30:1.0.1.12.37.1 | SUBPART A
| Subpart A - General | |
30:1.0.1.12.37.1.215.1 | SECTION 75.1
| 75.1 Scope. | |
30:1.0.1.12.37.1.215.2 | SECTION 75.2
| 75.2 Definitions. | |
30:1.0.1.12.37.2 | SUBPART B
| Subpart B - Qualified and Certified Persons | |
30:1.0.1.12.37.2.215 | SUBJGRP 215
| [Statutory Provision] | |
30:1.0.1.12.37.2.215.1 | SECTION 75.100
| 75.100 Certified person. | |
30:1.0.1.12.37.2.215.2 | SECTION 75.150
| 75.150 Tests for methane and for oxygen deficiency; qualified person. | |
30:1.0.1.12.37.2.215.3 | SECTION 75.151
| 75.151 Tests for methane; qualified person; additional requirement. | |
30:1.0.1.12.37.2.215.4 | SECTION 75.152
| 75.152 Tests of air flow; qualified person. | |
30:1.0.1.12.37.2.215.5 | SECTION 75.153
| 75.153 Electrical work; qualified person. | |
30:1.0.1.12.37.2.215.6 | SECTION 75.154
| 75.154 Repair of energized surface high voltage lines; qualified person. | |
30:1.0.1.12.37.2.215.7 | SECTION 75.155
| 75.155 Qualified hoisting engineer; qualifications. | |
30:1.0.1.12.37.2.215.8 | SECTION 75.156
| 75.156 AMS operator, qualifications. | |
30:1.0.1.12.37.2.215.9 | SECTION 75.159
| 75.159 Records of certified and qualified persons. | |
30:1.0.1.12.37.2.215.10 | SECTION 75.160
| 75.160 Training programs. | |
30:1.0.1.12.37.2.215.11 | SECTION 75.161
| 75.161 Plans for training programs. | |
30:1.0.1.12.37.3 | SUBPART C
| Subpart C - Roof Support | |
30:1.0.1.12.37.3.216.1 | SECTION 75.200
| 75.200 Scope. | |
30:1.0.1.12.37.3.216.2 | SECTION 75.201
| 75.201 Definitions. | |
30:1.0.1.12.37.3.216.3 | SECTION 75.202
| 75.202 Protection from falls of roof, face and ribs. | |
30:1.0.1.12.37.3.216.4 | SECTION 75.203
| 75.203 Mining methods. | |
30:1.0.1.12.37.3.216.5 | SECTION 75.204
| 75.204 Roof bolting. | |
30:1.0.1.12.37.3.216.6 | SECTION 75.205
| 75.205 Installation of roof support using mining machines with integral roof bolters. | |
30:1.0.1.12.37.3.216.7 | SECTION 75.206
| 75.206 Conventional roof support. | |
30:1.0.1.12.37.3.216.8 | SECTION 75.207
| 75.207 Pillar recovery. | |
30:1.0.1.12.37.3.216.9 | SECTION 75.208
| 75.208 Warning devices. | |
30:1.0.1.12.37.3.216.10 | SECTION 75.209
| 75.209 Automated Temporary Roof Support (ATRS) systems. | |
30:1.0.1.12.37.3.216.11 | SECTION 75.210
| 75.210 Manual installation of temporary support. | |
30:1.0.1.12.37.3.216.12 | SECTION 75.211
| 75.211 Roof testing and scaling. | |
30:1.0.1.12.37.3.216.13 | SECTION 75.212
| 75.212 Rehabilitation of areas with unsupported roof. | |
30:1.0.1.12.37.3.216.14 | SECTION 75.213
| 75.213 Roof support removal. | |
30:1.0.1.12.37.3.216.15 | SECTION 75.214
| 75.214 Supplemental support materials, equipment and tools. | |
30:1.0.1.12.37.3.216.16 | SECTION 75.215
| 75.215 Longwall mining systems. | |
30:1.0.1.12.37.3.216.17 | SECTION 75.220
| 75.220 Roof control plan. | |
30:1.0.1.12.37.3.216.18 | SECTION 75.221
| 75.221 Roof control plan information. | |
30:1.0.1.12.37.3.216.19 | SECTION 75.222
| 75.222 Roof control plan-approval criteria. | |
30:1.0.1.12.37.3.216.20 | SECTION 75.223
| 75.223 Evaluation and revision of roof control plan. | |
30:1.0.1.12.37.4 | SUBPART D
| Subpart D - Ventilation | |
30:1.0.1.12.37.4.216.1 | SECTION 75.300
| 75.300 Scope. | |
30:1.0.1.12.37.4.216.2 | SECTION 75.301
| 75.301 Definitions. | |
30:1.0.1.12.37.4.216.3 | SECTION 75.302
| 75.302 Main mine fans. | |
30:1.0.1.12.37.4.216.4 | SECTION 75.310
| 75.310 Installation of main mine fans. | |
30:1.0.1.12.37.4.216.5 | SECTION 75.311
| 75.311 Main mine fan operation. | |
30:1.0.1.12.37.4.216.6 | SECTION 75.312
| 75.312 Main mine fan examinations and records. | |
30:1.0.1.12.37.4.216.7 | SECTION 75.313
| 75.313 Main mine fan stoppage with persons underground. | |
30:1.0.1.12.37.4.216.8 | SECTION 75.320
| 75.320 Air quality detectors and measurement devices. | |
30:1.0.1.12.37.4.216.9 | SECTION 75.321
| 75.321 Air quality. | |
30:1.0.1.12.37.4.216.10 | SECTION 75.322
| 75.322 Harmful quantities of noxious gases. | |
30:1.0.1.12.37.4.216.11 | SECTION 75.323
| 75.323 Actions for excessive methane. | |
30:1.0.1.12.37.4.216.12 | SECTION 75.324
| 75.324 Intentional changes in the ventilation system. | |
30:1.0.1.12.37.4.216.13 | SECTION 75.325
| 75.325 Air quantity. | |
30:1.0.1.12.37.4.216.14 | SECTION 75.326
| 75.326 Mean entry air velocity. | |
30:1.0.1.12.37.4.216.15 | SECTION 75.327
| 75.327 Air courses and trolley haulage systems. | |
30:1.0.1.12.37.4.216.16 | SECTION 75.330
| 75.330 Face ventilation control devices. | |
30:1.0.1.12.37.4.216.17 | SECTION 75.331
| 75.331 Auxiliary fans and tubing. | |
30:1.0.1.12.37.4.216.18 | SECTION 75.332
| 75.332 Working sections and working places. | |
30:1.0.1.12.37.4.216.19 | SECTION 75.333
| 75.333 Ventilation controls. | |
30:1.0.1.12.37.4.216.20 | SECTION 75.334
| 75.334 Worked-out areas and areas where pillars are being recovered. | |
30:1.0.1.12.37.4.216.21 | SECTION 75.335
| 75.335 Seal strengths, design applications, and installation. | |
30:1.0.1.12.37.4.216.22 | SECTION 75.336
| 75.336 Sampling and monitoring requirements. | |
30:1.0.1.12.37.4.216.23 | SECTION 75.337
| 75.337 Construction and repair of seals. | |
30:1.0.1.12.37.4.216.24 | SECTION 75.338
| 75.338 Training. | |
30:1.0.1.12.37.4.216.25 | SECTION 75.339
| 75.339 Seals records. | |
30:1.0.1.12.37.4.216.26 | SECTION 75.340
| 75.340 Underground electrical installations. | |
30:1.0.1.12.37.4.216.27 | SECTION 75.341
| 75.341 Direct-fired intake air heaters. | |
30:1.0.1.12.37.4.216.28 | SECTION 75.342
| 75.342 Methane monitors. | |
30:1.0.1.12.37.4.216.29 | SECTION 75.343
| 75.343 Underground shops. | |
30:1.0.1.12.37.4.216.30 | SECTION 75.344
| 75.344 Compressors. | |
30:1.0.1.12.37.4.216.31 | SECTION 75.350
| 75.350 Belt air course ventilation. | |
30:1.0.1.12.37.4.216.32 | SECTION 75.351
| 75.351 Atmospheric monitoring systems. | |
30:1.0.1.12.37.4.216.33 | SECTION 75.352
| 75.352 Actions in response to AMS malfunction, alert, or alarm signals. | |
30:1.0.1.12.37.4.216.34 | SECTION 75.360
| 75.360 Preshift examination at fixed intervals. | |
30:1.0.1.12.37.4.216.35 | SECTION 75.361
| 75.361 Supplemental examination. | |
30:1.0.1.12.37.4.216.36 | SECTION 75.362
| 75.362 On-shift examination. | |
30:1.0.1.12.37.4.216.37 | SECTION 75.363
| 75.363 Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording. | |
30:1.0.1.12.37.4.216.38 | SECTION 75.364
| 75.364 Weekly examination. | |
