585.905 When must I submit my decommissioning application
30:2.0.3.5.13.9.315.7SECTION 585.906
     585.906 What must my decommissioning application include
30:2.0.3.5.13.9.315.8SECTION 585.907
     585.907 How will BOEM process my decommissioning application
30:2.0.3.5.13.9.315.9SECTION 585.908
     585.908 What must I include in my decommissioning notice
30:2.0.3.5.13.9.316SUBJGRP 316
  Facility Removal
30:2.0.3.5.13.9.316.10SECTION 585.909
     585.909 When may BOEM authorize facilities to remain in place following termination of a lease or grant
30:2.0.3.5.13.9.316.11SECTION 585.910
     585.910 What must I do when I remove my facility
30:2.0.3.5.13.9.316.12SECTION 585.911
     585.911 [Reserved]
30:2.0.3.5.13.9.317SUBJGRP 317
  Decommissioning Report
30:2.0.3.5.13.9.317.13SECTION 585.912
     585.912 After I remove a facility, cable, or pipeline, what information must I submit
30:2.0.3.5.13.9.318SUBJGRP 318
  Compliance With an Approved Decommissioning Application
30:2.0.3.5.13.9.318.14SECTION 585.913
     585.913 What happens if I fail to comply with my approved decommissioning application
30:2.0.3.5.13.10SUBPART J
Subpart J - Rights of Use and Easement for Energy- and Marine-Related Activities Using Existing OCS Facilities
30:2.0.3.5.13.10.319SUBJGRP 319
  Regulated Activities
30:2.0.3.5.13.10.319.1SECTION 585.1000
     585.1000 What activities does this subpart regulate
30:2.0.3.5.13.10.319.2SECTION 585.1001-585.1003
     585.1001-585.1003 [Reserved]
30:2.0.3.5.13.10.320SUBJGRP 320
  Requesting an Alternate Use RUE
30:2.0.3.5.13.10.320.3SECTION 585.1004
     585.1004 What must I do before I request an Alternate Use RUE
30:2.0.3.5.13.10.320.4SECTION 585.1005
     585.1005 How do I request an Alternate Use RUE
30:2.0.3.5.13.10.320.5SECTION 585.1006
     585.1006 How will BOEM decide whether to issue an Alternate Use RUE
30:2.0.3.5.13.10.320.6SECTION 585.1007
     585.1007 What process will BOEM use for competitively offering an Alternate Use RUE
30:2.0.3.5.13.10.320.7SECTION 585.1008-585.1009
     585.1008-585.1009 [Reserved]
30:2.0.3.5.13.10.321SUBJGRP 321
  Alternate Use RUE Administration
30:2.0.3.5.13.10.321.8SECTION 585.1010
     585.1010 How long may I conduct activities under an Alternate Use RUE
30:2.0.3.5.13.10.321.9SECTION 585.1011
     585.1011 What payments are required for an Alternate Use RUE
30:2.0.3.5.13.10.321.10SECTION 585.1012
     585.1012 What financial assurance is required for an Alternate Use RUE
30:2.0.3.5.13.10.321.11SECTION 585.1013
     585.1013 Is an Alternate Use RUE assignable
30:2.0.3.5.13.10.321.12SECTION 585.1014
     585.1014 When will BOEM suspend an Alternate Use RUE
30:2.0.3.5.13.10.321.13SECTION 585.1015
     585.1015 How do I relinquish an Alternate Use RUE
30:2.0.3.5.13.10.321.14SECTION 585.1016
     585.1016 When will an Alternate Use RUE be cancelled
30:2.0.3.5.13.10.321.15SECTION 585.1017
     585.1017 [Reserved]
30:2.0.3.5.13.10.322SUBJGRP 322
  Decommissioning an Alternate Use RUE
30:2.0.3.5.13.10.322.16SECTION 585.1018
     585.1018 Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE
30:2.0.3.5.13.10.322.17SECTION 585.1019
     585.1019 What are the decommissioning requirements for an Alternate Use RUE