33:2.0.1.5.26.1 | SUBPART A
| Subpart A - General | |
33:2.0.1.5.26.1.187.1 | SECTION 157.01
| 157.01 Applicability. | |
33:2.0.1.5.26.1.187.2 | SECTION 157.02
| 157.02 Incorporation by reference: Where can I get a copy of the publications mentioned in this part | |
33:2.0.1.5.26.1.187.3 | SECTION 157.03
| 157.03 Definitions. | |
33:2.0.1.5.26.1.187.4 | SECTION 157.04
| 157.04 Authorization of classification societies. | |
33:2.0.1.5.26.1.187.5 | SECTION 157.05
| 157.05 Performing calculations for this part. | |
33:2.0.1.5.26.1.187.6 | SECTION 157.06
| 157.06 Appeals. | |
33:2.0.1.5.26.1.187.7 | SECTION 157.07
| 157.07 Equivalents. | |
33:2.0.1.5.26.2 | SUBPART B
| Subpart B - Design, Equipment, and Installation | |
33:2.0.1.5.26.2.187.1 | SECTION 157.08
| 157.08 Applicability of subpart B. | |
33:2.0.1.5.26.2.187.2 | SECTION 157.09
| 157.09 Segregated ballast. | |
33:2.0.1.5.26.2.187.3 | SECTION 157.10
| 157.10 Segregated ballast tanks and crude oil washing systems for certain new vessels. | |
33:2.0.1.5.26.2.187.4 | SECTION 157.10a
| 157.10a Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing vessels of 40,000 DWT or more. | |
33:2.0.1.5.26.2.187.5 | SECTION 157.10b
| 157.10b Segregated ballast tanks, dedicated clean ballast tanks, and special ballast arrangements for tank vessels transporting Outer Continental Shelf oil. | |
33:2.0.1.5.26.2.187.6 | SECTION 157.10c
| 157.10c Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing tankships of 20,000 to 40,000 DWT. | |
33:2.0.1.5.26.2.187.7 | SECTION 157.10d
| 157.10d Double hulls on tank vessels. | |
33:2.0.1.5.26.2.187.8 | SECTION 157.11
| 157.11 Pumping, piping and discharge arrangements. | |
33:2.0.1.5.26.2.187.9 | SECTION 157.12
| 157.12 Oil discharge monitoring and control system. | |
33:2.0.1.5.26.2.187.10 | SECTION 157.12a
| 157.12a Definitions. | |
33:2.0.1.5.26.2.187.11 | SECTION 157.12b
| 157.12b Implementation requirements. | |
33:2.0.1.5.26.2.187.12 | SECTION 157.12c
| 157.12c Construction, maintenance, security, calibration, and training. | |
33:2.0.1.5.26.2.187.13 | SECTION 157.12d
| 157.12d Technical specifications. | |
33:2.0.1.5.26.2.187.14 | SECTION 157.12e
| 157.12e Certificate of approval. | |
33:2.0.1.5.26.2.187.15 | SECTION 157.12f
| 157.12f Workshop functional test requirements. | |
33:2.0.1.5.26.2.187.16 | SECTION 157.12g
| 157.12g Plan approval requirements. | |
33:2.0.1.5.26.2.187.17 | SECTION 157.13
| 157.13 Designated observation area. | |
33:2.0.1.5.26.2.187.18 | SECTION 157.14
| 157.14 Pump-room bottom protection. | |
33:2.0.1.5.26.2.187.19 | SECTION 157.15
| 157.15 Slop tanks in tank vessels. | |
33:2.0.1.5.26.2.187.20 | SECTION 157.17
| 157.17 Oil residue (sludge) tank. | |
33:2.0.1.5.26.2.187.21 | SECTION 157.19
| 157.19 Cargo tank arrangement and size. | |
33:2.0.1.5.26.2.187.22 | SECTION 157.20
| 157.20 Accidental oil outflow performance. | |
