30:2.0.1.2.3.1 | SUBPART A
| Subpart A - General | |
30:2.0.1.2.3.1.66 | SUBJGRP 66
| Authority and Definition of Terms | |
30:2.0.1.2.3.1.66.1 | SECTION 250.101
| 250.101 Authority and applicability. | |
30:2.0.1.2.3.1.66.2 | SECTION 250.102
| 250.102 What does this part do | |
30:2.0.1.2.3.1.66.3 | SECTION 250.103
| 250.103 Where can I find more information about the requirements in this part | |
30:2.0.1.2.3.1.66.4 | SECTION 250.104
| 250.104 How may I appeal a decision made under BSEE regulations | |
30:2.0.1.2.3.1.66.5 | SECTION 250.105
| 250.105 Definitions. | |
30:2.0.1.2.3.1.67 | SUBJGRP 67
| Performance Standards | |
30:2.0.1.2.3.1.67.6 | SECTION 250.106
| 250.106 What standards will the Director use to regulate lease operations | |
30:2.0.1.2.3.1.67.7 | SECTION 250.107
| 250.107 What must I do to protect health, safety, property, and the environment | |
30:2.0.1.2.3.1.67.8 | SECTION 250.108
| 250.108 What requirements must I follow for cranes and other material-handling equipment | |
30:2.0.1.2.3.1.67.9 | SECTION 250.109
| 250.109 What documents must I prepare and maintain related to welding | |
30:2.0.1.2.3.1.67.10 | SECTION 250.110
| 250.110 What must I include in my welding plan | |
30:2.0.1.2.3.1.67.11 | SECTION 250.111
| 250.111 Who oversees operations under my welding plan | |
30:2.0.1.2.3.1.67.12 | SECTION 250.112
| 250.112 What standards must my welding equipment meet | |
30:2.0.1.2.3.1.67.13 | SECTION 250.113
| 250.113 What procedures must I follow when welding | |
30:2.0.1.2.3.1.67.14 | SECTION 250.114
| 250.114 How must I install, maintain, and operate electrical equipment | |
30:2.0.1.2.3.1.67.15 | SECTION 250.115
| 250.115 What are the procedures for, and effects of, incorporation of documents by reference in this part | |
30:2.0.1.2.3.1.67.16 | SECTION 250.116-250.117
| 250.116-250.117 [Reserved] | |
30:2.0.1.2.3.1.68 | SUBJGRP 68
| Gas Storage or Injection | |
30:2.0.1.2.3.1.68.17 | SECTION 250.118
| 250.118 Will BSEE approve gas injection | |
30:2.0.1.2.3.1.68.18 | SECTION 250.119
| 250.119 [Reserved] | |
30:2.0.1.2.3.1.68.19 | SECTION 250.120
| 250.120 How does injecting, storing, or treating gas affect my royalty payments | |
30:2.0.1.2.3.1.68.20 | SECTION 250.121
| 250.121 What happens when the reservoir contains both original gas in place and injected gas | |
30:2.0.1.2.3.1.68.21 | SECTION 250.122
| 250.122 What effect does subsurface storage have on the lease term | |
30:2.0.1.2.3.1.68.22 | SECTION 250.123
| 250.123 [Reserved] | |
30:2.0.1.2.3.1.68.23 | SECTION 250.124
| 250.124 Will BSEE approve gas injection into the cap rock containing a sulphur deposit | |
30:2.0.1.2.3.1.69 | SUBJGRP 69
| Fees | |
30:2.0.1.2.3.1.69.24 | SECTION 250.125
| 250.125 Service fees. | |
30:2.0.1.2.3.1.69.25 | SECTION 250.126
| 250.126 Electronic payment instructions. | |
30:2.0.1.2.3.1.70 | SUBJGRP 70
| Inspections of Operations | |
30:2.0.1.2.3.1.70.26 | SECTION 250.130
| 250.130 Why does BSEE conduct inspections | |
30:2.0.1.2.3.1.70.27 | SECTION 250.131
| 250.131 Will BSEE notify me before conducting an inspection | |
30:2.0.1.2.3.1.70.28 | SECTION 250.132
| 250.132 What must I do when BSEE conducts an inspection | |
30:2.0.1.2.3.1.70.29 | SECTION 250.133
| 250.133 Will BSEE reimburse me for my expenses related to inspections | |
30:2.0.1.2.3.1.71 | SUBJGRP 71
| Disqualification | |
30:2.0.1.2.3.1.71.30 | SECTION 250.135
| 250.135 What will BSEE do if my operating performance is unacceptable | |
30:2.0.1.2.3.1.71.31 | SECTION 250.136
| 250.136 How will BSEE determine if my operating performance is unacceptable | |
30:2.0.1.2.3.1.72 | SUBJGRP 72
| Special Types of Approvals | |
30:2.0.1.2.3.1.72.32 | SECTION 250.140
| 250.140 When will I receive an oral approval | |
30:2.0.1.2.3.1.72.33 | SECTION 250.141
| 250.141 May I ever use alternate procedures or equipment | |
30:2.0.1.2.3.1.72.34 | SECTION 250.142
| 250.142 How do I receive approval for departures | |
30:2.0.1.2.3.1.72.35 | SECTION 250.143-250.144
| 250.143-250.144 [Reserved] | |
30:2.0.1.2.3.1.72.36 | SECTION 250.145
| 250.145 How do I designate an agent or a local agent | |
30:2.0.1.2.3.1.72.37 | SECTION 250.146
| 250.146 Who is responsible for fulfilling leasehold obligations | |
30:2.0.1.2.3.1.73 | SUBJGRP 73
| Naming and Identifying Facilities and Wells (Does Not Include MODUs) | |
30:2.0.1.2.3.1.73.38 | SECTION 250.150
| 250.150 How do I name facilities and wells in the Gulf of Mexico Region | |
30:2.0.1.2.3.1.73.39 | SECTION 250.151
| 250.151 How do I name facilities in the Pacific Region | |
30:2.0.1.2.3.1.73.40 | SECTION 250.152
| 250.152 How do I name facilities in the Alaska Region | |
30:2.0.1.2.3.1.73.41 | SECTION 250.153
| 250.153 Do I have to rename an existing facility or well | |
30:2.0.1.2.3.1.73.42 | SECTION 250.154
| 250.154 What identification signs must I display | |
30:2.0.1.2.3.1.73.43 | SECTION 250.160-250.167
| 250.160-250.167 [Reserved] | |
30:2.0.1.2.3.1.74 | SUBJGRP 74
| Suspensions | |
30:2.0.1.2.3.1.74.44 | SECTION 250.168
| 250.168 May operations or production be suspended | |
30:2.0.1.2.3.1.74.45 | SECTION 250.169
| 250.169 What effect does suspension have on my lease | |
30:2.0.1.2.3.1.74.46 | SECTION 250.170
| 250.170 How long does a suspension last | |
30:2.0.1.2.3.1.74.47 | SECTION 250.171
| 250.171 How do I request a suspension | |
30:2.0.1.2.3.1.74.48 | SECTION 250.172
| 250.172 When may the Regional Supervisor grant or direct an SOO or SOP | |
30:2.0.1.2.3.1.74.49 | SECTION 250.173
| 250.173 When may the Regional Supervisor direct an SOO or SOP | |
30:2.0.1.2.3.1.74.50 | SECTION 250.174
| 250.174 When may the Regional Supervisor grant or direct an SOP | |
30:2.0.1.2.3.1.74.51 | SECTION 250.175
| 250.175 When may the Regional Supervisor grant an SOO | |
30:2.0.1.2.3.1.74.52 | SECTION 250.176
| 250.176 Does a suspension affect my royalty payment | |
30:2.0.1.2.3.1.74.53 | SECTION 250.177
| 250.177 What additional requirements may the Regional Supervisor order for a suspension | |
30:2.0.1.2.3.1.75 | SUBJGRP 75
| Primary Lease Requirements, Lease Term Extensions, and Lease Cancellations | |
30:2.0.1.2.3.1.75.54 | SECTION 250.180
| 250.180 What am I required to do to keep my lease term in effect | |
30:2.0.1.2.3.1.75.55 | SECTION 250.181-250.185
| 250.181-250.185 [Reserved] | |
30:2.0.1.2.3.1.76 | SUBJGRP 76
| Information and Reporting Requirements | |
30:2.0.1.2.3.1.76.56 | SECTION 250.186
| 250.186 What reporting information and report forms must I submit | |
30:2.0.1.2.3.1.76.57 | SECTION 250.187
| 250.187 What are BSEE's incident reporting requirements | |
30:2.0.1.2.3.1.76.58 | SECTION 250.188
| 250.188 What incidents must I report to BSEE and when must I report them | |
30:2.0.1.2.3.1.76.59 | SECTION 250.189
| 250.189 Reporting requirements for incidents requiring immediate notification. | |
30:2.0.1.2.3.1.76.60 | SECTION 250.190
| 250.190 Reporting requirements for incidents requiring written notification. | |
30:2.0.1.2.3.1.76.61 | SECTION 250.191
