Title 30

PART 585

Part 585 - Renewable Energy And Alternate Uses Of Existing Facilities On The Outer Continental Shelf

PART 585 - RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Authority:Section 104, Public Law 97-451, 96 Stat. 2451 (30 U.S.C. 1714), Public Law 109-432, Div C, Title I, 120 Stat. 3000; 30 U.S.C. 1751; 31 U.S.C. 9701; 43 U.S.C. 1334; 33 U.S.C. 2704, 2716; E.O. 12777, as amended; 43 U.S.C. 1331 et seq., 43 U.S.C. 1337. Source:76 FR 64623, Oct. 18, 2011, unless otherwise noted.

30:2.0.3.5.13.1SUBPART A
Subpart A - General Provisions
30:2.0.3.5.13.1.274.1SECTION 585.100
   585.100 Authority.
30:2.0.3.5.13.1.274.2SECTION 585.101
   585.101 What is the purpose of this part
30:2.0.3.5.13.1.274.3SECTION 585.102
   585.102 What are BOEM's responsibilities under this part
30:2.0.3.5.13.1.274.4SECTION 585.103
   585.103 When may BOEM prescribe or approve departures from these regulations
30:2.0.3.5.13.1.274.5SECTION 585.104
   585.104 Do I need a BOEM lease or other authorization to produce or support the production of electricity or other energy product from a renewable energy resource on the OCS
30:2.0.3.5.13.1.274.6SECTION 585.105
   585.105 What are my responsibilities under this part
30:2.0.3.5.13.1.274.7SECTION 585.106
   585.106 Who can hold a lease or grant under this part
30:2.0.3.5.13.1.274.8SECTION 585.107
   585.107 How do I show that I am qualified to be a lessee or grant holder
30:2.0.3.5.13.1.274.9SECTION 585.108
   585.108 When must I notify BOEM if an action has been filed alleging that I am insolvent or bankrupt
30:2.0.3.5.13.1.274.10SECTION 585.109
   585.109 When must I notify BOEM of mergers, name changes, or changes of business form
30:2.0.3.5.13.1.274.11SECTION 585.110
   585.110 How do I submit plans, applications, reports, or notices required by this part
30:2.0.3.5.13.1.274.12SECTION 585.111
   585.111 When and how does BOEM charge me processing fees on a case-by-case basis
30:2.0.3.5.13.1.274.13SECTION 585.112
   585.112 Definitions.
30:2.0.3.5.13.1.274.14SECTION 585.113
   585.113 How will data and information obtained by BOEM under this part be disclosed to the public
30:2.0.3.5.13.1.274.15SECTION 585.114
   585.114 Paperwork Reduction Act statements - information collection.
30:2.0.3.5.13.1.274.16SECTION 585.115
   585.115 Documents incorporated by reference.
30:2.0.3.5.13.1.274.17SECTION 585.116
   585.116 Requests for information on the state of the offshore renewable energy industry.
30:2.0.3.5.13.1.274.18SECTION 585.117
   585.117 [Reserved]
30:2.0.3.5.13.1.274.19SECTION 585.118
   585.118 What are my appeal rights
30:2.0.3.5.13.2SUBPART B
Subpart B - Issuance of OCS Renewable Energy Leases
30:2.0.3.5.13.2.274SUBJGRP 274
   General Lease Information
30:2.0.3.5.13.2.274.1SECTION 585.200
   585.200 What rights are granted with a lease issued under this part
30:2.0.3.5.13.2.274.2SECTION 585.201
   585.201 How will BOEM issue leases
30:2.0.3.5.13.2.274.3SECTION 585.202
   585.202 What types of leases will BOEM issue
30:2.0.3.5.13.2.274.4SECTION 585.203
   585.203 With whom will BOEM consult before issuance of a lease
30:2.0.3.5.13.2.274.5SECTION 585.204
   585.204 What areas are available for leasing consideration
30:2.0.3.5.13.2.274.6SECTION 585.205
   585.205 How will leases be mapped
30:2.0.3.5.13.2.274.7SECTION 585.206
   585.206 What is the lease size
30:2.0.3.5.13.2.274.8SECTION 585.207-585.209
   585.207-585.209 [Reserved]
30:2.0.3.5.13.2.275SUBJGRP 275
   Competitive Lease Process
30:2.0.3.5.13.2.275.9SECTION 585.210
   585.210 How does BOEM initiate the competitive leasing process
30:2.0.3.5.13.2.275.10SECTION 585.211
   585.211 What is the process for competitive issuance of leases
30:2.0.3.5.13.2.275.11SECTION 585.212
   585.212 What is the process BOEM will follow if there is reason to believe that competitors have withdrawn before the Final Sale Notice is issued
30:2.0.3.5.13.2.275.12SECTION 585.213
   585.213 What must I submit in response to a Request for Interest or a Call for Information and Nominations
