18:1.0.1.2.9 | PART 4
| PART 4 - LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS | |
18:1.0.1.2.9.1 | SUBPART A
| Subpart A - Determination of Cost of Projects Constructed Under License | |
18:1.0.1.2.9.1.21.1 | SECTION 4.1
| 4.1 Initial cost statement. | |
18:1.0.1.2.9.1.21.2 | SECTION 4.3
| 4.3 Report on project cost. | |
18:1.0.1.2.9.1.21.3 | SECTION 4.4
| 4.4 Service of report. | |
18:1.0.1.2.9.1.21.4 | SECTION 4.5
| 4.5 Time for filing protest. | |
18:1.0.1.2.9.1.21.5 | SECTION 4.6
| 4.6 Burden of proof. | |
18:1.0.1.2.9.1.21.6 | SECTION 4.7
| 4.7 Findings. | |
18:1.0.1.2.9.2 | SUBPART B
| Subpart B - Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act | |
18:1.0.1.2.9.2.21.1 | SECTION 4.10
| 4.10 Valuation data. | |
18:1.0.1.2.9.2.21.2 | SECTION 4.11
| 4.11 Reports. | |
18:1.0.1.2.9.2.21.3 | SECTION 4.12
| 4.12 Service of report. | |
18:1.0.1.2.9.2.21.4 | SECTION 4.13
| 4.13 Time for filing protest. | |
18:1.0.1.2.9.2.21.5 | SECTION 4.14
| 4.14 Hearing upon report. | |
18:1.0.1.2.9.3 | SUBPART C
| Subpart C - Determination of Cost of Constructed Projects not Subject to Section 23(a) of the Act | |
18:1.0.1.2.9.3.21.1 | SECTION 4.20
| 4.20 Initial statement. | |
18:1.0.1.2.9.3.21.2 | SECTION 4.21
| 4.21 Reports. | |
18:1.0.1.2.9.3.21.3 | SECTION 4.22
| 4.22 Service of report. | |
18:1.0.1.2.9.3.21.4 | SECTION 4.23
| 4.23 Time for filing protest. | |
18:1.0.1.2.9.3.21.5 | SECTION 4.24
| 4.24 Determination of cost. | |
18:1.0.1.2.9.3.21.6 | SECTION 4.25
| 4.25 Findings. | |
18:1.0.1.2.9.4 | SUBPART D
| Subpart D - Application for Preliminary Permit, License or Exemption: General Provisions | |
18:1.0.1.2.9.4.21.1 | SECTION 4.30
| 4.30 Applicability and definitions. | |
18:1.0.1.2.9.4.21.2 | SECTION 4.31
| 4.31 Initial or competing application: who may file. | |
18:1.0.1.2.9.4.21.3 | SECTION 4.32
| 4.32 Acceptance for filing or rejection; information to be made available to the public; requests for additional studies. | |
18:1.0.1.2.9.4.21.4 | SECTION 4.33
| 4.33 Limitations on submitting applications. | |
18:1.0.1.2.9.4.21.5 | SECTION 4.34
| 4.34 Hearings on applications; consultation on terms and conditions; motions to intervene; alternative procedures. | |
18:1.0.1.2.9.4.21.6 | SECTION 4.35
| 4.35 Amendment of application; date of acceptance. | |
18:1.0.1.2.9.4.21.7 | SECTION 4.36
| 4.36 Competing applications: deadlines for filing; notices of intent; comparisons of plans of development. | |
18:1.0.1.2.9.4.21.8 | SECTION 4.37
| 4.37 Rules of preference among competing applications. | |
18:1.0.1.2.9.4.21.9 | SECTION 4.38
| 4.38 Consultation requirements. | |
18:1.0.1.2.9.4.21.10 | SECTION 4.39
| 4.39 Specifications for maps and drawings. | |
18:1.0.1.2.9.5 | SUBPART E
| Subpart E - Application for License for Major Unconstructed Project and Major Modified Project | |
18:1.0.1.2.9.5.21.1 | SECTION 4.40
| 4.40 Applicability. | |
18:1.0.1.2.9.5.21.2 | SECTION 4.41
| 4.41 Contents of application. | |
18:1.0.1.2.9.6 | SUBPART F
| Subpart F - Application for License for Major Project - Existing Dam | |
18:1.0.1.2.9.6.21.1 | SECTION 4.50
| 4.50 Applicability. | |
18:1.0.1.2.9.6.21.2 | SECTION 4.51
| 4.51 Contents of application. | |
18:1.0.1.2.9.7 | SUBPART G
| Subpart G - Application for License for Minor Water Power Projects and Major Water Power Projects 5 Megawatts or Less | |
18:1.0.1.2.9.7.21.1 | SECTION 4.60
| 4.60 Applicability and notice to agencies. | |
18:1.0.1.2.9.7.21.2 | SECTION 4.61
| 4.61 Contents of application. | |
18:1.0.1.2.9.8 | SUBPART H
| Subpart H - Application for License for Transmission Line Only | |
18:1.0.1.2.9.8.21.1 | SECTION 4.70
| 4.70 Applicability. | |
18:1.0.1.2.9.8.21.2 | SECTION 4.71
| 4.71 Contents of application. | |
18:1.0.1.2.9.9 | SUBPART I
| Subpart I - Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit | |
18:1.0.1.2.9.9.21.1 | SECTION 4.80
| 4.80 Applicability. | |
18:1.0.1.2.9.9.21.2 | SECTION 4.81
| 4.81 Contents of application. | |
18:1.0.1.2.9.9.21.3 | SECTION 4.82
| 4.82 Amendments. | |
18:1.0.1.2.9.9.21.4 | SECTION 4.83
| 4.83 Cancellation and loss of priority. | |
18:1.0.1.2.9.9.21.5 | SECTION 4.84
| 4.84 Surrender of permit. | |
18:1.0.1.2.9.10 | SUBPART J
| Subpart J - Exemption of Small Conduit Hydroelectric Facilities | |
18:1.0.1.2.9.10.21.1 | SECTION 4.90
| 4.90 Applicability and purpose. | |
18:1.0.1.2.9.10.21.2 | SECTION 4.91
| 4.91 [Reserved] | |
18:1.0.1.2.9.10.21.3 | SECTION 4.92
| 4.92 Contents of exemption application. | |