| 250.191 How does BSEE conduct incident investigations | |
30:2.0.1.2.3.1.76.62 | SECTION 250.192
| 250.192 What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence | |
30:2.0.1.2.3.1.76.63 | SECTION 250.193
| 250.193 Reports and investigations of possible violations. | |
30:2.0.1.2.3.1.76.64 | SECTION 250.194
| 250.194 How must I protect archaeological resources | |
30:2.0.1.2.3.1.76.65 | SECTION 250.195
| 250.195 What notification does BSEE require on the production status of wells | |
30:2.0.1.2.3.1.76.66 | SECTION 250.196
| 250.196 Reimbursements for reproduction and processing costs. | |
30:2.0.1.2.3.1.76.67 | SECTION 250.197
| 250.197 Data and information to be made available to the public or for limited inspection. | |
30:2.0.1.2.3.1.77 | SUBJGRP 77
| References | |
30:2.0.1.2.3.1.77.68 | SECTION 250.198
| 250.198 Documents incorporated by reference. | |
30:2.0.1.2.3.1.77.69 | SECTION 250.199
| 250.199 Paperwork Reduction Act statements - information collection. | |
30:2.0.1.2.3.2 | SUBPART B
| Subpart B - Plans and Information | |
30:2.0.1.2.3.2.78 | SUBJGRP 78
| General Information | |
30:2.0.1.2.3.2.78.1 | SECTION 250.200
| 250.200 Definitions. | |
30:2.0.1.2.3.2.78.2 | SECTION 250.201
| 250.201 What plans and information must I submit before I conduct any activities on my lease or unit | |
30:2.0.1.2.3.2.78.3 | SECTION 250.202-250.203
| 250.202-250.203 [Reserved] | |
30:2.0.1.2.3.2.78.4 | SECTION 250.204
| 250.204 How must I protect the rights of the Federal government | |
30:2.0.1.2.3.2.78.5 | SECTION 250.205
| 250.205 Are there special requirements if my well affects an adjacent property | |
30:2.0.1.2.3.2.79 | SUBJGRP 79
| Post-Approval Requirements for the EP, DPP, and DOCD | |
30:2.0.1.2.3.2.79.6 | SECTION 250.282
| 250.282 Do I have to conduct post-approval monitoring | |
30:2.0.1.2.3.2.80 | SUBJGRP 80
| Deepwater Operations Plan (DWOP) | |
30:2.0.1.2.3.2.80.7 | SECTION 250.286
| 250.286 What is a DWOP | |
30:2.0.1.2.3.2.80.8 | SECTION 250.287
| 250.287 For what development projects must I submit a DWOP | |
30:2.0.1.2.3.2.80.9 | SECTION 250.288
| 250.288 When and how must I submit the Conceptual Plan | |
30:2.0.1.2.3.2.80.10 | SECTION 250.289
| 250.289 What must the Conceptual Plan contain | |
30:2.0.1.2.3.2.80.11 | SECTION 250.290
| 250.290 What operations require approval of the Conceptual Plan | |
30:2.0.1.2.3.2.80.12 | SECTION 250.291
| 250.291 When and how must I submit the DWOP | |
30:2.0.1.2.3.2.80.13 | SECTION 250.292
| 250.292 What must the DWOP contain | |
30:2.0.1.2.3.2.80.14 | SECTION 250.293
| 250.293 What operations require approval of the DWOP | |
30:2.0.1.2.3.2.80.15 | SECTION 250.294
| 250.294 May I combine the Conceptual Plan and the DWOP | |
30:2.0.1.2.3.2.80.16 | SECTION 250.295
| 250.295 When must I revise my DWOP | |
30:2.0.1.2.3.3 | SUBPART C
| Subpart C - Pollution Prevention and Control | |
30:2.0.1.2.3.3.81.1 | SECTION 250.300
| 250.300 Pollution prevention. | |
30:2.0.1.2.3.3.81.2 | SECTION 250.301
| 250.301 Inspection of facilities. | |
30:2.0.1.2.3.4 | SUBPART D
| Subpart D - Oil and Gas Drilling Operations | |
30:2.0.1.2.3.4.81 | SUBJGRP 81
| General Requirements | |
30:2.0.1.2.3.4.81.1 | SECTION 250.400
| 250.400 General requirements. | |
30:2.0.1.2.3.4.81.2 | SECTION 250.401-250.403
| 250.401-250.403 [Reserved] | |
30:2.0.1.2.3.4.81.3 | SECTION 250.404
| 250.404 What are the requirements for the crown block | |
30:2.0.1.2.3.4.81.4 | SECTION 250.405
| 250.405 What are the safety requirements for diesel engines used on a drilling rig | |
30:2.0.1.2.3.4.81.5 | SECTION 250.406
| 250.406 [Reserved] | |
30:2.0.1.2.3.4.81.6 | SECTION 250.407
| 250.407 What tests must I conduct to determine reservoir characteristics | |
30:2.0.1.2.3.4.81.7 | SECTION 250.408
| 250.408 May I use alternative procedures or equipment during drilling operations | |
30:2.0.1.2.3.4.81.8 | SECTION 250.409
| 250.409 May I obtain departures from these drilling requirements | |
30:2.0.1.2.3.4.82 | SUBJGRP 82
| Applying for a Permit To Drill | |
30:2.0.1.2.3.4.82.9 | SECTION 250.410
| 250.410 How do I obtain approval to drill a well | |
30:2.0.1.2.3.4.82.10 | SECTION 250.411
| 250.411 What information must I submit with my application | |
30:2.0.1.2.3.4.82.11 | SECTION 250.412
| 250.412 What requirements must the location plat meet | |
30:2.0.1.2.3.4.82.12 | SECTION 250.413
| 250.413 What must my description of well drilling design criteria address | |
30:2.0.1.2.3.4.82.13 | SECTION 250.414
| 250.414 What must my drilling prognosis include | |
30:2.0.1.2.3.4.82.14 | SECTION 250.415
| 250.415 What must my casing and cementing programs include | |
30:2.0.1.2.3.4.82.15 | SECTION 250.416
| 250.416 What must I include in the diverter description | |
30:2.0.1.2.3.4.82.16 | SECTION 250.417
| 250.417 [Reserved] | |
30:2.0.1.2.3.4.82.17 | SECTION 250.418
| 250.418 What additional information must I submit with my APD | |
30:2.0.1.2.3.4.83 | SUBJGRP 83
| Casing and Cementing Requirements | |
30:2.0.1.2.3.4.83.18 | SECTION 250.420
| 250.420 What well casing and cementing requirements must I meet | |
30:2.0.1.2.3.4.83.19 | SECTION 250.421
| 250.421 What are the casing and cementing requirements by type of casing string | |
30:2.0.1.2.3.4.83.20 | SECTION 250.422
| 250.422 When may I resume drilling after cementing | |
30:2.0.1.2.3.4.83.21 | SECTION 250.423
| 250.423 What are the requirements for casing and liner installation | |
30:2.0.1.2.3.4.83.22 | SECTION 250.424-250.426
| 250.424-250.426 [Reserved] | |
30:2.0.1.2.3.4.83.23 | SECTION 250.427
| 250.427 What are the requirements for pressure integrity tests | |
30:2.0.1.2.3.4.83.24 | SECTION 250.428
| 250.428 What must I do in certain cementing and casing situations | |
30:2.0.1.2.3.4.84 | SUBJGRP 84
| Diverter System Requirements | |
30:2.0.1.2.3.4.84.25 | SECTION 250.430
| 250.430 When must I install a diverter system | |
30:2.0.1.2.3.4.84.26 | SECTION 250.431
| 250.431 What are the diverter design and installation requirements | |
30:2.0.1.2.3.4.84.27 | SECTION 250.432
| 250.432 How do I obtain a departure to diverter design and installation requirements | |
30:2.0.1.2.3.4.84.28 | SECTION 250.433
| 250.433 What are the diverter actuation and testing requirements | |
30:2.0.1.2.3.4.84.29 | SECTION 250.434
| 250.434 What are the recordkeeping requirements for diverter actuations and tests | |
30:2.0.1.2.3.4.84.30 | SECTION 250.440-250.451
| 250.440-250.451 [Reserved] | |
30:2.0.1.2.3.4.84.31 | SECTION 250.452
| 250.452 What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations | |
30:2.0.1.2.3.4.85 | SUBJGRP 85
| Drilling Fluid Requirements | |
30:2.0.1.2.3.4.85.32 | SECTION 250.455
| 250.455 What are the general requirements for a drilling fluid program | |
30:2.0.1.2.3.4.85.33 | SECTION 250.456
| 250.456 What safe practices must the drilling fluid program follow | |
30:2.0.1.2.3.4.85.34 | SECTION 250.457
| 250.457 What equipment is required to monitor drilling fluids | |