30:1.0.1.12.37.4.216.39 | SECTION 75.370
| 75.370 Mine ventilation plan; submission and approval. | |
30:1.0.1.12.37.4.216.40 | SECTION 75.371
| 75.371 Mine ventilation plan; contents. | |
30:1.0.1.12.37.4.216.41 | SECTION 75.372
| 75.372 Mine ventilation map. | |
30:1.0.1.12.37.4.216.42 | SECTION 75.373
| 75.373 Reopening mines. | |
30:1.0.1.12.37.4.216.43 | SECTION 75.380
| 75.380 Escapeways; bituminous and lignite mines. | |
30:1.0.1.12.37.4.216.44 | SECTION 75.381
| 75.381 Escapeways; anthracite mines. | |
30:1.0.1.12.37.4.216.45 | SECTION 75.382
| 75.382 Mechanical escape facilities. | |
30:1.0.1.12.37.4.216.46 | SECTION 75.384
| 75.384 Longwall and shortwall travelways. | |
30:1.0.1.12.37.4.216.47 | SECTION 75.385
| 75.385 Opening new mines. | |
30:1.0.1.12.37.4.216.48 | SECTION 75.386
| 75.386 Final mining of pillars. | |
30:1.0.1.12.37.4.216.49 | SECTION 75.388
| 75.388 Boreholes in advance of mining. | |
30:1.0.1.12.37.4.216.50 | SECTION 75.389
| 75.389 Mining into inaccessible areas. | |
30:1.0.1.12.37.5 | SUBPART E
| Subpart E - Combustible Materials and Rock Dusting | |
30:1.0.1.12.37.5.216.1 | SECTION 75.400
| 75.400 Accumulation of combustible materials. | |
30:1.0.1.12.37.5.216.2 | SECTION 75.400-1
| 75.400-1 Definitions. | |
30:1.0.1.12.37.5.216.3 | SECTION 75.400-2
| 75.400-2 Cleanup program. | |
30:1.0.1.12.37.5.216.4 | SECTION 75.401
| 75.401 Abatement of dust; water or water with a wetting agent. | |
30:1.0.1.12.37.5.216.5 | SECTION 75.401-1
| 75.401-1 Excessive amounts of dust. | |
30:1.0.1.12.37.5.216.6 | SECTION 75.402
| 75.402 Rock dusting. | |
30:1.0.1.12.37.5.216.7 | SECTION 75.402-1
| 75.402-1 Definition. | |
30:1.0.1.12.37.5.216.8 | SECTION 75.402-2
| 75.402-2 Exceptions. | |
30:1.0.1.12.37.5.216.9 | SECTION 75.403
| 75.403 Maintenance of incombustible content of rock dust. | |
30:1.0.1.12.37.5.216.10 | SECTION 75.403-1
| 75.403-1 Incombustible content. | |
30:1.0.1.12.37.5.216.11 | SECTION 75.404
| 75.404 Exemption of anthracite mines. | |
30:1.0.1.12.37.6 | SUBPART F
| Subpart F - Electrical Equipment - General | |
30:1.0.1.12.37.6.216.1 | SECTION 75.500
| 75.500 Permissible electric equipment. | |
30:1.0.1.12.37.6.216.2 | SECTION 75.500-1
| 75.500-1 Other low horsepower electric face equipment. | |
30:1.0.1.12.37.6.216.3 | SECTION 75.501
| 75.501 Permissible electric face equipment; coal seams above water table. | |
30:1.0.1.12.37.6.216.4 | SECTION 75.501-1
| 75.501-1 Coal seams above the water table. | |
30:1.0.1.12.37.6.216.5 | SECTION 75.501-2
| 75.501-2 Permissible electric face equipment. | |
30:1.0.1.12.37.6.216.6 | SECTION 75.501-3
| 75.501-3 New openings; mines above water table and never classed gassy. | |
30:1.0.1.12.37.6.216.7 | SECTION 75.502
| 75.502 Permits for noncompliance. | |
30:1.0.1.12.37.6.216.8 | SECTION 75.503
| 75.503 Permissible electric face equipment; maintenance. | |
30:1.0.1.12.37.6.216.9 | SECTION 75.503-1
| 75.503-1 Statement listing all electric face equipment. | |
30:1.0.1.12.37.6.216.10 | SECTION 75.504
| 75.504 Permissibility of new, replacement, used, reconditioned, additional, and rebuilt electric face equipment. | |
30:1.0.1.12.37.6.216.11 | SECTION 75.505
| 75.505 Mines classed gassy; use and maintenance of permissible electric face equipment. | |
30:1.0.1.12.37.6.216.12 | SECTION 75.506
| 75.506 Electric face equipment; requirements for permissibility. | |
30:1.0.1.12.37.6.216.13 | SECTION 75.506-1
| 75.506-1 Electric face equipment; permissible condition; maintenance requirements. | |
30:1.0.1.12.37.6.216.14 | SECTION 75.507
| 75.507 Power connection points. | |
30:1.0.1.12.37.6.216.15 | SECTION 75.507-1
| 75.507-1 Electric equipment other than power-connection points; outby the last open crosscut; return air; permissibility requirements. | |
30:1.0.1.12.37.6.216.16 | SECTION 75.508
| 75.508 Map of electrical system. | |
30:1.0.1.12.37.6.216.17 | SECTION 75.508-1
| 75.508-1 Mine tracks. | |
30:1.0.1.12.37.6.216.18 | SECTION 75.508-2
| 75.508-2 Changes in electric system map; recording. | |
30:1.0.1.12.37.6.216.19 | SECTION 75.509
| 75.509 Electric power circuit and electric equipment; deenergization. | |
30:1.0.1.12.37.6.216.20 | SECTION 75.510
| 75.510 Energized trolley wires; repair. | |
30:1.0.1.12.37.6.216.21 | SECTION 75.510-1
| 75.510-1 Repair of energized trolley wires; training. | |
30:1.0.1.12.37.6.216.22 | SECTION 75.511
| 75.511 Low-, medium-, or high-voltage distribution circuits and equipment; repair. | |
30:1.0.1.12.37.6.216.23 | SECTION 75.511-1
| 75.511-1 Qualified person. | |
30:1.0.1.12.37.6.216.24 | SECTION 75.512
| 75.512 Electric equipment; examination, testing and maintenance. | |
30:1.0.1.12.37.6.216.25 | SECTION 75.512-1
| 75.512-1 Qualified person. | |
30:1.0.1.12.37.6.216.26 | SECTION 75.512-2
| 75.512-2 Frequency of examinations. | |
30:1.0.1.12.37.6.216.27 | SECTION 75.513
| 75.513 Electric conductor; capacity and insulation. | |
30:1.0.1.12.37.6.216.28 | SECTION 75.513-1
| 75.513-1 Electric conductor; size. | |
30:1.0.1.12.37.6.216.29 | SECTION 75.514
| 75.514 Electrical connections or splices; suitability. | |
30:1.0.1.12.37.6.216.30 | SECTION 75.515
| 75.515 Cable fittings; suitability. | |
30:1.0.1.12.37.6.216.31 | SECTION 75.516
| 75.516 Power wires; support. | |
30:1.0.1.12.37.6.216.32 | SECTION 75.516-1
| 75.516-1 Installed insulators. | |
30:1.0.1.12.37.6.216.33 | SECTION 75.516-2
| 75.516-2 Communication wires and cables; installation; insulation; support. | |
30:1.0.1.12.37.6.216.34 | SECTION 75.517
| 75.517 Power wires and cables; insulation and protection. | |
30:1.0.1.12.37.6.216.35 | SECTION 75.517-1
| 75.517-1 Power wires and cables; insulation and protection. | |
30:1.0.1.12.37.6.216.36 | SECTION 75.517-2
| 75.517-2 Plans for insulation of existing bare power wires and cables. | |
30:1.0.1.12.37.6.216.37 | SECTION 75.518
| 75.518 Electric equipment and circuits; overload and short circuit protection. | |
30:1.0.1.12.37.6.216.38 | SECTION 75.518-1
| 75.518-1 Electric equipment and circuits; overload and short circuit protection; minimum requirements. | |
30:1.0.1.12.37.6.216.39 | SECTION 75.518-2
| 75.518-2 Incandescent lamps, overload and short circuit protection. | |
30:1.0.1.12.37.6.216.40 | SECTION 75.519
| 75.519 Main power circuits; disconnecting switches. | |
30:1.0.1.12.37.6.216.41 | SECTION 75.519-1
| 75.519-1 Main power circuits; disconnecting switches; locations. | |