18:1.0.1.2.9.10.21.4 | SECTION 4.93
| 4.93 Action on exemption applications. | |
18:1.0.1.2.9.10.21.5 | SECTION 4.94
| 4.94 Standard terms and conditions of exemption. | |
18:1.0.1.2.9.10.21.6 | SECTION 4.95
| 4.95 Surrender of exemption. | |
18:1.0.1.2.9.10.21.7 | SECTION 4.96
| 4.96 Amendment of exemption. | |
18:1.0.1.2.9.11 | SUBPART K
| Subpart K - Exemption of Small Hydroelectric Power Projects of 10 Megawatts or Less | |
18:1.0.1.2.9.11.21.1 | SECTION 4.101
| 4.101 Applicability. | |
18:1.0.1.2.9.11.21.2 | SECTION 4.102
| 4.102 Surrender of exemption. | |
18:1.0.1.2.9.11.21.3 | SECTION 4.103
| 4.103 General provisions for case-specific exemption. | |
18:1.0.1.2.9.11.21.4 | SECTION 4.104
| 4.104 Amendment of exemption. | |
18:1.0.1.2.9.11.21.5 | SECTION 4.105
| 4.105 Action on exemption applications. | |
18:1.0.1.2.9.11.21.6 | SECTION 4.106
| 4.106 Standard terms and conditions of case-specific exemption from licensing. | |
18:1.0.1.2.9.11.21.7 | SECTION 4.107
| 4.107 Contents of application for exemption from licensing. | |
18:1.0.1.2.9.11.21.8 | SECTION 4.108
| 4.108 Contents of application for exemption from provisions other than licensing. | |
18:1.0.1.2.9.12 | SUBPART L
| Subpart L - Application for Amendment of License | |
18:1.0.1.2.9.12.21.1 | SECTION 4.200
| 4.200 Applicability. | |
18:1.0.1.2.9.12.21.2 | SECTION 4.201
| 4.201 Contents of application. | |
18:1.0.1.2.9.12.21.3 | SECTION 4.202
| 4.202 Alteration and extension of license. | |
18:1.0.1.2.9.13 | SUBPART M
| Subpart M - Fees Under Section 30(e) of the Act | |
18:1.0.1.2.9.13.21.1 | SECTION 4.300
| 4.300 Purpose, definitions, and applicability. | |
18:1.0.1.2.9.13.21.2 | SECTION 4.301
| 4.301 Notice to fish and wildlife agencies and estimation of fees prior to filing. | |
18:1.0.1.2.9.13.21.3 | SECTION 4.302
| 4.302 Fees at filing. | |
18:1.0.1.2.9.13.21.4 | SECTION 4.303
| 4.303 Post-filing procedures. | |
18:1.0.1.2.9.13.21.5 | SECTION 4.304
| 4.304 Payment. | |
18:1.0.1.2.9.13.21.6 | SECTION 4.305
| 4.305 Enforcement. | |
18:1.0.1.2.9.14 | SUBPART N
| Subpart N - Notice of Intent To Construct Qualifying Conduit Hydropower Facilities | |
18:1.0.1.2.9.14.21.1 | SECTION 4.400
| 4.400 Applicability and purpose. | |
18:1.0.1.2.9.14.21.2 | SECTION 4.401
| 4.401 Contents of notice of intent to construct a qualifying conduit hydropower facility. | |
18:1.0.1.2.10 | PART 5
| PART 5 - INTEGRATED LICENSE APPLICATION PROCESS | |
18:1.0.1.2.10.0.21.1 | SECTION 5.1
| 5.1 Applicability, definitions, and requirement to consult. | |
18:1.0.1.2.10.0.21.2 | SECTION 5.2
| 5.2 Document availability. | |
18:1.0.1.2.10.0.21.3 | SECTION 5.3
| 5.3 Process selection. | |
18:1.0.1.2.10.0.21.4 | SECTION 5.4
| 5.4 Acceleration of a license expiration date. | |
18:1.0.1.2.10.0.21.5 | SECTION 5.5
| 5.5 Notification of intent. | |
18:1.0.1.2.10.0.21.6 | SECTION 5.6
| 5.6 Pre-application document. | |
18:1.0.1.2.10.0.21.7 | SECTION 5.7
| 5.7 Tribal consultation. | |
18:1.0.1.2.10.0.21.8 | SECTION 5.8
| 5.8 Notice of commencement of proceeding and scoping document, or of approval to use traditional licensing process or alternative procedures. | |
18:1.0.1.2.10.0.21.9 | SECTION 5.9
| 5.9 Comments and information or study requests. | |
18:1.0.1.2.10.0.21.10 | SECTION 5.10
| 5.10 Scoping Document 2. | |
18:1.0.1.2.10.0.21.11 | SECTION 5.11
| 5.11 Potential Applicant's proposed study plan and study plan meetings. | |
18:1.0.1.2.10.0.21.12 | SECTION 5.12
| 5.12 Comments on proposed study plan. | |
18:1.0.1.2.10.0.21.13 | SECTION 5.13
| 5.13 Revised study plan and study plan determination. | |
18:1.0.1.2.10.0.21.14 | SECTION 5.14
| 5.14 Formal study dispute resolution process. | |
18:1.0.1.2.10.0.21.15 | SECTION 5.15
| 5.15 Conduct of studies. | |
18:1.0.1.2.10.0.21.16 | SECTION 5.16
| 5.16 Preliminary licensing proposal. | |
18:1.0.1.2.10.0.21.17 | SECTION 5.17
| 5.17 Filing of application. | |
18:1.0.1.2.10.0.21.18 | SECTION 5.18
| 5.18 Application content. | |
18:1.0.1.2.10.0.21.19 | SECTION 5.19
| 5.19 Tendering notice and schedule. | |
18:1.0.1.2.10.0.21.20 | SECTION 5.20
| 5.20 Deficient applications. | |
18:1.0.1.2.10.0.21.21 | SECTION 5.21
| 5.21 Additional information. | |
18:1.0.1.2.10.0.21.22 | SECTION 5.22
| 5.22 Notice of acceptance and ready for environmental analysis. | |
18:1.0.1.2.10.0.21.23 | SECTION 5.23
| 5.23 Response to notice. | |
18:1.0.1.2.10.0.21.24 | SECTION 5.24
| 5.24 Applications not requiring a draft NEPA document. | |
18:1.0.1.2.10.0.21.25 | SECTION 5.25