30:2.0.1.2.3.4.85.35 | SECTION 250.458
| 250.458 What quantities of drilling fluids are required | |
30:2.0.1.2.3.4.85.36 | SECTION 250.459
| 250.459 What are the safety requirements for drilling fluid-handling areas | |
30:2.0.1.2.3.4.86 | SUBJGRP 86
| Other Drilling Requirements | |
30:2.0.1.2.3.4.86.37 | SECTION 250.460
| 250.460 What are the requirements for conducting a well test | |
30:2.0.1.2.3.4.86.38 | SECTION 250.461
| 250.461 What are the requirements for directional and inclination surveys | |
30:2.0.1.2.3.4.86.39 | SECTION 250.462
| 250.462 What are the source control, containment, and collocated equipment requirements | |
30:2.0.1.2.3.4.86.40 | SECTION 250.463
| 250.463 Who establishes field drilling rules | |
30:2.0.1.2.3.4.87 | SUBJGRP 87
| Applying for a Permit To Modify and Well Records | |
30:2.0.1.2.3.4.87.41 | SECTION 250.465
| 250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE | |
30:2.0.1.2.3.4.87.42 | SECTION 250.466-250.469
| 250.466-250.469 [Reserved] | |
30:2.0.1.2.3.4.88 | SUBJGRP 88
| Additional Arctic OCS Requirements | |
30:2.0.1.2.3.4.88.43 | SECTION 250.470
| 250.470 What additional information must I submit with my APD for Arctic OCS exploratory drilling operations | |
30:2.0.1.2.3.4.88.44 | SECTION 250.471
| 250.471 What are the requirements for Arctic OCS source control and containment | |
30:2.0.1.2.3.4.88.45 | SECTION 250.472
| 250.472 What are the relief rig requirements for the Arctic OCS | |
30:2.0.1.2.3.4.88.46 | SECTION 250.473
| 250.473 What must I do to protect health, safety, property, and the environment while operating on the Arctic OCS | |
30:2.0.1.2.3.4.89 | SUBJGRP 89
| Hydrogen Sulfide | |
30:2.0.1.2.3.4.89.47 | SECTION 250.490
| 250.490 Hydrogen sulfide. | |
30:2.0.1.2.3.5 | SUBPART E
| Subpart E - Oil and Gas Well-Completion Operations | |
30:2.0.1.2.3.5.90 | SUBJGRP 90
| Casing Pressure Management | |
30:2.0.1.2.3.5.90.1 | SECTION 250.500
| 250.500 General requirements. | |
30:2.0.1.2.3.5.90.2 | SECTION 250.501
| 250.501 Definition. | |
30:2.0.1.2.3.5.90.3 | SECTION 250.502
| 250.502 [Reserved] | |
30:2.0.1.2.3.5.90.4 | SECTION 250.503
| 250.503 Emergency shutdown system. | |
30:2.0.1.2.3.5.90.5 | SECTION 250.504
| 250.504 Hydrogen sulfide. | |
30:2.0.1.2.3.5.90.6 | SECTION 250.505
| 250.505 Subsea completions. | |
30:2.0.1.2.3.5.90.7 | SECTION 250.506-250.508
| 250.506-250.508 [Reserved] | |
30:2.0.1.2.3.5.90.8 | SECTION 250.509
| 250.509 Well-completion structures on fixed platforms. | |
30:2.0.1.2.3.5.90.9 | SECTION 250.510
| 250.510 Diesel engine air intakes. | |
30:2.0.1.2.3.5.90.10 | SECTION 250.511
| 250.511 Traveling-block safety device. | |
30:2.0.1.2.3.5.90.11 | SECTION 250.512
| 250.512 Field well-completion rules. | |
30:2.0.1.2.3.5.90.12 | SECTION 250.513
| 250.513 Approval and reporting of well-completion operations. | |
30:2.0.1.2.3.5.90.13 | SECTION 250.514
| 250.514 Well-control fluids, equipment, and operations. | |
30:2.0.1.2.3.5.90.14 | SECTION 250.515-250.517
| 250.515-250.517 [Reserved] | |
30:2.0.1.2.3.5.90.15 | SECTION 250.518
| 250.518 Tubing and wellhead equipment. | |
30:2.0.1.2.3.5.90.16 | SECTION 250.519
| 250.519 What are the requirements for casing pressure management | |
30:2.0.1.2.3.5.90.17 | SECTION 250.520
| 250.520 How often do I have to monitor for casing pressure | |
30:2.0.1.2.3.5.90.18 | SECTION 250.521
| 250.521 When do I have to perform a casing diagnostic test | |
30:2.0.1.2.3.5.90.19 | SECTION 250.522
| 250.522 How do I manage the thermal effects caused by initial production on a newly completed or recompleted well | |
30:2.0.1.2.3.5.90.20 | SECTION 250.523
| 250.523 When do I have to repeat casing diagnostic testing | |
30:2.0.1.2.3.5.90.21 | SECTION 250.524
| 250.524 How long do I keep records of casing pressure and diagnostic tests | |
30:2.0.1.2.3.5.90.22 | SECTION 250.525
| 250.525 When am I required to take action from my casing diagnostic test | |
30:2.0.1.2.3.5.90.23 | SECTION 250.526
| 250.526 What do I submit if my casing diagnostic test requires action | |
30:2.0.1.2.3.5.90.24 | SECTION 250.527
| 250.527 What must I include in my notification of corrective action | |
30:2.0.1.2.3.5.90.25 | SECTION 250.528
| 250.528 What must I include in my casing pressure request | |
30:2.0.1.2.3.5.90.26 | SECTION 250.529
| 250.529 What are the terms of my casing pressure request | |
30:2.0.1.2.3.5.90.27 | SECTION 250.530
| 250.530 What if my casing pressure request is denied | |
30:2.0.1.2.3.5.90.28 | SECTION 250.531
| 250.531 When does my casing pressure request approval become invalid | |
30:2.0.1.2.3.6 | SUBPART F
| Subpart F - Oil and Gas Well-Workover Operations | |
30:2.0.1.2.3.6.91.1 | SECTION 250.600
| 250.600 General requirements. | |
30:2.0.1.2.3.6.91.2 | SECTION 250.601
| 250.601 Definitions. | |
30:2.0.1.2.3.6.91.3 | SECTION 250.602
| 250.602 [Reserved] | |
30:2.0.1.2.3.6.91.4 | SECTION 250.603
| 250.603 Emergency shutdown system. | |
30:2.0.1.2.3.6.91.5 | SECTION 250.604
| 250.604 Hydrogen sulfide. | |
30:2.0.1.2.3.6.91.6 | SECTION 250.605
| 250.605 Subsea workovers. | |
30:2.0.1.2.3.6.91.7 | SECTION 250.606-250.608
| 250.606-250.608 [Reserved] | |
30:2.0.1.2.3.6.91.8 | SECTION 250.609
| 250.609 Well-workover structures on fixed platforms. | |
30:2.0.1.2.3.6.91.9 | SECTION 250.610
| 250.610 Diesel engine air intakes. | |
30:2.0.1.2.3.6.91.10 | SECTION 250.611
| 250.611 Traveling-block safety device. | |
30:2.0.1.2.3.6.91.11 | SECTION 250.612
| 250.612 Field well-workover rules. | |
30:2.0.1.2.3.6.91.12 | SECTION 250.613
| 250.613 Approval and reporting for well-workover operations. | |
30:2.0.1.2.3.6.91.13 | SECTION 250.614
| 250.614 Well-control fluids, equipment, and operations. | |
30:2.0.1.2.3.6.91.14 | SECTION 250.615-250.618
| 250.615-250.618 [Reserved] | |
30:2.0.1.2.3.6.91.15 | SECTION 250.619
| 250.619 Tubing and wellhead equipment. | |
30:2.0.1.2.3.6.91.16 | SECTION 250.620
| 250.620 Wireline operations. | |
30:2.0.1.2.3.7 | SUBPART G
| Subpart G - Well Operations and Equipment | |
30:2.0.1.2.3.7.91 | SUBJGRP 91
| General Requirements | |
30:2.0.1.2.3.7.91.1 | SECTION 250.700
| 250.700 What operations and equipment does this subpart cover | |
30:2.0.1.2.3.7.91.2 | SECTION 250.701
| 250.701 May I use alternate procedures or equipment during operations | |
30:2.0.1.2.3.7.91.3 | SECTION 250.702
| 250.702 May I obtain departures from these requirements | |
30:2.0.1.2.3.7.91.4 | SECTION 250.703
| 250.703 What must I do to keep wells under control | |
30:2.0.1.2.3.7.92 | SUBJGRP 92
| Rig Requirements | |
30:2.0.1.2.3.7.92.5 | SECTION 250.710
| 250.710 What instructions must be given to personnel engaged in well operations | |
30:2.0.1.2.3.7.92.6 | SECTION 250.711
| 250.711 What are the requirements for well-control drills | |
30:2.0.1.2.3.7.92.7 | SECTION 250.712
| 250.712 What rig unit movements must I report | |
30:2.0.1.2.3.7.92.8 | SECTION 250.713
| 250.713 What must I provide if I plan to use a mobile offshore drilling unit (MODU) for well operations | |
