Title 30

PART 250

Part 250 - Oil And Gas And Sulphur Operations In The Outer Continental Shelf

PART 250 - OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Authority:30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334. Source:76 FR 64462, Oct. 18, 2011, unless otherwise noted. Editorial Note:Nomenclature changes to part 250 appear at 77 FR 50891, Aug. 22, 2012.

30:2.0.1.2.3.1SUBPART A
Subpart A - General
30:2.0.1.2.3.1.66SUBJGRP 66
   Authority and Definition of Terms
30:2.0.1.2.3.1.66.1SECTION 250.101
   250.101 Authority and applicability.
30:2.0.1.2.3.1.66.2SECTION 250.102
   250.102 What does this part do
30:2.0.1.2.3.1.66.3SECTION 250.103
   250.103 Where can I find more information about the requirements in this part
30:2.0.1.2.3.1.66.4SECTION 250.104
   250.104 How may I appeal a decision made under BSEE regulations
30:2.0.1.2.3.1.66.5SECTION 250.105
   250.105 Definitions.
30:2.0.1.2.3.1.67SUBJGRP 67
   Performance Standards
30:2.0.1.2.3.1.67.6SECTION 250.106
   250.106 What standards will the Director use to regulate lease operations
30:2.0.1.2.3.1.67.7SECTION 250.107
   250.107 What must I do to protect health, safety, property, and the environment
30:2.0.1.2.3.1.67.8SECTION 250.108
   250.108 What requirements must I follow for cranes and other material-handling equipment
30:2.0.1.2.3.1.67.9SECTION 250.109
   250.109 What documents must I prepare and maintain related to welding
30:2.0.1.2.3.1.67.10SECTION 250.110
   250.110 What must I include in my welding plan
30:2.0.1.2.3.1.67.11SECTION 250.111
   250.111 Who oversees operations under my welding plan
30:2.0.1.2.3.1.67.12SECTION 250.112
   250.112 What standards must my welding equipment meet
30:2.0.1.2.3.1.67.13SECTION 250.113
   250.113 What procedures must I follow when welding
30:2.0.1.2.3.1.67.14SECTION 250.114
   250.114 How must I install, maintain, and operate electrical equipment
30:2.0.1.2.3.1.67.15SECTION 250.115
   250.115 What are the procedures for, and effects of, incorporation of documents by reference in this part
30:2.0.1.2.3.1.67.16SECTION 250.116-250.117
   250.116-250.117 [Reserved]
30:2.0.1.2.3.1.68SUBJGRP 68
   Gas Storage or Injection
30:2.0.1.2.3.1.68.17SECTION 250.118
   250.118 Will BSEE approve gas injection
30:2.0.1.2.3.1.68.18SECTION 250.119
   250.119 [Reserved]
30:2.0.1.2.3.1.68.19SECTION 250.120
   250.120 How does injecting, storing, or treating gas affect my royalty payments
30:2.0.1.2.3.1.68.20SECTION 250.121
   250.121 What happens when the reservoir contains both original gas in place and injected gas
30:2.0.1.2.3.1.68.21SECTION 250.122
   250.122 What effect does subsurface storage have on the lease term
30:2.0.1.2.3.1.68.22SECTION 250.123
   250.123 [Reserved]
30:2.0.1.2.3.1.68.23SECTION 250.124
   250.124 Will BSEE approve gas injection into the cap rock containing a sulphur deposit
30:2.0.1.2.3.1.69SUBJGRP 69
   Fees
30:2.0.1.2.3.1.69.24SECTION 250.125
   250.125 Service fees.
30:2.0.1.2.3.1.69.25SECTION 250.126
   250.126 Electronic payment instructions.
30:2.0.1.2.3.1.70SUBJGRP 70
   Inspections of Operations
30:2.0.1.2.3.1.70.26SECTION 250.130
   250.130 Why does BSEE conduct inspections
30:2.0.1.2.3.1.70.27SECTION 250.131
   250.131 Will BSEE notify me before conducting an inspection
30:2.0.1.2.3.1.70.28SECTION 250.132
   250.132 What must I do when BSEE conducts an inspection
30:2.0.1.2.3.1.70.29SECTION 250.133
   250.133 Will BSEE reimburse me for my expenses related to inspections
30:2.0.1.2.3.1.71SUBJGRP 71
   Disqualification
30:2.0.1.2.3.1.71.30SECTION 250.135
   250.135 What will BSEE do if my operating performance is unacceptable
30:2.0.1.2.3.1.71.31SECTION 250.136
   250.136 How will BSEE determine if my operating performance is unacceptable
30:2.0.1.2.3.1.72SUBJGRP 72
   Special Types of Approvals
30:2.0.1.2.3.1.72.32SECTION 250.140
   250.140 When will I receive an oral approval
30:2.0.1.2.3.1.72.33SECTION 250.141
   250.141 May I ever use alternate procedures or equipment
30:2.0.1.2.3.1.72.34SECTION 250.142
   250.142 How do I receive approval for departures
30:2.0.1.2.3.1.72.35SECTION 250.143-250.144
   250.143-250.144 [Reserved]
30:2.0.1.2.3.1.72.36SECTION 250.145
   250.145 How do I designate an agent or a local agent
30:2.0.1.2.3.1.72.37SECTION 250.146
   250.146 Who is responsible for fulfilling leasehold obligations
30:2.0.1.2.3.1.73SUBJGRP 73
   Naming and Identifying Facilities and Wells (Does Not Include MODUs)
30:2.0.1.2.3.1.73.38SECTION 250.150
   250.150 How do I name facilities and wells in the Gulf of Mexico Region
30:2.0.1.2.3.1.73.39SECTION 250.151
   250.151 How do I name facilities in the Pacific Region
30:2.0.1.2.3.1.73.40SECTION 250.152
   250.152 How do I name facilities in the Alaska Region
30:2.0.1.2.3.1.73.41SECTION 250.153
   250.153 Do I have to rename an existing facility or well
30:2.0.1.2.3.1.73.42SECTION 250.154
   250.154 What identification signs must I display
30:2.0.1.2.3.1.73.43SECTION 250.160-250.167
   250.160-250.167 [Reserved]
30:2.0.1.2.3.1.74SUBJGRP 74
   Suspensions
30:2.0.1.2.3.1.74.44SECTION 250.168
   250.168 May operations or production be suspended
30:2.0.1.2.3.1.74.45SECTION 250.169
   250.169 What effect does suspension have on my lease
30:2.0.1.2.3.1.74.46SECTION 250.170
   250.170 How long does a suspension last
30:2.0.1.2.3.1.74.47SECTION 250.171
   250.171 How do I request a suspension
30:2.0.1.2.3.1.74.48SECTION 250.172
   250.172 When may the Regional Supervisor grant or direct an SOO or SOP
30:2.0.1.2.3.1.74.49SECTION 250.173
   250.173 When may the Regional Supervisor direct an SOO or SOP
30:2.0.1.2.3.1.74.50SECTION 250.174
   250.174 When may the Regional Supervisor grant or direct an SOP
30:2.0.1.2.3.1.74.51SECTION 250.175
   250.175 When may the Regional Supervisor grant an SOO
30:2.0.1.2.3.1.74.52SECTION 250.176
   250.176 Does a suspension affect my royalty payment
30:2.0.1.2.3.1.74.53SECTION 250.177
   250.177 What additional requirements may the Regional Supervisor order for a suspension
30:2.0.1.2.3.1.75SUBJGRP 75
   Primary Lease Requirements, Lease Term Extensions, and Lease Cancellations
30:2.0.1.2.3.1.75.54SECTION 250.180
   250.180 What am I required to do to keep my lease term in effect
30:2.0.1.2.3.1.75.55SECTION 250.181-250.185
   250.181-250.185 [Reserved]
