';
Toggle navigation
eCFR
Home
Title 30
PART 250 SUBPART D
CFR
›
Title 30
›
Volume 2
›
Chapter II
›
Subchapter B
›
Part 250
›
Subpart D
Subpart D - Oil and Gas Drilling Operations
30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.
76 FR 64462, Oct. 18, 2011, unless otherwise noted.
30:2.0.1.2.3.4.81
SUBJGRP 81
General Requirements
30:2.0.1.2.3.4.81.1
SECTION 250.400
250.400 General requirements.
30:2.0.1.2.3.4.81.2
SECTION 250.401-250.403
250.401-250.403 [Reserved]
30:2.0.1.2.3.4.81.3
SECTION 250.404
250.404 What are the requirements for the crown block
30:2.0.1.2.3.4.81.4
SECTION 250.405
250.405 What are the safety requirements for diesel engines used on a drilling rig
30:2.0.1.2.3.4.81.5
SECTION 250.406
250.406 [Reserved]
30:2.0.1.2.3.4.81.6
SECTION 250.407
250.407 What tests must I conduct to determine reservoir characteristics
30:2.0.1.2.3.4.81.7
SECTION 250.408
250.408 May I use alternative procedures or equipment during drilling operations
30:2.0.1.2.3.4.81.8
SECTION 250.409
250.409 May I obtain departures from these drilling requirements
30:2.0.1.2.3.4.82
SUBJGRP 82
Applying for a Permit To Drill
30:2.0.1.2.3.4.82.9
SECTION 250.410
250.410 How do I obtain approval to drill a well
30:2.0.1.2.3.4.82.10
SECTION 250.411
250.411 What information must I submit with my application
30:2.0.1.2.3.4.82.11
SECTION 250.412
250.412 What requirements must the location plat meet
30:2.0.1.2.3.4.82.12
SECTION 250.413
250.413 What must my description of well drilling design criteria address
30:2.0.1.2.3.4.82.13
SECTION 250.414
250.414 What must my drilling prognosis include
30:2.0.1.2.3.4.82.14
SECTION 250.415
250.415 What must my casing and cementing programs include
30:2.0.1.2.3.4.82.15
SECTION 250.416
250.416 What must I include in the diverter description
30:2.0.1.2.3.4.82.16
SECTION 250.417
250.417 [Reserved]
30:2.0.1.2.3.4.82.17
SECTION 250.418
250.418 What additional information must I submit with my APD
30:2.0.1.2.3.4.83
SUBJGRP 83
Casing and Cementing Requirements
30:2.0.1.2.3.4.83.18
SECTION 250.420
250.420 What well casing and cementing requirements must I meet
30:2.0.1.2.3.4.83.19
SECTION 250.421
250.421 What are the casing and cementing requirements by type of casing string
30:2.0.1.2.3.4.83.20
SECTION 250.422
250.422 When may I resume drilling after cementing
30:2.0.1.2.3.4.83.21
SECTION 250.423
250.423 What are the requirements for casing and liner installation
30:2.0.1.2.3.4.83.22
SECTION 250.424-250.426
250.424-250.426 [Reserved]
30:2.0.1.2.3.4.83.23
SECTION 250.427
250.427 What are the requirements for pressure integrity tests
30:2.0.1.2.3.4.83.24
SECTION 250.428
250.428 What must I do in certain cementing and casing situations
30:2.0.1.2.3.4.84
SUBJGRP 84
Diverter System Requirements
30:2.0.1.2.3.4.84.25
SECTION 250.430
250.430 When must I install a diverter system
30:2.0.1.2.3.4.84.26
SECTION 250.431
250.431 What are the diverter design and installation requirements
30:2.0.1.2.3.4.84.27
SECTION 250.432
250.432 How do I obtain a departure to diverter design and installation requirements
30:2.0.1.2.3.4.84.28
SECTION 250.433
250.433 What are the diverter actuation and testing requirements
30:2.0.1.2.3.4.84.29
SECTION 250.434
250.434 What are the recordkeeping requirements for diverter actuations and tests
30:2.0.1.2.3.4.84.30
SECTION 250.440-250.451
250.440-250.451 [Reserved]
30:2.0.1.2.3.4.84.31
SECTION 250.452
250.452 What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations
30:2.0.1.2.3.4.85
SUBJGRP 85
Drilling Fluid Requirements
30:2.0.1.2.3.4.85.32
SECTION 250.455
250.455 What are the general requirements for a drilling fluid program
30:2.0.1.2.3.4.85.33
SECTION 250.456
250.456 What safe practices must the drilling fluid program follow
30:2.0.1.2.3.4.85.34
SECTION 250.457
250.457 What equipment is required to monitor drilling fluids
30:2.0.1.2.3.4.85.35
SECTION 250.458
250.458 What quantities of drilling fluids are required
30:2.0.1.2.3.4.85.36
SECTION 250.459
250.459 What are the safety requirements for drilling fluid-handling areas
30:2.0.1.2.3.4.86
SUBJGRP 86
Other Drilling Requirements
30:2.0.1.2.3.4.86.37
SECTION 250.460
250.460 What are the requirements for conducting a well test
30:2.0.1.2.3.4.86.38
SECTION 250.461
250.461 What are the requirements for directional and inclination surveys
30:2.0.1.2.3.4.86.39
SECTION 250.462
250.462 What are the source control, containment, and collocated equipment requirements
30:2.0.1.2.3.4.86.40
SECTION 250.463
250.463 Who establishes field drilling rules
30:2.0.1.2.3.4.87
SUBJGRP 87
Applying for a Permit To Modify and Well Records
30:2.0.1.2.3.4.87.41
SECTION 250.465
250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE
30:2.0.1.2.3.4.87.42
SECTION 250.466-250.469
250.466-250.469 [Reserved]
30:2.0.1.2.3.4.88
SUBJGRP 88
Additional Arctic OCS Requirements
30:2.0.1.2.3.4.88.43
SECTION 250.470
250.470 What additional information must I submit with my APD for Arctic OCS exploratory drilling operations
30:2.0.1.2.3.4.88.44
SECTION 250.471
250.471 What are the requirements for Arctic OCS source control and containment
30:2.0.1.2.3.4.88.45
SECTION 250.472
250.472 What are the relief rig requirements for the Arctic OCS
30:2.0.1.2.3.4.88.46
SECTION 250.473
250.473 What must I do to protect health, safety, property, and the environment while operating on the Arctic OCS
30:2.0.1.2.3.4.89
SUBJGRP 89
Hydrogen Sulfide
30:2.0.1.2.3.4.89.47
SECTION 250.490
250.490 Hydrogen sulfide.