30:2.0.1.2.3.1.66 | SUBJGRP 66
| Authority and Definition of Terms | |
30:2.0.1.2.3.1.66.1 | SECTION 250.101
| 250.101 Authority and applicability. | |
30:2.0.1.2.3.1.66.2 | SECTION 250.102
| 250.102 What does this part do | |
30:2.0.1.2.3.1.66.3 | SECTION 250.103
| 250.103 Where can I find more information about the requirements in this part | |
30:2.0.1.2.3.1.66.4 | SECTION 250.104
| 250.104 How may I appeal a decision made under BSEE regulations | |
30:2.0.1.2.3.1.66.5 | SECTION 250.105
| 250.105 Definitions. | |
30:2.0.1.2.3.1.67 | SUBJGRP 67
| Performance Standards | |
30:2.0.1.2.3.1.67.6 | SECTION 250.106
| 250.106 What standards will the Director use to regulate lease operations | |
30:2.0.1.2.3.1.67.7 | SECTION 250.107
| 250.107 What must I do to protect health, safety, property, and the environment | |
30:2.0.1.2.3.1.67.8 | SECTION 250.108
| 250.108 What requirements must I follow for cranes and other material-handling equipment | |
30:2.0.1.2.3.1.67.9 | SECTION 250.109
| 250.109 What documents must I prepare and maintain related to welding | |
30:2.0.1.2.3.1.67.10 | SECTION 250.110
| 250.110 What must I include in my welding plan | |
30:2.0.1.2.3.1.67.11 | SECTION 250.111
| 250.111 Who oversees operations under my welding plan | |
30:2.0.1.2.3.1.67.12 | SECTION 250.112
| 250.112 What standards must my welding equipment meet | |
30:2.0.1.2.3.1.67.13 | SECTION 250.113
| 250.113 What procedures must I follow when welding | |
30:2.0.1.2.3.1.67.14 | SECTION 250.114
| 250.114 How must I install, maintain, and operate electrical equipment | |
30:2.0.1.2.3.1.67.15 | SECTION 250.115
| 250.115 What are the procedures for, and effects of, incorporation of documents by reference in this part | |
30:2.0.1.2.3.1.67.16 | SECTION 250.116-250.117
| 250.116-250.117 [Reserved] | |
30:2.0.1.2.3.1.68 | SUBJGRP 68
| Gas Storage or Injection | |
30:2.0.1.2.3.1.68.17 | SECTION 250.118
| 250.118 Will BSEE approve gas injection | |
30:2.0.1.2.3.1.68.18 | SECTION 250.119
| 250.119 [Reserved] | |
30:2.0.1.2.3.1.68.19 | SECTION 250.120
| 250.120 How does injecting, storing, or treating gas affect my royalty payments | |
30:2.0.1.2.3.1.68.20 | SECTION 250.121
| 250.121 What happens when the reservoir contains both original gas in place and injected gas | |
30:2.0.1.2.3.1.68.21 | SECTION 250.122
| 250.122 What effect does subsurface storage have on the lease term | |
30:2.0.1.2.3.1.68.22 | SECTION 250.123
| 250.123 [Reserved] | |
30:2.0.1.2.3.1.68.23 | SECTION 250.124
| 250.124 Will BSEE approve gas injection into the cap rock containing a sulphur deposit | |
30:2.0.1.2.3.1.69 | SUBJGRP 69
| Fees | |
30:2.0.1.2.3.1.69.24 | SECTION 250.125
| 250.125 Service fees. | |
30:2.0.1.2.3.1.69.25 | SECTION 250.126
| 250.126 Electronic payment instructions. | |
30:2.0.1.2.3.1.70 | SUBJGRP 70
| Inspections of Operations | |
30:2.0.1.2.3.1.70.26 | SECTION 250.130
| 250.130 Why does BSEE conduct inspections | |
30:2.0.1.2.3.1.70.27 | SECTION 250.131
| 250.131 Will BSEE notify me before conducting an inspection | |
30:2.0.1.2.3.1.70.28 | SECTION 250.132
| 250.132 What must I do when BSEE conducts an inspection | |
30:2.0.1.2.3.1.70.29 | SECTION 250.133
| 250.133 Will BSEE reimburse me for my expenses related to inspections | |
30:2.0.1.2.3.1.71 | SUBJGRP 71
| Disqualification | |
30:2.0.1.2.3.1.71.30 | SECTION 250.135
| 250.135 What will BSEE do if my operating performance is unacceptable | |
30:2.0.1.2.3.1.71.31 | SECTION 250.136
| 250.136 How will BSEE determine if my operating performance is unacceptable | |
30:2.0.1.2.3.1.72 | SUBJGRP 72
| Special Types of Approvals | |
30:2.0.1.2.3.1.72.32 | SECTION 250.140
| 250.140 When will I receive an oral approval | |
30:2.0.1.2.3.1.72.33 | SECTION 250.141
| 250.141 May I ever use alternate procedures or equipment | |
30:2.0.1.2.3.1.72.34 | SECTION 250.142
| 250.142 How do I receive approval for departures | |
30:2.0.1.2.3.1.72.35 | SECTION 250.143-250.144
| 250.143-250.144 [Reserved] | |