30:1.0.1.12.37.6.216.42 | SECTION 75.520
| 75.520 Electric equipment; switches. | |
30:1.0.1.12.37.6.216.43 | SECTION 75.521
| 75.521 Lightning arresters; ungrounded and exposed power conductors and telephone wires. | |
30:1.0.1.12.37.6.216.44 | SECTION 75.522
| 75.522 Lighting devices. | |
30:1.0.1.12.37.6.216.45 | SECTION 75.522-1
| 75.522-1 Incandescent and fluorescent lamps. | |
30:1.0.1.12.37.6.216.46 | SECTION 75.523
| 75.523 Electric face equipment; deenergization. | |
30:1.0.1.12.37.6.216.47 | SECTION 75.523-1
| 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. | |
30:1.0.1.12.37.6.216.48 | SECTION 75.523-2
| 75.523-2 Deenergization of self-propelled electric face equipment; performance requirements. | |
30:1.0.1.12.37.6.216.49 | SECTION 75.523-3
| 75.523-3 Automatic emergency-parking brakes. | |
30:1.0.1.12.37.6.216.50 | SECTION 75.524
| 75.524 Electric face equipment; electric equipment used in return air outby the last open crosscut; maximum level of alternating or direct electric current between frames of equipment. | |
30:1.0.1.12.37.6.216.51.13 | APPENDIX Appendix A
| Appendix A to Subpart F of Part 75 - List of Permissible Electric Face Equipment Approved by the Bureau of Mines Prior to May 23, 1936 | |
30:1.0.1.12.37.7 | SUBPART G
| Subpart G - Trailing Cables | |
30:1.0.1.12.37.7.216.1 | SECTION 75.600
| 75.600 Trailing cables; flame resistance. | |
30:1.0.1.12.37.7.216.2 | SECTION 75.600-1
| 75.600-1 Approved cables; flame resistance. | |
30:1.0.1.12.37.7.216.3 | SECTION 75.601
| 75.601 Short circuit protection of trailing cables. | |
30:1.0.1.12.37.7.216.4 | SECTION 75.601-1
| 75.601-1 Short circuit protection; ratings and settings of circuit breakers. | |
30:1.0.1.12.37.7.216.5 | SECTION 75.601-2
| 75.601-2 Short circuit protection; use of fuses; approval by the Secretary. | |
30:1.0.1.12.37.7.216.6 | SECTION 75.601-3
| 75.601-3 Short circuit protection; dual element fuses; current ratings; maximum values. | |
30:1.0.1.12.37.7.216.7 | SECTION 75.602
| 75.602 Trailing cable junctions. | |
30:1.0.1.12.37.7.216.8 | SECTION 75.603
| 75.603 Temporary splice of trailing cable. | |
30:1.0.1.12.37.7.216.9 | SECTION 75.604
| 75.604 Permanent splicing of trailing cables. | |
30:1.0.1.12.37.7.216.10 | SECTION 75.605
| 75.605 Clamping of trailing cables to equipment. | |
30:1.0.1.12.37.7.216.11 | SECTION 75.606
| 75.606 Protection of trailing cables. | |
30:1.0.1.12.37.7.216.12 | SECTION 75.607
| 75.607 Breaking trailing cable and power cable connections. | |
30:1.0.1.12.37.8 | SUBPART H
| Subpart H - Grounding | |
30:1.0.1.12.37.8.216.1 | SECTION 75.700
| 75.700 Grounding metallic sheaths, armors, and conduits enclosing power conductors. | |
30:1.0.1.12.37.8.216.2 | SECTION 75.700-1
| 75.700-1 Approved methods of grounding. | |
30:1.0.1.12.37.8.216.3 | SECTION 75.701
| 75.701 Grounding metallic frames, casings, and other enclosures of electric equipment. | |
30:1.0.1.12.37.8.216.4 | SECTION 75.701-1
| 75.701-1 Approved methods of grounding of equipment receiving power from ungrounded alternating current power systems. | |
30:1.0.1.12.37.8.216.5 | SECTION 75.701-2
| 75.701-2 Approved method of grounding metallic frames, casings and other enclosures receiving power from single-phase 110-220-volt circuit. | |
30:1.0.1.12.37.8.216.6 | SECTION 75.701-3
| 75.701-3 Approved methods of grounding metallic frames, casings and other enclosures of electric equipment receiving power from direct current power systems with one polarity grounded. | |
30:1.0.1.12.37.8.216.7 | SECTION 75.701-4
| 75.701-4 Grounding wires; capacity of wires. | |
30:1.0.1.12.37.8.216.8 | SECTION 75.701-5
| 75.701-5 Use of grounding connectors. | |
30:1.0.1.12.37.8.216.9 | SECTION 75.702
| 75.702 Protection other than grounding. | |
30:1.0.1.12.37.8.216.10 | SECTION 75.702-1
| 75.702-1 Protection other than grounding; approved by an authorized representative of the Secretary. | |
30:1.0.1.12.37.8.216.11 | SECTION 75.703
| 75.703 Grounding offtrack direct-current machines and the enclosures of related detached components. | |
30:1.0.1.12.37.8.216.12 | SECTION 75.703-1
| 75.703-1 Approved method of grounding. | |
30:1.0.1.12.37.8.216.13 | SECTION 75.703-2
| 75.703-2 Approved grounding mediums. | |
30:1.0.1.12.37.8.216.14 | SECTION 75.703-3
| 75.703-3 Approved methods of grounding offtrack mobile, portable and stationary direct-current machines. | |
30:1.0.1.12.37.8.216.15 | SECTION 75.703-4
| 75.703-4 Other methods of protecting offtrack direct-current equipment; approved by an authorized representative of the Secretary. | |
30:1.0.1.12.37.8.216.16 | SECTION 75.704
| 75.704 Grounding frames of stationary high-voltage equipment receiving power from ungrounded delta systems. | |
30:1.0.1.12.37.8.216.17 | SECTION 75.704-1
| 75.704-1 Approved methods of grounding. | |
30:1.0.1.12.37.8.216.18 | SECTION 75.705
| 75.705 Work on high-voltage lines; deenergizing and grounding. | |
30:1.0.1.12.37.8.216.19 | SECTION 75.705-1
| 75.705-1 Work on high-voltage lines. | |
30:1.0.1.12.37.8.216.20 | SECTION 75.705-2
| 75.705-2 Repairs to energized surface high-voltage lines. | |
30:1.0.1.12.37.8.216.21 | SECTION 75.705-3
| 75.705-3 Work on energized high-voltage surface lines; reporting. | |
30:1.0.1.12.37.8.216.22 | SECTION 75.705-4
| 75.705-4 Simultaneous repairs. | |
30:1.0.1.12.37.8.216.23 | SECTION 75.705-5
| 75.705-5 Installation of protective equipment. | |
30:1.0.1.12.37.8.216.24 | SECTION 75.705-6
| 75.705-6 Protective clothing; use and inspection. | |
30:1.0.1.12.37.8.216.25 | SECTION 75.705-7
| 75.705-7 Protective equipment; inspection. | |
30:1.0.1.12.37.8.216.26 | SECTION 75.705-8
| 75.705-8 Protective equipment; testing and storage. | |
30:1.0.1.12.37.8.216.27 | SECTION 75.705-9
| 75.705-9 Operating disconnecting or cutout switches. | |
30:1.0.1.12.37.8.216.28 | SECTION 75.705-10
| 75.705-10 Tying into energized high-voltage surface circuits. | |
30:1.0.1.12.37.8.216.29 | SECTION 75.705-11
| 75.705-11 Use of grounded messenger wires; ungrounded systems. | |
30:1.0.1.12.37.8.216.30 | SECTION 75.706
| 75.706 Deenergized underground power circuits; idle days - idle shifts. | |
30:1.0.1.12.37.9 | SUBPART I
| Subpart I - Underground High-Voltage Distribution | |
30:1.0.1.12.37.9.216 | SUBJGRP 216
| High-Voltage Longwalls | |
30:1.0.1.12.37.9.216.1 | SECTION 75.800
| 75.800 High-voltage circuits; circuit breakers. | |