30:2.0.1.2.3.7.92.9 | SECTION 250.714
| 250.714 Do I have to develop a dropped objects plan | |
30:2.0.1.2.3.7.92.10 | SECTION 250.715
| 250.715 Do I need a global positioning system (GPS) for all MODUs | |
30:2.0.1.2.3.7.93 | SUBJGRP 93
| Well Operations | |
30:2.0.1.2.3.7.93.11 | SECTION 250.720
| 250.720 When and how must I secure a well | |
30:2.0.1.2.3.7.93.12 | SECTION 250.721
| 250.721 What are the requirements for pressure testing casing and liners | |
30:2.0.1.2.3.7.93.13 | SECTION 250.722
| 250.722 What are the requirements for prolonged operations in a well | |
30:2.0.1.2.3.7.93.14 | SECTION 250.723
| 250.723 What additional safety measures must I take when I conduct operations on a platform that has producing wells or has other hydrocarbon flow | |
30:2.0.1.2.3.7.93.15 | SECTION 250.724
| 250.724 What are the real-time monitoring requirements | |
30:2.0.1.2.3.7.94 | SUBJGRP 94
| Blowout Preventer (BOP) System Requirements | |
30:2.0.1.2.3.7.94.16 | SECTION 250.730
| 250.730 What are the general requirements for BOP systems and system components | |
30:2.0.1.2.3.7.94.17 | SECTION 250.731
| 250.731 What information must I submit for BOP systems and system components | |
30:2.0.1.2.3.7.94.18 | SECTION 250.732
| 250.732 What are the independent third party requirements for BOP systems and system components | |
30:2.0.1.2.3.7.94.19 | SECTION 250.733
| 250.733 What are the requirements for a surface BOP stack | |
30:2.0.1.2.3.7.94.20 | SECTION 250.734
| 250.734 What are the requirements for a subsea BOP system | |
30:2.0.1.2.3.7.94.21 | SECTION 250.735
| 250.735 What associated systems and related equipment must all BOP systems include | |
30:2.0.1.2.3.7.94.22 | SECTION 250.736
| 250.736 What are the requirements for choke manifolds, kelly-type valves inside BOPs, and drill string safety valves | |
30:2.0.1.2.3.7.94.23 | SECTION 250.737
| 250.737 What are the BOP system testing requirements | |
30:2.0.1.2.3.7.94.24 | SECTION 250.738
| 250.738 What must I do in certain situations involving BOP equipment or systems | |
30:2.0.1.2.3.7.94.25 | SECTION 250.739
| 250.739 What are the BOP maintenance and inspection requirements | |
30:2.0.1.2.3.7.95 | SUBJGRP 95
| Records and Reporting | |
30:2.0.1.2.3.7.95.26 | SECTION 250.740
| 250.740 What records must I keep | |
30:2.0.1.2.3.7.95.27 | SECTION 250.741
| 250.741 How long must I keep records | |
30:2.0.1.2.3.7.95.28 | SECTION 250.742
| 250.742 What well records am I required to submit | |
30:2.0.1.2.3.7.95.29 | SECTION 250.743
| 250.743 What are the well activity reporting requirements | |
30:2.0.1.2.3.7.95.30 | SECTION 250.744
| 250.744 What are the end of operation reporting requirements | |
30:2.0.1.2.3.7.95.31 | SECTION 250.745
| 250.745 What other well records could I be required to submit | |
30:2.0.1.2.3.7.95.32 | SECTION 250.746
| 250.746 What are the recordkeeping requirements for casing, liner, and BOP tests, and inspections of BOP systems and marine risers | |
30:2.0.1.2.3.7.96 | SUBJGRP 96
| Coiled Tubing Operations | |
30:2.0.1.2.3.7.96.33 | SECTION 250.750
| 250.750 What are the coiled tubing requirements | |
30:2.0.1.2.3.7.96.34 | SECTION 250.751
| 250.751 Coiled tubing testing requirements. | |
30:2.0.1.2.3.7.97 | SUBJGRP 97
| Snubbing Operations | |
30:2.0.1.2.3.7.97.35 | SECTION 250.760
| 250.760 What are the snubbing requirements | |
30:2.0.1.2.3.8 | SUBPART H
| Subpart H - Oil and Gas Production Safety Systems | |
30:2.0.1.2.3.8.98 | SUBJGRP 98
| General Requirements | |
30:2.0.1.2.3.8.98.1 | SECTION 250.800
| 250.800 General. | |
30:2.0.1.2.3.8.98.2 | SECTION 250.801
| 250.801 Safety and pollution prevention equipment (SPPE) certification. | |
30:2.0.1.2.3.8.98.3 | SECTION 250.802
| 250.802 Requirements for SPPE. | |
30:2.0.1.2.3.8.98.4 | SECTION 250.803
| 250.803 What SPPE failure reporting procedures must I follow | |
30:2.0.1.2.3.8.98.5 | SECTION 250.804
| 250.804 Additional requirements for subsurface safety valves (SSSVs) and related equipment installed in high pressure high temperature (HPHT) environments. | |
30:2.0.1.2.3.8.98.6 | SECTION 250.805
| 250.805 Hydrogen sulfide. | |
30:2.0.1.2.3.8.98.7 | SECTION 250.806-250.809
| 250.806-250.809 [Reserved] 2 | |
30:2.0.1.2.3.8.99 | SUBJGRP 99
| Surface and Subsurface Safety Systems - Dry Trees | |
30:2.0.1.2.3.8.99.8 | SECTION 250.810
| 250.810 Dry tree subsurface safety devices - general. | |
30:2.0.1.2.3.8.99.9 | SECTION 250.811
| 250.811 Specifications for SSSVs - dry trees. | |
30:2.0.1.2.3.8.99.10 | SECTION 250.812
| 250.812 Surface-controlled SSSVs - dry trees. | |
30:2.0.1.2.3.8.99.11 | SECTION 250.813
| 250.813 Subsurface-controlled SSSVs. | |
30:2.0.1.2.3.8.99.12 | SECTION 250.814
| 250.814 Design, installation, and operation of SSSVs - dry trees. | |
30:2.0.1.2.3.8.99.13 | SECTION 250.815
| 250.815 Subsurface safety devices in shut-in wells - dry trees. | |
30:2.0.1.2.3.8.99.14 | SECTION 250.816
| 250.816 Subsurface safety devices in injection wells - dry trees. | |
30:2.0.1.2.3.8.99.15 | SECTION 250.817
| 250.817 Temporary removal of subsurface safety devices for routine operations. | |
30:2.0.1.2.3.8.99.16 | SECTION 250.818
| 250.818 Additional safety equipment - dry trees. | |
30:2.0.1.2.3.8.99.17 | SECTION 250.819
| 250.819 Specification for surface safety valves (SSVs). | |
30:2.0.1.2.3.8.99.18 | SECTION 250.820
| 250.820 Use of SSVs. | |
30:2.0.1.2.3.8.99.19 | SECTION 250.821
| 250.821 Emergency action and safety system shutdown - dry trees. | |
30:2.0.1.2.3.8.99.20 | SECTION 250.822-250.824
| 250.822-250.824 [Reserved] | |
30:2.0.1.2.3.8.100 | SUBJGRP 100
| Subsea and Subsurface Safety Systems - Subsea Trees | |
30:2.0.1.2.3.8.100.21 | SECTION 250.825
| 250.825 Subsea tree subsurface safety devices - general. | |
30:2.0.1.2.3.8.100.22 | SECTION 250.826
| 250.826 Specifications for SSSVs - subsea trees. | |
30:2.0.1.2.3.8.100.23 | SECTION 250.827
| 250.827 Surface-controlled SSSVs - subsea trees. | |
30:2.0.1.2.3.8.100.24 | SECTION 250.828
| 250.828 Design, installation, and operation of SSSVs - subsea trees. | |
30:2.0.1.2.3.8.100.25 | SECTION 250.829
| 250.829 Subsurface safety devices in shut-in wells - subsea trees. | |
30:2.0.1.2.3.8.100.26 | SECTION 250.830
| 250.830 Subsurface safety devices in injection wells - subsea trees. | |
30:2.0.1.2.3.8.100.27 | SECTION 250.831
| 250.831 Alteration or disconnection of subsea pipeline or umbilical. | |
30:2.0.1.2.3.8.100.28 | SECTION 250.832
| 250.832 Additional safety equipment - subsea trees. | |
30:2.0.1.2.3.8.100.29 | SECTION 250.833
| 250.833 Specification for underwater safety valves (USVs). | |
30:2.0.1.2.3.8.100.30 | SECTION 250.834
| 250.834 Use of USVs. | |
30:2.0.1.2.3.8.100.31 | SECTION 250.835
| 250.835 Specification for all boarding shutdown valves (BSDVs) associated with subsea systems. | |
30:2.0.1.2.3.8.100.32 | SECTION 250.836
| 250.836 Use of BSDVs. | |
30:2.0.1.2.3.8.100.33 | SECTION 250.837
| 250.837 Emergency action and safety system shutdown - subsea trees. | |