30:2.0.3.5.13.2.275.13SECTION 585.214
   585.214 What will BOEM do with information from the Requests for Information or Calls for Information and Nominations
30:2.0.3.5.13.2.275.14SECTION 585.215
   585.215 What areas will BOEM offer in a lease sale
30:2.0.3.5.13.2.275.15SECTION 585.216
   585.216 What information will BOEM publish in the Proposed Sale Notice and Final Sale Notice
30:2.0.3.5.13.2.275.16SECTION 585.217-585.219
   585.217-585.219 [Reserved]
30:2.0.3.5.13.2.276SUBJGRP 276
   Competitive Lease Award Process
30:2.0.3.5.13.2.276.17SECTION 585.220
   585.220 What auction format may BOEM use in a lease sale
30:2.0.3.5.13.2.276.18SECTION 585.221
   585.221 What bidding systems may BOEM use for commercial leases and limited leases
30:2.0.3.5.13.2.276.19SECTION 585.222
   585.222 What does BOEM do with my bid
30:2.0.3.5.13.2.276.20SECTION 585.223
   585.223 What does BOEM do if there is a tie for the highest bid
30:2.0.3.5.13.2.276.21SECTION 585.224
   585.224 What happens if BOEM accepts my bid
30:2.0.3.5.13.2.276.22SECTION 585.225
   585.225 What happens if my bid is rejected, and what are my appeal rights
30:2.0.3.5.13.2.276.23SECTION 585.226-585.229
   585.226-585.229 [Reserved]
30:2.0.3.5.13.2.277SUBJGRP 277
   Noncompetitive Lease Award Process
30:2.0.3.5.13.2.277.24SECTION 585.230
   585.230 May I request a lease if there is no Call
30:2.0.3.5.13.2.277.25SECTION 585.231
   585.231 How will BOEM process my unsolicited request for a noncompetitive lease
30:2.0.3.5.13.2.277.26SECTION 585.232
   585.232 May I acquire a lease noncompetitively after responding to a Request for Interest or Call for Information and Nominations
30:2.0.3.5.13.2.277.27SECTION 585.233-585.234
   585.233-585.234 [Reserved]
30:2.0.3.5.13.2.278SUBJGRP 278
   Commercial and Limited Lease Terms
30:2.0.3.5.13.2.278.28SECTION 585.235
   585.235 If I have a commercial lease, how long will my lease remain in effect
30:2.0.3.5.13.2.278.29SECTION 585.236
   585.236 If I have a limited lease, how long will my lease remain in effect
30:2.0.3.5.13.2.278.30SECTION 585.237
   585.237 What is the effective date of a lease
30:2.0.3.5.13.2.278.31SECTION 585.238
   585.238 Are there any other renewable energy research activities that will be allowed on the OCS
30:2.0.3.5.13.3SUBPART C
Subpart C - Rights-of-Way Grants and Rights-of-Use and Easement Grants for Renewable Energy Activities
30:2.0.3.5.13.3.279SUBJGRP 279
   ROW Grants and RUE Grants
30:2.0.3.5.13.3.279.1SECTION 585.300
   585.300 What types of activities are authorized by ROW grants and RUE grants issued under this part
30:2.0.3.5.13.3.279.2SECTION 585.301
   585.301 What do ROW grants and RUE grants include
30:2.0.3.5.13.3.279.3SECTION 585.302
   585.302 What are the general requirements for ROW grant and RUE grant holders
30:2.0.3.5.13.3.279.4SECTION 585.303
   585.303 How long will my ROW grant or RUE grant remain in effect
30:2.0.3.5.13.3.279.5SECTION 585.304
   585.304 [Reserved]
30:2.0.3.5.13.3.280SUBJGRP 280
   Obtaining ROW Grants and RUE Grants
30:2.0.3.5.13.3.280.6SECTION 585.305
   585.305 How do I request an ROW grant or RUE grant
30:2.0.3.5.13.3.280.7SECTION 585.306
   585.306 What action will BOEM take on my request
30:2.0.3.5.13.3.280.8SECTION 585.307
   585.307 How will BOEM determine whether competitive interest exists for ROW grants and RUE grants
30:2.0.3.5.13.3.280.9SECTION 585.308
   585.308 How will BOEM conduct an auction for ROW grants and RUE grants
30:2.0.3.5.13.3.280.10SECTION 585.309
   585.309 When will BOEM issue a noncompetitive ROW grant or RUE grant
30:2.0.3.5.13.3.280.11SECTION 585.310
   585.310 What is the effective date of an ROW grant or RUE grant
30:2.0.3.5.13.3.280.12SECTION 585.311-585.314
   585.311-585.314 [Reserved]
30:2.0.3.5.13.3.281SUBJGRP 281
   Financial Requirements for ROW Grants and RUE Grants
30:2.0.3.5.13.3.281.13SECTION 585.315
   585.315 What deposits are required for a competitive ROW grant or RUE grant
30:2.0.3.5.13.3.281.14SECTION 585.316