30:2.0.1.2.3.1.76SUBJGRP 76
   Information and Reporting Requirements
30:2.0.1.2.3.1.76.56SECTION 250.186
   250.186 What reporting information and report forms must I submit
30:2.0.1.2.3.1.76.57SECTION 250.187
   250.187 What are BSEE's incident reporting requirements
30:2.0.1.2.3.1.76.58SECTION 250.188
   250.188 What incidents must I report to BSEE and when must I report them
30:2.0.1.2.3.1.76.59SECTION 250.189
   250.189 Reporting requirements for incidents requiring immediate notification.
30:2.0.1.2.3.1.76.60SECTION 250.190
   250.190 Reporting requirements for incidents requiring written notification.
30:2.0.1.2.3.1.76.61SECTION 250.191
   250.191 How does BSEE conduct incident investigations
30:2.0.1.2.3.1.76.62SECTION 250.192
   250.192 What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence
30:2.0.1.2.3.1.76.63SECTION 250.193
   250.193 Reports and investigations of possible violations.
30:2.0.1.2.3.1.76.64SECTION 250.194
   250.194 How must I protect archaeological resources
30:2.0.1.2.3.1.76.65SECTION 250.195
   250.195 What notification does BSEE require on the production status of wells
30:2.0.1.2.3.1.76.66SECTION 250.196
   250.196 Reimbursements for reproduction and processing costs.
30:2.0.1.2.3.1.76.67SECTION 250.197
   250.197 Data and information to be made available to the public or for limited inspection.
30:2.0.1.2.3.1.77SUBJGRP 77
   References
30:2.0.1.2.3.1.77.68SECTION 250.198
   250.198 Documents incorporated by reference.
30:2.0.1.2.3.1.77.69SECTION 250.199
   250.199 Paperwork Reduction Act statements - information collection.
30:2.0.1.2.3.2SUBPART B
Subpart B - Plans and Information
30:2.0.1.2.3.2.78SUBJGRP 78
   General Information
30:2.0.1.2.3.2.78.1SECTION 250.200
   250.200 Definitions.
30:2.0.1.2.3.2.78.2SECTION 250.201
   250.201 What plans and information must I submit before I conduct any activities on my lease or unit
30:2.0.1.2.3.2.78.3SECTION 250.202-250.203
   250.202-250.203 [Reserved]
30:2.0.1.2.3.2.78.4SECTION 250.204
   250.204 How must I protect the rights of the Federal government
30:2.0.1.2.3.2.78.5SECTION 250.205
   250.205 Are there special requirements if my well affects an adjacent property
30:2.0.1.2.3.2.79SUBJGRP 79
   Post-Approval Requirements for the EP, DPP, and DOCD
30:2.0.1.2.3.2.79.6SECTION 250.282
   250.282 Do I have to conduct post-approval monitoring
30:2.0.1.2.3.2.80SUBJGRP 80
   Deepwater Operations Plan (DWOP)
30:2.0.1.2.3.2.80.7SECTION 250.286
   250.286 What is a DWOP
30:2.0.1.2.3.2.80.8SECTION 250.287
   250.287 For what development projects must I submit a DWOP
30:2.0.1.2.3.2.80.9SECTION 250.288
   250.288 When and how must I submit the Conceptual Plan
30:2.0.1.2.3.2.80.10SECTION 250.289
   250.289 What must the Conceptual Plan contain
30:2.0.1.2.3.2.80.11SECTION 250.290
   250.290 What operations require approval of the Conceptual Plan
30:2.0.1.2.3.2.80.12SECTION 250.291
   250.291 When and how must I submit the DWOP
30:2.0.1.2.3.2.80.13SECTION 250.292
   250.292 What must the DWOP contain
30:2.0.1.2.3.2.80.14SECTION 250.293
   250.293 What operations require approval of the DWOP
30:2.0.1.2.3.2.80.15SECTION 250.294
   250.294 May I combine the Conceptual Plan and the DWOP
30:2.0.1.2.3.2.80.16SECTION 250.295
   250.295 When must I revise my DWOP
30:2.0.1.2.3.3SUBPART C
Subpart C - Pollution Prevention and Control
30:2.0.1.2.3.3.81.1SECTION 250.300
   250.300 Pollution prevention.
30:2.0.1.2.3.3.81.2SECTION 250.301
   250.301 Inspection of facilities.
30:2.0.1.2.3.4SUBPART D
Subpart D - Oil and Gas Drilling Operations
30:2.0.1.2.3.4.81SUBJGRP 81
   General Requirements
30:2.0.1.2.3.4.81.1SECTION 250.400
   250.400 General requirements.
30:2.0.1.2.3.4.81.2SECTION 250.401-250.403
   250.401-250.403 [Reserved]
30:2.0.1.2.3.4.81.3SECTION 250.404
   250.404 What are the requirements for the crown block
30:2.0.1.2.3.4.81.4SECTION 250.405
   250.405 What are the safety requirements for diesel engines used on a drilling rig
30:2.0.1.2.3.4.81.5SECTION 250.406
   250.406 [Reserved]
30:2.0.1.2.3.4.81.6SECTION 250.407
   250.407 What tests must I conduct to determine reservoir characteristics
30:2.0.1.2.3.4.81.7SECTION 250.408
   250.408 May I use alternative procedures or equipment during drilling operations
30:2.0.1.2.3.4.81.8SECTION 250.409
   250.409 May I obtain departures from these drilling requirements
30:2.0.1.2.3.4.82SUBJGRP 82
   Applying for a Permit To Drill
30:2.0.1.2.3.4.82.9SECTION 250.410
   250.410 How do I obtain approval to drill a well
30:2.0.1.2.3.4.82.10SECTION 250.411
   250.411 What information must I submit with my application
30:2.0.1.2.3.4.82.11SECTION 250.412
   250.412 What requirements must the location plat meet
30:2.0.1.2.3.4.82.12SECTION 250.413
   250.413 What must my description of well drilling design criteria address
30:2.0.1.2.3.4.82.13SECTION 250.414
   250.414 What must my drilling prognosis include
30:2.0.1.2.3.4.82.14SECTION 250.415
   250.415 What must my casing and cementing programs include
30:2.0.1.2.3.4.82.15SECTION 250.416
   250.416 What must I include in the diverter description
30:2.0.1.2.3.4.82.16SECTION 250.417
   250.417 [Reserved]
30:2.0.1.2.3.4.82.17SECTION 250.418
   250.418 What additional information must I submit with my APD
30:2.0.1.2.3.4.83SUBJGRP 83
   Casing and Cementing Requirements
30:2.0.1.2.3.4.83.18SECTION 250.420
   250.420 What well casing and cementing requirements must I meet
30:2.0.1.2.3.4.83.19SECTION 250.421
   250.421 What are the casing and cementing requirements by type of casing string
30:2.0.1.2.3.4.83.20SECTION 250.422
   250.422 When may I resume drilling after cementing
30:2.0.1.2.3.4.83.21SECTION 250.423
   250.423 What are the requirements for casing and liner installation
30:2.0.1.2.3.4.83.22SECTION 250.424-250.426
   250.424-250.426 [Reserved]
30:2.0.1.2.3.4.83.23SECTION 250.427
   250.427 What are the requirements for pressure integrity tests
30:2.0.1.2.3.4.83.24SECTION 250.428
   250.428 What must I do in certain cementing and casing situations
30:2.0.1.2.3.4.84SUBJGRP 84
   Diverter System Requirements
30:2.0.1.2.3.4.84.25SECTION 250.430
   250.430 When must I install a diverter system
30:2.0.1.2.3.4.84.26SECTION 250.431
   250.431 What are the diverter design and installation requirements
30:2.0.1.2.3.4.84.27SECTION 250.432
   250.432 How do I obtain a departure to diverter design and installation requirements
30:2.0.1.2.3.4.84.28SECTION 250.433
   250.433 What are the diverter actuation and testing requirements
30:2.0.1.2.3.4.84.29SECTION 250.434
   250.434 What are the recordkeeping requirements for diverter actuations and tests
30:2.0.1.2.3.4.84.30SECTION 250.440-250.451
   250.440-250.451 [Reserved]
30:2.0.1.2.3.4.84.31SECTION 250.452
   250.452 What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations
30:2.0.1.2.3.4.85SUBJGRP 85
   Drilling Fluid Requirements
30:2.0.1.2.3.4.85.32SECTION 250.455
   250.455 What are the general requirements for a drilling fluid program
30:2.0.1.2.3.4.85.33SECTION 250.456
   250.456 What safe practices must the drilling fluid program follow
30:2.0.1.2.3.4.85.34SECTION 250.457
   250.457 What equipment is required to monitor drilling fluids
30:2.0.1.2.3.4.85.35SECTION 250.458
   250.458 What quantities of drilling fluids are required
30:2.0.1.2.3.4.85.36SECTION 250.459
   250.459 What are the safety requirements for drilling fluid-handling areas
30:2.0.1.2.3.4.86SUBJGRP 86
   Other Drilling Requirements
30:2.0.1.2.3.4.86.37SECTION 250.460
   250.460 What are the requirements for conducting a well test
30:2.0.1.2.3.4.86.38SECTION 250.461
   250.461 What are the requirements for directional and inclination surveys
30:2.0.1.2.3.4.86.39SECTION 250.462
   250.462 What are the source control, containment, and collocated equipment requirements
30:2.0.1.2.3.4.86.40SECTION 250.463
   250.463 Who establishes field drilling rules
30:2.0.1.2.3.4.87SUBJGRP 87
   Applying for a Permit To Modify and Well Records
30:2.0.1.2.3.4.87.41SECTION 250.465
   250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE
30:2.0.1.2.3.4.87.42SECTION 250.466-250.469
   250.466-250.469 [Reserved]