30:1.0.1.12.37.9.216.2 | SECTION 75.800-1
| 75.800-1 Circuit breakers; location. | |
30:1.0.1.12.37.9.216.3 | SECTION 75.800-2
| 75.800-2 Approved circuit schemes. | |
30:1.0.1.12.37.9.216.4 | SECTION 75.800-3
| 75.800-3 Testing, examination and maintenance of circuit breakers; procedures. | |
30:1.0.1.12.37.9.216.5 | SECTION 75.800-4
| 75.800-4 Testing, examination, and maintenance of circuit breakers; record. | |
30:1.0.1.12.37.9.216.6 | SECTION 75.801
| 75.801 Grounding resistors. | |
30:1.0.1.12.37.9.216.7 | SECTION 75.802
| 75.802 Protection of high-voltage circuits extending underground. | |
30:1.0.1.12.37.9.216.8 | SECTION 75.803
| 75.803 Fail safe ground check circuits on high-voltage resistance grounded systems. | |
30:1.0.1.12.37.9.216.9 | SECTION 75.803-1
| 75.803-1 Maximum voltage ground check circuits. | |
30:1.0.1.12.37.9.216.10 | SECTION 75.803-2
| 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. | |
30:1.0.1.12.37.9.216.11 | SECTION 75.804
| 75.804 Underground high-voltage cables. | |
30:1.0.1.12.37.9.216.12 | SECTION 75.805
| 75.805 Couplers. | |
30:1.0.1.12.37.9.216.13 | SECTION 75.806
| 75.806 Connection of single-phase loads. | |
30:1.0.1.12.37.9.216.14 | SECTION 75.807
| 75.807 Installation of high-voltage transmission cables. | |
30:1.0.1.12.37.9.216.15 | SECTION 75.808
| 75.808 Disconnecting devices. | |
30:1.0.1.12.37.9.216.16 | SECTION 75.809
| 75.809 Identification of circuit breakers and disconnecting switches. | |
30:1.0.1.12.37.9.216.17 | SECTION 75.810
| 75.810 High-voltage trailing cables; splices. | |
30:1.0.1.12.37.9.216.18 | SECTION 75.811
| 75.811 High-voltage underground equipment; grounding. | |
30:1.0.1.12.37.9.216.19 | SECTION 75.812
| 75.812 Movement of high-voltage power centers and portable transformers; permit. | |
30:1.0.1.12.37.9.216.20 | SECTION 75.812-1
| 75.812-1 Qualified person. | |
30:1.0.1.12.37.9.216.21 | SECTION 75.812-2
| 75.812-2 High-voltage power centers and transformers; record of examination. | |
30:1.0.1.12.37.9.216.22 | SECTION 75.813
| 75.813 High-voltage longwalls; scope. | |
30:1.0.1.12.37.9.216.23 | SECTION 75.814
| 75.814 Electrical protection. | |
30:1.0.1.12.37.9.216.24 | SECTION 75.815
| 75.815 Disconnect devices. | |
30:1.0.1.12.37.9.216.25 | SECTION 75.816
| 75.816 Guarding of cables. | |
30:1.0.1.12.37.9.216.26 | SECTION 75.817
| 75.817 Cable handling and support systems. | |
30:1.0.1.12.37.9.216.27 | SECTION 75.818
| 75.818 Use of insulated cable handling equipment. | |
30:1.0.1.12.37.9.216.28 | SECTION 75.819
| 75.819 Motor-starter enclosures; barriers and interlocks. | |
30:1.0.1.12.37.9.216.29 | SECTION 75.820
| 75.820 Electrical work; troubleshooting and testing. | |
30:1.0.1.12.37.9.216.30 | SECTION 75.821
| 75.821 Testing, examination and maintenance. | |
30:1.0.1.12.37.9.216.31 | SECTION 75.822
| 75.822 Underground high-voltage longwall cables. | |
30:1.0.1.12.37.9.216.32 | SECTION 75.823
| 75.823 Scope. | |
30:1.0.1.12.37.9.216.33 | SECTION 75.824
| 75.824 Electrical protection. | |
30:1.0.1.12.37.9.216.34 | SECTION 75.825
| 75.825 Power centers. | |
30:1.0.1.12.37.9.216.35 | SECTION 75.826
| 75.826 High-voltage trailing cables. | |
30:1.0.1.12.37.9.216.36 | SECTION 75.827
| 75.827 Guarding of trailing cables. | |
30:1.0.1.12.37.9.216.37 | SECTION 75.828
| 75.828 Trailing cable pulling. | |
30:1.0.1.12.37.9.216.38 | SECTION 75.829
| 75.829 Tramming continuous mining machines in and out of the mine and from section to section. | |
30:1.0.1.12.37.9.216.39 | SECTION 75.830
| 75.830 Splicing and repair of trailing cables. | |
30:1.0.1.12.37.9.216.40 | SECTION 75.831
| 75.831 Electrical work; troubleshooting and testing. | |
30:1.0.1.12.37.9.216.41 | SECTION 75.832
| 75.832 Frequency of examinations; recordkeeping. | |
30:1.0.1.12.37.9.216.42 | SECTION 75.833
| 75.833 Handling high-voltage trailing cables. | |
30:1.0.1.12.37.9.216.43 | SECTION 75.834
| 75.834 Training. | |
30:1.0.1.12.37.9.217.44.14 | APPENDIX Appendix A
| Appendix A to Subpart I of Part 75 - Diagrams of Inby and Outby Switching | |
30:1.0.1.12.37.10 | SUBPART J
| Subpart J - Underground Low- and Medium-Voltage Alternating Current Circuits | |
30:1.0.1.12.37.10.217.1 | SECTION 75.900
| 75.900 Low- and medium-voltage circuits serving three-phase alternating current equipment; circuit breakers. | |
30:1.0.1.12.37.10.217.2 | SECTION 75.900-1
| 75.900-1 Circuit breakers; location. | |
30:1.0.1.12.37.10.217.3 | SECTION 75.900-2
| 75.900-2 Approved circuit schemes. | |
30:1.0.1.12.37.10.217.4 | SECTION 75.900-3
| 75.900-3 Testing, examination, and maintenance of circuit breakers; procedures. | |
30:1.0.1.12.37.10.217.5 | SECTION 75.900-4
| 75.900-4 Testing, examination, and maintenance of circuit breakers; record. | |
30:1.0.1.12.37.10.217.6 | SECTION 75.901
| 75.901 Protection of low- and medium-voltage three-phase circuits used underground. | |
30:1.0.1.12.37.10.217.7 | SECTION 75.902
| 75.902 Low- and medium-voltage ground check monitor circuits. | |
30:1.0.1.12.37.10.217.8 | SECTION 75.902-1
| 75.902-1 Maximum voltage ground check circuits. | |
30:1.0.1.12.37.10.217.9 | SECTION 75.902-2
| 75.902-2 Approved ground check systems not employing pilot check wires. | |
30:1.0.1.12.37.10.217.10 | SECTION 75.902-4
| 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. | |
30:1.0.1.12.37.10.217.11 | SECTION 75.903
| 75.903 Disconnecting devices. | |
30:1.0.1.12.37.10.217.12 | SECTION 75.904
| 75.904 Identification of circuit breakers. | |
30:1.0.1.12.37.10.217.13 | SECTION 75.905
| 75.905 Connection of single-phase loads. | |
30:1.0.1.12.37.10.217.14 | SECTION 75.906
| 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires. | |
30:1.0.1.12.37.10.217.15 | SECTION 75.907
| 75.907 Design of trailing cables for medium-voltage circuits. | |
30:1.0.1.12.37.10.217.16.15 | APPENDIX Appendix A
| Appendix A to Subpart J of Part 75 | |
30:1.0.1.12.37.11 | SUBPART K
| Subpart K - Trolley Wires and Trolley Feeder Wires | |
30:1.0.1.12.37.11.217.1 | SECTION 75.1000
| 75.1000 Cutout switches. | |
30:1.0.1.12.37.11.217.2 | SECTION 75.1001
| 75.1001 Overcurrent protection. | |
30:1.0.1.12.37.11.217.3 | SECTION 75.1001-1
| 75.1001-1 Devices for overcurrent protection; testing and calibration requirements; records. | |
30:1.0.1.12.37.11.217.4 | SECTION 75.1002
| 75.1002 Installation of electric equipment and conductors; permissibility. | |
30:1.0.1.12.37.11.217.5 | SECTION 75.1003
