Title 30

PART 585 SUBPART G

Subpart G - Facility Design, Fabrication, and Installation

30:2.0.3.5.13.7.307SUBJGRP 307
Reports
30:2.0.3.5.13.7.307.1SECTION 585.700
   585.700 What reports must I submit to BOEM before installing facilities described in my approved SAP, COP, or GAP
30:2.0.3.5.13.7.307.2SECTION 585.701
   585.701 What must I include in my Facility Design Report
30:2.0.3.5.13.7.307.3SECTION 585.702
   585.702 What must I include in my Fabrication and Installation Report
30:2.0.3.5.13.7.307.4SECTION 585.703
   585.703 What reports must I submit for project modifications and repairs
30:2.0.3.5.13.7.307.5SECTION 585.704
   585.704 [Reserved]
30:2.0.3.5.13.7.308SUBJGRP 308
Certified Verification Agent
30:2.0.3.5.13.7.308.6SECTION 585.705
   585.705 When must I use a Certified Verification Agent (CVA)
30:2.0.3.5.13.7.308.7SECTION 585.706
   585.706 How do I nominate a CVA for BOEM approval
30:2.0.3.5.13.7.308.8SECTION 585.707
   585.707 What are the CVA's primary duties for facility design review
30:2.0.3.5.13.7.308.9SECTION 585.708
   585.708 What are the CVA's or project engineer's primary duties for fabrication and installation review
30:2.0.3.5.13.7.308.10SECTION 585.709
   585.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify
30:2.0.3.5.13.7.308.11SECTION 585.710
   585.710 When conducting onsite installation inspections, what must the CVA or project engineer do
30:2.0.3.5.13.7.308.12SECTION 585.711
   585.711 [Reserved]
30:2.0.3.5.13.7.308.13SECTION 585.712
   585.712 What are the CVA's or project engineer's reporting requirements
30:2.0.3.5.13.7.308.14SECTION 585.713
   585.713 What must I do after the CVA or project engineer confirms conformance with the Fabrication and Installation Report on my commercial lease
30:2.0.3.5.13.7.308.15SECTION 585.714
   585.714 What records relating to SAPs, COPs, and GAPs must I keep