30:2.0.1.2.3.4.88SUBJGRP 88
   Additional Arctic OCS Requirements
30:2.0.1.2.3.4.88.43SECTION 250.470
   250.470 What additional information must I submit with my APD for Arctic OCS exploratory drilling operations
30:2.0.1.2.3.4.88.44SECTION 250.471
   250.471 What are the requirements for Arctic OCS source control and containment
30:2.0.1.2.3.4.88.45SECTION 250.472
   250.472 What are the relief rig requirements for the Arctic OCS
30:2.0.1.2.3.4.88.46SECTION 250.473
   250.473 What must I do to protect health, safety, property, and the environment while operating on the Arctic OCS
30:2.0.1.2.3.4.89SUBJGRP 89
   Hydrogen Sulfide
30:2.0.1.2.3.4.89.47SECTION 250.490
   250.490 Hydrogen sulfide.
30:2.0.1.2.3.5SUBPART E
Subpart E - Oil and Gas Well-Completion Operations
30:2.0.1.2.3.5.90SUBJGRP 90
   Casing Pressure Management
30:2.0.1.2.3.5.90.1SECTION 250.500
   250.500 General requirements.
30:2.0.1.2.3.5.90.2SECTION 250.501
   250.501 Definition.
30:2.0.1.2.3.5.90.3SECTION 250.502
   250.502 [Reserved]
30:2.0.1.2.3.5.90.4SECTION 250.503
   250.503 Emergency shutdown system.
30:2.0.1.2.3.5.90.5SECTION 250.504
   250.504 Hydrogen sulfide.
30:2.0.1.2.3.5.90.6SECTION 250.505
   250.505 Subsea completions.
30:2.0.1.2.3.5.90.7SECTION 250.506-250.508
   250.506-250.508 [Reserved]
30:2.0.1.2.3.5.90.8SECTION 250.509
   250.509 Well-completion structures on fixed platforms.
30:2.0.1.2.3.5.90.9SECTION 250.510
   250.510 Diesel engine air intakes.
30:2.0.1.2.3.5.90.10SECTION 250.511
   250.511 Traveling-block safety device.
30:2.0.1.2.3.5.90.11SECTION 250.512
   250.512 Field well-completion rules.
30:2.0.1.2.3.5.90.12SECTION 250.513
   250.513 Approval and reporting of well-completion operations.
30:2.0.1.2.3.5.90.13SECTION 250.514
   250.514 Well-control fluids, equipment, and operations.
30:2.0.1.2.3.5.90.14SECTION 250.515-250.517
   250.515-250.517 [Reserved]
30:2.0.1.2.3.5.90.15SECTION 250.518
   250.518 Tubing and wellhead equipment.
30:2.0.1.2.3.5.90.16SECTION 250.519
   250.519 What are the requirements for casing pressure management
30:2.0.1.2.3.5.90.17SECTION 250.520
   250.520 How often do I have to monitor for casing pressure
30:2.0.1.2.3.5.90.18SECTION 250.521
   250.521 When do I have to perform a casing diagnostic test
30:2.0.1.2.3.5.90.19SECTION 250.522
   250.522 How do I manage the thermal effects caused by initial production on a newly completed or recompleted well
30:2.0.1.2.3.5.90.20SECTION 250.523
   250.523 When do I have to repeat casing diagnostic testing
30:2.0.1.2.3.5.90.21SECTION 250.524
   250.524 How long do I keep records of casing pressure and diagnostic tests
30:2.0.1.2.3.5.90.22SECTION 250.525
   250.525 When am I required to take action from my casing diagnostic test
30:2.0.1.2.3.5.90.23SECTION 250.526
   250.526 What do I submit if my casing diagnostic test requires action
30:2.0.1.2.3.5.90.24SECTION 250.527
   250.527 What must I include in my notification of corrective action
30:2.0.1.2.3.5.90.25SECTION 250.528
   250.528 What must I include in my casing pressure request
30:2.0.1.2.3.5.90.26SECTION 250.529
   250.529 What are the terms of my casing pressure request
30:2.0.1.2.3.5.90.27SECTION 250.530
   250.530 What if my casing pressure request is denied
30:2.0.1.2.3.5.90.28SECTION 250.531
   250.531 When does my casing pressure request approval become invalid
30:2.0.1.2.3.6SUBPART F
Subpart F - Oil and Gas Well-Workover Operations
30:2.0.1.2.3.6.91.1SECTION 250.600
   250.600 General requirements.
30:2.0.1.2.3.6.91.2SECTION 250.601
   250.601 Definitions.
30:2.0.1.2.3.6.91.3SECTION 250.602
   250.602 [Reserved]
30:2.0.1.2.3.6.91.4SECTION 250.603
   250.603 Emergency shutdown system.
30:2.0.1.2.3.6.91.5SECTION 250.604
   250.604 Hydrogen sulfide.
30:2.0.1.2.3.6.91.6SECTION 250.605
   250.605 Subsea workovers.
30:2.0.1.2.3.6.91.7SECTION 250.606-250.608
   250.606-250.608 [Reserved]
30:2.0.1.2.3.6.91.8SECTION 250.609
   250.609 Well-workover structures on fixed platforms.
30:2.0.1.2.3.6.91.9SECTION 250.610
   250.610 Diesel engine air intakes.
30:2.0.1.2.3.6.91.10SECTION 250.611
   250.611 Traveling-block safety device.
30:2.0.1.2.3.6.91.11SECTION 250.612
   250.612 Field well-workover rules.
30:2.0.1.2.3.6.91.12SECTION 250.613
   250.613 Approval and reporting for well-workover operations.
30:2.0.1.2.3.6.91.13SECTION 250.614
   250.614 Well-control fluids, equipment, and operations.
30:2.0.1.2.3.6.91.14SECTION 250.615-250.618
   250.615-250.618 [Reserved]