   585.316 What payments are required for ROW grants or RUE grants
30:2.0.3.5.13.4SUBPART D
Subpart D - Lease and Grant Administration
30:2.0.3.5.13.4.282SUBJGRP 282
   Noncompliance and Cessation Orders
30:2.0.3.5.13.4.282.1SECTION 585.400
   585.400 What happens if I fail to comply with this part
30:2.0.3.5.13.4.282.2SECTION 585.401
   585.401 When may BOEM issue a cessation order
30:2.0.3.5.13.4.282.3SECTION 585.402
   585.402 What is the effect of a cessation order
30:2.0.3.5.13.4.282.4SECTION 585.403-585.404
   585.403-585.404 [Reserved]
30:2.0.3.5.13.4.283SUBJGRP 283
   Designation of Operator
30:2.0.3.5.13.4.283.5SECTION 585.405
   585.405 How do I designate an operator
30:2.0.3.5.13.4.283.6SECTION 585.406
   585.406 Who is responsible for fulfilling lease and grant obligations
30:2.0.3.5.13.4.283.7SECTION 585.407
   585.407 [Reserved]
30:2.0.3.5.13.4.284SUBJGRP 284
   Lease or Grant Assignment
30:2.0.3.5.13.4.284.8SECTION 585.408
   585.408 May I assign my lease or grant interest
30:2.0.3.5.13.4.284.9SECTION 585.409
   585.409 How do I request approval of a lease or grant assignment
30:2.0.3.5.13.4.284.10SECTION 585.410
   585.410 How does an assignment affect the assignor's liability
30:2.0.3.5.13.4.284.11SECTION 585.411
   585.411 How does an assignment affect the assignee's liability
30:2.0.3.5.13.4.284.12SECTION 585.412-585.414
   585.412-585.414 [Reserved]
30:2.0.3.5.13.4.285SUBJGRP 285
   Lease or Grant Suspension
30:2.0.3.5.13.4.285.13SECTION 585.415
   585.415 What is a lease or grant suspension
30:2.0.3.5.13.4.285.14SECTION 585.416
   585.416 How do I request a lease or grant suspension
30:2.0.3.5.13.4.285.15SECTION 585.417
   585.417 When may BOEM order a suspension
30:2.0.3.5.13.4.285.16SECTION 585.418
   585.418 How will BOEM issue a suspension
30:2.0.3.5.13.4.285.17SECTION 585.419
   585.419 What are my immediate responsibilities if I receive a suspension order
30:2.0.3.5.13.4.285.18SECTION 585.420
   585.420 What effect does a suspension order have on my payments
30:2.0.3.5.13.4.285.19SECTION 585.421
   585.421 How long will a suspension be in effect
30:2.0.3.5.13.4.285.20SECTION 585.422-585.424
   585.422-585.424 [Reserved]
30:2.0.3.5.13.4.286SUBJGRP 286
   Lease or Grant Renewal
30:2.0.3.5.13.4.286.21SECTION 585.425
   585.425 May I obtain a renewal of my lease or grant before it terminates
30:2.0.3.5.13.4.286.22SECTION 585.426
   585.426 When must I submit my request for renewal
30:2.0.3.5.13.4.286.23SECTION 585.427
   585.427 How long is a renewal
30:2.0.3.5.13.4.286.24SECTION 585.428
   585.428 What effect does applying for a renewal have on my activities and payments
30:2.0.3.5.13.4.286.25SECTION 585.429
   585.429 What criteria will BOEM consider in deciding whether to renew a lease or grant
30:2.0.3.5.13.4.286.26SECTION 585.430-585.431
   585.430-585.431 [Reserved]
30:2.0.3.5.13.4.287SUBJGRP 287
   Lease or Grant Termination
30:2.0.3.5.13.4.287.27SECTION 585.432
   585.432 When does my lease or grant terminate
30:2.0.3.5.13.4.287.28SECTION 585.433
   585.433 What must I do after my lease or grant terminates
30:2.0.3.5.13.4.287.29SECTION 585.434
   585.434 [Reserved]
30:2.0.3.5.13.4.288SUBJGRP 288
   Lease or Grant Relinquishment
30:2.0.3.5.13.4.288.30SECTION 585.435
   585.435 How can I relinquish a lease or a grant or parts of a lease or grant
30:2.0.3.5.13.4.289SUBJGRP 289
   Lease or Grant Contraction
30:2.0.3.5.13.4.289.31SECTION 585.436
   585.436 Can BOEM require lease or grant contraction
30:2.0.3.5.13.4.290SUBJGRP 290
   Lease or Grant Cancellation
30:2.0.3.5.13.4.290.32SECTION 585.437
   585.437 When can my lease or grant be canceled
30:2.0.3.5.13.5SUBPART E
Subpart E - Payments and Financial Assurance Requirements
30:2.0.3.5.13.5.291SUBJGRP 291
   Payments
30:2.0.3.5.13.5.291.1SECTION 585.500
   585.500 How do I make payments under this part
30:2.0.3.5.13.5.291.2SECTION 585.501
   585.501 What deposits must I submit for a competitively issued lease, ROW grant, or RUE grant
30:2.0.3.5.13.5.291.3SECTION 585.502