| 5.25 Applications requiring a draft NEPA document. | |
18:1.0.1.2.10.0.21.26 | SECTION 5.26
| 5.26 Section 10(j) process. | |
18:1.0.1.2.10.0.21.27 | SECTION 5.27
| 5.27 Amendment of application. | |
18:1.0.1.2.10.0.21.28 | SECTION 5.28
| 5.28 Competing applications. | |
18:1.0.1.2.10.0.21.29 | SECTION 5.29
| 5.29 Other provisions. | |
18:1.0.1.2.10.0.21.30 | SECTION 5.30
| 5.30 Critical energy infrastructure information. | |
18:1.0.1.2.10.0.21.31 | SECTION 5.31
| 5.31 Transition provision. | |
18:1.0.1.2.11 | PART 6
| PART 6 - SURRENDER OR TERMINATION OF LICENSE | |
18:1.0.1.2.11.0.21.1 | SECTION 6.1
| 6.1 Application for surrender. | |
18:1.0.1.2.11.0.21.2 | SECTION 6.2
| 6.2 Surrender of license. | |
18:1.0.1.2.11.0.21.3 | SECTION 6.3
| 6.3 Termination of license. | |
18:1.0.1.2.11.0.21.4 | SECTION 6.4
| 6.4 Termination by implied surrender. | |
18:1.0.1.2.11.0.21.5 | SECTION 6.5
| 6.5 Annual charges. | |
18:1.0.1.2.12 | PART 7
| PART 7 - EXPEDITED LICENSING PROCESS FOR QUALIFYING NON-FEDERAL HYDROPOWER PROJECTS AT EXISTING NONPOWERED DAMS AND FOR CLOSED-LOOP PUMPED STORAGE PROJECTS | |
18:1.0.1.2.12.0.21.1 | SECTION 7.1
| 7.1 Applicability and definitions. | |
18:1.0.1.2.12.0.21.2 | SECTION 7.2
| 7.2 Use of expedited licensing process. | |
18:1.0.1.2.12.0.21.3 | SECTION 7.3
| 7.3 Adequacy review of application. | |
18:1.0.1.2.12.0.21.4 | SECTION 7.4
| 7.4 Additional information. | |
18:1.0.1.2.12.0.21.5 | SECTION 7.5
| 7.5 Decision on request to use expedited licensing process. | |
18:1.0.1.2.12.0.21.6 | SECTION 7.6
| 7.6 Notice of acceptance and ready for environmental analysis. | |
18:1.0.1.2.12.0.21.7 | SECTION 7.7
| 7.7 Amendment of application. | |
18:1.0.1.2.12.0.21.8 | SECTION 7.8
| 7.8 Other provisions. | |
18:1.0.1.2.12.0.21.9 | SECTION 7.9
| 7.9 Transition provision. | |
18:1.0.1.2.13 | PART 8
| PART 8 - RECREATIONAL OPPORTUNITIES AND DEVELOPMENT AT LICENSED PROJECTS | |
18:1.0.1.2.13.0.21.1 | SECTION 8.1
| 8.1 Publication of license conditions relating to recreation. | |
18:1.0.1.2.13.0.21.2 | SECTION 8.2
| 8.2 Posting of project lands as to recreational use and availability of information. | |
18:1.0.1.2.13.0.21.3 | SECTION 8.3
| 8.3 Discrimination prohibited. | |
18:1.0.1.2.14 | PART 9
| PART 9 - TRANSFER OF LICENSE OR LEASE OF PROJECT PROPERTY | |
18:1.0.1.2.14.0.21 | SUBJGRP 21
| Application for Transfer of License | |
18:1.0.1.2.14.0.21.1 | SECTION 9.1
| 9.1 Filing. | |
18:1.0.1.2.14.0.21.2 | SECTION 9.2
| 9.2 Contents of application. | |
18:1.0.1.2.14.0.21.3 | SECTION 9.3
| 9.3 Transfer. | |
18:1.0.1.2.14.0.22 | SUBJGRP 22
| Application for Lease of Project Property | |
18:1.0.1.2.14.0.22.4 | SECTION 9.10
| 9.10 Filing. | |
18:1.0.1.2.15 | PART 11
| PART 11 - ANNUAL CHARGES UNDER PART I OF THE FEDERAL POWER ACT | |
18:1.0.1.2.15.1 | SUBPART A
| Subpart A - Charges for Costs of Administration, Use of Tribal Lands and Other Government Lands, and Use of Government Dams | |
18:1.0.1.2.15.1.23.1 | SECTION 11.1
| 11.1 Costs of administration. | |
18:1.0.1.2.15.1.23.2 | SECTION 11.2
| 11.2 Use of government lands. | |
18:1.0.1.2.15.1.23.3 | SECTION 11.3
| 11.3 Use of government dams, excluding pumped storage projects. | |
18:1.0.1.2.15.1.23.4 | SECTION 11.4
| 11.4 Use of government dams for pumped storage projects, and use of tribal lands. | |
18:1.0.1.2.15.1.23.5 | SECTION 11.5
| 11.5 Exemption of minor projects. | |
18:1.0.1.2.15.1.23.6 | SECTION 11.6
| 11.6 Exemption of State and municipal licensees and exemptees. | |
18:1.0.1.2.15.1.23.7 | SECTION 11.7
| 11.7 Effective date. | |
18:1.0.1.2.15.1.23.8 | SECTION 11.8
| 11.8 Adjustment of annual charges. | |
18:1.0.1.2.15.2 | SUBPART B
| Subpart B - Charges for Headwater Benefits | |
18:1.0.1.2.15.2.23.1 | SECTION 11.10
| 11.10 General provision; waiver and exemptions; definitions. | |
18:1.0.1.2.15.2.23.2 | SECTION 11.11
| 11.11 Energy gains method of determining headwater benefits charges. | |
18:1.0.1.2.15.2.23.3 | SECTION 11.12
| 11.12 Determination of section 10(f) costs. | |
18:1.0.1.2.15.2.23.4 | SECTION 11.13
| 11.13 Energy gains calculations. | |
18:1.0.1.2.15.2.23.5 | SECTION 11.14
| 11.14 Procedures for establishing charges without an energy gains investigation. | |
18:1.0.1.2.15.2.23.6 | SECTION 11.15
| 11.15 Procedures for determining charges by energy gains investigation. | |
18:1.0.1.2.15.2.23.7 | SECTION 11.16
| 11.16 Filing requirements. | |
18:1.0.1.2.15.2.23.8 | SECTION 11.17
| 11.17 Procedures for payment of charges and costs. | |