30:2.0.1.2.3.8.100.34 | SECTION 250.838
| 250.838 What are the maximum allowable valve closure times and hydraulic bleeding requirements for an electro-hydraulic control system | |
30:2.0.1.2.3.8.100.35 | SECTION 250.839
| 250.839 What are the maximum allowable valve closure times and hydraulic bleeding requirements for a direct-hydraulic control system | |
30:2.0.1.2.3.8.101 | SUBJGRP 101
| PRODUCTION SAFETY SYSTEMS | |
30:2.0.1.2.3.8.101.36 | SECTION 250.840
| 250.840 Design, installation, and maintenance - general. | |
30:2.0.1.2.3.8.101.37 | SECTION 250.841
| 250.841 Platforms. | |
30:2.0.1.2.3.8.101.38 | SECTION 250.842
| 250.842 Approval of safety systems design and installation features. | |
30:2.0.1.2.3.8.101.39 | SECTION 250.843-250.849
| 250.843-250.849 [Reserved] | |
30:2.0.1.2.3.8.102 | SUBJGRP 102
| Additional Production System Requirements | |
30:2.0.1.2.3.8.102.40 | SECTION 250.850
| 250.850 Production system requirements - general. | |
30:2.0.1.2.3.8.102.41 | SECTION 250.851
| 250.851 Pressure vessels (including heat exchangers) and fired vessels. | |
30:2.0.1.2.3.8.102.42 | SECTION 250.852
| 250.852 Flowlines/Headers. | |
30:2.0.1.2.3.8.102.43 | SECTION 250.853
| 250.853 Safety sensors. | |
30:2.0.1.2.3.8.102.44 | SECTION 250.854
| 250.854 Floating production units equipped with turrets and turret-mounted systems. | |
30:2.0.1.2.3.8.102.45 | SECTION 250.855
| 250.855 Emergency shutdown (ESD) system. | |
30:2.0.1.2.3.8.102.46 | SECTION 250.856
| 250.856 Engines. | |
30:2.0.1.2.3.8.102.47 | SECTION 250.857
| 250.857 Glycol dehydration units. | |
30:2.0.1.2.3.8.102.48 | SECTION 250.858
| 250.858 Gas compressors. | |
30:2.0.1.2.3.8.102.49 | SECTION 250.859
| 250.859 Firefighting systems. | |
30:2.0.1.2.3.8.102.50 | SECTION 250.860
| 250.860 Chemical firefighting system. | |
30:2.0.1.2.3.8.102.51 | SECTION 250.861
| 250.861 Foam firefighting systems. | |
30:2.0.1.2.3.8.102.52 | SECTION 250.862
| 250.862 Fire and gas-detection systems. | |
30:2.0.1.2.3.8.102.53 | SECTION 250.863
| 250.863 Electrical equipment. | |
30:2.0.1.2.3.8.102.54 | SECTION 250.864
| 250.864 Erosion. | |
30:2.0.1.2.3.8.102.55 | SECTION 250.865
| 250.865 Surface pumps. | |
30:2.0.1.2.3.8.102.56 | SECTION 250.866
| 250.866 Personnel safety equipment. | |
30:2.0.1.2.3.8.102.57 | SECTION 250.867
| 250.867 Temporary quarters and temporary equipment. | |
30:2.0.1.2.3.8.102.58 | SECTION 250.868
| 250.868 Non-metallic piping. | |
30:2.0.1.2.3.8.102.59 | SECTION 250.869
| 250.869 General platform operations. | |
30:2.0.1.2.3.8.102.60 | SECTION 250.870
| 250.870 Time delays on pressure safety low (PSL) sensors. | |
30:2.0.1.2.3.8.102.61 | SECTION 250.871
| 250.871 Welding and burning practices and procedures. | |
30:2.0.1.2.3.8.102.62 | SECTION 250.872
| 250.872 Atmospheric vessels. | |
30:2.0.1.2.3.8.102.63 | SECTION 250.873
| 250.873 Subsea gas lift requirements. | |
30:2.0.1.2.3.8.102.64 | SECTION 250.874
| 250.874 Subsea water injection systems. | |
30:2.0.1.2.3.8.102.65 | SECTION 250.875
| 250.875 Subsea pump systems. | |
30:2.0.1.2.3.8.102.66 | SECTION 250.876
| 250.876 Fired and exhaust heated components. | |
30:2.0.1.2.3.8.102.67 | SECTION 250.877-250.879
| 250.877-250.879 [Reserved] | |
30:2.0.1.2.3.8.103 | SUBJGRP 103
| Safety Device Testing | |
30:2.0.1.2.3.8.103.68 | SECTION 250.880
| 250.880 Production safety system testing. | |
30:2.0.1.2.3.8.103.69 | SECTION 250.881-250.889
| 250.881-250.889 [Reserved] | |
30:2.0.1.2.3.8.104 | SUBJGRP 104
| Records and Training | |
30:2.0.1.2.3.8.104.70 | SECTION 250.890
| 250.890 Records. | |
30:2.0.1.2.3.8.104.71 | SECTION 250.891
| 250.891 Safety device training. | |
30:2.0.1.2.3.8.104.72 | SECTION 250.892-250.899
| 250.892-250.899 [Reserved] | |
30:2.0.1.2.3.9 | SUBPART I
| Subpart I - Platforms and Structures | |
30:2.0.1.2.3.9.105 | SUBJGRP 105
| General Requirements for Platforms | |
30:2.0.1.2.3.9.105.1 | SECTION 250.900
| 250.900 What general requirements apply to all platforms | |
30:2.0.1.2.3.9.105.2 | SECTION 250.901
| 250.901 What industry standards must your platform meet | |
30:2.0.1.2.3.9.105.3 | SECTION 250.902
| 250.902 What are the requirements for platform removal and location clearance | |
30:2.0.1.2.3.9.105.4 | SECTION 250.903
| 250.903 What records must I keep | |
30:2.0.1.2.3.9.106 | SUBJGRP 106
| Platform Approval Program | |
30:2.0.1.2.3.9.106.5 | SECTION 250.904
| 250.904 What is the Platform Approval Program | |
30:2.0.1.2.3.9.106.6 | SECTION 250.905
| 250.905 How do I get approval for the installation, modification, or repair of my platform | |
30:2.0.1.2.3.9.106.7 | SECTION 250.906
| 250.906 What must I do to obtain approval for the proposed site of my platform | |
30:2.0.1.2.3.9.106.8 | SECTION 250.907
| 250.907 Where must I locate foundation boreholes | |
30:2.0.1.2.3.9.106.9 | SECTION 250.908
| 250.908 What are the minimum structural fatigue design requirements | |
30:2.0.1.2.3.9.107 | SUBJGRP 107
| Platform Verification Program | |
30:2.0.1.2.3.9.107.10 | SECTION 250.909
| 250.909 What is the Platform Verification Program | |
30:2.0.1.2.3.9.107.11 | SECTION 250.910
| 250.910 Which of my facilities are subject to the Platform Verification Program | |
30:2.0.1.2.3.9.107.12 | SECTION 250.911
| 250.911 If my platform is subject to the Platform Verification Program, what must I do | |
30:2.0.1.2.3.9.107.13 | SECTION 250.912
| 250.912 What plans must I submit under the Platform Verification Program | |
30:2.0.1.2.3.9.107.14 | SECTION 250.913
| 250.913 When must I resubmit Platform Verification Program plans | |
30:2.0.1.2.3.9.107.15 | SECTION 250.914
| 250.914 How do I nominate a CVA | |
30:2.0.1.2.3.9.107.16 | SECTION 250.915
| 250.915 What are the CVA's primary responsibilities | |
30:2.0.1.2.3.9.107.17 | SECTION 250.916
| 250.916 What are the CVA's primary duties during the design phase | |
30:2.0.1.2.3.9.107.18 | SECTION 250.917
| 250.917 What are the CVA's primary duties during the fabrication phase | |
30:2.0.1.2.3.9.107.19 | SECTION 250.918
| 250.918 What are the CVA's primary duties during the installation phase | |
30:2.0.1.2.3.9.108 | SUBJGRP 108
| Inspection, Maintenance, and Assessment of Platforms | |
30:2.0.1.2.3.9.108.20 | SECTION 250.919
| 250.919 What in-service inspection requirements must I meet | |
30:2.0.1.2.3.9.108.21 | SECTION 250.920
| 250.920 What are the BSEE requirements for assessment of fixed platforms | |
30:2.0.1.2.3.9.108.22 | SECTION 250.921
| 250.921 How do I analyze my platform for cumulative fatigue | |
30:2.0.1.2.3.10 | SUBPART J
| Subpart J - Pipelines and Pipeline Rights-of-Way | |
30:2.0.1.2.3.10.109.1 | SECTION 250.1000
| 250.1000 General requirements. | |
30:2.0.1.2.3.10.109.2 | SECTION 250.1001
| 250.1001 Definitions. | |
30:2.0.1.2.3.10.109.3 | SECTION 250.1002
| 250.1002 Design requirements for DOI pipelines. | |
30:2.0.1.2.3.10.109.4 | SECTION 250.1003
| 250.1003 Installation, testing, and repair requirements for DOI pipelines. | |