30:2.0.1.2.3.6.91.15SECTION 250.619
   250.619 Tubing and wellhead equipment.
30:2.0.1.2.3.6.91.16SECTION 250.620
   250.620 Wireline operations.
30:2.0.1.2.3.7SUBPART G
Subpart G - Well Operations and Equipment
30:2.0.1.2.3.7.91SUBJGRP 91
   General Requirements
30:2.0.1.2.3.7.91.1SECTION 250.700
   250.700 What operations and equipment does this subpart cover
30:2.0.1.2.3.7.91.2SECTION 250.701
   250.701 May I use alternate procedures or equipment during operations
30:2.0.1.2.3.7.91.3SECTION 250.702
   250.702 May I obtain departures from these requirements
30:2.0.1.2.3.7.91.4SECTION 250.703
   250.703 What must I do to keep wells under control
30:2.0.1.2.3.7.92SUBJGRP 92
   Rig Requirements
30:2.0.1.2.3.7.92.5SECTION 250.710
   250.710 What instructions must be given to personnel engaged in well operations
30:2.0.1.2.3.7.92.6SECTION 250.711
   250.711 What are the requirements for well-control drills
30:2.0.1.2.3.7.92.7SECTION 250.712
   250.712 What rig unit movements must I report
30:2.0.1.2.3.7.92.8SECTION 250.713
   250.713 What must I provide if I plan to use a mobile offshore drilling unit (MODU) for well operations
30:2.0.1.2.3.7.92.9SECTION 250.714
   250.714 Do I have to develop a dropped objects plan
30:2.0.1.2.3.7.92.10SECTION 250.715
   250.715 Do I need a global positioning system (GPS) for all MODUs
30:2.0.1.2.3.7.93SUBJGRP 93
   Well Operations
30:2.0.1.2.3.7.93.11SECTION 250.720
   250.720 When and how must I secure a well
30:2.0.1.2.3.7.93.12SECTION 250.721
   250.721 What are the requirements for pressure testing casing and liners
30:2.0.1.2.3.7.93.13SECTION 250.722
   250.722 What are the requirements for prolonged operations in a well
30:2.0.1.2.3.7.93.14SECTION 250.723
   250.723 What additional safety measures must I take when I conduct operations on a platform that has producing wells or has other hydrocarbon flow
30:2.0.1.2.3.7.93.15SECTION 250.724
   250.724 What are the real-time monitoring requirements
30:2.0.1.2.3.7.94SUBJGRP 94
   Blowout Preventer (BOP) System Requirements
30:2.0.1.2.3.7.94.16SECTION 250.730
   250.730 What are the general requirements for BOP systems and system components
30:2.0.1.2.3.7.94.17SECTION 250.731
   250.731 What information must I submit for BOP systems and system components
30:2.0.1.2.3.7.94.18SECTION 250.732
   250.732 What are the independent third party requirements for BOP systems and system components
30:2.0.1.2.3.7.94.19SECTION 250.733
   250.733 What are the requirements for a surface BOP stack
30:2.0.1.2.3.7.94.20SECTION 250.734
   250.734 What are the requirements for a subsea BOP system
30:2.0.1.2.3.7.94.21SECTION 250.735
   250.735 What associated systems and related equipment must all BOP systems include
30:2.0.1.2.3.7.94.22SECTION 250.736
   250.736 What are the requirements for choke manifolds, kelly-type valves inside BOPs, and drill string safety valves
30:2.0.1.2.3.7.94.23SECTION 250.737
   250.737 What are the BOP system testing requirements
30:2.0.1.2.3.7.94.24SECTION 250.738
   250.738 What must I do in certain situations involving BOP equipment or systems
30:2.0.1.2.3.7.94.25SECTION 250.739
   250.739 What are the BOP maintenance and inspection requirements
30:2.0.1.2.3.7.95SUBJGRP 95
   Records and Reporting
30:2.0.1.2.3.7.95.26SECTION 250.740
   250.740 What records must I keep
30:2.0.1.2.3.7.95.27SECTION 250.741
   250.741 How long must I keep records
30:2.0.1.2.3.7.95.28SECTION 250.742
   250.742 What well records am I required to submit
30:2.0.1.2.3.7.95.29SECTION 250.743
   250.743 What are the well activity reporting requirements
30:2.0.1.2.3.7.95.30SECTION 250.744
   250.744 What are the end of operation reporting requirements
30:2.0.1.2.3.7.95.31SECTION 250.745
   250.745 What other well records could I be required to submit
30:2.0.1.2.3.7.95.32SECTION 250.746
   250.746 What are the recordkeeping requirements for casing, liner, and BOP tests, and inspections of BOP systems and marine risers
30:2.0.1.2.3.7.96SUBJGRP 96
   Coiled Tubing Operations
30:2.0.1.2.3.7.96.33SECTION 250.750
   250.750 What are the coiled tubing requirements
30:2.0.1.2.3.7.96.34SECTION 250.751
   250.751 Coiled tubing testing requirements.
30:2.0.1.2.3.7.97SUBJGRP 97
   Snubbing Operations
30:2.0.1.2.3.7.97.35SECTION 250.760
   250.760 What are the snubbing requirements
30:2.0.1.2.3.8SUBPART H
Subpart H - Oil and Gas Production Safety Systems
30:2.0.1.2.3.8.98SUBJGRP 98
   General Requirements
30:2.0.1.2.3.8.98.1SECTION 250.800
   250.800 General.
30:2.0.1.2.3.8.98.2SECTION 250.801
   250.801 Safety and pollution prevention equipment (SPPE) certification.
30:2.0.1.2.3.8.98.3SECTION 250.802
   250.802 Requirements for SPPE.
30:2.0.1.2.3.8.98.4SECTION 250.803
   250.803 What SPPE failure reporting procedures must I follow
30:2.0.1.2.3.8.98.5SECTION 250.804
   250.804 Additional requirements for subsurface safety valves (SSSVs) and related equipment installed in high pressure high temperature (HPHT) environments.
30:2.0.1.2.3.8.98.6SECTION 250.805
   250.805 Hydrogen sulfide.
30:2.0.1.2.3.8.98.7SECTION 250.806-250.809
   250.806-250.809 [Reserved] 2
30:2.0.1.2.3.8.99SUBJGRP 99
   Surface and Subsurface Safety Systems - Dry Trees
30:2.0.1.2.3.8.99.8SECTION 250.810
   250.810 Dry tree subsurface safety devices - general.
30:2.0.1.2.3.8.99.9SECTION 250.811
   250.811 Specifications for SSSVs - dry trees.
30:2.0.1.2.3.8.99.10SECTION 250.812
   250.812 Surface-controlled SSSVs - dry trees.
30:2.0.1.2.3.8.99.11SECTION 250.813
   250.813 Subsurface-controlled SSSVs.
30:2.0.1.2.3.8.99.12SECTION 250.814
   250.814 Design, installation, and operation of SSSVs - dry trees.
30:2.0.1.2.3.8.99.13SECTION 250.815
   250.815 Subsurface safety devices in shut-in wells - dry trees.
30:2.0.1.2.3.8.99.14SECTION 250.816
   250.816 Subsurface safety devices in injection wells - dry trees.
30:2.0.1.2.3.8.99.15SECTION 250.817
   250.817 Temporary removal of subsurface safety devices for routine operations.
30:2.0.1.2.3.8.99.16SECTION 250.818
   250.818 Additional safety equipment - dry trees.
30:2.0.1.2.3.8.99.17SECTION 250.819
   250.819 Specification for surface safety valves (SSVs).
30:2.0.1.2.3.8.99.18SECTION 250.820
   250.820 Use of SSVs.
30:2.0.1.2.3.8.99.19SECTION 250.821
   250.821 Emergency action and safety system shutdown - dry trees.
30:2.0.1.2.3.8.99.20SECTION 250.822-250.824
   250.822-250.824 [Reserved]