| 75.1003 Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. | |
30:1.0.1.12.37.11.217.6 | SECTION 75.1003-1
| 75.1003-1 Other requirements for guarding of trolley wires and trolley feeder wires. | |
30:1.0.1.12.37.11.217.7 | SECTION 75.1003-2
| 75.1003-2 Requirements for movement of off-track mining equipment in areas of active workings where energized trolley wires or trolley feeder wires are present; pre-movement requirements; certified and qualified persons. | |
30:1.0.1.12.37.12 | SUBPART L
| Subpart L - Fire Protection | |
30:1.0.1.12.37.12.217 | SUBJGRP 217
| Fire Suppression Devices and Fire-Resistant Hydraulic Fluids on Underground Equipment | |
30:1.0.1.12.37.12.217.1 | SECTION 75.1100
| 75.1100 Requirements. | |
30:1.0.1.12.37.12.217.2 | SECTION 75.1100-1
| 75.1100-1 Type and quality of firefighting equipment. | |
30:1.0.1.12.37.12.217.3 | SECTION 75.1100-2
| 75.1100-2 Quantity and location of firefighting equipment. | |
30:1.0.1.12.37.12.217.4 | SECTION 75.1100-3
| 75.1100-3 Condition and examination of firefighting equipment. | |
30:1.0.1.12.37.12.217.5 | SECTION 75.1101
| 75.1101 Deluge-type water sprays, foam generators; main and secondary belt-conveyor drives. | |
30:1.0.1.12.37.12.217.6 | SECTION 75.1101-1
| 75.1101-1 Deluge-type water spray systems. | |
30:1.0.1.12.37.12.217.7 | SECTION 75.1101-2
| 75.1101-2 Installation of deluge-type sprays. | |
30:1.0.1.12.37.12.217.8 | SECTION 75.1101-3
| 75.1101-3 Water requirements. | |
30:1.0.1.12.37.12.217.9 | SECTION 75.1101-4
| 75.1101-4 Branch lines. | |
30:1.0.1.12.37.12.217.10 | SECTION 75.1101-5
| 75.1101-5 Installation of foam generator systems. | |
30:1.0.1.12.37.12.217.11 | SECTION 75.1101-6
| 75.1101-6 Water sprinkler systems; general. | |
30:1.0.1.12.37.12.217.12 | SECTION 75.1101-7
| 75.1101-7 Installation of water sprinkler systems; requirements. | |
30:1.0.1.12.37.12.217.13 | SECTION 75.1101-8
| 75.1101-8 Water sprinkler systems; arrangement of sprinklers. | |
30:1.0.1.12.37.12.217.14 | SECTION 75.1101-9
| 75.1101-9 Back-up water system. | |
30:1.0.1.12.37.12.217.15 | SECTION 75.1101-10
| 75.1101-10 Water sprinkler systems; fire warning devices at belt drives. | |
30:1.0.1.12.37.12.217.16 | SECTION 75.1101-11
| 75.1101-11 Inspection of water sprinkler systems. | |
30:1.0.1.12.37.12.217.17 | SECTION 75.1101-12
| 75.1101-12 Equivalent dry-pipe system. | |
30:1.0.1.12.37.12.217.18 | SECTION 75.1101-13
| 75.1101-13 Dry powder chemical systems; general. | |
30:1.0.1.12.37.12.217.19 | SECTION 75.1101-14
| 75.1101-14 Installation of dry powder chemical systems. | |
30:1.0.1.12.37.12.217.20 | SECTION 75.1101-15
| 75.1101-15 Construction of dry powder chemical systems. | |
30:1.0.1.12.37.12.217.21 | SECTION 75.1101-16
| 75.1101-16 Dry powder chemical systems; sensing and fire-suppression devices. | |
30:1.0.1.12.37.12.217.22 | SECTION 75.1101-17
| 75.1101-17 Sealing of dry powder chemical systems. | |
30:1.0.1.12.37.12.217.23 | SECTION 75.1101-18
| 75.1101-18 Dry powder requirements. | |
30:1.0.1.12.37.12.217.24 | SECTION 75.1101-19
| 75.1101-19 Nozzles; flow rate and direction. | |
30:1.0.1.12.37.12.217.25 | SECTION 75.1101-20
| 75.1101-20 Safeguards for dry powder chemical systems. | |
30:1.0.1.12.37.12.217.26 | SECTION 75.1101-21
| 75.1101-21 Back-up water system. | |
30:1.0.1.12.37.12.217.27 | SECTION 75.1101-22
| 75.1101-22 Inspection of dry powder chemical systems. | |
30:1.0.1.12.37.12.217.28 | SECTION 75.1102
| 75.1102 Slippage and sequence switches. | |
30:1.0.1.12.37.12.217.29 | SECTION 75.1103
| 75.1103 Automatic fire warning devices. | |
30:1.0.1.12.37.12.217.30 | SECTION 75.1103-1
| 75.1103-1 Automatic fire sensors. | |
30:1.0.1.12.37.12.217.31 | SECTION 75.1103-2
| 75.1103-2 Automatic fire sensors; approved components; installation requirements. | |
30:1.0.1.12.37.12.217.32 | SECTION 75.1103-3
| 75.1103-3 Automatic fire sensor and warning device systems; minimum requirements; general. | |
30:1.0.1.12.37.12.217.33 | SECTION 75.1103-4
| 75.1103-4 Automatic fire sensor and warning device systems; installation; minimum requirements. | |
30:1.0.1.12.37.12.217.34 | SECTION 75.1103-5
| 75.1103-5 Automatic fire warning devices; actions and response. | |
30:1.0.1.12.37.12.217.35 | SECTION 75.1103-6
| 75.1103-6 Automatic fire sensors; actuation of fire suppression systems. | |
30:1.0.1.12.37.12.217.36 | SECTION 75.1103-7
| 75.1103-7 Electrical components; permissibility requirements. | |
30:1.0.1.12.37.12.217.37 | SECTION 75.1103-8
| 75.1103-8 Automatic fire sensor and warning device systems; examination and test requirements. | |
30:1.0.1.12.37.12.217.38 | SECTION 75.1103-9
| 75.1103-9 Minimum requirements; fire suppression materials and location; maintenance of entries and crosscuts; access doors; communications; fire crews; high-expansion foam devices. | |
30:1.0.1.12.37.12.217.39 | SECTION 75.1103-10
| 75.1103-10 Fire suppression systems; additional requirements. | |
30:1.0.1.12.37.12.217.40 | SECTION 75.1103-11
| 75.1103-11 Tests of fire hydrants and fire hose; record of tests. | |
30:1.0.1.12.37.12.217.41 | SECTION 75.1104
| 75.1104 Underground storage, lubricating oil and grease. | |
30:1.0.1.12.37.12.217.42 | SECTION 75.1106
| 75.1106 Welding, cutting, or soldering with arc or flame underground. | |
30:1.0.1.12.37.12.217.43 | SECTION 75.1106-1
| 75.1106-1 Test for methane. | |
30:1.0.1.12.37.12.217.44 | SECTION 75.1106-2
| 75.1106-2 Transportation of liquefied and nonliquefied compressed gas cylinders; requirements. | |
30:1.0.1.12.37.12.217.45 | SECTION 75.1106-3
| 75.1106-3 Storage of liquefied and nonliquefied compressed gas cylinders; requirements. | |
30:1.0.1.12.37.12.217.46 | SECTION 75.1106-4
| 75.1106-4 Use of liquefied and nonliquefied compressed gas cylinders; general requirements. | |
30:1.0.1.12.37.12.217.47 | SECTION 75.1106-5
| 75.1106-5 Maintenance and tests of liquefied and nonliquefied compressed gas cylinders; accessories and equipment; requirements. | |
30:1.0.1.12.37.12.217.48 | SECTION 75.1106-6
| 75.1106-6 Exemption of small low pressure gas cylinders containing nonflammable or nonexplosive gas mixtures. | |
30:1.0.1.12.37.12.217.49 | SECTION 75.1107
| 75.1107 Fire suppression devices. | |
30:1.0.1.12.37.12.217.50 | SECTION 75.1107-1
| 75.1107-1 Fire-resistant hydraulic fluids and fire suppression devices on underground equipment. | |
30:1.0.1.12.37.12.217.51 | SECTION 75.1107-2