30:2.0.1.2.3.10.109.5 | SECTION 250.1004
| 250.1004 Safety equipment requirements for DOI pipelines. | |
30:2.0.1.2.3.10.109.6 | SECTION 250.1005
| 250.1005 Inspection requirements for DOI pipelines. | |
30:2.0.1.2.3.10.109.7 | SECTION 250.1006
| 250.1006 How must I decommission and take out of service a DOI pipeline | |
30:2.0.1.2.3.10.109.8 | SECTION 250.1007
| 250.1007 What to include in applications. | |
30:2.0.1.2.3.10.109.9 | SECTION 250.1008
| 250.1008 Reports. | |
30:2.0.1.2.3.10.109.10 | SECTION 250.1009
| 250.1009 Requirements to obtain pipeline right-of-way grants. | |
30:2.0.1.2.3.10.109.11 | SECTION 250.1010
| 250.1010 General requirements for pipeline right-of-way holders. | |
30:2.0.1.2.3.10.109.12 | SECTION 250.1011
| 250.1011 [Reserved] | |
30:2.0.1.2.3.10.109.13 | SECTION 250.1012
| 250.1012 Required payments for pipeline right-of-way holders. | |
30:2.0.1.2.3.10.109.14 | SECTION 250.1013
| 250.1013 Grounds for forfeiture of pipeline right-of-way grants. | |
30:2.0.1.2.3.10.109.15 | SECTION 250.1014
| 250.1014 When pipeline right-of-way grants expire. | |
30:2.0.1.2.3.10.109.16 | SECTION 250.1015
| 250.1015 Applications for pipeline right-of-way grants. | |
30:2.0.1.2.3.10.109.17 | SECTION 250.1016
| 250.1016 Granting pipeline rights-of-way. | |
30:2.0.1.2.3.10.109.18 | SECTION 250.1017
| 250.1017 Requirements for construction under pipeline right-of-way grants. | |
30:2.0.1.2.3.10.109.19 | SECTION 250.1018
| 250.1018 Assignment of pipeline right-of-way grants. | |
30:2.0.1.2.3.10.109.20 | SECTION 250.1019
| 250.1019 Relinquishment of pipeline right-of-way grants. | |
30:2.0.1.2.3.11 | SUBPART K
| Subpart K - Oil and Gas Production Requirements | |
30:2.0.1.2.3.11.109 | SUBJGRP 109
| General | |
30:2.0.1.2.3.11.109.1 | SECTION 250.1150
| 250.1150 What are the general reservoir production requirements | |
30:2.0.1.2.3.11.110 | SUBJGRP 110
| Well Tests and Surveys | |
30:2.0.1.2.3.11.110.2 | SECTION 250.1151
| 250.1151 How often must I conduct well production tests | |
30:2.0.1.2.3.11.110.3 | SECTION 250.1152
| 250.1152 How do I conduct well tests | |
30:2.0.1.2.3.11.110.4 | SECTION 250.1153-250.1155
| 250.1153-250.1155 [Reserved] | |
30:2.0.1.2.3.11.111 | SUBJGRP 111
| Approvals Prior to Production | |
30:2.0.1.2.3.11.111.5 | SECTION 250.1156
| 250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line | |
30:2.0.1.2.3.11.111.6 | SECTION 250.1157
| 250.1157 How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap | |
30:2.0.1.2.3.11.111.7 | SECTION 250.1158
| 250.1158 How do I receive approval to downhole commingle hydrocarbons | |
30:2.0.1.2.3.11.112 | SUBJGRP 112
| Production Rates | |
30:2.0.1.2.3.11.112.8 | SECTION 250.1159
| 250.1159 May the Regional Supervisor limit my well or reservoir production rates | |
30:2.0.1.2.3.11.113 | SUBJGRP 113
| Flaring, Venting, and Burning Hydrocarbons | |
30:2.0.1.2.3.11.113.9 | SECTION 250.1160
| 250.1160 When may I flare or vent gas | |
30:2.0.1.2.3.11.113.10 | SECTION 250.1161
| 250.1161 When may I flare or vent gas for extended periods of time | |
30:2.0.1.2.3.11.113.11 | SECTION 250.1162
| 250.1162 When may I burn produced liquid hydrocarbons | |
30:2.0.1.2.3.11.113.12 | SECTION 250.1163
| 250.1163 How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain | |
30:2.0.1.2.3.11.113.13 | SECTION 250.1164
| 250.1164 What are the requirements for flaring or venting gas containing H2S | |
30:2.0.1.2.3.11.114 | SUBJGRP 114
| Other Requirements | |
30:2.0.1.2.3.11.114.14 | SECTION 250.1165
| 250.1165 What must I do for enhanced recovery operations | |
30:2.0.1.2.3.11.114.15 | SECTION 250.1166
| 250.1166 What additional reporting is required for developments in the Alaska OCS Region | |
30:2.0.1.2.3.11.114.16 | SECTION 250.1167
| 250.1167 What information must I submit with forms and for approvals | |
30:2.0.1.2.3.12 | SUBPART L
| Subpart L - Oil and Gas Production Measurement, Surface Commingling, and Security | |
30:2.0.1.2.3.12.115.1 | SECTION 250.1200
| 250.1200 Question index table. | |
30:2.0.1.2.3.12.115.2 | SECTION 250.1201
| 250.1201 Definitions. | |
30:2.0.1.2.3.12.115.3 | SECTION 250.1202
| 250.1202 Liquid hydrocarbon measurement. | |
30:2.0.1.2.3.12.115.4 | SECTION 250.1203
| 250.1203 Gas measurement. | |
30:2.0.1.2.3.12.115.5 | SECTION 250.1204
| 250.1204 Surface commingling. | |
30:2.0.1.2.3.12.115.6 | SECTION 250.1205
| 250.1205 Site security. | |
30:2.0.1.2.3.13 | SUBPART M
| Subpart M - Unitization | |
30:2.0.1.2.3.13.115.1 | SECTION 250.1300
| 250.1300 What is the purpose of this subpart | |
30:2.0.1.2.3.13.115.2 | SECTION 250.1301
| 250.1301 What are the requirements for unitization | |
30:2.0.1.2.3.13.115.3 | SECTION 250.1302
| 250.1302 What if I have a competitive reservoir on a lease | |
30:2.0.1.2.3.13.115.4 | SECTION 250.1303
| 250.1303 How do I apply for voluntary unitization | |
30:2.0.1.2.3.13.115.5 | SECTION 250.1304
| 250.1304 How will BSEE require unitization | |
30:2.0.1.2.3.14 | SUBPART N
| Subpart N - Outer Continental Shelf Civil Penalties | |
30:2.0.1.2.3.14.115 | SUBJGRP 115
| Outer Continental Shelf Lands Act Civil Penalties | |
30:2.0.1.2.3.14.115.1 | SECTION 250.1400
| 250.1400 How does BSEE begin the civil penalty process | |
30:2.0.1.2.3.14.115.2 | SECTION 250.1401
| 250.1401 [Reserved] | |
30:2.0.1.2.3.14.115.3 | SECTION 250.1402
| 250.1402 Definitions. | |
30:2.0.1.2.3.14.115.4 | SECTION 250.1403
| 250.1403 What is the maximum civil penalty | |
30:2.0.1.2.3.14.115.5 | SECTION 250.1404
| 250.1404 Which violations will BSEE review for potential civil penalties | |
30:2.0.1.2.3.14.115.6 | SECTION 250.1405
| 250.1405 When is a case file developed | |
30:2.0.1.2.3.14.115.7 | SECTION 250.1406
| 250.1406 When will BSEE notify me and provide penalty information | |
30:2.0.1.2.3.14.115.8 | SECTION 250.1407
| 250.1407 How do I respond to the letter of notification | |
30:2.0.1.2.3.14.115.9 | SECTION 250.1408
| 250.1408 When will I be notified of the Reviewing Officer's decision | |
30:2.0.1.2.3.14.115.10 | SECTION 250.1409
| 250.1409 What are my appeal rights | |
30:2.0.1.2.3.14.116 | SUBJGRP 116
| Federal Oil and Gas Royalty Management Act Civil Penalties Definitions | |
30:2.0.1.2.3.14.116.11 | SECTION 250.1450
| 250.1450 What definitions apply to this subpart | |
30:2.0.1.2.3.14.117 | SUBJGRP 117
| Penalties After a Period To Correct | |
30:2.0.1.2.3.14.117.12 | SECTION 250.1451
| 250.1451 What may BSEE do if I violate a statute, regulation, order, or lease term relating to a Federal oil and gas lease | |
30:2.0.1.2.3.14.117.13 | SECTION 250.1452
| 250.1452 What if I correct the violation | |
30:2.0.1.2.3.14.117.14 | SECTION 250.1453
| 250.1453 What if I do not correct the violation | |
30:2.0.1.2.3.14.117.15 | SECTION 250.1454
| 250.1454 How may I request a hearing on the record on a Notice of Noncompliance | |
30:2.0.1.2.3.14.117.16 | SECTION 250.1455
| 250.1455 Does my request for a hearing on the record affect the penalties | |
30:2.0.1.2.3.14.117.17 | SECTION 250.1456