   585.502 What initial payment requirements must I meet to obtain a noncompetitive lease, ROW grant, or RUE grant
30:2.0.3.5.13.5.291.4SECTION 585.503
   585.503 What are the rent and operating fee requirements for a commercial lease
30:2.0.3.5.13.5.291.5SECTION 585.504
   585.504 How are my payments affected if I develop my lease in phases
30:2.0.3.5.13.5.291.6SECTION 585.505
   585.505 What are the rent and operating fee requirements for a limited lease
30:2.0.3.5.13.5.291.7SECTION 585.506
   585.506 What operating fees must I pay on a commercial lease
30:2.0.3.5.13.5.291.8SECTION 585.507
   585.507 What rent payments must I pay on a project easement
30:2.0.3.5.13.5.291.9SECTION 585.508
   585.508 What rent payments must I pay on ROW grants or RUE grants associated with renewable energy projects
30:2.0.3.5.13.5.291.10SECTION 585.509
   585.509 Who is responsible for submitting lease or grant payments to BOEM
30:2.0.3.5.13.5.291.11SECTION 585.510
   585.510 May BOEM reduce or waive my lease or grant payments
30:2.0.3.5.13.5.291.12SECTION 585.511-585.514
   585.511-585.514 [Reserved]
30:2.0.3.5.13.5.292SUBJGRP 292
   Financial Assurance Requirements for Commercial Leases
30:2.0.3.5.13.5.292.13SECTION 585.515
   585.515 What financial assurance must I provide when I obtain my commercial lease
30:2.0.3.5.13.5.292.14SECTION 585.516
   585.516 What are the financial assurance requirements for each stage of my commercial lease
30:2.0.3.5.13.5.292.15SECTION 585.517
   585.517 How will BOEM determine the amounts of the supplemental and decommissioning financial assurance requirements associated with commercial leases
30:2.0.3.5.13.5.292.16SECTION 585.518-585.519
   585.518-585.519 [Reserved]
30:2.0.3.5.13.5.293SUBJGRP 293
   Financial Assurance for Limited Leases, ROW Grants, and RUE Grants
30:2.0.3.5.13.5.293.17SECTION 585.520
   585.520 What financial assurance must I provide when I obtain my limited lease, ROW grant, or RUE grant
30:2.0.3.5.13.5.293.18SECTION 585.521
   585.521 Do my financial assurance requirements change as activities progress on my limited lease or grant
30:2.0.3.5.13.5.293.19SECTION 585.522-585.524
   585.522-585.524 [Reserved]
30:2.0.3.5.13.5.294SUBJGRP 294
   Requirements for Financial Assurance Instruments
30:2.0.3.5.13.5.294.20SECTION 585.525
   585.525 What general requirements must a financial assurance instrument meet
30:2.0.3.5.13.5.294.21SECTION 585.526
   585.526 What instruments other than a surety bond may I use to meet the financial assurance requirement
30:2.0.3.5.13.5.294.22SECTION 585.527
   585.527 May I demonstrate financial strength and reliability to meet the financial assurance requirement for lease or grant activities
30:2.0.3.5.13.5.294.23SECTION 585.528
   585.528 May I use a third-party guaranty to meet the financial assurance requirement for lease or grant activities
30:2.0.3.5.13.5.294.24SECTION 585.529
   585.529 Can I use a lease- or grant-specific decommissioning account to meet the financial assurance requirements related to decommissioning
30:2.0.3.5.13.5.295SUBJGRP 295
   Changes in Financial Assurance
30:2.0.3.5.13.5.295.25SECTION 585.530
   585.530 What must I do if my financial assurance lapses
30:2.0.3.5.13.5.295.26SECTION 585.531
   585.531 What happens if the value of my financial assurance is reduced
30:2.0.3.5.13.5.295.27SECTION 585.532
   585.532 What happens if my surety wants to terminate the period of liability of my bond
30:2.0.3.5.13.5.295.28SECTION 585.533
   585.533 How does my surety obtain cancellation of my bond
30:2.0.3.5.13.5.295.29SECTION 585.534
   585.534 When may BOEM cancel my bond
30:2.0.3.5.13.5.295.30SECTION 585.535
   585.535 Why might BOEM call for forfeiture of my bond
30:2.0.3.5.13.5.295.31SECTION 585.536
   585.536 How will I be notified of a call for forfeiture
30:2.0.3.5.13.5.295.32SECTION 585.537
   585.537 How will BOEM proceed once my bond or other security is forfeited
30:2.0.3.5.13.5.295.33SECTION 585.538-585.539
   585.538-585.539 [Reserved]
