Subpart G - Well Operations and Equipment Source:81 FR 26022, Apr. 29, 2016, unless otherwise noted.

30:2.0.1.2.3.7.91SUBJGRP 91
General Requirements
30:2.0.1.2.3.7.91.1SECTION 250.700
   250.700 What operations and equipment does this subpart cover
30:2.0.1.2.3.7.91.2SECTION 250.701
   250.701 May I use alternate procedures or equipment during operations
30:2.0.1.2.3.7.91.3SECTION 250.702
   250.702 May I obtain departures from these requirements
30:2.0.1.2.3.7.91.4SECTION 250.703
   250.703 What must I do to keep wells under control
30:2.0.1.2.3.7.92SUBJGRP 92
Rig Requirements
30:2.0.1.2.3.7.92.5SECTION 250.710
   250.710 What instructions must be given to personnel engaged in well operations
30:2.0.1.2.3.7.92.6SECTION 250.711
   250.711 What are the requirements for well-control drills
30:2.0.1.2.3.7.92.7SECTION 250.712
   250.712 What rig unit movements must I report
30:2.0.1.2.3.7.92.8SECTION 250.713
   250.713 What must I provide if I plan to use a mobile offshore drilling unit (MODU) for well operations
30:2.0.1.2.3.7.92.9SECTION 250.714
   250.714 Do I have to develop a dropped objects plan
30:2.0.1.2.3.7.92.10SECTION 250.715
   250.715 Do I need a global positioning system (GPS) for all MODUs
30:2.0.1.2.3.7.93SUBJGRP 93
Well Operations
30:2.0.1.2.3.7.93.11SECTION 250.720
   250.720 When and how must I secure a well
30:2.0.1.2.3.7.93.12SECTION 250.721
   250.721 What are the requirements for pressure testing casing and liners
30:2.0.1.2.3.7.93.13SECTION 250.722
   250.722 What are the requirements for prolonged operations in a well
30:2.0.1.2.3.7.93.14SECTION 250.723
   250.723 What additional safety measures must I take when I conduct operations on a platform that has producing wells or has other hydrocarbon flow
30:2.0.1.2.3.7.93.15SECTION 250.724
   250.724 What are the real-time monitoring requirements
30:2.0.1.2.3.7.94SUBJGRP 94
Blowout Preventer (BOP) System Requirements
30:2.0.1.2.3.7.94.16SECTION 250.730
   250.730 What are the general requirements for BOP systems and system components
30:2.0.1.2.3.7.94.17SECTION 250.731
   250.731 What information must I submit for BOP systems and system components
30:2.0.1.2.3.7.94.18SECTION 250.732
   250.732 What are the independent third party requirements for BOP systems and system components
30:2.0.1.2.3.7.94.19SECTION 250.733
   250.733 What are the requirements for a surface BOP stack
30:2.0.1.2.3.7.94.20SECTION 250.734
   250.734 What are the requirements for a subsea BOP system
30:2.0.1.2.3.7.94.21SECTION 250.735
   250.735 What associated systems and related equipment must all BOP systems include
30:2.0.1.2.3.7.94.22SECTION 250.736
   250.736 What are the requirements for choke manifolds, kelly-type valves inside BOPs, and drill string safety valves
30:2.0.1.2.3.7.94.23SECTION 250.737
   250.737 What are the BOP system testing requirements
30:2.0.1.2.3.7.94.24SECTION 250.738
   250.738 What must I do in certain situations involving BOP equipment or systems
30:2.0.1.2.3.7.94.25SECTION 250.739
   250.739 What are the BOP maintenance and inspection requirements
30:2.0.1.2.3.7.95SUBJGRP 95
Records and Reporting
30:2.0.1.2.3.7.95.26SECTION 250.740
   250.740 What records must I keep
30:2.0.1.2.3.7.95.27SECTION 250.741
   250.741 How long must I keep records
30:2.0.1.2.3.7.95.28SECTION 250.742
   250.742 What well records am I required to submit
30:2.0.1.2.3.7.95.29SECTION 250.743
   250.743 What are the well activity reporting requirements
30:2.0.1.2.3.7.95.30SECTION 250.744
   250.744 What are the end of operation reporting requirements
30:2.0.1.2.3.7.95.31SECTION 250.745
   250.745 What other well records could I be required to submit
30:2.0.1.2.3.7.95.32SECTION 250.746
   250.746 What are the recordkeeping requirements for casing, liner, and BOP tests, and inspections of BOP systems and marine risers
30:2.0.1.2.3.7.96SUBJGRP 96
Coiled Tubing Operations
30:2.0.1.2.3.7.96.33SECTION 250.750
   250.750 What are the coiled tubing requirements
30:2.0.1.2.3.7.96.34SECTION 250.751
   250.751 Coiled tubing testing requirements.
30:2.0.1.2.3.7.97SUBJGRP 97
Snubbing Operations
30:2.0.1.2.3.7.97.35SECTION 250.760
   250.760 What are the snubbing requirements