30:2.0.1.2.3.8.100SUBJGRP 100
   Subsea and Subsurface Safety Systems - Subsea Trees
30:2.0.1.2.3.8.100.21SECTION 250.825
   250.825 Subsea tree subsurface safety devices - general.
30:2.0.1.2.3.8.100.22SECTION 250.826
   250.826 Specifications for SSSVs - subsea trees.
30:2.0.1.2.3.8.100.23SECTION 250.827
   250.827 Surface-controlled SSSVs - subsea trees.
30:2.0.1.2.3.8.100.24SECTION 250.828
   250.828 Design, installation, and operation of SSSVs - subsea trees.
30:2.0.1.2.3.8.100.25SECTION 250.829
   250.829 Subsurface safety devices in shut-in wells - subsea trees.
30:2.0.1.2.3.8.100.26SECTION 250.830
   250.830 Subsurface safety devices in injection wells - subsea trees.
30:2.0.1.2.3.8.100.27SECTION 250.831
   250.831 Alteration or disconnection of subsea pipeline or umbilical.
30:2.0.1.2.3.8.100.28SECTION 250.832
   250.832 Additional safety equipment - subsea trees.
30:2.0.1.2.3.8.100.29SECTION 250.833
   250.833 Specification for underwater safety valves (USVs).
30:2.0.1.2.3.8.100.30SECTION 250.834
   250.834 Use of USVs.
30:2.0.1.2.3.8.100.31SECTION 250.835
   250.835 Specification for all boarding shutdown valves (BSDVs) associated with subsea systems.
30:2.0.1.2.3.8.100.32SECTION 250.836
   250.836 Use of BSDVs.
30:2.0.1.2.3.8.100.33SECTION 250.837
   250.837 Emergency action and safety system shutdown - subsea trees.
30:2.0.1.2.3.8.100.34SECTION 250.838
   250.838 What are the maximum allowable valve closure times and hydraulic bleeding requirements for an electro-hydraulic control system
30:2.0.1.2.3.8.100.35SECTION 250.839
   250.839 What are the maximum allowable valve closure times and hydraulic bleeding requirements for a direct-hydraulic control system
30:2.0.1.2.3.8.101SUBJGRP 101
   PRODUCTION SAFETY SYSTEMS
30:2.0.1.2.3.8.101.36SECTION 250.840
   250.840 Design, installation, and maintenance - general.
30:2.0.1.2.3.8.101.37SECTION 250.841
   250.841 Platforms.
30:2.0.1.2.3.8.101.38SECTION 250.842
   250.842 Approval of safety systems design and installation features.
30:2.0.1.2.3.8.101.39SECTION 250.843-250.849
   250.843-250.849 [Reserved]
30:2.0.1.2.3.8.102SUBJGRP 102
   Additional Production System Requirements
30:2.0.1.2.3.8.102.40SECTION 250.850
   250.850 Production system requirements - general.
30:2.0.1.2.3.8.102.41SECTION 250.851
   250.851 Pressure vessels (including heat exchangers) and fired vessels.
30:2.0.1.2.3.8.102.42SECTION 250.852
   250.852 Flowlines/Headers.
30:2.0.1.2.3.8.102.43SECTION 250.853
   250.853 Safety sensors.
30:2.0.1.2.3.8.102.44SECTION 250.854
   250.854 Floating production units equipped with turrets and turret-mounted systems.
30:2.0.1.2.3.8.102.45SECTION 250.855
   250.855 Emergency shutdown (ESD) system.
30:2.0.1.2.3.8.102.46SECTION 250.856
   250.856 Engines.
30:2.0.1.2.3.8.102.47SECTION 250.857
   250.857 Glycol dehydration units.
30:2.0.1.2.3.8.102.48SECTION 250.858
   250.858 Gas compressors.
30:2.0.1.2.3.8.102.49SECTION 250.859
   250.859 Firefighting systems.
30:2.0.1.2.3.8.102.50SECTION 250.860
   250.860 Chemical firefighting system.
30:2.0.1.2.3.8.102.51SECTION 250.861
   250.861 Foam firefighting systems.
30:2.0.1.2.3.8.102.52SECTION 250.862
   250.862 Fire and gas-detection systems.
30:2.0.1.2.3.8.102.53SECTION 250.863
   250.863 Electrical equipment.
30:2.0.1.2.3.8.102.54SECTION 250.864
   250.864 Erosion.
30:2.0.1.2.3.8.102.55SECTION 250.865
   250.865 Surface pumps.
30:2.0.1.2.3.8.102.56SECTION 250.866
   250.866 Personnel safety equipment.
30:2.0.1.2.3.8.102.57SECTION 250.867
   250.867 Temporary quarters and temporary equipment.
30:2.0.1.2.3.8.102.58SECTION 250.868
   250.868 Non-metallic piping.
30:2.0.1.2.3.8.102.59SECTION 250.869
   250.869 General platform operations.
30:2.0.1.2.3.8.102.60SECTION 250.870
   250.870 Time delays on pressure safety low (PSL) sensors.
30:2.0.1.2.3.8.102.61SECTION 250.871
   250.871 Welding and burning practices and procedures.
30:2.0.1.2.3.8.102.62SECTION 250.872
   250.872 Atmospheric vessels.
30:2.0.1.2.3.8.102.63SECTION 250.873
   250.873 Subsea gas lift requirements.
30:2.0.1.2.3.8.102.64SECTION 250.874
   250.874 Subsea water injection systems.
30:2.0.1.2.3.8.102.65SECTION 250.875
   250.875 Subsea pump systems.
30:2.0.1.2.3.8.102.66SECTION 250.876
   250.876 Fired and exhaust heated components.
30:2.0.1.2.3.8.102.67SECTION 250.877-250.879
   250.877-250.879 [Reserved]
30:2.0.1.2.3.8.103SUBJGRP 103
   Safety Device Testing
30:2.0.1.2.3.8.103.68SECTION 250.880
   250.880 Production safety system testing.
30:2.0.1.2.3.8.103.69SECTION 250.881-250.889
   250.881-250.889 [Reserved]
30:2.0.1.2.3.8.104SUBJGRP 104
   Records and Training
30:2.0.1.2.3.8.104.70SECTION 250.890
   250.890 Records.
30:2.0.1.2.3.8.104.71SECTION 250.891
   250.891 Safety device training.
30:2.0.1.2.3.8.104.72SECTION 250.892-250.899
   250.892-250.899 [Reserved]
