Subpart J—Underground Low- and Medium-Voltage Alternating Current Circuits
Contents
-
75.900
§ 75.900 Low- and medium-voltage circuits serving three-phase alternating current equipment; circuit breakers. -
75.900-1
§ 75.900-1 Circuit breakers; location. -
75.900-2
§ 75.900-2 Approved circuit schemes. -
75.900-3
§ 75.900-3 Testing, examination, and maintenance of circuit breakers; procedures. -
75.900-4
§ 75.900-4 Testing, examination, and maintenance of circuit breakers; record. -
75.901
§ 75.901 Protection of low- and medium-voltage three-phase circuits used underground. -
75.902
§ 75.902 Low- and medium-voltage ground check monitor circuits. -
75.902-1
§ 75.902-1 Maximum voltage ground check circuits. -
75.902-2
§ 75.902-2 Approved ground check systems not employing pilot check wires. -
75.902-4
§ 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. -
75.903
§ 75.903 Disconnecting devices. -
75.904
§ 75.904 Identification of circuit breakers. -
75.905
§ 75.905 Connection of single-phase loads. -
75.906
§ 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires. -
75.907
§ 75.907 Design of trailing cables for medium-voltage circuits. -
Appendix A to Subpart J of Part 75
Appendix A to Subpart J of Part 75