30:2.0.3.5.13.5.296SUBJGRP 296
   Revenue Sharing With States
30:2.0.3.5.13.5.296.34SECTION 585.540
   585.540 How will BOEM equitably distribute revenues to States
30:2.0.3.5.13.5.296.35SECTION 585.541
   585.541 What is a qualified project for revenue sharing purposes
30:2.0.3.5.13.5.296.36SECTION 585.542
   585.542 What makes a State eligible for payment of revenues
30:2.0.3.5.13.5.296.37SECTION 585.543
   585.543 Example of how the inverse distance formula works.
30:2.0.3.5.13.6SUBPART F
Subpart F - Plans and Information Requirements
30:2.0.3.5.13.6.297SUBJGRP 297
   Site Assessment Plan and Information Requirements for Commercial Leases
30:2.0.3.5.13.6.297.1SECTION 585.600
   585.600 What plans and information must I submit to BOEM before I conduct activities on my lease or grant
30:2.0.3.5.13.6.297.2SECTION 585.601
   585.601 When am I required to submit my plans to BOEM
30:2.0.3.5.13.6.297.3SECTION 585.602
   585.602 What records must I maintain
30:2.0.3.5.13.6.297.4SECTION 585.603-585.604
   585.603-585.604 [Reserved]
30:2.0.3.5.13.6.297.5SECTION 585.605
   585.605 What is a Site Assessment Plan (SAP)
30:2.0.3.5.13.6.297.6SECTION 585.606
   585.606 What must I demonstrate in my SAP
30:2.0.3.5.13.6.297.7SECTION 585.607
   585.607 How do I submit my SAP
30:2.0.3.5.13.6.297.8SECTION 585.608-585.609
   585.608-585.609 [Reserved]
30:2.0.3.5.13.6.298SUBJGRP 298
   Contents of the Site Assessment Plan
30:2.0.3.5.13.6.298.9SECTION 585.610
   585.610 What must I include in my SAP
30:2.0.3.5.13.6.298.10SECTION 585.611
   585.611 What information and certifications must I submit with my SAP to assist BOEM in complying with NEPA and other relevant laws
30:2.0.3.5.13.6.298.11SECTION 585.612
   585.612 How will my SAP be processed for Federal consistency under the Coastal Zone Management Act
30:2.0.3.5.13.6.298.12SECTION 585.613
   585.613 How will BOEM process my SAP
30:2.0.3.5.13.6.299SUBJGRP 299
   Activities Under an Approved SAP
30:2.0.3.5.13.6.299.13SECTION 585.614
   585.614 When may I begin conducting activities under my approved SAP
30:2.0.3.5.13.6.299.14SECTION 585.615
   585.615 What other reports or notices must I submit to BOEM under my approved SAP
30:2.0.3.5.13.6.299.15SECTION 585.616
   585.616 [Reserved]
30:2.0.3.5.13.6.299.16SECTION 585.617
   585.617 What activities require a revision to my SAP, and when will BOEM approve the revision
30:2.0.3.5.13.6.299.17SECTION 585.618
   585.618 What must I do upon completion of approved site assessment activities
30:2.0.3.5.13.6.299.18SECTION 585.619
   585.619 [Reserved]
30:2.0.3.5.13.6.300SUBJGRP 300
   Construction and Operations Plan for Commercial Leases
30:2.0.3.5.13.6.300.19SECTION 585.620
   585.620 What is a Construction and Operations Plan (COP)
30:2.0.3.5.13.6.300.20SECTION 585.621
   585.621 What must I demonstrate in my COP
30:2.0.3.5.13.6.300.21SECTION 585.622
   585.622 How do I submit my COP
30:2.0.3.5.13.6.300.22SECTION 585.623-585.625
   585.623-585.625 [Reserved]
30:2.0.3.5.13.6.301SUBJGRP 301
   Contents of the Construction and Operations Plan
30:2.0.3.5.13.6.301.23SECTION 585.626
   585.626 What must I include in my COP
30:2.0.3.5.13.6.301.24SECTION 585.627
   585.627 What information and certifications must I submit with my COP to assist the BOEM in complying with NEPA and other relevant laws
30:2.0.3.5.13.6.301.25SECTION 585.628
   585.628 How will BOEM process my COP
30:2.0.3.5.13.6.301.26SECTION 585.629
   585.629 May I develop my lease in phases
30:2.0.3.5.13.6.301.27SECTION 585.630
   585.630 [Reserved]
30:2.0.3.5.13.6.302SUBJGRP 302
   Activities Under an Approved COP
30:2.0.3.5.13.6.302.28SECTION 585.631
   585.631 When must I initiate activities under an approved COP
30:2.0.3.5.13.6.302.29SECTION 585.632
   585.632 What documents must I submit before I may construct and install facilities under my approved COP
30:2.0.3.5.13.6.302.30SECTION 585.633
   585.633 How do I comply with my COP
30:2.0.3.5.13.6.302.31SECTION 585.634