18:1.0.1.2.15.3 | SUBPART C
| Subpart C - General Procedures | |
18:1.0.1.2.15.3.23.1 | SECTION 11.20
| 11.20 Time for payment. | |
18:1.0.1.2.15.3.23.2 | SECTION 11.21
| 11.21 Penalties. | |
18:1.0.1.2.15.3.23.3.4 | APPENDIX Appendix A
| Appendix A to Part 11 - Fee Schedule for FY 2021 | |
18:1.0.1.2.16 | PART 12
| PART 12 - SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS | |
18:1.0.1.2.16.1 | SUBPART A
| Subpart A - General Provisions | |
18:1.0.1.2.16.1.23.1 | SECTION 12.1
| 12.1 Applicability. | |
18:1.0.1.2.16.1.23.2 | SECTION 12.2
| 12.2 Rules of construction. | |
18:1.0.1.2.16.1.23.3 | SECTION 12.3
| 12.3 Definitions. | |
18:1.0.1.2.16.1.23.4 | SECTION 12.4
| 12.4 Staff administrative responsibility and supervisory authority. | |
18:1.0.1.2.16.1.23.5 | SECTION 12.5
| 12.5 Responsibilities of licensee or applicant. | |
18:1.0.1.2.16.2 | SUBPART B
| Subpart B - Reports and Records | |
18:1.0.1.2.16.2.23.1 | SECTION 12.10
| 12.10 Reporting safety-related incidents. | |
18:1.0.1.2.16.2.23.2 | SECTION 12.11
| 12.11 Reporting modifications of the project or project works. | |
18:1.0.1.2.16.2.23.3 | SECTION 12.12
| 12.12 Maintenance of records. | |
18:1.0.1.2.16.2.23.4 | SECTION 12.13
| 12.13 Verification form. | |
18:1.0.1.2.16.3 | SUBPART C
| Subpart C - Emergency Action Plans | |
18:1.0.1.2.16.3.23.1 | SECTION 12.20
| 12.20 General requirements. | |
18:1.0.1.2.16.3.23.2 | SECTION 12.21
| 12.21 Exemptions. | |
18:1.0.1.2.16.3.23.3 | SECTION 12.22
| 12.22 Contents of emergency action plan. | |
18:1.0.1.2.16.3.23.4 | SECTION 12.23
| 12.23 Time for filing emergency action plan. | |
18:1.0.1.2.16.3.23.5 | SECTION 12.24
| 12.24 Review and updating of plans. | |
18:1.0.1.2.16.3.23.6 | SECTION 12.25
| 12.25 Posting and readiness. | |
18:1.0.1.2.16.4 | SUBPART D
| Subpart D - Inspection by Independent Consultant | |
18:1.0.1.2.16.4.23.1 | SECTION 12.30
| 12.30 Applicability. | |
18:1.0.1.2.16.4.23.2 | SECTION 12.31
| 12.31 Definitions. | |
18:1.0.1.2.16.4.23.3 | SECTION 12.32
| 12.32 General inspection requirement. | |
18:1.0.1.2.16.4.23.4 | SECTION 12.33
| 12.33 Exemption. | |
18:1.0.1.2.16.4.23.5 | SECTION 12.34
| 12.34 Approval of independent consultant. | |
18:1.0.1.2.16.4.23.6 | SECTION 12.35
| 12.35 Specific inspection requirements. | |
18:1.0.1.2.16.4.23.7 | SECTION 12.36
| 12.36 Emergency corrective measures. | |
18:1.0.1.2.16.4.23.8 | SECTION 12.37
| 12.37 Report of the independent consultant. | |
18:1.0.1.2.16.4.23.9 | SECTION 12.38
| 12.38 Time for inspections and reports. | |
18:1.0.1.2.16.4.23.10 | SECTION 12.39
| 12.39 Taking corrective measures after the report. | |
18:1.0.1.2.16.5 | SUBPART E
| Subpart E - Other Responsibilities of Applicant or Licensee | |
18:1.0.1.2.16.5.23.1 | SECTION 12.40
| 12.40 Quality control programs. | |
18:1.0.1.2.16.5.23.2 | SECTION 12.41
| 12.41 Monitoring instruments. | |
18:1.0.1.2.16.5.23.3 | SECTION 12.42
| 12.42 Warning and safety devices. | |
18:1.0.1.2.16.5.23.4 | SECTION 12.43
| 12.43 Power and communication lines and gas pipelines. | |
18:1.0.1.2.16.5.23.5 | SECTION 12.44
| 12.44 Testing spillway gates. | |
18:1.0.1.2.17 | PART 16
| PART 16 - PROCEDURES RELATING TO TAKEOVER AND RELICENSING OF LICENSED PROJECTS | |
18:1.0.1.2.17.1 | SUBPART A
| Subpart A - General Provisions | |
18:1.0.1.2.17.1.23.1 | SECTION 16.1
| 16.1 Applicability. | |
18:1.0.1.2.17.1.23.2 | SECTION 16.2
| 16.2 Definitions. | |
18:1.0.1.2.17.1.23.3 | SECTION 16.3
| 16.3 Public notice of projects under expiring licenses. | |
18:1.0.1.2.17.1.23.4 | SECTION 16.4
| 16.4 Acceleration of a license expiration date. | |
18:1.0.1.2.17.1.23.5 | SECTION 16.5
| 16.5 Site access for a competing applicant. | |
18:1.0.1.2.17.2 | SUBPART B
| Subpart B - Applications for Projects Subject to Sections 14 and 15 of the Federal Power Act | |
18:1.0.1.2.17.2.23.1 | SECTION 16.6
| 16.6 Notification procedures under section 15 of the Federal Power Act. | |
18:1.0.1.2.17.2.23.2 | SECTION 16.7
| 16.7 Information to be made available to the public at the time of notification of intent under section 15(b) of the Federal Power Act. | |
18:1.0.1.2.17.2.23.3 | SECTION 16.8
| 16.8 Consultation requirements. | |
18:1.0.1.2.17.2.23.4 | SECTION 16.9
| 16.9 Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of the Federal Power Act. | |
18:1.0.1.2.17.2.23.5 | SECTION 16.10
| 16.10 Information to be provided by an applicant for new license: Filing requirements. | |
18:1.0.1.2.17.2.23.6 | SECTION 16.11