30:2.0.1.2.3.9SUBPART I
Subpart I - Platforms and Structures
30:2.0.1.2.3.9.105SUBJGRP 105
   General Requirements for Platforms
30:2.0.1.2.3.9.105.1SECTION 250.900
   250.900 What general requirements apply to all platforms
30:2.0.1.2.3.9.105.2SECTION 250.901
   250.901 What industry standards must your platform meet
30:2.0.1.2.3.9.105.3SECTION 250.902
   250.902 What are the requirements for platform removal and location clearance
30:2.0.1.2.3.9.105.4SECTION 250.903
   250.903 What records must I keep
30:2.0.1.2.3.9.106SUBJGRP 106
   Platform Approval Program
30:2.0.1.2.3.9.106.5SECTION 250.904
   250.904 What is the Platform Approval Program
30:2.0.1.2.3.9.106.6SECTION 250.905
   250.905 How do I get approval for the installation, modification, or repair of my platform
30:2.0.1.2.3.9.106.7SECTION 250.906
   250.906 What must I do to obtain approval for the proposed site of my platform
30:2.0.1.2.3.9.106.8SECTION 250.907
   250.907 Where must I locate foundation boreholes
30:2.0.1.2.3.9.106.9SECTION 250.908
   250.908 What are the minimum structural fatigue design requirements
30:2.0.1.2.3.9.107SUBJGRP 107
   Platform Verification Program
30:2.0.1.2.3.9.107.10SECTION 250.909
   250.909 What is the Platform Verification Program
30:2.0.1.2.3.9.107.11SECTION 250.910
   250.910 Which of my facilities are subject to the Platform Verification Program
30:2.0.1.2.3.9.107.12SECTION 250.911
   250.911 If my platform is subject to the Platform Verification Program, what must I do
30:2.0.1.2.3.9.107.13SECTION 250.912
   250.912 What plans must I submit under the Platform Verification Program
30:2.0.1.2.3.9.107.14SECTION 250.913
   250.913 When must I resubmit Platform Verification Program plans
30:2.0.1.2.3.9.107.15SECTION 250.914
   250.914 How do I nominate a CVA
30:2.0.1.2.3.9.107.16SECTION 250.915
   250.915 What are the CVA's primary responsibilities
30:2.0.1.2.3.9.107.17SECTION 250.916
   250.916 What are the CVA's primary duties during the design phase
30:2.0.1.2.3.9.107.18SECTION 250.917
   250.917 What are the CVA's primary duties during the fabrication phase
30:2.0.1.2.3.9.107.19SECTION 250.918
   250.918 What are the CVA's primary duties during the installation phase
30:2.0.1.2.3.9.108SUBJGRP 108
   Inspection, Maintenance, and Assessment of Platforms
30:2.0.1.2.3.9.108.20SECTION 250.919
   250.919 What in-service inspection requirements must I meet
30:2.0.1.2.3.9.108.21SECTION 250.920
   250.920 What are the BSEE requirements for assessment of fixed platforms
30:2.0.1.2.3.9.108.22SECTION 250.921
   250.921 How do I analyze my platform for cumulative fatigue
30:2.0.1.2.3.10SUBPART J
Subpart J - Pipelines and Pipeline Rights-of-Way
30:2.0.1.2.3.10.109.1SECTION 250.1000
   250.1000 General requirements.
30:2.0.1.2.3.10.109.2SECTION 250.1001
   250.1001 Definitions.
30:2.0.1.2.3.10.109.3SECTION 250.1002
   250.1002 Design requirements for DOI pipelines.
30:2.0.1.2.3.10.109.4SECTION 250.1003
   250.1003 Installation, testing, and repair requirements for DOI pipelines.
30:2.0.1.2.3.10.109.5SECTION 250.1004
   250.1004 Safety equipment requirements for DOI pipelines.
30:2.0.1.2.3.10.109.6SECTION 250.1005
   250.1005 Inspection requirements for DOI pipelines.
30:2.0.1.2.3.10.109.7SECTION 250.1006
   250.1006 How must I decommission and take out of service a DOI pipeline
30:2.0.1.2.3.10.109.8SECTION 250.1007
   250.1007 What to include in applications.
30:2.0.1.2.3.10.109.9SECTION 250.1008
   250.1008 Reports.
30:2.0.1.2.3.10.109.10SECTION 250.1009
   250.1009 Requirements to obtain pipeline right-of-way grants.
30:2.0.1.2.3.10.109.11SECTION 250.1010
   250.1010 General requirements for pipeline right-of-way holders.
30:2.0.1.2.3.10.109.12SECTION 250.1011
   250.1011 [Reserved]
30:2.0.1.2.3.10.109.13SECTION 250.1012
   250.1012 Required payments for pipeline right-of-way holders.
30:2.0.1.2.3.10.109.14SECTION 250.1013
   250.1013 Grounds for forfeiture of pipeline right-of-way grants.
30:2.0.1.2.3.10.109.15SECTION 250.1014
   250.1014 When pipeline right-of-way grants expire.
30:2.0.1.2.3.10.109.16SECTION 250.1015
   250.1015 Applications for pipeline right-of-way grants.
30:2.0.1.2.3.10.109.17SECTION 250.1016
   250.1016 Granting pipeline rights-of-way.
30:2.0.1.2.3.10.109.18SECTION 250.1017
   250.1017 Requirements for construction under pipeline right-of-way grants.
30:2.0.1.2.3.10.109.19SECTION 250.1018
   250.1018 Assignment of pipeline right-of-way grants.
30:2.0.1.2.3.10.109.20SECTION 250.1019
   250.1019 Relinquishment of pipeline right-of-way grants.
30:2.0.1.2.3.11SUBPART K
Subpart K - Oil and Gas Production Requirements
30:2.0.1.2.3.11.109SUBJGRP 109
   General
30:2.0.1.2.3.11.109.1SECTION 250.1150
   250.1150 What are the general reservoir production requirements
30:2.0.1.2.3.11.110SUBJGRP 110
   Well Tests and Surveys
30:2.0.1.2.3.11.110.2SECTION 250.1151
   250.1151 How often must I conduct well production tests
30:2.0.1.2.3.11.110.3SECTION 250.1152
   250.1152 How do I conduct well tests
30:2.0.1.2.3.11.110.4SECTION 250.1153-250.1155
   250.1153-250.1155 [Reserved]
30:2.0.1.2.3.11.111SUBJGRP 111
   Approvals Prior to Production
30:2.0.1.2.3.11.111.5SECTION 250.1156
   250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line
30:2.0.1.2.3.11.111.6SECTION 250.1157
   250.1157 How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap
30:2.0.1.2.3.11.111.7SECTION 250.1158
   250.1158 How do I receive approval to downhole commingle hydrocarbons
30:2.0.1.2.3.11.112SUBJGRP 112
   Production Rates
30:2.0.1.2.3.11.112.8SECTION 250.1159
   250.1159 May the Regional Supervisor limit my well or reservoir production rates
30:2.0.1.2.3.11.113SUBJGRP 113
   Flaring, Venting, and Burning Hydrocarbons
30:2.0.1.2.3.11.113.9SECTION 250.1160
   250.1160 When may I flare or vent gas
30:2.0.1.2.3.11.113.10SECTION 250.1161
   250.1161 When may I flare or vent gas for extended periods of time
30:2.0.1.2.3.11.113.11SECTION 250.1162
   250.1162 When may I burn produced liquid hydrocarbons
30:2.0.1.2.3.11.113.12SECTION 250.1163
   250.1163 How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain
30:2.0.1.2.3.11.113.13SECTION 250.1164
   250.1164 What are the requirements for flaring or venting gas containing H2S
30:2.0.1.2.3.11.114SUBJGRP 114
   Other Requirements
30:2.0.1.2.3.11.114.14SECTION 250.1165
   250.1165 What must I do for enhanced recovery operations
30:2.0.1.2.3.11.114.15SECTION 250.1166
   250.1166 What additional reporting is required for developments in the Alaska OCS Region
30:2.0.1.2.3.11.114.16SECTION 250.1167
   250.1167 What information must I submit with forms and for approvals
30:2.0.1.2.3.12SUBPART L
Subpart L - Oil and Gas Production Measurement, Surface Commingling, and Security
30:2.0.1.2.3.12.115.1SECTION 250.1200
   250.1200 Question index table.
30:2.0.1.2.3.12.115.2SECTION 250.1201
   250.1201 Definitions.
30:2.0.1.2.3.12.115.3SECTION 250.1202
   250.1202 Liquid hydrocarbon measurement.
30:2.0.1.2.3.12.115.4SECTION 250.1203
   250.1203 Gas measurement.
30:2.0.1.2.3.12.115.5SECTION 250.1204
   250.1204 Surface commingling.
30:2.0.1.2.3.12.115.6SECTION 250.1205
   250.1205 Site security.
30:2.0.1.2.3.13SUBPART M
Subpart M - Unitization
30:2.0.1.2.3.13.115.1SECTION 250.1300
   250.1300 What is the purpose of this subpart
30:2.0.1.2.3.13.115.2SECTION 250.1301
   250.1301 What are the requirements for unitization
30:2.0.1.2.3.13.115.3SECTION 250.1302
   250.1302 What if I have a competitive reservoir on a lease
30:2.0.1.2.3.13.115.4SECTION 250.1303
   250.1303 How do I apply for voluntary unitization
30:2.0.1.2.3.13.115.5SECTION 250.1304
   250.1304 How will BSEE require unitization
30:2.0.1.2.3.14SUBPART N
Subpart N - Outer Continental Shelf Civil Penalties
30:2.0.1.2.3.14.115SUBJGRP 115
   Outer Continental Shelf Lands Act Civil Penalties
30:2.0.1.2.3.14.115.1SECTION 250.1400
   250.1400 How does BSEE begin the civil penalty process
30:2.0.1.2.3.14.115.2SECTION 250.1401
   250.1401 [Reserved]