   585.634 What activities require a revision to my COP, and when will BOEM approve the revision
30:2.0.3.5.13.6.302.32SECTION 585.635
   585.635 What must I do if I cease activities approved in my COP before the end of my commercial lease
30:2.0.3.5.13.6.302.33SECTION 585.636
   585.636 What notices must I provide BOEM following approval of my COP
30:2.0.3.5.13.6.302.34SECTION 585.637
   585.637 When may I commence commercial operations on my commercial lease
30:2.0.3.5.13.6.302.35SECTION 585.638
   585.638 What must I do upon completion of my commercial operations as approved in my COP or FERC license
30:2.0.3.5.13.6.302.36SECTION 585.639
   585.639 [Reserved]
30:2.0.3.5.13.6.303SUBJGRP 303
   General Activities Plan Requirements For Limited Leases, ROW Grants, and RUE Grants
30:2.0.3.5.13.6.303.37SECTION 585.640
   585.640 What is a General Activities Plan (GAP)
30:2.0.3.5.13.6.303.38SECTION 585.641
   585.641 What must I demonstrate in my GAP
30:2.0.3.5.13.6.303.39SECTION 585.642
   585.642 How do I submit my GAP
30:2.0.3.5.13.6.303.40SECTION 585.643-585.644
   585.643-585.644 [Reserved]
30:2.0.3.5.13.6.304SUBJGRP 304
   Contents of the General Activities Plan
30:2.0.3.5.13.6.304.41SECTION 585.645
   585.645 What must I include in my GAP
30:2.0.3.5.13.6.304.42SECTION 585.646
   585.646 What information and certifications must I submit with my GAP to assist BOEM in complying with NEPA and other relevant laws
30:2.0.3.5.13.6.304.43SECTION 585.647
   585.647 How will my GAP be processed for Federal consistency under the Coastal Zone Management Act
30:2.0.3.5.13.6.304.44SECTION 585.648
   585.648 How will BOEM process my GAP
30:2.0.3.5.13.6.304.45SECTION 585.649
   585.649 [Reserved]
30:2.0.3.5.13.6.305SUBJGRP 305
   Activities Under an Approved GAP
30:2.0.3.5.13.6.305.46SECTION 585.650
   585.650 When may I begin conducting activities under my GAP
30:2.0.3.5.13.6.305.47SECTION 585.651
   585.651 When may I construct complex or significant OCS facilities on my limited lease or any facilities on my project easement proposed under my GAP
30:2.0.3.5.13.6.305.48SECTION 585.652
   585.652 How long do I have to conduct activities under an approved GAP
30:2.0.3.5.13.6.305.49SECTION 585.653
   585.653 What other reports or notices must I submit to BOEM under my approved GAP
30:2.0.3.5.13.6.305.50SECTION 585.654
   585.654 [Reserved]
30:2.0.3.5.13.6.305.51SECTION 585.655
   585.655 What activities require a revision to my GAP, and when will BOEM approve the revision
30:2.0.3.5.13.6.305.52SECTION 585.656
   585.656 What must I do if I cease activities approved in my GAP before the end of my term
30:2.0.3.5.13.6.305.53SECTION 585.657
   585.657 What must I do upon completion of approved activities under my GAP
30:2.0.3.5.13.6.306SUBJGRP 306
   Cable and Pipeline Deviations
30:2.0.3.5.13.6.306.54SECTION 585.658
   585.658 Can my cable or pipeline construction deviate from my approved COP or GAP
30:2.0.3.5.13.6.306.55SECTION 585.659
   585.659 What requirements must I include in my SAP, COP, or GAP regarding air quality
30:2.0.3.5.13.7SUBPART G
Subpart G - Facility Design, Fabrication, and Installation
30:2.0.3.5.13.7.307SUBJGRP 307
   Reports
30:2.0.3.5.13.7.307.1SECTION 585.700
   585.700 What reports must I submit to BOEM before installing facilities described in my approved SAP, COP, or GAP
30:2.0.3.5.13.7.307.2SECTION 585.701
   585.701 What must I include in my Facility Design Report
30:2.0.3.5.13.7.307.3SECTION 585.702
   585.702 What must I include in my Fabrication and Installation Report
30:2.0.3.5.13.7.307.4SECTION 585.703
   585.703 What reports must I submit for project modifications and repairs
30:2.0.3.5.13.7.307.5SECTION 585.704
   585.704 [Reserved]
30:2.0.3.5.13.7.308SUBJGRP 308
   Certified Verification Agent
30:2.0.3.5.13.7.308.6SECTION 585.705
   585.705 When must I use a Certified Verification Agent (CVA)
30:2.0.3.5.13.7.308.7SECTION 585.706
   585.706 How do I nominate a CVA for BOEM approval
30:2.0.3.5.13.7.308.8SECTION 585.707