33:2.0.1.5.26.2.187.23 | SECTION 157.21
| 157.21 Subdivision and stability. | |
33:2.0.1.5.26.2.187.24 | SECTION 157.22
| 157.22 Intact stability requirements. | |
33:2.0.1.5.26.2.187.25 | SECTION 157.23
| 157.23 Cargo and ballast system information. | |
33:2.0.1.5.26.2.187.26 | SECTION 157.24
| 157.24 Submission of calculations, plans, and specifications. | |
33:2.0.1.5.26.2.187.27 | SECTION 157.24a
| 157.24a Submission of calculations, plans, and specifications for existing vessels installing segregated ballast tanks. | |
33:2.0.1.5.26.3 | SUBPART C
| Subpart C - Vessel Operation | |
33:2.0.1.5.26.3.187.1 | SECTION 157.25
| 157.25 Applicability of subpart C. | |
33:2.0.1.5.26.3.187.2 | SECTION 157.26
| 157.26 Operation of a tank vessel in violation of regulations. | |
33:2.0.1.5.26.3.187.3 | SECTION 157.27
| 157.27 Discharges: Tank vessels carrying oil exclusively on rivers, lakes, bays, sounds, and the Great Lakes, and seagoing tank vessels of less than 150 gross tons. | |
33:2.0.1.5.26.3.187.4 | SECTION 157.28
| 157.28 Discharges from tank barges exempted from certain design requirements. | |
33:2.0.1.5.26.3.187.5 | SECTION 157.29
| 157.29 Discharges: Seagoing tank vessels of 150 gross tons or more. | |
33:2.0.1.5.26.3.187.6 | SECTION 157.31
| 157.31 Discharges: Chemical additives. | |
33:2.0.1.5.26.3.187.7 | SECTION 157.33
| 157.33 Water ballast in fuel oil tanks. | |
33:2.0.1.5.26.3.187.8 | SECTION 157.35
| 157.35 Ballast added to cargo tanks. | |
33:2.0.1.5.26.3.187.9 | SECTION 157.37
| 157.37 Discharge of oily mixtures from oil cargoes. | |
33:2.0.1.5.26.3.187.10 | SECTION 157.39
| 157.39 Machinery space bilges. | |
33:2.0.1.5.26.3.187.11 | SECTION 157.41
| 157.41 Emergencies. | |
33:2.0.1.5.26.3.187.12 | SECTION 157.43
| 157.43 Discharges of clean and segregated ballast: Seagoing tank vessels of 150 gross tons or more. | |
33:2.0.1.5.26.3.187.13 | SECTION 157.45
| 157.45 Valves in cargo or ballast piping system. | |
33:2.0.1.5.26.3.187.14 | SECTION 157.47
| 157.47 Information for master. | |
33:2.0.1.5.26.3.187.15 | SECTION 157.49
| 157.49 Instruction manual. | |
33:2.0.1.5.26.4 | SUBPART D
| Subpart D - Crude Oil Washing (COW) System on Tank Vessels | |
33:2.0.1.5.26.4.187 | SUBJGRP 187
| General | |
33:2.0.1.5.26.4.187.1 | SECTION 157.100
| 157.100 Plans for U.S. tank vessels: Submission. | |
33:2.0.1.5.26.4.187.2 | SECTION 157.102
| 157.102 Plans for foreign tank vessels: Submission. | |
33:2.0.1.5.26.4.187.3 | SECTION 157.104
| 157.104 Scale models. | |
33:2.0.1.5.26.4.187.4 | SECTION 157.106
| 157.106 Letter of acceptance. | |
33:2.0.1.5.26.4.187.5 | SECTION 157.108
| 157.108 Crude Oil Washing Operations and Equipment Manual for U.S. tank vessels: Submission. | |
33:2.0.1.5.26.4.187.6 | SECTION 157.110
| 157.110 Crude Oil Washing Operations and Equipment Manual for foreign tank vessels: Submission. | |
33:2.0.1.5.26.4.187.7 | SECTION 157.112
