Title 30

PART 75 SUBPART K

Subpart K - Trolley Wires and Trolley Feeder Wires

30:1.0.1.12.37.11.217.1SECTION 75.1000
   75.1000 Cutout switches.
30:1.0.1.12.37.11.217.2SECTION 75.1001
   75.1001 Overcurrent protection.
30:1.0.1.12.37.11.217.3SECTION 75.1001-1
   75.1001-1 Devices for overcurrent protection; testing and calibration requirements; records.
30:1.0.1.12.37.11.217.4SECTION 75.1002
   75.1002 Installation of electric equipment and conductors; permissibility.
30:1.0.1.12.37.11.217.5SECTION 75.1003
   75.1003 Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires.
30:1.0.1.12.37.11.217.6SECTION 75.1003-1
   75.1003-1 Other requirements for guarding of trolley wires and trolley feeder wires.
30:1.0.1.12.37.11.217.7SECTION 75.1003-2
   75.1003-2 Requirements for movement of off-track mining equipment in areas of active workings where energized trolley wires or trolley feeder wires are present; pre-movement requirements; certified and qualified persons.