| 16.11 Nonpower licenses. | |
18:1.0.1.2.17.2.23.7 | SECTION 16.12
| 16.12 Application for exemption from licensing by a licensee whose license is subject to sections 14 and 15 of the Federal Power Act. | |
18:1.0.1.2.17.2.23.8 | SECTION 16.13
| 16.13 Standards and factors for issuing a new license. | |
18:1.0.1.2.17.3 | SUBPART C
| Subpart C - Takeover Provisions for Projects Subject to Sections 14 and 15 of the Federal Power Act | |
18:1.0.1.2.17.3.23.1 | SECTION 16.14
| 16.14 Departmental recommendation for takeover. | |
18:1.0.1.2.17.3.23.2 | SECTION 16.15
| 16.15 Commission recommendation to Congress. | |
18:1.0.1.2.17.3.23.3 | SECTION 16.16
| 16.16 Motion for stay by Federal department or agency. | |
18:1.0.1.2.17.3.23.4 | SECTION 16.17
| 16.17 Procedures upon Congressional authorization of takeover. | |
18:1.0.1.2.17.4 | SUBPART D
| Subpart D - Annual Licenses for Projects Subject to Sections 14 and 15 of the Federal Power Act | |
18:1.0.1.2.17.4.23.1 | SECTION 16.18
| 16.18 Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. | |
18:1.0.1.2.17.5 | SUBPART E
| Subpart E - Projects With Minor and Minor Part Licenses Not Subject to Sections 14 and 15 of the Federal Power Act | |
18:1.0.1.2.17.5.23.1 | SECTION 16.19
| 16.19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. | |
18:1.0.1.2.17.5.23.2 | SECTION 16.20
| 16.20 Applications for subsequent license for a project with an expiring license not subject to sections 14 and 15 of the Federal Power Act. | |
18:1.0.1.2.17.5.23.3 | SECTION 16.21
| 16.21 Operation of projects with a minor or minor part license not subject to sections 14 and 15 of the Federal Power Act after expiration of a license. | |
18:1.0.1.2.17.5.23.4 | SECTION 16.22
| 16.22 Application for an exemption by a licensee with a minor or minor part license for a project not subject to sections 14 and 15 of the Federal Power Act. | |
18:1.0.1.2.17.6 | SUBPART F
| Subpart F - Procedural Matters | |
18:1.0.1.2.17.6.23.1 | SECTION 16.23
| 16.23 Failure to file timely notices of intent. | |
18:1.0.1.2.17.6.23.2 | SECTION 16.24
| 16.24 Prohibitions against filing applications for new license, nonpower license, exemption, or subsequent license. | |
18:1.0.1.2.17.6.23.3 | SECTION 16.25
| 16.25 Disposition of a project for which no timely application is filed following a notice of intent to file. | |
18:1.0.1.2.17.6.23.4 | SECTION 16.26
| 16.26 Disposition of a project for which no timely application is filed following a notice of intent not to file. | |
18:1.0.1.2.18 | PART 20
| PART 20 - AUTHORIZATION OF THE ISSUANCE OF SECURITIES BY LICENSEES AND COMPANIES SUBJECT TO SECTIONS 19 AND 20 OF THE FEDERAL POWER ACT | |
18:1.0.1.2.18.0.23.1 | SECTION 20.1
| 20.1 Applicability. | |
18:1.0.1.2.18.0.23.2 | SECTION 20.2
| 20.2 Regulation of issuance of securities. | |
18:1.0.1.2.19 | PART 24
| PART 24 - DECLARATION OF INTENTION | |
18:1.0.1.2.19.0.23.1 | SECTION 24.1
| 24.1 Filing. | |
18:1.0.1.2.20 | PART 25
| PART 25 - APPLICATION FOR VACATION OF WITHDRAWAL AND FOR DETERMINATION PERMITTING RESTORATION TO ENTRY | |
18:1.0.1.2.20.0.23.1 | SECTION 25.1
| 25.1 Contents of application. | |
18:1.0.1.2.20.0.23.2 | SECTION 25.2
| 25.2 Hearings. | |
18:1.0.1.2.21 | PART 32
| PART 32 - INTERCONNECTION OF FACILITIES | |
18:1.0.1.2.21.0.23 | SUBJGRP 23
| Application for an Order Directing the Establishment of Physical Connection of Facilities | |
18:1.0.1.2.21.0.23.1 | SECTION 32.1
| 32.1 Contents of the application. | |
18:1.0.1.2.21.0.23.2 | SECTION 32.2
| 32.2 Required exhibits. | |
18:1.0.1.2.21.0.23.3 | SECTION 32.3
| 32.3 Other information. | |
18:1.0.1.2.21.0.23.4 | SECTION 32.4
| 32.4 Filing procedure. | |
18:1.0.1.2.22 | PART 33
| PART 33 - APPLICATIONS UNDER FEDERAL POWER ACT SECTION 203 | |
18:1.0.1.2.22.0.24.1 | SECTION 33.1
| 33.1 Applicability, definitions, and blanket authorizations. | |
18:1.0.1.2.22.0.24.2 | SECTION 33.2
| 33.2 Contents of application - general information requirements. | |
18:1.0.1.2.22.0.24.3 | SECTION 33.3
| 33.3 Additional information requirements for applications involving horizontal competitive impacts. | |
18:1.0.1.2.22.0.24.4 | SECTION 33.4
| 33.4 Additional information requirements for applications involving vertical competitive impacts. | |
18:1.0.1.2.22.0.24.5 | SECTION 33.5
| 33.5 Proposed accounting entries. | |
18:1.0.1.2.22.0.24.6 | SECTION 33.7
| 33.7 Verification. | |
18:1.0.1.2.22.0.24.7 | SECTION 33.8
| 33.8 Requirements for filing applications. | |