   585.707 What are the CVA's primary duties for facility design review
30:2.0.3.5.13.7.308.9SECTION 585.708
   585.708 What are the CVA's or project engineer's primary duties for fabrication and installation review
30:2.0.3.5.13.7.308.10SECTION 585.709
   585.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify
30:2.0.3.5.13.7.308.11SECTION 585.710
   585.710 When conducting onsite installation inspections, what must the CVA or project engineer do
30:2.0.3.5.13.7.308.12SECTION 585.711
   585.711 [Reserved]
30:2.0.3.5.13.7.308.13SECTION 585.712
   585.712 What are the CVA's or project engineer's reporting requirements
30:2.0.3.5.13.7.308.14SECTION 585.713
   585.713 What must I do after the CVA or project engineer confirms conformance with the Fabrication and Installation Report on my commercial lease
30:2.0.3.5.13.7.308.15SECTION 585.714
   585.714 What records relating to SAPs, COPs, and GAPs must I keep
30:2.0.3.5.13.8SUBPART H
Subpart H - Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs, COPs and GAPs
30:2.0.3.5.13.8.309SUBJGRP 309
   Safety Management Systems
30:2.0.3.5.13.8.309.1SECTION 585.800
   585.800 How must I conduct my activities to comply with safety and environmental requirements
30:2.0.3.5.13.8.309.2SECTION 585.801
   585.801 How must I conduct my approved activities to protect marine mammals, threatened and endangered species, and designated critical habitat
30:2.0.3.5.13.8.309.3SECTION 585.802
   585.802 What must I do if I discover a potential archaeological resource while conducting my approved activities
30:2.0.3.5.13.8.309.4SECTION 585.803
   585.803 How must I conduct my approved activities to protect essential fish habitats identified and described under the Magnuson-Stevens Fishery Conservation and Management Act
30:2.0.3.5.13.8.309.5SECTION 585.804-585.809
   585.804-585.809 [Reserved]
30:2.0.3.5.13.8.309.6SECTION 585.810
   585.810 What must I include in my Safety Management System
30:2.0.3.5.13.8.309.7SECTION 585.811
   585.811 When must I follow my Safety Management System
30:2.0.3.5.13.8.309.8SECTION 585.812
   585.812 [Reserved]
30:2.0.3.5.13.8.310SUBJGRP 310
   Maintenance and Shutdowns
30:2.0.3.5.13.8.310.9SECTION 585.813
   585.813 When do I have to report removing equipment from service
30:2.0.3.5.13.8.310.10SECTION 585.814
   585.814 [Reserved]
30:2.0.3.5.13.8.311SUBJGRP 311
   Equipment Failure and Adverse Environmental Effects
30:2.0.3.5.13.8.311.11SECTION 585.815
   585.815 What must I do if I have facility damage or an equipment failure
30:2.0.3.5.13.8.311.12SECTION 585.816
   585.816 What must I do if environmental or other conditions adversely affect a cable, pipeline, or facility
30:2.0.3.5.13.8.311.13SECTION 585.817-585.819
   585.817-585.819 [Reserved]
30:2.0.3.5.13.8.312SUBJGRP 312
   Inspections and Assessment
30:2.0.3.5.13.8.312.14SECTION 585.820
   585.820 Will BOEM conduct inspections
30:2.0.3.5.13.8.312.15SECTION 585.821
   585.821 Will BOEM conduct scheduled and unscheduled inspections
30:2.0.3.5.13.8.312.16SECTION 585.822
   585.822 What must I do when BOEM conducts an inspection
30:2.0.3.5.13.8.312.17SECTION 585.823
   585.823 Will BOEM reimburse me for my expenses related to inspections
30:2.0.3.5.13.8.312.18SECTION 585.824
   585.824 How must I conduct self-inspections
30:2.0.3.5.13.8.312.19SECTION 585.825
   585.825 When must I assess my facilities
30:2.0.3.5.13.8.312.20SECTION 585.826-585.829
   585.826-585.829 [Reserved]
30:2.0.3.5.13.8.313SUBJGRP 313
   Incident Reporting and Investigation
30:2.0.3.5.13.8.313.21SECTION 585.830
   585.830 What are my incident reporting requirements
30:2.0.3.5.13.8.313.22SECTION 585.831
   585.831 What incidents must I report, and when must I report them
30:2.0.3.5.13.8.313.23SECTION 585.832
   585.832 How do I report incidents requiring immediate notification
30:2.0.3.5.13.8.313.24SECTION 585.833
   585.833 What are the reporting requirements for incidents requiring written notification
30:2.0.3.5.13.9SUBPART I