| 75.1107-2 Approved fire-resistant hydraulic fluids; minimum requirements. | |
30:1.0.1.12.37.12.217.52 | SECTION 75.1107-3
| 75.1107-3 Fire suppression devices; approved components; installation requirements. | |
30:1.0.1.12.37.12.217.53 | SECTION 75.1107-4
| 75.1107-4 Automatic fire sensors and manual actuators; installation; minimum requirements. | |
30:1.0.1.12.37.12.217.54 | SECTION 75.1107-5
| 75.1107-5 Electrical components of fire suppression devices; permissibility requirements. | |
30:1.0.1.12.37.12.217.55 | SECTION 75.1107-6
| 75.1107-6 Capacity of fire suppression devices; location and direction of nozzles. | |
30:1.0.1.12.37.12.217.56 | SECTION 75.1107-7
| 75.1107-7 Water spray devices; capacity; water supply; minimum requirements. | |
30:1.0.1.12.37.12.217.57 | SECTION 75.1107-8
| 75.1107-8 Fire suppression devices; extinguishant supply systems. | |
30:1.0.1.12.37.12.217.58 | SECTION 75.1107-9
| 75.1107-9 Dry chemical devices; capacity; minimum requirements. | |
30:1.0.1.12.37.12.217.59 | SECTION 75.1107-10
| 75.1107-10 High expansion foam devices; minimum capacity. | |
30:1.0.1.12.37.12.217.60 | SECTION 75.1107-11
| 75.1107-11 Extinguishing agents; requirements on mining equipment employed in low coal. | |
30:1.0.1.12.37.12.217.61 | SECTION 75.1107-12
| 75.1107-12 Inerting of mine atmosphere prohibited. | |
30:1.0.1.12.37.12.217.62 | SECTION 75.1107-13
| 75.1107-13 Approval of other fire suppression devices. | |
30:1.0.1.12.37.12.217.63 | SECTION 75.1107-14
| 75.1107-14 Guards and handrails; requirements where fire suppression devices are employed. | |
30:1.0.1.12.37.12.217.64 | SECTION 75.1107-15
| 75.1107-15 Fire suppression devices; hazards; training of miners. | |
30:1.0.1.12.37.12.217.65 | SECTION 75.1107-16
| 75.1107-16 Inspection of fire suppression devices. | |
30:1.0.1.12.37.12.217.66 | SECTION 75.1107-17
| 75.1107-17 Incorporation by reference; availability of publications. | |
30:1.0.1.12.37.12.217.67 | SECTION 75.1108
| 75.1108 Approved conveyor belts. | |
30:1.0.1.12.37.13 | SUBPART M
| Subpart M - Maps | |
30:1.0.1.12.37.13.218.1 | SECTION 75.1200
| 75.1200 Mine map. | |
30:1.0.1.12.37.13.218.2 | SECTION 75.1200-1
| 75.1200-1 Additional information on mine map. | |
30:1.0.1.12.37.13.218.3 | SECTION 75.1200-2
| 75.1200-2 Accuracy and scale of mine maps. | |
30:1.0.1.12.37.13.218.4 | SECTION 75.1201
| 75.1201 Certification. | |
30:1.0.1.12.37.13.218.5 | SECTION 75.1202
| 75.1202 Temporary notations, revisions, and supplements. | |
30:1.0.1.12.37.13.218.6 | SECTION 75.1202-1
| 75.1202-1 Temporary notations, revisions, and supplements. | |
30:1.0.1.12.37.13.218.7 | SECTION 75.1203
| 75.1203 Availability of mine map. | |
30:1.0.1.12.37.13.218.8 | SECTION 75.1204
| 75.1204 Mine closure; filing of map with Secretary. | |
30:1.0.1.12.37.13.218.9 | SECTION 75.1204-1
| 75.1204-1 Places to give notice and file maps. | |
30:1.0.1.12.37.14 | SUBPART N
| Subpart N - Explosives and Blasting | |
30:1.0.1.12.37.14.218.1 | SECTION 75.1300
| 75.1300 Definitions. | |
30:1.0.1.12.37.14.218.2 | SECTION 75.1301
| 75.1301 Qualified person. | |
30:1.0.1.12.37.14.218.3 | SECTION 75.1310
| 75.1310 Explosives and blasting equipment. | |
30:1.0.1.12.37.14.218.4 | SECTION 75.1311
| 75.1311 Transporting explosives and detonators. | |
30:1.0.1.12.37.14.218.5 | SECTION 75.1312
| 75.1312 Explosives and detonators in underground magazines. | |
30:1.0.1.12.37.14.218.6 | SECTION 75.1313
| 75.1313 Explosives and detonators outside of magazines. | |
30:1.0.1.12.37.14.218.7 | SECTION 75.1314
| 75.1314 Sheathed explosive units. | |
30:1.0.1.12.37.14.218.8 | SECTION 75.1315
| 75.1315 Boreholes for explosives. | |
30:1.0.1.12.37.14.218.9 | SECTION 75.1316
| 75.1316 Preparation before blasting. | |
30:1.0.1.12.37.14.218.10 | SECTION 75.1317
| 75.1317 Primer cartridges. | |
30:1.0.1.12.37.14.218.11 | SECTION 75.1318
| 75.1318 Loading boreholes. | |
30:1.0.1.12.37.14.218.12 | SECTION 75.1319
| 75.1319 Weight of explosives permitted in boreholes in bituminous and lignite mines. | |
30:1.0.1.12.37.14.218.13 | SECTION 75.1320
| 75.1320 Multiple-shot blasting. | |
30:1.0.1.12.37.14.218.14 | SECTION 75.1321
| 75.1321 Permits for firing more than 20 boreholes and for use of nonpermissible blasting units. | |
30:1.0.1.12.37.14.218.15 | SECTION 75.1322
| 75.1322 Stemming boreholes. | |
30:1.0.1.12.37.14.218.16 | SECTION 75.1323
| 75.1323 Blasting circuits. | |
30:1.0.1.12.37.14.218.17 | SECTION 75.1324
| 75.1324 Methane concentration and tests. | |
30:1.0.1.12.37.14.218.18 | SECTION 75.1325
| 75.1325 Firing procedures. | |
30:1.0.1.12.37.14.218.19 | SECTION 75.1326
| 75.1326 Examination after blasting. | |
30:1.0.1.12.37.14.218.20 | SECTION 75.1327
| 75.1327 Misfires. | |
30:1.0.1.12.37.14.218.21 | SECTION 75.1328
| 75.1328 Damaged or deteriorated explosives and detonators. | |
30:1.0.1.12.37.15 | SUBPART O
| Subpart O - Hoisting and Mantrips | |
30:1.0.1.12.37.15.218 | SUBJGRP 218
| Wire Ropes | |
30:1.0.1.12.37.15.218.1 | SECTION 75.1400
| 75.1400 Hoisting equipment; general. | |
30:1.0.1.12.37.15.218.2 | SECTION 75.1400-1
| 75.1400-1 Hoists; brakes, capability. | |
30:1.0.1.12.37.15.218.3 | SECTION 75.1400-2
| 75.1400-2 Hoists; tests of safety catches; records. | |
30:1.0.1.12.37.15.218.4 | SECTION 75.1400-3
| 75.1400-3 Daily examination of hoisting equipment. | |
30:1.0.1.12.37.15.218.5 | SECTION 75.1400-4
| 75.1400-4 Certifications and records of daily examinations. | |
30:1.0.1.12.37.15.218.6 | SECTION 75.1401
| 75.1401 Hoists; rated capacities; indicators. | |
30:1.0.1.12.37.15.218.7 | SECTION 75.1401-1
| 75.1401-1 Hoists; indicators. | |
30:1.0.1.12.37.15.218.8 | SECTION 75.1402
| 75.1402 Communication between shaft stations and hoist room. | |
30:1.0.1.12.37.15.218.9 | SECTION 75.1402-1
| 75.1402-1 Communication between shaft stations and hoist room. | |
30:1.0.1.12.37.15.218.10 | SECTION 75.1402-2
| 75.1402-2 Tests of signaling systems. | |
30:1.0.1.12.37.15.218.11 | SECTION 75.1403
| 75.1403 Other safeguards. | |
30:1.0.1.12.37.15.218.12 | SECTION 75.1403-1
| 75.1403-1 General criteria. | |
30:1.0.1.12.37.15.218.13 | SECTION 75.1403-2
| 75.1403-2 Criteria - Hoists transporting materials; brakes. | |
30:1.0.1.12.37.15.218.14 | SECTION 75.1403-3
| 75.1403-3 Criteria - Drum clutch; cage construction. | |
30:1.0.1.12.37.15.218.15 | SECTION 75.1403-4
| 75.1403-4 Criteria - Automatic elevators. | |