18:1.0.1.2.22.0.24.8 | SECTION 33.9
| 33.9 [Reserved] | |
18:1.0.1.2.22.0.24.9 | SECTION 33.10
| 33.10 Additional information. | |
18:1.0.1.2.22.0.24.10 | SECTION 33.11
| 33.11 Commission procedures for the consideration of applications under section 203 of the FPA. | |
18:1.0.1.2.22.0.24.11 | SECTION 33.12
| 33.12 Notification requirement for certain transactions. | |
18:1.0.1.2.23 | PART 34
| PART 34 - APPLICATION FOR AUTHORIZATION OF THE ISSUANCE OF SECURITIES OR THE ASSUMPTION OF LIABILITIES | |
18:1.0.1.2.23.0.24.1 | SECTION 34.1
| 34.1 Applicability; definitions; exemptions in case of certain State regulation, certain short-term issuances and certain qualifying facilities. | |
18:1.0.1.2.23.0.24.2 | SECTION 34.2
| 34.2 Placement of securities. | |
18:1.0.1.2.23.0.24.3 | SECTION 34.3
| 34.3 Contents of application for issuance of securities. | |
18:1.0.1.2.23.0.24.4 | SECTION 34.4
| 34.4 Required exhibits. | |
18:1.0.1.2.23.0.24.5 | SECTION 34.5
| 34.5 Additional information. | |
18:1.0.1.2.23.0.24.6 | SECTION 34.6
| 34.6 Form and style. | |
18:1.0.1.2.23.0.24.7 | SECTION 34.7
| 34.7 Filing requirements. | |
18:1.0.1.2.23.0.24.8 | SECTION 34.8
| 34.8 Verification. | |
18:1.0.1.2.23.0.24.10 | SECTION 34.9
| 34.9 Reports. | |
18:1.0.1.2.24 | PART 35
| PART 35 - FILING OF RATE SCHEDULES AND TARIFFS | |
18:1.0.1.2.24.1 | SUBPART A
| Subpart A - Application | |
18:1.0.1.2.24.1.24.1 | SECTION 35.1
| 35.1 Application; obligation to file rate schedules, tariffs and certain service agreements. | |
18:1.0.1.2.24.1.24.2 | SECTION 35.2
| 35.2 Definitions. | |
18:1.0.1.2.24.1.24.3 | SECTION 35.3
| 35.3 Notice requirements. | |
18:1.0.1.2.24.1.24.4 | SECTION 35.4
| 35.4 Permission to become effective is not approval. | |
18:1.0.1.2.24.1.24.5 | SECTION 35.5
| 35.5 Rejection of material submitted for filing. | |
18:1.0.1.2.24.1.24.6 | SECTION 35.6
| 35.6 Submission for staff suggestions. | |
18:1.0.1.2.24.1.24.7 | SECTION 35.7
| 35.7 Electronic filing of tariffs and related materials. | |
18:1.0.1.2.24.1.24.8 | SECTION 35.8
| 35.8 Protests and interventions by interested parties. | |
18:1.0.1.2.24.1.24.9 | SECTION 35.9
| 35.9 Requirements for filing rate schedules, tariffs or service agreements. | |
18:1.0.1.2.24.1.24.10 | SECTION 35.10
| 35.10 Form and style of rate schedules, tariffs and service agreements. | |
18:1.0.1.2.24.1.24.11 | SECTION 35.10a
| 35.10a Forms of service agreements. | |
18:1.0.1.2.24.1.24.12 | SECTION 35.10b
| 35.10b Electric Quarterly Reports. | |
18:1.0.1.2.24.1.24.13 | SECTION 35.11
| 35.11 Waiver of notice requirement. | |
18:1.0.1.2.24.2 | SUBPART B
| Subpart B - Documents To Be Submitted With a Filing | |
18:1.0.1.2.24.2.24.1 | SECTION 35.12
| 35.12 Filing of initial rate schedules and tariffs. | |
18:1.0.1.2.24.2.24.2 | SECTION 35.13
| 35.13 Filing of changes in rate schedules, tariffs or service agreements. | |
18:1.0.1.2.24.3 | SUBPART C
| Subpart C - Other Filing Requirements | |
18:1.0.1.2.24.3.24.1 | SECTION 35.14
| 35.14 Fuel cost and purchased economic power adjustment clauses. | |
18:1.0.1.2.24.3.24.2 | SECTION 35.15
| 35.15 Notices of cancellation or termination. | |
18:1.0.1.2.24.3.24.3 | SECTION 35.16
| 35.16 Notice of succession. | |
18:1.0.1.2.24.3.24.4 | SECTION 35.17
| 35.17 Withdrawals and amendments of rate schedule, tariff or service agreement filings. | |
18:1.0.1.2.24.3.24.5 | SECTION 35.18
| 35.18 Asset retirement obligations. | |
18:1.0.1.2.24.3.24.6 | SECTION 35.19
| 35.19 Submission of information by reference. | |
18:1.0.1.2.24.3.24.7 | SECTION 35.19a
| 35.19a Refund requirements under suspension orders. | |
18:1.0.1.2.24.3.24.8 | SECTION 35.21
| 35.21 Applicability to licensees and others subject to section 19 or 20 of the Federal Power Act. | |
18:1.0.1.2.24.3.24.9 | SECTION 35.22
| 35.22 Limits for percentage adders in rates for transmission services; revision of rate schedules, tariffs or service agreements. | |
18:1.0.1.2.24.3.24.10 | SECTION 35.23
| 35.23 General provisions. | |
18:1.0.1.2.24.3.24.11 | SECTION 35.24
| 35.24 Tax normalization for public utilities. | |
18:1.0.1.2.24.3.24.12 | SECTION 35.25
| 35.25 Construction work in progress. | |
18:1.0.1.2.24.3.24.13 | SECTION 35.26
| 35.26 Recovery of stranded costs by public utilities and transmitting utilities. | |
18:1.0.1.2.24.3.24.14 | SECTION 35.27
| 35.27 Authority of State commissions. | |
18:1.0.1.2.24.3.24.15 | SECTION 35.28
| 35.28 Non-discriminatory open access transmission tariff. | |
18:1.0.1.2.24.3.24.16 | SECTION 35.29