30:2.0.1.2.3.1.72.36 | SECTION 250.145
| 250.145 How do I designate an agent or a local agent | |
30:2.0.1.2.3.1.72.37 | SECTION 250.146
| 250.146 Who is responsible for fulfilling leasehold obligations | |
30:2.0.1.2.3.1.73 | SUBJGRP 73
| Naming and Identifying Facilities and Wells (Does Not Include MODUs) | |
30:2.0.1.2.3.1.73.38 | SECTION 250.150
| 250.150 How do I name facilities and wells in the Gulf of Mexico Region | |
30:2.0.1.2.3.1.73.39 | SECTION 250.151
| 250.151 How do I name facilities in the Pacific Region | |
30:2.0.1.2.3.1.73.40 | SECTION 250.152
| 250.152 How do I name facilities in the Alaska Region | |
30:2.0.1.2.3.1.73.41 | SECTION 250.153
| 250.153 Do I have to rename an existing facility or well | |
30:2.0.1.2.3.1.73.42 | SECTION 250.154
| 250.154 What identification signs must I display | |
30:2.0.1.2.3.1.73.43 | SECTION 250.160-250.167
| 250.160-250.167 [Reserved] | |
30:2.0.1.2.3.1.74 | SUBJGRP 74
| Suspensions | |
30:2.0.1.2.3.1.74.44 | SECTION 250.168
| 250.168 May operations or production be suspended | |
30:2.0.1.2.3.1.74.45 | SECTION 250.169
| 250.169 What effect does suspension have on my lease | |
30:2.0.1.2.3.1.74.46 | SECTION 250.170
| 250.170 How long does a suspension last | |
30:2.0.1.2.3.1.74.47 | SECTION 250.171
| 250.171 How do I request a suspension | |
30:2.0.1.2.3.1.74.48 | SECTION 250.172
| 250.172 When may the Regional Supervisor grant or direct an SOO or SOP | |
30:2.0.1.2.3.1.74.49 | SECTION 250.173
| 250.173 When may the Regional Supervisor direct an SOO or SOP | |
30:2.0.1.2.3.1.74.50 | SECTION 250.174
| 250.174 When may the Regional Supervisor grant or direct an SOP | |
30:2.0.1.2.3.1.74.51 | SECTION 250.175
| 250.175 When may the Regional Supervisor grant an SOO | |
30:2.0.1.2.3.1.74.52 | SECTION 250.176
| 250.176 Does a suspension affect my royalty payment | |
30:2.0.1.2.3.1.74.53 | SECTION 250.177
| 250.177 What additional requirements may the Regional Supervisor order for a suspension | |
30:2.0.1.2.3.1.75 | SUBJGRP 75
| Primary Lease Requirements, Lease Term Extensions, and Lease Cancellations | |
30:2.0.1.2.3.1.75.54 | SECTION 250.180
| 250.180 What am I required to do to keep my lease term in effect | |
30:2.0.1.2.3.1.75.55 | SECTION 250.181-250.185
| 250.181-250.185 [Reserved] | |
30:2.0.1.2.3.1.76 | SUBJGRP 76
| Information and Reporting Requirements | |
30:2.0.1.2.3.1.76.56 | SECTION 250.186
| 250.186 What reporting information and report forms must I submit | |
30:2.0.1.2.3.1.76.57 | SECTION 250.187
| 250.187 What are BSEE's incident reporting requirements | |
30:2.0.1.2.3.1.76.58 | SECTION 250.188
| 250.188 What incidents must I report to BSEE and when must I report them | |
30:2.0.1.2.3.1.76.59 | SECTION 250.189
| 250.189 Reporting requirements for incidents requiring immediate notification. | |
30:2.0.1.2.3.1.76.60 | SECTION 250.190
| 250.190 Reporting requirements for incidents requiring written notification. | |
30:2.0.1.2.3.1.76.61 | SECTION 250.191
| 250.191 How does BSEE conduct incident investigations | |
30:2.0.1.2.3.1.76.62 | SECTION 250.192
| 250.192 What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence | |
30:2.0.1.2.3.1.76.63 | SECTION 250.193
| 250.193 Reports and investigations of possible violations. | |
30:2.0.1.2.3.1.76.64 | SECTION 250.194
| 250.194 How must I protect archaeological resources | |
30:2.0.1.2.3.1.76.65 | SECTION 250.195
| 250.195 What notification does BSEE require on the production status of wells | |
30:2.0.1.2.3.1.76.66 | SECTION 250.196
| 250.196 Reimbursements for reproduction and processing costs. | |
30:2.0.1.2.3.1.76.67 | SECTION 250.197
| 250.197 Data and information to be made available to the public or for limited inspection. | |
30:2.0.1.2.3.1.77 | SUBJGRP 77
| References | |
30:2.0.1.2.3.1.77.68 | SECTION 250.198
| 250.198 Documents incorporated by reference. | |
30:2.0.1.2.3.1.77.69 | SECTION 250.199
| 250.199 Paperwork Reduction Act statements - information collection. | |