Subpart I - Decommissioning
30:2.0.3.5.13.9.314SUBJGRP 314
   Decommissioning Obligations and Requirements
30:2.0.3.5.13.9.314.1SECTION 585.900
   585.900 Who must meet the decommissioning obligations in this subpart
30:2.0.3.5.13.9.314.2SECTION 585.901
   585.901 When do I accrue decommissioning obligations
30:2.0.3.5.13.9.314.3SECTION 585.902
   585.902 What are the general requirements for decommissioning for facilities authorized under my SAP, COP, or GAP
30:2.0.3.5.13.9.314.4SECTION 585.903
   585.903 What are the requirements for decommissioning FERC-licensed hydrokinetic facilities
30:2.0.3.5.13.9.314.5SECTION 585.904
   585.904 Can I request a departure from the decommissioning requirements
30:2.0.3.5.13.9.315SUBJGRP 315
   Decommissioning Applications
30:2.0.3.5.13.9.315.6SECTION 585.905
   585.905 When must I submit my decommissioning application
30:2.0.3.5.13.9.315.7SECTION 585.906
   585.906 What must my decommissioning application include
30:2.0.3.5.13.9.315.8SECTION 585.907
   585.907 How will BOEM process my decommissioning application
30:2.0.3.5.13.9.315.9SECTION 585.908
   585.908 What must I include in my decommissioning notice
30:2.0.3.5.13.9.316SUBJGRP 316
   Facility Removal
30:2.0.3.5.13.9.316.10SECTION 585.909
   585.909 When may BOEM authorize facilities to remain in place following termination of a lease or grant
30:2.0.3.5.13.9.316.11SECTION 585.910
   585.910 What must I do when I remove my facility
30:2.0.3.5.13.9.316.12SECTION 585.911
   585.911 [Reserved]
30:2.0.3.5.13.9.317SUBJGRP 317
   Decommissioning Report
30:2.0.3.5.13.9.317.13SECTION 585.912
   585.912 After I remove a facility, cable, or pipeline, what information must I submit
30:2.0.3.5.13.9.318SUBJGRP 318
   Compliance With an Approved Decommissioning Application
30:2.0.3.5.13.9.318.14SECTION 585.913
   585.913 What happens if I fail to comply with my approved decommissioning application
30:2.0.3.5.13.10SUBPART J
Subpart J - Rights of Use and Easement for Energy- and Marine-Related Activities Using Existing OCS Facilities
30:2.0.3.5.13.10.319SUBJGRP 319
   Regulated Activities
30:2.0.3.5.13.10.319.1SECTION 585.1000
   585.1000 What activities does this subpart regulate
30:2.0.3.5.13.10.319.2SECTION 585.1001-585.1003
   585.1001-585.1003 [Reserved]
30:2.0.3.5.13.10.320SUBJGRP 320
   Requesting an Alternate Use RUE
30:2.0.3.5.13.10.320.3SECTION 585.1004
   585.1004 What must I do before I request an Alternate Use RUE
30:2.0.3.5.13.10.320.4SECTION 585.1005
   585.1005 How do I request an Alternate Use RUE
30:2.0.3.5.13.10.320.5SECTION 585.1006
   585.1006 How will BOEM decide whether to issue an Alternate Use RUE
30:2.0.3.5.13.10.320.6SECTION 585.1007
   585.1007 What process will BOEM use for competitively offering an Alternate Use RUE
30:2.0.3.5.13.10.320.7SECTION 585.1008-585.1009
   585.1008-585.1009 [Reserved]
30:2.0.3.5.13.10.321SUBJGRP 321
   Alternate Use RUE Administration
30:2.0.3.5.13.10.321.8SECTION 585.1010
   585.1010 How long may I conduct activities under an Alternate Use RUE
30:2.0.3.5.13.10.321.9SECTION 585.1011
   585.1011 What payments are required for an Alternate Use RUE
30:2.0.3.5.13.10.321.10SECTION 585.1012
   585.1012 What financial assurance is required for an Alternate Use RUE
30:2.0.3.5.13.10.321.11SECTION 585.1013
   585.1013 Is an Alternate Use RUE assignable
30:2.0.3.5.13.10.321.12SECTION 585.1014
   585.1014 When will BOEM suspend an Alternate Use RUE
30:2.0.3.5.13.10.321.13SECTION 585.1015
   585.1015 How do I relinquish an Alternate Use RUE
30:2.0.3.5.13.10.321.14SECTION 585.1016
   585.1016 When will an Alternate Use RUE be cancelled
30:2.0.3.5.13.10.321.15SECTION 585.1017
   585.1017 [Reserved]
30:2.0.3.5.13.10.322SUBJGRP 322
   Decommissioning an Alternate Use RUE
30:2.0.3.5.13.10.322.16SECTION 585.1018
   585.1018 Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE
30:2.0.3.5.13.10.322.17SECTION 585.1019
   585.1019 What are the decommissioning requirements for an Alternate Use RUE