Subpart D - Oil and Gas Drilling Operations

30:2.0.1.2.3.4.81SUBJGRP 81
General Requirements
30:2.0.1.2.3.4.81.1SECTION 250.400
   250.400 General requirements.
30:2.0.1.2.3.4.81.2SECTION 250.401-250.403
   250.401-250.403 [Reserved]
30:2.0.1.2.3.4.81.3SECTION 250.404
   250.404 What are the requirements for the crown block
30:2.0.1.2.3.4.81.4SECTION 250.405
   250.405 What are the safety requirements for diesel engines used on a drilling rig
30:2.0.1.2.3.4.81.5SECTION 250.406
   250.406 [Reserved]
30:2.0.1.2.3.4.81.6SECTION 250.407
   250.407 What tests must I conduct to determine reservoir characteristics
30:2.0.1.2.3.4.81.7SECTION 250.408
   250.408 May I use alternative procedures or equipment during drilling operations
30:2.0.1.2.3.4.81.8SECTION 250.409
   250.409 May I obtain departures from these drilling requirements
30:2.0.1.2.3.4.82SUBJGRP 82
Applying for a Permit To Drill
30:2.0.1.2.3.4.82.9SECTION 250.410
   250.410 How do I obtain approval to drill a well
30:2.0.1.2.3.4.82.10SECTION 250.411
   250.411 What information must I submit with my application
30:2.0.1.2.3.4.82.11SECTION 250.412
   250.412 What requirements must the location plat meet
30:2.0.1.2.3.4.82.12SECTION 250.413
   250.413 What must my description of well drilling design criteria address
30:2.0.1.2.3.4.82.13SECTION 250.414
   250.414 What must my drilling prognosis include
30:2.0.1.2.3.4.82.14SECTION 250.415
   250.415 What must my casing and cementing programs include
30:2.0.1.2.3.4.82.15SECTION 250.416
   250.416 What must I include in the diverter description
30:2.0.1.2.3.4.82.16SECTION 250.417
   250.417 [Reserved]
30:2.0.1.2.3.4.82.17SECTION 250.418
   250.418 What additional information must I submit with my APD
30:2.0.1.2.3.4.83SUBJGRP 83
Casing and Cementing Requirements
30:2.0.1.2.3.4.83.18SECTION 250.420
   250.420 What well casing and cementing requirements must I meet
30:2.0.1.2.3.4.83.19SECTION 250.421
   250.421 What are the casing and cementing requirements by type of casing string
30:2.0.1.2.3.4.83.20SECTION 250.422
   250.422 When may I resume drilling after cementing
30:2.0.1.2.3.4.83.21SECTION 250.423
   250.423 What are the requirements for casing and liner installation
30:2.0.1.2.3.4.83.22SECTION 250.424-250.426
   250.424-250.426 [Reserved]
30:2.0.1.2.3.4.83.23SECTION 250.427
   250.427 What are the requirements for pressure integrity tests
30:2.0.1.2.3.4.83.24SECTION 250.428
   250.428 What must I do in certain cementing and casing situations
30:2.0.1.2.3.4.84SUBJGRP 84
Diverter System Requirements
30:2.0.1.2.3.4.84.25SECTION 250.430
   250.430 When must I install a diverter system
30:2.0.1.2.3.4.84.26SECTION 250.431
   250.431 What are the diverter design and installation requirements
30:2.0.1.2.3.4.84.27SECTION 250.432
   250.432 How do I obtain a departure to diverter design and installation requirements
30:2.0.1.2.3.4.84.28SECTION 250.433
   250.433 What are the diverter actuation and testing requirements
30:2.0.1.2.3.4.84.29SECTION 250.434
   250.434 What are the recordkeeping requirements for diverter actuations and tests
30:2.0.1.2.3.4.84.30SECTION 250.440-250.451
   250.440-250.451 [Reserved]
30:2.0.1.2.3.4.84.31SECTION 250.452
   250.452 What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations
30:2.0.1.2.3.4.85SUBJGRP 85
Drilling Fluid Requirements
30:2.0.1.2.3.4.85.32SECTION 250.455
   250.455 What are the general requirements for a drilling fluid program
30:2.0.1.2.3.4.85.33SECTION 250.456
   250.456 What safe practices must the drilling fluid program follow
30:2.0.1.2.3.4.85.34SECTION 250.457
   250.457 What equipment is required to monitor drilling fluids
30:2.0.1.2.3.4.85.35SECTION 250.458
   250.458 What quantities of drilling fluids are required
30:2.0.1.2.3.4.85.36SECTION 250.459
   250.459 What are the safety requirements for drilling fluid-handling areas
30:2.0.1.2.3.4.86SUBJGRP 86
Other Drilling Requirements
30:2.0.1.2.3.4.86.37SECTION 250.460
   250.460 What are the requirements for conducting a well test
30:2.0.1.2.3.4.86.38SECTION 250.461
   250.461 What are the requirements for directional and inclination surveys
30:2.0.1.2.3.4.86.39SECTION 250.462
   250.462 What are the source control, containment, and collocated equipment requirements
30:2.0.1.2.3.4.86.40SECTION 250.463
   250.463 Who establishes field drilling rules
30:2.0.1.2.3.4.87SUBJGRP 87
Applying for a Permit To Modify and Well Records
30:2.0.1.2.3.4.87.41SECTION 250.465
   250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE
30:2.0.1.2.3.4.87.42SECTION 250.466-250.469
   250.466-250.469 [Reserved]
30:2.0.1.2.3.4.88SUBJGRP 88
Additional Arctic OCS Requirements
30:2.0.1.2.3.4.88.43SECTION 250.470
   250.470 What additional information must I submit with my APD for Arctic OCS exploratory drilling operations
30:2.0.1.2.3.4.88.44SECTION 250.471
   250.471 What are the requirements for Arctic OCS source control and containment
30:2.0.1.2.3.4.88.45SECTION 250.472
   250.472 What are the relief rig requirements for the Arctic OCS
30:2.0.1.2.3.4.88.46SECTION 250.473
   250.473 What must I do to protect health, safety, property, and the environment while operating on the Arctic OCS
30:2.0.1.2.3.4.89SUBJGRP 89
Hydrogen Sulfide
30:2.0.1.2.3.4.89.47SECTION 250.490
   250.490 Hydrogen sulfide.