Title 30

PART 250 SUBPART E

Subpart E - Oil and Gas Well-Completion Operations

30:2.0.1.2.3.5.90SUBJGRP 90
Casing Pressure Management
30:2.0.1.2.3.5.90.1SECTION 250.500
   250.500 General requirements.
30:2.0.1.2.3.5.90.2SECTION 250.501
   250.501 Definition.
30:2.0.1.2.3.5.90.3SECTION 250.502
   250.502 [Reserved]
30:2.0.1.2.3.5.90.4SECTION 250.503
   250.503 Emergency shutdown system.
30:2.0.1.2.3.5.90.5SECTION 250.504
   250.504 Hydrogen sulfide.
30:2.0.1.2.3.5.90.6SECTION 250.505
   250.505 Subsea completions.
30:2.0.1.2.3.5.90.7SECTION 250.506-250.508
   250.506-250.508 [Reserved]
30:2.0.1.2.3.5.90.8SECTION 250.509
   250.509 Well-completion structures on fixed platforms.
30:2.0.1.2.3.5.90.9SECTION 250.510
   250.510 Diesel engine air intakes.
30:2.0.1.2.3.5.90.10SECTION 250.511
   250.511 Traveling-block safety device.
30:2.0.1.2.3.5.90.11SECTION 250.512
   250.512 Field well-completion rules.
30:2.0.1.2.3.5.90.12SECTION 250.513
   250.513 Approval and reporting of well-completion operations.
30:2.0.1.2.3.5.90.13SECTION 250.514
   250.514 Well-control fluids, equipment, and operations.
30:2.0.1.2.3.5.90.14SECTION 250.515-250.517
   250.515-250.517 [Reserved]
30:2.0.1.2.3.5.90.15SECTION 250.518
   250.518 Tubing and wellhead equipment.
30:2.0.1.2.3.5.90.16SECTION 250.519
   250.519 What are the requirements for casing pressure management
30:2.0.1.2.3.5.90.17SECTION 250.520
   250.520 How often do I have to monitor for casing pressure
30:2.0.1.2.3.5.90.18SECTION 250.521
   250.521 When do I have to perform a casing diagnostic test
30:2.0.1.2.3.5.90.19SECTION 250.522
   250.522 How do I manage the thermal effects caused by initial production on a newly completed or recompleted well
30:2.0.1.2.3.5.90.20SECTION 250.523
   250.523 When do I have to repeat casing diagnostic testing
30:2.0.1.2.3.5.90.21SECTION 250.524
   250.524 How long do I keep records of casing pressure and diagnostic tests
30:2.0.1.2.3.5.90.22SECTION 250.525
   250.525 When am I required to take action from my casing diagnostic test
30:2.0.1.2.3.5.90.23SECTION 250.526
   250.526 What do I submit if my casing diagnostic test requires action
30:2.0.1.2.3.5.90.24SECTION 250.527
   250.527 What must I include in my notification of corrective action
30:2.0.1.2.3.5.90.25SECTION 250.528
   250.528 What must I include in my casing pressure request
30:2.0.1.2.3.5.90.26SECTION 250.529
   250.529 What are the terms of my casing pressure request
30:2.0.1.2.3.5.90.27SECTION 250.530
   250.530 What if my casing pressure request is denied
30:2.0.1.2.3.5.90.28SECTION 250.531
   250.531 When does my casing pressure request approval become invalid