30:2.0.1.2.3.14.115.3SECTION 250.1402
   250.1402 Definitions.
30:2.0.1.2.3.14.115.4SECTION 250.1403
   250.1403 What is the maximum civil penalty
30:2.0.1.2.3.14.115.5SECTION 250.1404
   250.1404 Which violations will BSEE review for potential civil penalties
30:2.0.1.2.3.14.115.6SECTION 250.1405
   250.1405 When is a case file developed
30:2.0.1.2.3.14.115.7SECTION 250.1406
   250.1406 When will BSEE notify me and provide penalty information
30:2.0.1.2.3.14.115.8SECTION 250.1407
   250.1407 How do I respond to the letter of notification
30:2.0.1.2.3.14.115.9SECTION 250.1408
   250.1408 When will I be notified of the Reviewing Officer's decision
30:2.0.1.2.3.14.115.10SECTION 250.1409
   250.1409 What are my appeal rights
30:2.0.1.2.3.14.116SUBJGRP 116
   Federal Oil and Gas Royalty Management Act Civil Penalties Definitions
30:2.0.1.2.3.14.116.11SECTION 250.1450
   250.1450 What definitions apply to this subpart
30:2.0.1.2.3.14.117SUBJGRP 117
   Penalties After a Period To Correct
30:2.0.1.2.3.14.117.12SECTION 250.1451
   250.1451 What may BSEE do if I violate a statute, regulation, order, or lease term relating to a Federal oil and gas lease
30:2.0.1.2.3.14.117.13SECTION 250.1452
   250.1452 What if I correct the violation
30:2.0.1.2.3.14.117.14SECTION 250.1453
   250.1453 What if I do not correct the violation
30:2.0.1.2.3.14.117.15SECTION 250.1454
   250.1454 How may I request a hearing on the record on a Notice of Noncompliance
30:2.0.1.2.3.14.117.16SECTION 250.1455
   250.1455 Does my request for a hearing on the record affect the penalties
30:2.0.1.2.3.14.117.17SECTION 250.1456
   250.1456 May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance
30:2.0.1.2.3.14.118SUBJGRP 118
   Penalties Without a Period To Correct
30:2.0.1.2.3.14.118.18SECTION 250.1460
   250.1460 May I be subject to penalties without prior notice and an opportunity to correct
30:2.0.1.2.3.14.118.19SECTION 250.1461
   250.1461 How will BSEE inform me of violations without a period to correct
30:2.0.1.2.3.14.118.20SECTION 250.1462
   250.1462 How may I request a hearing on the record on a Notice of Noncompliance regarding violations without a period to correct
