30:2.0.3.5.13.7.307 | SUBJGRP 307
| Reports | |
30:2.0.3.5.13.7.307.1 | SECTION 585.700
| 585.700 What reports must I submit to BOEM before installing facilities described in my approved SAP, COP, or GAP | |
30:2.0.3.5.13.7.307.2 | SECTION 585.701
| 585.701 What must I include in my Facility Design Report | |
30:2.0.3.5.13.7.307.3 | SECTION 585.702
| 585.702 What must I include in my Fabrication and Installation Report | |
30:2.0.3.5.13.7.307.4 | SECTION 585.703
| 585.703 What reports must I submit for project modifications and repairs | |
30:2.0.3.5.13.7.307.5 | SECTION 585.704
| 585.704 [Reserved] | |
30:2.0.3.5.13.7.308 | SUBJGRP 308
| Certified Verification Agent | |
30:2.0.3.5.13.7.308.6 | SECTION 585.705
| 585.705 When must I use a Certified Verification Agent (CVA) | |
30:2.0.3.5.13.7.308.7 | SECTION 585.706
| 585.706 How do I nominate a CVA for BOEM approval | |
30:2.0.3.5.13.7.308.8 | SECTION 585.707
| 585.707 What are the CVA's primary duties for facility design review | |
30:2.0.3.5.13.7.308.9 | SECTION 585.708
| 585.708 What are the CVA's or project engineer's primary duties for fabrication and installation review | |
30:2.0.3.5.13.7.308.10 | SECTION 585.709
| 585.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify | |
30:2.0.3.5.13.7.308.11 | SECTION 585.710
| 585.710 When conducting onsite installation inspections, what must the CVA or project engineer do | |
30:2.0.3.5.13.7.308.12 | SECTION 585.711
| 585.711 [Reserved] | |
30:2.0.3.5.13.7.308.13 | SECTION 585.712
| 585.712 What are the CVA's or project engineer's reporting requirements | |
30:2.0.3.5.13.7.308.14 | SECTION 585.713
| 585.713 What must I do after the CVA or project engineer confirms conformance with the Fabrication and Installation Report on my commercial lease | |
30:2.0.3.5.13.7.308.15 | SECTION 585.714
| 585.714 What records relating to SAPs, COPs, and GAPs must I keep | |