| 157.112 Approved Crude Oil Washing Operations and Equipment Manual. | |
33:2.0.1.5.26.4.187.8 | SECTION 157.114
| 157.114 Crude Oil Washing Operations and Equipment Manual: Not approved. | |
33:2.0.1.5.26.4.187.9 | SECTION 157.116
| 157.116 Required documents: U.S. tank vessels. | |
33:2.0.1.5.26.4.187.10 | SECTION 157.118
| 157.118 Required documents: Foreign tank vessels. | |
33:2.0.1.5.26.4.187.11 | SECTION 157.120
| 157.120 Waiver of required documents. | |
33:2.0.1.5.26.4.188 | SUBJGRP 188
| Design, Equipment, and Installation | |
33:2.0.1.5.26.4.188.12 | SECTION 157.122
| 157.122 Piping, valves, and fittings. | |
33:2.0.1.5.26.4.188.13 | SECTION 157.124
| 157.124 COW tank washing machines. | |
33:2.0.1.5.26.4.188.14 | SECTION 157.126
| 157.126 Pumps. | |
33:2.0.1.5.26.4.188.15 | SECTION 157.128
| 157.128 Stripping system. | |
33:2.0.1.5.26.4.188.16 | SECTION 157.130
| 157.130 Crude oil washing with more than one grade of crude oil. | |
33:2.0.1.5.26.4.188.17 | SECTION 157.132
| 157.132 Cargo tanks: Hydrocarbon vapor emissions. | |
33:2.0.1.5.26.4.188.18 | SECTION 157.134
| 157.134 Cargo tank drainage. | |
33:2.0.1.5.26.4.188.19 | SECTION 157.136
| 157.136 Two-way voice communications. | |
33:2.0.1.5.26.4.188.20 | SECTION 157.138
| 157.138 Crude Oil Washing Operations and Equipment Manual. | |
33:2.0.1.5.26.4.189 | SUBJGRP 189
| Inspections | |
33:2.0.1.5.26.4.189.21 | SECTION 157.140
| 157.140 Tank vessel inspections. | |
33:2.0.1.5.26.4.189.22 | SECTION 157.142
| 157.142 Letter of acceptance: Inspections. | |
33:2.0.1.5.26.4.189.23 | SECTION 157.144
| 157.144 Tank vessels of the same class: Inspections. | |
33:2.0.1.5.26.4.189.24 | SECTION 157.146
| 157.146 Similar tank design: Inspections on U.S. tank vessels. | |
33:2.0.1.5.26.4.189.25 | SECTION 157.147
| 157.147 Similar tank design: Inspections on foreign tank vessels. | |
33:2.0.1.5.26.4.189.26 | SECTION 157.148
| 157.148 COW system: Evidence for inspections. | |
33:2.0.1.5.26.4.189.27 | SECTION 157.150
| 157.150 Crude Oil Washing Operations and Equipment Manual: Recording information after inspections. | |
33:2.0.1.5.26.4.190 | SUBJGRP 190
| Personnel | |
33:2.0.1.5.26.4.190.28 | SECTION 157.152
| 157.152 Person in charge of COW operations. | |
33:2.0.1.5.26.4.190.29 | SECTION 157.154
| 157.154 Assistant personnel. | |
33:2.0.1.5.26.4.191 | SUBJGRP 191
| COW Operations | |
33:2.0.1.5.26.4.191.30 | SECTION 157.155
| 157.155 COW operations: General. | |
33:2.0.1.5.26.4.191.31 | SECTION 157.156
| 157.156 COW operations: Meeting manual requirements. | |
33:2.0.1.5.26.4.191.32 | SECTION 157.158
| 157.158 COW operations: Changed characteristics. | |
33:2.0.1.5.26.4.191.33 | SECTION 157.160
| 157.160 Tanks: Ballasting and crude oil washing. | |
33:2.0.1.5.26.4.191.34 | SECTION 157.162
| 157.162 Crude oil washing during a voyage. | |
33:2.0.1.5.26.4.191.35 | SECTION 157.164
| 157.164 Use of inert gas system. | |
