Title 33

PART 157 SUBPART B

Subpart B - Design, Equipment, and Installation

33:2.0.1.5.26.2.187.1SECTION 157.08
   157.08 Applicability of subpart B.
33:2.0.1.5.26.2.187.2SECTION 157.09
   157.09 Segregated ballast.
33:2.0.1.5.26.2.187.3SECTION 157.10
   157.10 Segregated ballast tanks and crude oil washing systems for certain new vessels.
33:2.0.1.5.26.2.187.4SECTION 157.10a
   157.10a Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing vessels of 40,000 DWT or more.
33:2.0.1.5.26.2.187.5SECTION 157.10b
   157.10b Segregated ballast tanks, dedicated clean ballast tanks, and special ballast arrangements for tank vessels transporting Outer Continental Shelf oil.
33:2.0.1.5.26.2.187.6SECTION 157.10c
   157.10c Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing tankships of 20,000 to 40,000 DWT.
33:2.0.1.5.26.2.187.7SECTION 157.10d
   157.10d Double hulls on tank vessels.
33:2.0.1.5.26.2.187.8SECTION 157.11
   157.11 Pumping, piping and discharge arrangements.
33:2.0.1.5.26.2.187.9SECTION 157.12
   157.12 Oil discharge monitoring and control system.
33:2.0.1.5.26.2.187.10SECTION 157.12a
   157.12a Definitions.
33:2.0.1.5.26.2.187.11SECTION 157.12b
   157.12b Implementation requirements.
33:2.0.1.5.26.2.187.12SECTION 157.12c
   157.12c Construction, maintenance, security, calibration, and training.
33:2.0.1.5.26.2.187.13SECTION 157.12d
   157.12d Technical specifications.
33:2.0.1.5.26.2.187.14SECTION 157.12e
   157.12e Certificate of approval.
33:2.0.1.5.26.2.187.15SECTION 157.12f
   157.12f Workshop functional test requirements.
33:2.0.1.5.26.2.187.16SECTION 157.12g
   157.12g Plan approval requirements.
33:2.0.1.5.26.2.187.17SECTION 157.13
   157.13 Designated observation area.
33:2.0.1.5.26.2.187.18SECTION 157.14
   157.14 Pump-room bottom protection.
33:2.0.1.5.26.2.187.19SECTION 157.15
   157.15 Slop tanks in tank vessels.
33:2.0.1.5.26.2.187.20SECTION 157.17
   157.17 Oil residue (sludge) tank.
33:2.0.1.5.26.2.187.21SECTION 157.19
   157.19 Cargo tank arrangement and size.
33:2.0.1.5.26.2.187.22SECTION 157.20
   157.20 Accidental oil outflow performance.
33:2.0.1.5.26.2.187.23SECTION 157.21
   157.21 Subdivision and stability.
33:2.0.1.5.26.2.187.24SECTION 157.22
   157.22 Intact stability requirements.
33:2.0.1.5.26.2.187.25SECTION 157.23
   157.23 Cargo and ballast system information.
33:2.0.1.5.26.2.187.26SECTION 157.24
   157.24 Submission of calculations, plans, and specifications.
33:2.0.1.5.26.2.187.27SECTION 157.24a
   157.24a Submission of calculations, plans, and specifications for existing vessels installing segregated ballast tanks.