| 35.29 Treatment of special assessments levied under the Atomic Energy Act of 1954, as amended by Title XI of the Energy Policy Act of 1992. | |
18:1.0.1.2.24.4 | SUBPART D
| Subpart D - Procedures and Requirements for Public Utility Sales of Power to Bonneville Power Administration Under Northwest Power Act | |
18:1.0.1.2.24.4.24.1 | SECTION 35.30
| 35.30 General provisions. | |
18:1.0.1.2.24.4.24.2 | SECTION 35.31
| 35.31 Commission review. | |
18:1.0.1.2.24.5 | SUBPART E
| Subpart E - Regulations Governing Nuclear Plant Decommissioning Trust Funds | |
18:1.0.1.2.24.5.24.1 | SECTION 35.32
| 35.32 General provisions. | |
18:1.0.1.2.24.5.24.2 | SECTION 35.33
| 35.33 Specific provisions. | |
18:1.0.1.2.24.6 | SUBPART F
| Subpart F - Procedures and Requirements Regarding Regional Transmission Organizations | |
18:1.0.1.2.24.6.24.1 | SECTION 35.34
| 35.34 Regional Transmission Organizations. | |
18:1.0.1.2.24.7 | SUBPART G
| Subpart G - Transmission Infrastructure Investment Provisions | |
18:1.0.1.2.24.7.24.1 | SECTION 35.35
| 35.35 Transmission infrastructure investment. | |
18:1.0.1.2.24.8 | SUBPART H
| Subpart H - Wholesale Sales of Electric Energy, Capacity and Ancillary Services at Market-Based Rates | |
18:1.0.1.2.24.8.24.1 | SECTION 35.36
| 35.36 Generally. | |
18:1.0.1.2.24.8.24.2 | SECTION 35.37
| 35.37 Market power analysis required. | |
18:1.0.1.2.24.8.24.3 | SECTION 35.38
| 35.38 Mitigation. | |
18:1.0.1.2.24.8.24.4 | SECTION 35.39
| 35.39 Affiliate restrictions. | |
18:1.0.1.2.24.8.24.5 | SECTION 35.40
| 35.40 Ancillary services. | |
18:1.0.1.2.24.8.24.6 | SECTION 35.41
| 35.41 Market behavior rules. | |
18:1.0.1.2.24.8.24.7 | SECTION 35.42
| 35.42 Change in status reporting requirement. | |
18:1.0.1.2.24.9 | SUBPART I
| Subpart I - Cross-Subsidization Restrictions on Affiliate Transactions | |
18:1.0.1.2.24.9.24.1 | SECTION 35.43
| 35.43 Generally. | |
18:1.0.1.2.24.9.24.2 | SECTION 35.44
| 35.44 Protections against affiliate cross-subsidization. | |
18:1.0.1.2.24.10 | SUBPART J
| Subpart J - Credit Practices In Organized Wholesale Electric Markets | |
18:1.0.1.2.24.10.24.1 | SECTION 35.45
| 35.45 Applicability. | |
18:1.0.1.2.24.10.24.2 | SECTION 35.46
| 35.46 Definitions. | |
18:1.0.1.2.24.10.24.3 | SECTION 35.47
| 35.47 Tariff provisions regarding credit practices in organized wholesale electric markets. | |
18:1.0.1.2.25 | PART 36
| PART 36 - RULES CONCERNING APPLICATIONS FOR TRANSMISSION SERVICES UNDER SECTION 211 OF THE FEDERAL POWER ACT | |
18:1.0.1.2.25.0.24.1 | SECTION 36.1
| 36.1 Notice provisions applicable to applications for transmission services under section 211 of the Federal Power Act. | |
18:1.0.1.2.26 | PART 37
| PART 37 - OPEN ACCESS SAME-TIME INFORMATION SYSTEMS | |
18:1.0.1.2.26.0.24.1 | SECTION 37.1
| 37.1 Applicability. | |
18:1.0.1.2.26.0.24.2 | SECTION 37.2
| 37.2 Purpose. | |
18:1.0.1.2.26.0.24.3 | SECTION 37.3
| 37.3 Definitions. | |
18:1.0.1.2.26.0.24.4 | SECTION 37.4
| 37.4 [Reserved] | |
18:1.0.1.2.26.0.24.5 | SECTION 37.5
| 37.5 Obligations of Transmission Providers and Responsible Parties. | |
18:1.0.1.2.26.0.24.6 | SECTION 37.6
| 37.6 Information to be posted on the OASIS. | |
18:1.0.1.2.26.0.24.7 | SECTION 37.7
| 37.7 Auditing Transmission Service Information. | |
18:1.0.1.2.26.0.24.8 | SECTION 37.8
| 37.8 Obligations of OASIS users. | |
18:1.0.1.2.27 | PART 38
| PART 38 - STANDARDS FOR PUBLIC UTILITY BUSINESS OPERATIONS AND COMMUNICATIONS | |
18:1.0.1.2.27.0.24.1 | SECTION 38.1
| 38.1 Incorporation by reference of North American Energy Standards Board Wholesale Electric Quadrant standards. | |
18:1.0.1.2.27.0.24.2 | SECTION 38.2
| 38.2 Communication and information sharing among public utilities and pipelines. | |
18:1.0.1.2.28 | PART 39
| PART 39 - RULES CONCERNING CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS | |
18:1.0.1.2.28.0.24.1 | SECTION 39.1
| 39.1 Definitions. | |
18:1.0.1.2.28.0.24.2 | SECTION 39.2
| 39.2 Jurisdiction and applicability. | |
18:1.0.1.2.28.0.24.3 | SECTION 39.3
| 39.3 Electric Reliability Organization certification. | |
18:1.0.1.2.28.0.24.4 | SECTION 39.4
| 39.4 Funding of the Electric Reliability Organization. | |
18:1.0.1.2.28.0.24.5 | SECTION 39.5
| 39.5 Reliability Standards. | |
18:1.0.1.2.28.0.24.6 | SECTION 39.6
| 39.6 Conflict of a Reliability Standard with a Commission Order. | |
18:1.0.1.2.28.0.24.7 | SECTION 39.7
| 39.7 Enforcement of Reliability Standards. | |
18:1.0.1.2.28.0.24.8 | SECTION 39.8