33:2.0.1.5.26.4.191.36 | SECTION 157.166
| 157.166 Hydrocarbon emissions. | |
33:2.0.1.5.26.4.191.37 | SECTION 157.168
| 157.168 Crew member: Main deck watch. | |
33:2.0.1.5.26.4.191.38 | SECTION 157.170
| 157.170 COW equipment: Removal. | |
33:2.0.1.5.26.4.191.39 | SECTION 157.172
| 157.172 Limitations on grades of crude oil carried. | |
33:2.0.1.5.26.5 | SUBPART E
| Subpart E - Dedicated Clean Ballast Tanks on Tank Vessels | |
33:2.0.1.5.26.5.192 | SUBJGRP 192
| General | |
33:2.0.1.5.26.5.192.1 | SECTION 157.200
| 157.200 Plans for U.S. tank vessels: Submission. | |
33:2.0.1.5.26.5.192.2 | SECTION 157.202
| 157.202 Plans and documents for foreign tank vessels: Submission. | |
33:2.0.1.5.26.5.192.3 | SECTION 157.204
| 157.204 Letter of acceptance. | |
33:2.0.1.5.26.5.192.4 | SECTION 157.206
| 157.206 Dedicated Clean Ballast Tanks Operations Manual for U.S. tank vessels: Submission. | |
33:2.0.1.5.26.5.192.5 | SECTION 157.208
| 157.208 Dedicated Clean Ballast Tanks Operations Manual for foreign tank vessels: Submission. | |
33:2.0.1.5.26.5.192.6 | SECTION 157.210
| 157.210 Approved Dedicated Clean Ballast Tanks Operations Manual. | |
33:2.0.1.5.26.5.192.7 | SECTION 157.212
| 157.212 Dedicated Clean Ballast Tanks Operations Manual: Not approved. | |
33:2.0.1.5.26.5.192.8 | SECTION 157.214
| 157.214 Required documents: U.S. tank vessels. | |
33:2.0.1.5.26.5.192.9 | SECTION 157.216
| 157.216 Required documents: Foreign tank vessels. | |
33:2.0.1.5.26.5.192.10 | SECTION 157.218
| 157.218 Dedicated clean ballast tanks: Alterations. | |
33:2.0.1.5.26.5.193 | SUBJGRP 193
| Design and Equipment | |
33:2.0.1.5.26.5.193.11 | SECTION 157.220
| 157.220 Dedicated clean ballast tanks: Standards. | |
33:2.0.1.5.26.5.193.12 | SECTION 157.222
| 157.222 Pump and piping arrangements. | |
33:2.0.1.5.26.5.193.13 | SECTION 157.224
| 157.224 Dedicated Clean Ballast Tanks Operations Manual. | |
33:2.0.1.5.26.5.194 | SUBJGRP 194
| Dedicated Clean Ballast Tanks Operations | |
33:2.0.1.5.26.5.194.14 | SECTION 157.225
| 157.225 Dedicated clean ballast tanks operations: General. | |
33:2.0.1.5.26.5.194.15 | SECTION 157.226
| 157.226 Dedicated Clean Ballast Tanks Operations Manual: Procedures to be followed. | |
33:2.0.1.5.26.5.194.16 | SECTION 157.228
| 157.228 Isolating Valves: Closed during a voyage. | |
33:2.0.1.5.26.6 | SUBPART F
| Subpart F - Exemption From § 157.10a or § 157.10c | |
33:2.0.1.5.26.6.195.1 | SECTION 157.300
| 157.300 Qualifications for exemptions under this part. | |
33:2.0.1.5.26.6.195.2 | SECTION 157.302
| 157.302 Applying for an exemption or requesting modification of an exemption. | |
33:2.0.1.5.26.6.195.3 | SECTION 157.304
| 157.304 Shore-based reception facility: standards. | |
33:2.0.1.5.26.6.195.4 | SECTION 157.306
| 157.306 Granting, denying, or modifying an exemption. | |
33:2.0.1.5.26.6.195.5 | SECTION 157.308