| 250.1456 May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance | |
30:2.0.1.2.3.14.118 | SUBJGRP 118
| Penalties Without a Period To Correct | |
30:2.0.1.2.3.14.118.18 | SECTION 250.1460
| 250.1460 May I be subject to penalties without prior notice and an opportunity to correct | |
30:2.0.1.2.3.14.118.19 | SECTION 250.1461
| 250.1461 How will BSEE inform me of violations without a period to correct | |
30:2.0.1.2.3.14.118.20 | SECTION 250.1462
| 250.1462 How may I request a hearing on the record on a Notice of Noncompliance regarding violations without a period to correct | |
30:2.0.1.2.3.14.118.21 | SECTION 250.1463
| 250.1463 Does my request for a hearing on the record affect the penalties | |
30:2.0.1.2.3.14.118.22 | SECTION 250.1464
| 250.1464 May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance | |
30:2.0.1.2.3.14.119 | SUBJGRP 119
| General Provisions | |
30:2.0.1.2.3.14.119.23 | SECTION 250.1470
| 250.1470 How does BSEE decide what the amount of the penalty should be | |
30:2.0.1.2.3.14.119.24 | SECTION 250.1471
| 250.1471 Does the penalty affect whether I owe interest | |
30:2.0.1.2.3.14.119.25 | SECTION 250.1472
| 250.1472 How will the Office of Hearings and Appeals conduct the hearing on the record | |
30:2.0.1.2.3.14.119.26 | SECTION 250.1473
| 250.1473 How may I appeal the Administrative Law Judge's decision | |
30:2.0.1.2.3.14.119.27 | SECTION 250.1474
| 250.1474 May I seek judicial review of the decision of the Interior Board of Land Appeals | |
30:2.0.1.2.3.14.119.28 | SECTION 250.1475
| 250.1475 When must I pay the penalty | |
30:2.0.1.2.3.14.119.29 | SECTION 250.1476
| 250.1476 Can BSEE reduce my penalty once it is assessed | |
30:2.0.1.2.3.14.119.30 | SECTION 250.1477
| 250.1477 How may BSEE collect the penalty | |
30:2.0.1.2.3.14.120 | SUBJGRP 120
| Criminal Penalties | |
30:2.0.1.2.3.14.120.31 | SECTION 250.1480
| 250.1480 May the United States criminally prosecute me for violations under Federal oil and gas leases | |
30:2.0.1.2.3.15 | SUBPART O
| Subpart O - Well Control and Production Safety Training | |
30:2.0.1.2.3.15.121.1 | SECTION 250.1500
| 250.1500 Definitions. | |
30:2.0.1.2.3.15.121.2 | SECTION 250.1501
| 250.1501 What is the goal of my training program | |
30:2.0.1.2.3.15.121.3 | SECTION 250.1503
| 250.1503 What are my general responsibilities for training | |
30:2.0.1.2.3.15.121.4 | SECTION 250.1504
| 250.1504 May I use alternative training methods | |
30:2.0.1.2.3.15.121.5 | SECTION 250.1505
| 250.1505 Where may I get training for my employees | |
30:2.0.1.2.3.15.121.6 | SECTION 250.1506
| 250.1506 How often must I train my employees | |
30:2.0.1.2.3.15.121.7 | SECTION 250.1507
| 250.1507 How will BSEE measure training results | |
30:2.0.1.2.3.15.121.8 | SECTION 250.1508
| 250.1508 What must I do when BSEE administers written or oral tests | |
30:2.0.1.2.3.15.121.9 | SECTION 250.1509
| 250.1509 What must I do when BSEE administers or requires hands-on, simulator, or other types of testing | |
30:2.0.1.2.3.15.121.10 | SECTION 250.1510
| 250.1510 What will BSEE do if my training program does not comply with this subpart | |
30:2.0.1.2.3.16 | SUBPART P
| Subpart P - Sulphur Operations | |
30:2.0.1.2.3.16.121.1 | SECTION 250.1600
| 250.1600 Performance standard. | |
30:2.0.1.2.3.16.121.2 | SECTION 250.1601
| 250.1601 Definitions. | |
30:2.0.1.2.3.16.121.3 | SECTION 250.1602
| 250.1602 Applicability. | |
30:2.0.1.2.3.16.121.4 | SECTION 250.1603
| 250.1603 Determination of sulphur deposit. | |
30:2.0.1.2.3.16.121.5 | SECTION 250.1604
| 250.1604 General requirements. | |
30:2.0.1.2.3.16.121.6 | SECTION 250.1605
| 250.1605 Drilling requirements. | |
30:2.0.1.2.3.16.121.7 | SECTION 250.1606
| 250.1606 Control of wells. | |
30:2.0.1.2.3.16.121.8 | SECTION 250.1607
| 250.1607 Field rules. | |
30:2.0.1.2.3.16.121.9 | SECTION 250.1608
| 250.1608 Well casing and cementing. | |
30:2.0.1.2.3.16.121.10 | SECTION 250.1609
| 250.1609 Pressure testing of casing. | |
30:2.0.1.2.3.16.121.11 | SECTION 250.1610
| 250.1610 Blowout preventer systems and system components. | |
30:2.0.1.2.3.16.121.12 | SECTION 250.1611
| 250.1611 Blowout preventer systems tests, actuations, inspections, and maintenance. | |
30:2.0.1.2.3.16.121.13 | SECTION 250.1612
| 250.1612 Well-control drills. | |
30:2.0.1.2.3.16.121.14 | SECTION 250.1613
| 250.1613 Diverter systems. | |
30:2.0.1.2.3.16.121.15 | SECTION 250.1614
| 250.1614 Mud program. | |
30:2.0.1.2.3.16.121.16 | SECTION 250.1615
| 250.1615 Securing of wells. | |
30:2.0.1.2.3.16.121.17 | SECTION 250.1616
| 250.1616 Supervision, surveillance, and training. | |
30:2.0.1.2.3.16.121.18 | SECTION 250.1617
| 250.1617 Application for permit to drill. | |
30:2.0.1.2.3.16.121.19 | SECTION 250.1618
| 250.1618 Application for permit to modify. | |
30:2.0.1.2.3.16.121.20 | SECTION 250.1619
| 250.1619 Well records. | |
30:2.0.1.2.3.16.121.21 | SECTION 250.1620
| 250.1620 Well-completion and well-workover requirements. | |
30:2.0.1.2.3.16.121.22 | SECTION 250.1621
| 250.1621 Crew instructions. | |
30:2.0.1.2.3.16.121.23 | SECTION 250.1622
| 250.1622 Approvals and reporting of well-completion and well-workover operations. | |
30:2.0.1.2.3.16.121.24 | SECTION 250.1623
| 250.1623 Well-control fluids, equipment, and operations. | |
30:2.0.1.2.3.16.121.25 | SECTION 250.1624
| 250.1624 Blowout prevention equipment. | |
30:2.0.1.2.3.16.121.26 | SECTION 250.1625
| 250.1625 Blowout preventer system testing, records, and drills. | |
30:2.0.1.2.3.16.121.27 | SECTION 250.1626
| 250.1626 Tubing and wellhead equipment. | |
30:2.0.1.2.3.16.121.28 | SECTION 250.1627
| 250.1627 Production requirements. | |
30:2.0.1.2.3.16.121.29 | SECTION 250.1628
| 250.1628 Design, installation, and operation of production systems. | |
30:2.0.1.2.3.16.121.30 | SECTION 250.1629
| 250.1629 Additional production and fuel gas system requirements. | |
30:2.0.1.2.3.16.121.31 | SECTION 250.1630
| 250.1630 Safety-system testing and records. | |
30:2.0.1.2.3.16.121.32 | SECTION 250.1631
| 250.1631 Safety device training. | |
30:2.0.1.2.3.16.121.33 | SECTION 250.1632
| 250.1632 Production rates. | |
30:2.0.1.2.3.16.121.34 | SECTION 250.1633
| 250.1633 Production measurement. | |
30:2.0.1.2.3.16.121.35 | SECTION 250.1634
| 250.1634 Site security. | |
30:2.0.1.2.3.17 | SUBPART Q
| Subpart Q - Decommissioning Activities | |
30:2.0.1.2.3.17.121 | SUBJGRP 121
| General | |
30:2.0.1.2.3.17.121.1 | SECTION 250.1700
| 250.1700 What do the terms “decommissioning”, “obstructions”, and “facility” mean | |
30:2.0.1.2.3.17.121.2 | SECTION 250.1701
| 250.1701 Who must meet the decommissioning obligations in this subpart | |
30:2.0.1.2.3.17.121.3 | SECTION 250.1702
| 250.1702 When do I accrue decommissioning obligations | |
30:2.0.1.2.3.17.121.4 | SECTION 250.1703
| 250.1703 What are the general requirements for decommissioning | |
30:2.0.1.2.3.17.121.5 | SECTION 250.1704
| 250.1704 What decommissioning applications and reports must I submit and when must I submit them | |