30:1.0.1.12.37.15.218.16 | SECTION 75.1403-5
| 75.1403-5 Criteria - Belt conveyors. | |
30:1.0.1.12.37.15.218.17 | SECTION 75.1403-6
| 75.1403-6 Criteria - Self-propelled personnel carriers. | |
30:1.0.1.12.37.15.218.18 | SECTION 75.1403-7
| 75.1403-7 Criteria - Mantrips. | |
30:1.0.1.12.37.15.218.19 | SECTION 75.1403-8
| 75.1403-8 Criteria - Track haulage roads. | |
30:1.0.1.12.37.15.218.20 | SECTION 75.1403-9
| 75.1403-9 Criteria - Shelter holes. | |
30:1.0.1.12.37.15.218.21 | SECTION 75.1403-10
| 75.1403-10 Criteria - Haulage; general. | |
30:1.0.1.12.37.15.218.22 | SECTION 75.1403-11
| 75.1403-11 Criteria - Entrances to shafts and slopes. | |
30:1.0.1.12.37.15.218.23 | SECTION 75.1404
| 75.1404 Automatic brakes; speed reduction gear. | |
30:1.0.1.12.37.15.218.24 | SECTION 75.1404-1
| 75.1404-1 Braking system. | |
30:1.0.1.12.37.15.218.25 | SECTION 75.1405
| 75.1405 Automatic couplers. | |
30:1.0.1.12.37.15.218.26 | SECTION 75.1405-1
| 75.1405-1 Automatic couplers, haulage equipment. | |
30:1.0.1.12.37.15.218.27 | SECTION 75.1429
| 75.1429 Guide ropes. | |
30:1.0.1.12.37.15.218.28 | SECTION 75.1430
| 75.1430 Wire ropes; scope. | |
30:1.0.1.12.37.15.218.29 | SECTION 75.1431
| 75.1431 Minimum rope strength. | |
30:1.0.1.12.37.15.218.30 | SECTION 75.1432
| 75.1432 Initial measurement. | |
30:1.0.1.12.37.15.218.31 | SECTION 75.1433
| 75.1433 Examinations. | |
30:1.0.1.12.37.15.218.32 | SECTION 75.1434
| 75.1434 Retirement criteria. | |
30:1.0.1.12.37.15.218.33 | SECTION 75.1435
| 75.1435 Load end attachments. | |
30:1.0.1.12.37.15.218.34 | SECTION 75.1436
| 75.1436 Drum end attachment. | |
30:1.0.1.12.37.15.218.35 | SECTION 75.1437
| 75.1437 End attachment retermination. | |
30:1.0.1.12.37.15.218.36 | SECTION 75.1438
| 75.1438 End attachment replacement. | |
30:1.0.1.12.37.16 | SUBPART P
| Subpart P - Mine Emergencies | |
30:1.0.1.12.37.16.219.1 | SECTION 75.1500
| 75.1500 [Reserved] | |
30:1.0.1.12.37.16.219.2 | SECTION 75.1501
| 75.1501 Emergency evacuations. | |
30:1.0.1.12.37.16.219.3 | SECTION 75.1502
| 75.1502 Mine emergency evacuation and firefighting program of instruction. | |
30:1.0.1.12.37.16.219.4 | SECTION 75.1503
| 75.1503 Use of fire suppression equipment. | |
30:1.0.1.12.37.16.219.5 | SECTION 75.1504
| 75.1504 Mine emergency evacuation training and drills. | |
30:1.0.1.12.37.16.219.6 | SECTION 75.1505
| 75.1505 Escapeway maps. | |
30:1.0.1.12.37.16.219.7 | SECTION 75.1506
| 75.1506 Refuge alternatives. | |
30:1.0.1.12.37.16.219.8 | SECTION 75.1507
| 75.1507 Emergency Response Plan; refuge alternatives. | |
30:1.0.1.12.37.16.219.9 | SECTION 75.1508
| 75.1508 Training and records for examination, maintenance and repair of refuge alternatives and components. | |
30:1.0.1.12.37.17 | SUBPART Q
| Subpart Q - Communications | |
30:1.0.1.12.37.17.219.1 | SECTION 75.1600
| 75.1600 Communications. | |
30:1.0.1.12.37.17.219.2 | SECTION 75.1600-1
| 75.1600-1 Communication facilities; main portals; installation requirements. | |
30:1.0.1.12.37.17.219.3 | SECTION 75.1600-2
| 75.1600-2 Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms. | |
30:1.0.1.12.37.17.219.4 | SECTION 75.1600-3
| 75.1600-3 Communications facilities; refuge alternatives. | |
30:1.0.1.12.37.18 | SUBPART R
| Subpart R - Miscellaneous | |
30:1.0.1.12.37.18.219.1 | SECTION 75.1700
| 75.1700 Oil and gas wells. | |
30:1.0.1.12.37.18.219.2 | SECTION 75.1702
| 75.1702 Smoking; prohibition. | |
30:1.0.1.12.37.18.219.3 | SECTION 75.1702-1
| 75.1702-1 Smoking programs. | |
30:1.0.1.12.37.18.219.4 | SECTION 75.1703
| 75.1703 Portable electric lamps. | |
30:1.0.1.12.37.18.219.5 | SECTION 75.1703-1
| 75.1703-1 Permissible lamps. | |
30:1.0.1.12.37.18.219.6 | SECTION 75.1707-1
| 75.1707-1 New working section. | |
30:1.0.1.12.37.18.219.7 | SECTION 75.1708
| 75.1708 Surface structures, fireproofing. | |
30:1.0.1.12.37.18.219.8 | SECTION 75.1708-1
| 75.1708-1 Surface structures; fireproof construction. | |
30:1.0.1.12.37.18.219.9 | SECTION 75.1709
| 75.1709 Accumulations of methane and coal dust on surface coal-handling facilities. | |
30:1.0.1.12.37.18.219.10 | SECTION 75.1710
| 75.1710 Canopies or cabs; diesel-powered and electric face equipment. | |
30:1.0.1.12.37.18.219.11 | SECTION 75.1710-1
| 75.1710-1 Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation requirements. | |
30:1.0.1.12.37.18.219.12 | SECTION 75.1711
| 75.1711 Sealing of mines. | |
30:1.0.1.12.37.18.219.13 | SECTION 75.1711-1
| 75.1711-1 Sealing of shaft openings. | |
30:1.0.1.12.37.18.219.14 | SECTION 75.1711-2
| 75.1711-2 Sealing of slope or drift openings. | |
30:1.0.1.12.37.18.219.15 | SECTION 75.1711-3
| 75.1711-3 Openings of active mines. | |
30:1.0.1.12.37.18.219.16 | SECTION 75.1712
| 75.1712 Bath houses and toilet facilities. | |
30:1.0.1.12.37.18.219.17 | SECTION 75.1712-1
| 75.1712-1 Availability of surface bathing facilities; change rooms; and sanitary facilities. | |
30:1.0.1.12.37.18.219.18 | SECTION 75.1712-2
| 75.1712-2 Location of surface facilities. | |
30:1.0.1.12.37.18.219.19 | SECTION 75.1712-3
| 75.1712-3 Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities. | |
30:1.0.1.12.37.18.219.20 | SECTION 75.1712-4
| 75.1712-4 Waiver of surface facilities requirements. | |
30:1.0.1.12.37.18.219.21 | SECTION 75.1712-5
| 75.1712-5 Application for waiver of surface facilities. | |
30:1.0.1.12.37.18.219.22 | SECTION 75.1712-6
| 75.1712-6 Underground sanitary facilities; installation and maintenance. | |
30:1.0.1.12.37.18.219.23 | SECTION 75.1712-7
| 75.1712-7 Underground sanitary facilities; waiver of requirements. | |
30:1.0.1.12.37.18.219.24 | SECTION 75.1712-8
| 75.1712-8 Application for waiver of location requirements for underground sanitary facilities. | |
30:1.0.1.12.37.18.219.25 | SECTION 75.1712-9
| 75.1712-9 Issuance of waivers. | |
30:1.0.1.12.37.18.219.26 | SECTION 75.1712-10
| 75.1712-10 Underground sanitary facilities; maintenance. | |
30:1.0.1.12.37.18.219.27 | SECTION 75.1713
| 75.1713 Emergency medical assistance; first-aid. | |
30:1.0.1.12.37.18.219.28 | SECTION 75.1713-1
| 75.1713-1 Arrangements for emergency medical assistance and transportation for injured persons; agreements; reporting requirements; posting requirements. | |
30:1.0.1.12.37.18.219.29 | SECTION 75.1713-2
| 75.1713-2 Emergency communications; requirements. | |
30:1.0.1.12.37.18.219.30 | SECTION 75.1713-3
| 75.1713-3 First-Aid training; supervisory employees. | |