| 157.308 Revocation of exemption: procedure and appeals. | |
33:2.0.1.5.26.6.195.6 | SECTION 157.310
| 157.310 Exempted vessels: operations. | |
33:2.0.1.5.26.7 | SUBPART G
| Subpart G - Interim Measures for Certain Tank Vessels Without Double Hulls Carrying Petroleum Oils | |
33:2.0.1.5.26.7.195.1 | SECTION 157.400
| 157.400 Purpose and applicability. | |
33:2.0.1.5.26.7.195.2 | SECTION 157.410
| 157.410 Emergency lightering requirements for oil tankers. | |
33:2.0.1.5.26.7.195.3 | SECTION 157.415
| 157.415 Bridge resource management policy and procedures. | |
33:2.0.1.5.26.7.195.4 | SECTION 157.420
| 157.420 Vessel specific watch policy and procedures. | |
33:2.0.1.5.26.7.195.5 | SECTION 157.430
| 157.430 Enhanced survey requirements. | |
33:2.0.1.5.26.7.195.6 | SECTION 157.435
| 157.435 Vital systems surveys. | |
33:2.0.1.5.26.7.195.7 | SECTION 157.440
| 157.440 Autopilot alarm or indicator. | |
33:2.0.1.5.26.7.195.8 | SECTION 157.445
| 157.445 Maneuvering performance capability. | |
33:2.0.1.5.26.7.195.9 | SECTION 157.450
| 157.450 Maneuvering and vessel status information. | |
33:2.0.1.5.26.7.195.10 | SECTION 157.455
| 157.455 Minimum under-keel clearance. | |
33:2.0.1.5.26.7.195.11 | SECTION 157.460
| 157.460 Additional operational requirements for tank barges. | |
33:2.0.1.5.26.8 | SUBPART H
| Subpart H - Interim Measures for Certain Tank Vessels Without Double Hulls Carrying Animal Fat or Vegetable Oil | |
33:2.0.1.5.26.8.195.1 | SECTION 157.500
| 157.500 Purpose and applicability. | |
33:2.0.1.5.26.8.195.2 | SECTION 157.510
| 157.510 Operational measures. | |
33:2.0.1.5.26.9 | SUBPART I
| Subpart I - Interim Measures for Certain Tank Vessels Without Double Hulls Carrying Other Non-Petroleum Oil | |
33:2.0.1.5.26.9.195.1 | SECTION 157.600
| 157.600 Purpose and applicability. | |
33:2.0.1.5.26.9.195.2 | SECTION 157.610
| 157.610 Operational measures. | |
33:2.0.1.5.26.10 | SUBPART 0
| | |
33:2.0.1.5.26.11.195.1.8 | APPENDIX Appendix A
| Appendix A to Part 157 - Damage Assumptions, Hypothetical Outflows, and Cargo Tank Size and Arrangements | |
33:2.0.1.5.26.11.195.1.9 | APPENDIX Appendix B
| Appendix B to Part 157 - Subdivision and Stability Assumptions | |
33:2.0.1.5.26.11.195.1.10 | APPENDIX Appendix C
| Appendix C to Part 157 - Procedure for Determining Distribution of Segregated Ballast Tanks To Provide Protection Against Oil Outflow in the Event of Grounding, Ramming, or Collision | |
33:2.0.1.5.26.11.195.1.11 | APPENDIX Appendix D
| Appendix D to Part 157 - Example of a Procedure for Dedicated Clean Ballast Tanks Operations | |
33:2.0.1.5.26.11.195.1.12 | APPENDIX Appendix E
| Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges | |
33:2.0.1.5.26.11.195.1.13 | APPENDIX Appendix F
| Appendix F to Part 157 [Reserved] | |
33:2.0.1.5.26.11.195.1.14 | APPENDIX Appendix G
| Appendix G to Part 157 - Timetables for Application of Double Hull Requirements | |