30:2.0.1.2.3.14.118.21SECTION 250.1463
   250.1463 Does my request for a hearing on the record affect the penalties
30:2.0.1.2.3.14.118.22SECTION 250.1464
   250.1464 May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance
30:2.0.1.2.3.14.119SUBJGRP 119
   General Provisions
30:2.0.1.2.3.14.119.23SECTION 250.1470
   250.1470 How does BSEE decide what the amount of the penalty should be
30:2.0.1.2.3.14.119.24SECTION 250.1471
   250.1471 Does the penalty affect whether I owe interest
30:2.0.1.2.3.14.119.25SECTION 250.1472
   250.1472 How will the Office of Hearings and Appeals conduct the hearing on the record
30:2.0.1.2.3.14.119.26SECTION 250.1473
   250.1473 How may I appeal the Administrative Law Judge's decision
30:2.0.1.2.3.14.119.27SECTION 250.1474
   250.1474 May I seek judicial review of the decision of the Interior Board of Land Appeals
30:2.0.1.2.3.14.119.28SECTION 250.1475
   250.1475 When must I pay the penalty
30:2.0.1.2.3.14.119.29SECTION 250.1476
   250.1476 Can BSEE reduce my penalty once it is assessed
30:2.0.1.2.3.14.119.30SECTION 250.1477
   250.1477 How may BSEE collect the penalty
30:2.0.1.2.3.14.120SUBJGRP 120
   Criminal Penalties
30:2.0.1.2.3.14.120.31SECTION 250.1480
   250.1480 May the United States criminally prosecute me for violations under Federal oil and gas leases
30:2.0.1.2.3.15SUBPART O
Subpart O - Well Control and Production Safety Training
30:2.0.1.2.3.15.121.1SECTION 250.1500
   250.1500 Definitions.
30:2.0.1.2.3.15.121.2SECTION 250.1501
   250.1501 What is the goal of my training program
30:2.0.1.2.3.15.121.3SECTION 250.1503
   250.1503 What are my general responsibilities for training
30:2.0.1.2.3.15.121.4SECTION 250.1504
   250.1504 May I use alternative training methods
30:2.0.1.2.3.15.121.5SECTION 250.1505
   250.1505 Where may I get training for my employees
30:2.0.1.2.3.15.121.6SECTION 250.1506
   250.1506 How often must I train my employees
30:2.0.1.2.3.15.121.7SECTION 250.1507
   250.1507 How will BSEE measure training results
30:2.0.1.2.3.15.121.8SECTION 250.1508
   250.1508 What must I do when BSEE administers written or oral tests
30:2.0.1.2.3.15.121.9SECTION 250.1509
   250.1509 What must I do when BSEE administers or requires hands-on, simulator, or other types of testing
30:2.0.1.2.3.15.121.10SECTION 250.1510
   250.1510 What will BSEE do if my training program does not comply with this subpart
30:2.0.1.2.3.16SUBPART P
Subpart P - Sulphur Operations
30:2.0.1.2.3.16.121.1SECTION 250.1600
   250.1600 Performance standard.
30:2.0.1.2.3.16.121.2SECTION 250.1601
   250.1601 Definitions.
30:2.0.1.2.3.16.121.3SECTION 250.1602
   250.1602 Applicability.
30:2.0.1.2.3.16.121.4SECTION 250.1603
   250.1603 Determination of sulphur deposit.
30:2.0.1.2.3.16.121.5SECTION 250.1604
   250.1604 General requirements.
30:2.0.1.2.3.16.121.6SECTION 250.1605
   250.1605 Drilling requirements.
30:2.0.1.2.3.16.121.7SECTION 250.1606
   250.1606 Control of wells.
30:2.0.1.2.3.16.121.8SECTION 250.1607
   250.1607 Field rules.
30:2.0.1.2.3.16.121.9SECTION 250.1608
   250.1608 Well casing and cementing.
30:2.0.1.2.3.16.121.10SECTION 250.1609
   250.1609 Pressure testing of casing.
30:2.0.1.2.3.16.121.11SECTION 250.1610
   250.1610 Blowout preventer systems and system components.
30:2.0.1.2.3.16.121.12SECTION 250.1611
   250.1611 Blowout preventer systems tests, actuations, inspections, and maintenance.
30:2.0.1.2.3.16.121.13SECTION 250.1612
   250.1612 Well-control drills.
30:2.0.1.2.3.16.121.14SECTION 250.1613
   250.1613 Diverter systems.
30:2.0.1.2.3.16.121.15SECTION 250.1614
   250.1614 Mud program.
30:2.0.1.2.3.16.121.16SECTION 250.1615
   250.1615 Securing of wells.
30:2.0.1.2.3.16.121.17SECTION 250.1616
   250.1616 Supervision, surveillance, and training.
30:2.0.1.2.3.16.121.18SECTION 250.1617
   250.1617 Application for permit to drill.
30:2.0.1.2.3.16.121.19SECTION 250.1618
   250.1618 Application for permit to modify.
30:2.0.1.2.3.16.121.20SECTION 250.1619
   250.1619 Well records.
30:2.0.1.2.3.16.121.21SECTION 250.1620
   250.1620 Well-completion and well-workover requirements.
30:2.0.1.2.3.16.121.22SECTION 250.1621
   250.1621 Crew instructions.
30:2.0.1.2.3.16.121.23SECTION 250.1622
   250.1622 Approvals and reporting of well-completion and well-workover operations.
30:2.0.1.2.3.16.121.24SECTION 250.1623
   250.1623 Well-control fluids, equipment, and operations.
30:2.0.1.2.3.16.121.25SECTION 250.1624
   250.1624 Blowout prevention equipment.
30:2.0.1.2.3.16.121.26SECTION 250.1625
   250.1625 Blowout preventer system testing, records, and drills.
30:2.0.1.2.3.16.121.27SECTION 250.1626
   250.1626 Tubing and wellhead equipment.
30:2.0.1.2.3.16.121.28SECTION 250.1627
   250.1627 Production requirements.
30:2.0.1.2.3.16.121.29SECTION 250.1628
   250.1628 Design, installation, and operation of production systems.
30:2.0.1.2.3.16.121.30SECTION 250.1629
   250.1629 Additional production and fuel gas system requirements.
30:2.0.1.2.3.16.121.31SECTION 250.1630
   250.1630 Safety-system testing and records.
30:2.0.1.2.3.16.121.32SECTION 250.1631
   250.1631 Safety device training.
30:2.0.1.2.3.16.121.33SECTION 250.1632
   250.1632 Production rates.
30:2.0.1.2.3.16.121.34SECTION 250.1633
   250.1633 Production measurement.
30:2.0.1.2.3.16.121.35SECTION 250.1634
   250.1634 Site security.
30:2.0.1.2.3.17SUBPART Q
Subpart Q - Decommissioning Activities
30:2.0.1.2.3.17.121SUBJGRP 121
   General
30:2.0.1.2.3.17.121.1SECTION 250.1700
   250.1700 What do the terms “decommissioning”, “obstructions”, and “facility” mean
30:2.0.1.2.3.17.121.2SECTION 250.1701
   250.1701 Who must meet the decommissioning obligations in this subpart
30:2.0.1.2.3.17.121.3SECTION 250.1702
   250.1702 When do I accrue decommissioning obligations
30:2.0.1.2.3.17.121.4SECTION 250.1703
   250.1703 What are the general requirements for decommissioning
30:2.0.1.2.3.17.121.5SECTION 250.1704
   250.1704 What decommissioning applications and reports must I submit and when must I submit them
30:2.0.1.2.3.17.121.6SECTION 250.1705-250.1709
   250.1705-250.1709 [Reserved]
30:2.0.1.2.3.17.122SUBJGRP 122
   Permanently Plugging Wells
30:2.0.1.2.3.17.122.7SECTION 250.1710
   250.1710 When must I permanently plug all wells on a lease
30:2.0.1.2.3.17.122.8SECTION 250.1711
   250.1711 When will BSEE order me to permanently plug a well
30:2.0.1.2.3.17.122.9SECTION 250.1712
   250.1712 What information must I submit before I permanently plug a well or zone
30:2.0.1.2.3.17.122.10SECTION 250.1713
   250.1713 [Reserved]
30:2.0.1.2.3.17.122.11SECTION 250.1714
   250.1714 What must I accomplish with well plugs
30:2.0.1.2.3.17.122.12SECTION 250.1715
   250.1715 How must I permanently plug a well
30:2.0.1.2.3.17.122.13SECTION 250.1716
   250.1716 To what depth must I remove wellheads and casings
30:2.0.1.2.3.17.122.14SECTION 250.1717
   250.1717 [Reserved]
30:2.0.1.2.3.17.123SUBJGRP 123
   Temporary Abandoned Wells
30:2.0.1.2.3.17.123.15SECTION 250.1721
   250.1721 If I temporarily abandon a well that I plan to re-enter, what must I do
30:2.0.1.2.3.17.123.16SECTION 250.1722
   250.1722 If I install a subsea protective device, what requirements must I meet
30:2.0.1.2.3.17.123.17SECTION 250.1723
   250.1723 What must I do when it is no longer necessary to maintain a well in temporary abandoned status
30:2.0.1.2.3.17.124SUBJGRP 124
   Removing Platforms and Other Facilities
30:2.0.1.2.3.17.124.18SECTION 250.1725
   250.1725 When do I have to remove platforms and other facilities
30:2.0.1.2.3.17.124.19SECTION 250.1726
   250.1726 When must I submit an initial platform removal application and what must it include
30:2.0.1.2.3.17.124.20SECTION 250.1727
   250.1727 What information must I include in my final application to remove a platform or other facility
30:2.0.1.2.3.17.124.21SECTION 250.1728
   250.1728 To what depth must I remove a platform or other facility
30:2.0.1.2.3.17.124.22SECTION 250.1729
   250.1729 After I remove a platform or other facility, what information must I submit
30:2.0.1.2.3.17.124.23SECTION 250.1730
   250.1730 When might BSEE approve partial structure removal or toppling in place
30:2.0.1.2.3.17.124.24SECTION 250.1731
   250.1731 Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE
30:2.0.1.2.3.17.125SUBJGRP 125
   Site Clearance for Wells, Platforms, and Other Facilities
30:2.0.1.2.3.17.125.25SECTION 250.1740
   250.1740 How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions
30:2.0.1.2.3.17.125.26SECTION 250.1741
   250.1741 If I drag a trawl across a site, what requirements must I meet
30:2.0.1.2.3.17.125.27SECTION 250.1742
   250.1742 What other methods can I use to verify that a site is clear
30:2.0.1.2.3.17.125.28SECTION 250.1743
   250.1743 How do I certify that a site is clear of obstructions
30:2.0.1.2.3.17.126SUBJGRP 126
   Pipeline Decommissioning
30:2.0.1.2.3.17.126.29SECTION 250.1750
   250.1750 When may I decommission a pipeline in place
30:2.0.1.2.3.17.126.30SECTION 250.1751
   250.1751 How do I decommission a pipeline in place
30:2.0.1.2.3.17.126.31SECTION 250.1752
   250.1752 How do I remove a pipeline
30:2.0.1.2.3.17.126.32SECTION 250.1753
   250.1753 After I decommission a pipeline, what information must I submit
30:2.0.1.2.3.17.126.33SECTION 250.1754
   250.1754 When must I remove a pipeline decommissioned in place
30:2.0.1.2.3.18SUBPART R
Subpart R [Reserved]
30:2.0.1.2.3.19SUBPART S
Subpart S - Safety and Environmental Management Systems (SEMS)
30:2.0.1.2.3.19.127.1SECTION 250.1900
   250.1900 Must I have a SEMS program
30:2.0.1.2.3.19.127.2SECTION 250.1901
   250.1901 What is the goal of my SEMS program
30:2.0.1.2.3.19.127.3SECTION 250.1902
   250.1902 What must I include in my SEMS program
30:2.0.1.2.3.19.127.4SECTION 250.1903
   250.1903 Acronyms and definitions.
30:2.0.1.2.3.19.127.5SECTION 250.1904
   250.1904 Special instructions.
30:2.0.1.2.3.19.127.6SECTION 250.1905-250.1908
   250.1905-250.1908 [Reserved]
30:2.0.1.2.3.19.127.7SECTION 250.1909
   250.1909 What are management's general responsibilities for the SEMS program
30:2.0.1.2.3.19.127.8SECTION 250.1910
   250.1910 What safety and environmental information is required
30:2.0.1.2.3.19.127.9SECTION 250.1911
   250.1911 What hazards analysis criteria must my SEMS program meet
30:2.0.1.2.3.19.127.10SECTION 250.1912
   250.1912 What criteria for management of change must my SEMS program meet
30:2.0.1.2.3.19.127.11SECTION 250.1913
   250.1913 What criteria for operating procedures must my SEMS program meet
30:2.0.1.2.3.19.127.12SECTION 250.1914
   250.1914 What criteria must be documented in my SEMS program for safe work practices and contractor selection
30:2.0.1.2.3.19.127.13SECTION 250.1915
   250.1915 What training criteria must be in my SEMS program
30:2.0.1.2.3.19.127.14SECTION 250.1916
   250.1916 What criteria for mechanical integrity must my SEMS program meet
30:2.0.1.2.3.19.127.15SECTION 250.1917
   250.1917 What criteria for pre-startup review must be in my SEMS program
30:2.0.1.2.3.19.127.16SECTION 250.1918
   250.1918 What criteria for emergency response and control must be in my SEMS program
30:2.0.1.2.3.19.127.17SECTION 250.1919
   250.1919 What criteria for investigation of incidents must be in my SEMS program
30:2.0.1.2.3.19.127.18SECTION 250.1920
   250.1920 What are the auditing requirements for my SEMS program
30:2.0.1.2.3.19.127.19SECTION 250.1921
   250.1921 What qualifications must the ASP meet
30:2.0.1.2.3.19.127.20SECTION 250.1922
   250.1922 What qualifications must an AB meet
30:2.0.1.2.3.19.127.21SECTION 250.1923
   250.1923 [Reserved]
30:2.0.1.2.3.19.127.22SECTION 250.1924
   250.1924 How will BSEE determine if my SEMS program is effective
30:2.0.1.2.3.19.127.23SECTION 250.1925
   250.1925 May BSEE direct me to conduct additional audits
30:2.0.1.2.3.19.127.24SECTION 250.1926
   250.1926 [Reserved]
30:2.0.1.2.3.19.127.25SECTION 250.1927
   250.1927 What happens if BSEE finds shortcomings in my SEMS program
30:2.0.1.2.3.19.127.26SECTION 250.1928
   250.1928 What are my recordkeeping and documentation requirements
30:2.0.1.2.3.19.127.27SECTION 250.1929
   250.1929 What are my responsibilities for submitting OCS performance measure data
30:2.0.1.2.3.19.127.28SECTION 250.1930
   250.1930 What must be included in my SEMS program for SWA
30:2.0.1.2.3.19.127.29SECTION 250.1931
   250.1931 What must be included in my SEMS program for UWA
30:2.0.1.2.3.19.127.30SECTION 250.1932
   250.1932 What are my EPP requirements
30:2.0.1.2.3.19.127.31SECTION 250.1933
   250.1933 What procedures must be included for reporting unsafe working conditions