30:1.0.1.12.37.18.219.31 | SECTION 75.1713-4
| 75.1713-4 First-aid training program; availability of instruction to all miners. | |
30:1.0.1.12.37.18.219.32 | SECTION 75.1713-5
| 75.1713-5 First-aid training program; retraining of supervisory employees; availability to all miners. | |
30:1.0.1.12.37.18.219.33 | SECTION 75.1713-6
| 75.1713-6 First-aid training program; minimum requirements. | |
30:1.0.1.12.37.18.219.34 | SECTION 75.1713-7
| 75.1713-7 First-aid equipment; location; minimum requirements. | |
30:1.0.1.12.37.18.219.35 | SECTION 75.1714
| 75.1714 Availability of approved self-rescue devices; instruction in use and location. | |
30:1.0.1.12.37.18.219.36 | SECTION 75.1714-1
| 75.1714-1 Approved self-rescue devices. | |
30:1.0.1.12.37.18.219.37 | SECTION 75.1714-2
| 75.1714-2 Self-rescue devices; use and location requirements. | |
30:1.0.1.12.37.18.219.38 | SECTION 75.1714-3
| 75.1714-3 Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping. | |
30:1.0.1.12.37.18.219.39 | SECTION 75.1714-4
| 75.1714-4 Additional self-contained self-rescuers (SCSRs). | |
30:1.0.1.12.37.18.219.40 | SECTION 75.1714-5
| 75.1714-5 Map locations of self-contained self-rescuers (SCSR). | |
30:1.0.1.12.37.18.219.41 | SECTION 75.1714-6
| 75.1714-6 Emergency tethers. | |
30:1.0.1.12.37.18.219.42 | SECTION 75.1714-7
| 75.1714-7 Multi-gas detectors. | |
30:1.0.1.12.37.18.219.43 | SECTION 75.1714-8
| 75.1714-8 Reporting SCSR inventory and malfunctions; retention of SCSRs. | |
30:1.0.1.12.37.18.219.44 | SECTION 75.1715
| 75.1715 Identification check system. | |
30:1.0.1.12.37.18.219.45 | SECTION 75.1716
| 75.1716 Operations under water. | |
30:1.0.1.12.37.18.219.46 | SECTION 75.1716-1
| 75.1716-1 Operations under water; notification by operator. | |
30:1.0.1.12.37.18.219.47 | SECTION 75.1716-2
| 75.1716-2 Permit required. | |
30:1.0.1.12.37.18.219.48 | SECTION 75.1716-3
| 75.1716-3 Applications for permits. | |
30:1.0.1.12.37.18.219.49 | SECTION 75.1716-4
| 75.1716-4 Issuance of permits. | |
30:1.0.1.12.37.18.219.50 | SECTION 75.1717
| 75.1717 Exemptions. | |
30:1.0.1.12.37.18.219.51 | SECTION 75.1718
| 75.1718 Drinking water. | |
30:1.0.1.12.37.18.219.52 | SECTION 75.1718-1
| 75.1718-1 Drinking water; quality. | |
30:1.0.1.12.37.18.219.53 | SECTION 75.1719
| 75.1719 Illumination; purpose and scope of §§ 75.1719 through 75.1719-4; time for compliance. | |
30:1.0.1.12.37.18.219.54 | SECTION 75.1719-1
| 75.1719-1 Illumination in working places. | |
30:1.0.1.12.37.18.219.55 | SECTION 75.1719-2
| 75.1719-2 Lighting fixtures; requirements. | |
30:1.0.1.12.37.18.219.56 | SECTION 75.1719-3
| 75.1719-3 Methods of measurement; light measuring instruments. | |
30:1.0.1.12.37.18.219.57 | SECTION 75.1719-4
| 75.1719-4 Mining machines, cap lamps; requirements. | |
30:1.0.1.12.37.18.219.58 | SECTION 75.1720
| 75.1720 Protective clothing; requirements. | |
30:1.0.1.12.37.18.219.59 | SECTION 75.1720-1
| 75.1720-1 Distinctively colored hard hats, or hard caps; identification for newly employed, inexperienced miners. | |
30:1.0.1.12.37.18.219.60 | SECTION 75.1721
| 75.1721 Opening of new underground coal mines, or reopening and reactivating of abandoned or deactivated coal mines, notification by the operator; requirements. | |
30:1.0.1.12.37.18.219.61 | SECTION 75.1722
| 75.1722 Mechanical equipment guards. | |
30:1.0.1.12.37.18.219.62 | SECTION 75.1723
| 75.1723 Stationary grinding machines; protective devices. | |
30:1.0.1.12.37.18.219.63 | SECTION 75.1724
| 75.1724 Hand-held power tools; safety devices. | |
30:1.0.1.12.37.18.219.64 | SECTION 75.1725
| 75.1725 Machinery and equipment; operation and maintenance. | |
30:1.0.1.12.37.18.219.65 | SECTION 75.1726
| 75.1726 Performing work from a raised position; safeguards. | |
30:1.0.1.12.37.18.219.66 | SECTION 75.1727
| 75.1727 Drive belts. | |
30:1.0.1.12.37.18.219.67 | SECTION 75.1728
| 75.1728 Power-driven pulleys. | |
30:1.0.1.12.37.18.219.68 | SECTION 75.1729
| 75.1729 Welding operations. | |
30:1.0.1.12.37.18.219.69 | SECTION 75.1730
| 75.1730 Compressed air; general; compressed air systems. | |
30:1.0.1.12.37.18.219.70 | SECTION 75.1731
| 75.1731 Maintenance of belt conveyors and belt conveyor entries. | |
30:1.0.1.12.37.18.219.71 | SECTION 75.1732
| 75.1732 Proximity detection systems. | |
30:1.0.1.12.37.19 | SUBPART S
| Subpart S [Reserved] | |
30:1.0.1.12.37.20 | SUBPART T
| Subpart T - Diesel-Powered Equipment | |
30:1.0.1.12.37.20.219.1 | SECTION 75.1900
| 75.1900 Definitions. | |
30:1.0.1.12.37.20.219.2 | SECTION 75.1901
| 75.1901 Diesel fuel requirements. | |
30:1.0.1.12.37.20.219.3 | SECTION 75.1902
| 75.1902 Underground diesel fuel storage - general requirements. | |
30:1.0.1.12.37.20.219.4 | SECTION 75.1903
| 75.1903 Underground diesel fuel storage facilities and areas; construction and safety precautions. | |
30:1.0.1.12.37.20.219.5 | SECTION 75.1904
| 75.1904 Underground diesel fuel tanks and safety cans. | |
30:1.0.1.12.37.20.219.6 | SECTION 75.1905
| 75.1905 Dispensing of diesel fuel. | |
30:1.0.1.12.37.20.219.7 | SECTION 75.1905-1
| 75.1905-1 Diesel fuel piping systems. | |
30:1.0.1.12.37.20.219.8 | SECTION 75.1906
| 75.1906 Transport of diesel fuel. | |
30:1.0.1.12.37.20.219.9 | SECTION 75.1907
| 75.1907 Diesel-powered equipment intended for use in underground coal mines. | |
30:1.0.1.12.37.20.219.10 | SECTION 75.1908
| 75.1908 Nonpermissible diesel-powered equipment; categories. | |
30:1.0.1.12.37.20.219.11 | SECTION 75.1909
| 75.1909 Nonpermissible diesel-powered equipment; design and performance requirements. | |
30:1.0.1.12.37.20.219.12 | SECTION 75.1910
| 75.1910 Nonpermissible diesel-powered equipment; electrical system design and performance requirements. | |
30:1.0.1.12.37.20.219.13 | SECTION 75.1911
| 75.1911 Fire suppression systems for diesel-powered equipment and fuel transportation units. | |
30:1.0.1.12.37.20.219.14 | SECTION 75.1912
| 75.1912 Fire suppression systems for permanent underground diesel fuel storage facilities. | |
30:1.0.1.12.37.20.219.15 | SECTION 75.1913
| 75.1913 Starting aids. | |
30:1.0.1.12.37.20.219.16 | SECTION 75.1914
| 75.1914 Maintenance of diesel-powered equipment. | |
30:1.0.1.12.37.20.219.17 | SECTION 75.1915
| 75.1915 Training and qualification of persons working on diesel-powered equipment. | |
30:1.0.1.12.37.20.219.18 | SECTION 75.1916
| 75.1916 Operation of diesel-powered equipment. | |