| 39.8 Delegation to a Regional Entity. | |
18:1.0.1.2.28.0.24.9 | SECTION 39.9
| 39.9 Enforcement of Commission Rules and Orders. | |
18:1.0.1.2.28.0.24.10 | SECTION 39.10
| 39.10 Changes to an Electric Reliability Organization Rule or Regional Entity Rule. | |
18:1.0.1.2.28.0.24.11 | SECTION 39.11
| 39.11 Reliability reports. | |
18:1.0.1.2.28.0.24.12 | SECTION 39.12
| 39.12 Review of state action. | |
18:1.0.1.2.28.0.24.13 | SECTION 39.13
| 39.13 Regional Advisory Bodies. | |
18:1.0.1.2.29 | PART 40
| PART 40 - MANDATORY RELIABILITY STANDARDS FOR THE BULK-POWER SYSTEM | |
18:1.0.1.2.29.0.24.1 | SECTION 40.1
| 40.1 Applicability. | |
18:1.0.1.2.29.0.24.2 | SECTION 40.2
| 40.2 Mandatory Reliability Standards. | |
18:1.0.1.2.29.0.24.3 | SECTION 40.3
| 40.3 Availability of Reliability Standards. | |
18:1.0.1.2.30 | PART 41
| PART 41 - ACCOUNTS, RECORDS, MEMORANDA AND DISPOSITION OF CONTESTED AUDIT FINDINGS AND PROPOSED REMEDIES | |
18:1.0.1.2.30.0.24 | SUBJGRP 24
| Disposition of Contested Audit Findings and Proposed Remedies | |
18:1.0.1.2.30.0.24.1 | SECTION 41.1
| 41.1 Notice to audited person. | |
18:1.0.1.2.30.0.24.2 | SECTION 41.2
| 41.2 Response to notification. | |
18:1.0.1.2.30.0.24.3 | SECTION 41.3
| 41.3 Shortened procedure. | |
18:1.0.1.2.30.0.24.4 | SECTION 41.4
| 41.4 Form and style. | |
18:1.0.1.2.30.0.24.5 | SECTION 41.5
| 41.5 Verification. | |
18:1.0.1.2.30.0.24.6 | SECTION 41.6
| 41.6 Determination. | |
18:1.0.1.2.30.0.24.7 | SECTION 41.7
| 41.7 Assignment for oral hearing. | |
18:1.0.1.2.30.0.24.8 | SECTION 41.8
| 41.8 Burden of proof. | |
18:1.0.1.2.30.0.25 | SUBJGRP 25
| Certification of Compliance With Accounting Regulations | |
18:1.0.1.2.30.0.25.9 | SECTION 41.10
| 41.10 Examination of accounts. | |
18:1.0.1.2.30.0.25.10 | SECTION 41.11
| 41.11 Report of certification. | |
18:1.0.1.2.30.0.25.11 | SECTION 41.12
| 41.12 Qualifications of accountants. | |
18:1.0.1.2.31 | PART 42
| PART 42 - LONG-TERM FIRM TRANSMISSION RIGHTS IN ORGANIZED ELECTRICITY MARKETS | |
18:1.0.1.2.31.0.26.1 | SECTION 42.1
| 42.1 Requirement that Transmission Organizations with Organized Electricity Markets Offer Long-Term Firm Transmission Rights. | |
18:1.0.1.2.32 | PART 45
| PART 45 - APPLICATION FOR AUTHORITY TO HOLD INTERLOCKING POSITIONS | |
18:1.0.1.2.32.0.26.1 | SECTION 45.1
| 45.1 Applicability; who must file. | |
18:1.0.1.2.32.0.26.2 | SECTION 45.2
| 45.2 Positions requiring authorization. | |
18:1.0.1.2.32.0.26.3 | SECTION 45.3
| 45.3 Timing of filing application. | |
18:1.0.1.2.32.0.26.4 | SECTION 45.4
| 45.4 Supplemental applications. | |
18:1.0.1.2.32.0.26.5 | SECTION 45.5
| 45.5 Supplemental information. | |
18:1.0.1.2.32.0.26.6 | SECTION 45.6
| 45.6 Termination of authorization. | |
18:1.0.1.2.32.0.26.7 | SECTION 45.7
| 45.7 Form of application; filing procedure. | |
18:1.0.1.2.32.0.26.8 | SECTION 45.8
| 45.8 Contents of application. | |
18:1.0.1.2.32.0.26.9 | SECTION 45.9
| 45.9 Automatic authorization of certain interlocking positions. | |
18:1.0.1.2.33 | PART 46
| PART 46 - PUBLIC UTILITY FILING REQUIREMENTS AND FILING REQUIREMENTS FOR PERSONS HOLDING INTERLOCKING POSITIONS | |
18:1.0.1.2.33.0.26.1 | SECTION 46.1
| 46.1 Purpose. | |
18:1.0.1.2.33.0.26.2 | SECTION 46.2
| 46.2 Definitions. | |
18:1.0.1.2.33.0.26.3 | SECTION 46.3
| 46.3 Purchaser list. | |
18:1.0.1.2.33.0.26.4 | SECTION 46.4
| 46.4 General rule. | |
18:1.0.1.2.33.0.26.5 | SECTION 46.5
| 46.5 Covered entities. | |
18:1.0.1.2.33.0.26.6 | SECTION 46.6
| 46.6 Contents of the statement and procedures for filing. | |
18:1.0.1.2.34 | PART 50
| PART 50 - APPLICATIONS FOR PERMITS TO SITE INTERSTATE ELECTRIC TRANSMISSION FACILITIES | |
18:1.0.1.2.34.0.26.1 | SECTION 50.1
| 50.1 Definitions. | |
18:1.0.1.2.34.0.26.2 | SECTION 50.2
| 50.2 Purpose and intent of rules. | |
18:1.0.1.2.34.0.26.3 | SECTION 50.3
| 50.3 Applications/pre-filing; rules and format. | |
18:1.0.1.2.34.0.26.4 | SECTION 50.4
| 50.4 Stakeholder participation. | |
18:1.0.1.2.34.0.26.5 | SECTION 50.5
| 50.5 Pre-filing procedures. | |
18:1.0.1.2.34.0.26.6 | SECTION 50.6
| 50.6 Applications: general content. | |
18:1.0.1.2.34.0.26.7 | SECTION 50.7
| 50.7 Applications: exhibits. | |
18:1.0.1.2.34.0.26.8 | SECTION 50.8
| 50.8 Acceptance/rejection of applications. | |
18:1.0.1.2.34.0.26.9 | SECTION 50.9
| 50.9 Notice of application. | |
18:1.0.1.2.34.0.26.10 | SECTION 50.10
| 50.10 Interventions. | |
18:1.0.1.2.34.0.26.11 | SECTION 50.11
| 50.11 General conditions applicable to permits. | |