30:2.0.1.2.3.17.121.6 | SECTION 250.1705-250.1709
| 250.1705-250.1709 [Reserved] | |
30:2.0.1.2.3.17.122 | SUBJGRP 122
| Permanently Plugging Wells | |
30:2.0.1.2.3.17.122.7 | SECTION 250.1710
| 250.1710 When must I permanently plug all wells on a lease | |
30:2.0.1.2.3.17.122.8 | SECTION 250.1711
| 250.1711 When will BSEE order me to permanently plug a well | |
30:2.0.1.2.3.17.122.9 | SECTION 250.1712
| 250.1712 What information must I submit before I permanently plug a well or zone | |
30:2.0.1.2.3.17.122.10 | SECTION 250.1713
| 250.1713 [Reserved] | |
30:2.0.1.2.3.17.122.11 | SECTION 250.1714
| 250.1714 What must I accomplish with well plugs | |
30:2.0.1.2.3.17.122.12 | SECTION 250.1715
| 250.1715 How must I permanently plug a well | |
30:2.0.1.2.3.17.122.13 | SECTION 250.1716
| 250.1716 To what depth must I remove wellheads and casings | |
30:2.0.1.2.3.17.122.14 | SECTION 250.1717
| 250.1717 [Reserved] | |
30:2.0.1.2.3.17.123 | SUBJGRP 123
| Temporary Abandoned Wells | |
30:2.0.1.2.3.17.123.15 | SECTION 250.1721
| 250.1721 If I temporarily abandon a well that I plan to re-enter, what must I do | |
30:2.0.1.2.3.17.123.16 | SECTION 250.1722
| 250.1722 If I install a subsea protective device, what requirements must I meet | |
30:2.0.1.2.3.17.123.17 | SECTION 250.1723
| 250.1723 What must I do when it is no longer necessary to maintain a well in temporary abandoned status | |
30:2.0.1.2.3.17.124 | SUBJGRP 124
| Removing Platforms and Other Facilities | |
30:2.0.1.2.3.17.124.18 | SECTION 250.1725
| 250.1725 When do I have to remove platforms and other facilities | |
30:2.0.1.2.3.17.124.19 | SECTION 250.1726
| 250.1726 When must I submit an initial platform removal application and what must it include | |
30:2.0.1.2.3.17.124.20 | SECTION 250.1727
| 250.1727 What information must I include in my final application to remove a platform or other facility | |
30:2.0.1.2.3.17.124.21 | SECTION 250.1728
| 250.1728 To what depth must I remove a platform or other facility | |
30:2.0.1.2.3.17.124.22 | SECTION 250.1729
| 250.1729 After I remove a platform or other facility, what information must I submit | |
30:2.0.1.2.3.17.124.23 | SECTION 250.1730
| 250.1730 When might BSEE approve partial structure removal or toppling in place | |
30:2.0.1.2.3.17.124.24 | SECTION 250.1731
| 250.1731 Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE | |
30:2.0.1.2.3.17.125 | SUBJGRP 125
| Site Clearance for Wells, Platforms, and Other Facilities | |
30:2.0.1.2.3.17.125.25 | SECTION 250.1740
| 250.1740 How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions | |
30:2.0.1.2.3.17.125.26 | SECTION 250.1741
| 250.1741 If I drag a trawl across a site, what requirements must I meet | |
30:2.0.1.2.3.17.125.27 | SECTION 250.1742
| 250.1742 What other methods can I use to verify that a site is clear | |
30:2.0.1.2.3.17.125.28 | SECTION 250.1743
| 250.1743 How do I certify that a site is clear of obstructions | |
30:2.0.1.2.3.17.126 | SUBJGRP 126
| Pipeline Decommissioning | |
30:2.0.1.2.3.17.126.29 | SECTION 250.1750
| 250.1750 When may I decommission a pipeline in place | |
30:2.0.1.2.3.17.126.30 | SECTION 250.1751
| 250.1751 How do I decommission a pipeline in place | |
30:2.0.1.2.3.17.126.31 | SECTION 250.1752
| 250.1752 How do I remove a pipeline | |
30:2.0.1.2.3.17.126.32 | SECTION 250.1753
| 250.1753 After I decommission a pipeline, what information must I submit | |
30:2.0.1.2.3.17.126.33 | SECTION 250.1754
| 250.1754 When must I remove a pipeline decommissioned in place | |
30:2.0.1.2.3.18 | SUBPART R
| Subpart R [Reserved] | |
30:2.0.1.2.3.19 | SUBPART S
| Subpart S - Safety and Environmental Management Systems (SEMS) | |
30:2.0.1.2.3.19.127.1 | SECTION 250.1900
| 250.1900 Must I have a SEMS program | |
30:2.0.1.2.3.19.127.2 | SECTION 250.1901
| 250.1901 What is the goal of my SEMS program | |
30:2.0.1.2.3.19.127.3 | SECTION 250.1902
| 250.1902 What must I include in my SEMS program | |
30:2.0.1.2.3.19.127.4 | SECTION 250.1903
| 250.1903 Acronyms and definitions. | |
30:2.0.1.2.3.19.127.5 | SECTION 250.1904
| 250.1904 Special instructions. | |
30:2.0.1.2.3.19.127.6 | SECTION 250.1905-250.1908
| 250.1905-250.1908 [Reserved] | |
30:2.0.1.2.3.19.127.7 | SECTION 250.1909
| 250.1909 What are management's general responsibilities for the SEMS program | |
30:2.0.1.2.3.19.127.8 | SECTION 250.1910
| 250.1910 What safety and environmental information is required | |
30:2.0.1.2.3.19.127.9 | SECTION 250.1911
| 250.1911 What hazards analysis criteria must my SEMS program meet | |
30:2.0.1.2.3.19.127.10 | SECTION 250.1912
| 250.1912 What criteria for management of change must my SEMS program meet | |
30:2.0.1.2.3.19.127.11 | SECTION 250.1913
| 250.1913 What criteria for operating procedures must my SEMS program meet | |
30:2.0.1.2.3.19.127.12 | SECTION 250.1914
| 250.1914 What criteria must be documented in my SEMS program for safe work practices and contractor selection | |
30:2.0.1.2.3.19.127.13 | SECTION 250.1915
| 250.1915 What training criteria must be in my SEMS program | |
30:2.0.1.2.3.19.127.14 | SECTION 250.1916
| 250.1916 What criteria for mechanical integrity must my SEMS program meet | |
30:2.0.1.2.3.19.127.15 | SECTION 250.1917
| 250.1917 What criteria for pre-startup review must be in my SEMS program | |
30:2.0.1.2.3.19.127.16 | SECTION 250.1918
| 250.1918 What criteria for emergency response and control must be in my SEMS program | |
30:2.0.1.2.3.19.127.17 | SECTION 250.1919
| 250.1919 What criteria for investigation of incidents must be in my SEMS program | |
30:2.0.1.2.3.19.127.18 | SECTION 250.1920
| 250.1920 What are the auditing requirements for my SEMS program | |
30:2.0.1.2.3.19.127.19 | SECTION 250.1921
| 250.1921 What qualifications must the ASP meet | |
30:2.0.1.2.3.19.127.20 | SECTION 250.1922
| 250.1922 What qualifications must an AB meet | |
30:2.0.1.2.3.19.127.21 | SECTION 250.1923
| 250.1923 [Reserved] | |
30:2.0.1.2.3.19.127.22 | SECTION 250.1924
| 250.1924 How will BSEE determine if my SEMS program is effective | |
30:2.0.1.2.3.19.127.23 | SECTION 250.1925
| 250.1925 May BSEE direct me to conduct additional audits | |
30:2.0.1.2.3.19.127.24 | SECTION 250.1926
| 250.1926 [Reserved] | |
30:2.0.1.2.3.19.127.25 | SECTION 250.1927
| 250.1927 What happens if BSEE finds shortcomings in my SEMS program | |
30:2.0.1.2.3.19.127.26 | SECTION 250.1928
| 250.1928 What are my recordkeeping and documentation requirements | |
30:2.0.1.2.3.19.127.27 | SECTION 250.1929
| 250.1929 What are my responsibilities for submitting OCS performance measure data | |
30:2.0.1.2.3.19.127.28 | SECTION 250.1930
| 250.1930 What must be included in my SEMS program for SWA | |
30:2.0.1.2.3.19.127.29 | SECTION 250.1931
| 250.1931 What must be included in my SEMS program for UWA | |
30:2.0.1.2.3.19.127.30 | SECTION 250.1932
| 250.1932 What are my EPP requirements | |
30:2.0.1.2.3.19.127.31 | SECTION 250.1933
| 250.1933 What procedures must be included for reporting unsafe working conditions | |