10:1.0.1.1.30.0.103 | SUBJGRP 103
| General Provisions | |
10:1.0.1.1.30.0.103.1 | SECTION 50.1
| 50.1 Basis, purpose, and procedures applicable. | |
10:1.0.1.1.30.0.103.2 | SECTION 50.2
| 50.2 Definitions. | |
10:1.0.1.1.30.0.103.3 | SECTION 50.3
| 50.3 Interpretations. | |
10:1.0.1.1.30.0.103.4 | SECTION 50.4
| 50.4 Written communications. | |
10:1.0.1.1.30.0.103.5 | SECTION 50.5
| 50.5 Deliberate misconduct. | |
10:1.0.1.1.30.0.103.6 | SECTION 50.7
| 50.7 Employee protection. | |
10:1.0.1.1.30.0.103.7 | SECTION 50.8
| 50.8 Information collection requirements: OMB approval. | |
10:1.0.1.1.30.0.103.8 | SECTION 50.9
| 50.9 Completeness and accuracy of information. | |
10:1.0.1.1.30.0.104 | SUBJGRP 104
| Requirement of License, Exceptions | |
10:1.0.1.1.30.0.104.9 | SECTION 50.10
| 50.10 License required; limited work authorization. | |
10:1.0.1.1.30.0.104.10 | SECTION 50.11
| 50.11 Exceptions and exemptions from licensing requirements. | |
10:1.0.1.1.30.0.104.11 | SECTION 50.12
| 50.12 Specific exemptions. | |
10:1.0.1.1.30.0.104.12 | SECTION 50.13
| 50.13 Attacks and destructive acts by enemies of the United States; and defense activities. | |
10:1.0.1.1.30.0.105 | SUBJGRP 105
| Classification and Description of Licenses | |
10:1.0.1.1.30.0.105.13 | SECTION 50.20
| 50.20 Two classes of licenses. | |
10:1.0.1.1.30.0.105.14 | SECTION 50.21
| 50.21 Class 104 licenses; for medical therapy and research and development facilities. | |
10:1.0.1.1.30.0.105.15 | SECTION 50.22
| 50.22 Class 103 licenses; for commercial and industrial facilities. | |
10:1.0.1.1.30.0.105.16 | SECTION 50.23
| 50.23 Construction permits. | |
10:1.0.1.1.30.0.106 | SUBJGRP 106
| Applications for Licenses, Certifications, and Regulatory Approvals; Form; Contents; Ineligibility of Certain Applicants | |
10:1.0.1.1.30.0.106.17 | SECTION 50.30
| 50.30 Filing of application; oath or affirmation. | |
10:1.0.1.1.30.0.106.18 | SECTION 50.31
| 50.31 Combining applications. | |
10:1.0.1.1.30.0.106.19 | SECTION 50.32
| 50.32 Elimination of repetition. | |
10:1.0.1.1.30.0.106.20 | SECTION 50.33
| 50.33 Contents of applications; general information. | |
10:1.0.1.1.30.0.106.21 | SECTION 50.34
| 50.34 Contents of applications; technical information. | |
10:1.0.1.1.30.0.106.22 | SECTION 50.34a
| 50.34a Design objectives for equipment to control releases of radioactive material in effluents - nuclear power reactors. | |
10:1.0.1.1.30.0.106.23 | SECTION 50.35
| 50.35 Issuance of construction permits. 1 | |
10:1.0.1.1.30.0.106.24 | SECTION 50.36
| 50.36 Technical specifications. | |
10:1.0.1.1.30.0.106.25 | SECTION 50.36a
| 50.36a Technical specifications on effluents from nuclear power reactors. | |
10:1.0.1.1.30.0.106.26 | SECTION 50.36b
| 50.36b Environmental conditions. | |
10:1.0.1.1.30.0.106.27 | SECTION 50.37
| 50.37 Agreement limiting access to Classified Information. | |
10:1.0.1.1.30.0.106.28 | SECTION 50.38
| 50.38 Ineligibility of certain applicants. | |
10:1.0.1.1.30.0.106.29 | SECTION 50.39
| 50.39 Public inspection of applications. | |
10:1.0.1.1.30.0.107 | SUBJGRP 107
| Standards for Licenses, Certifications, and Regulatory Approvals | |
10:1.0.1.1.30.0.107.30 | SECTION 50.40
| 50.40 Common standards. | |
10:1.0.1.1.30.0.107.31 | SECTION 50.41
| 50.41 Additional standards for class 104 licenses. | |
10:1.0.1.1.30.0.107.32 | SECTION 50.42
| 50.42 Additional standard for class 103 licenses. | |
10:1.0.1.1.30.0.107.33 | SECTION 50.43
| 50.43 Additional standards and provisions affecting class 103 licenses and certifications for commercial power. | |
10:1.0.1.1.30.0.107.34 | SECTION 50.44
| 50.44 Combustible gas control for nuclear power reactors. | |
10:1.0.1.1.30.0.107.35 | SECTION 50.45
| 50.45 Standards for construction permits, operating licenses, and combined licenses. | |
10:1.0.1.1.30.0.107.36 | SECTION 50.46
| 50.46 Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors. | |
10:1.0.1.1.30.0.107.37 | SECTION 50.46a
| 50.46a Acceptance criteria for reactor coolant system venting systems. | |
10:1.0.1.1.30.0.107.38 | SECTION 50.47
| 50.47 Emergency plans. | |
10:1.0.1.1.30.0.107.39 | SECTION 50.48
| 50.48 Fire protection. | |
10:1.0.1.1.30.0.107.40 | SECTION 50.49
| 50.49 Environmental qualification of electric equipment important to safety for nuclear power plants. | |
10:1.0.1.1.30.0.108 | SUBJGRP 108
| Issuance, Limitations, and Conditions of Licenses and Construction Permits | |
10:1.0.1.1.30.0.108.41 | SECTION 50.50
| 50.50 Issuance of licenses and construction permits. | |
10:1.0.1.1.30.0.108.42 | SECTION 50.51
| 50.51 Continuation of license. | |
10:1.0.1.1.30.0.108.43 | SECTION 50.52
| 50.52 Combining licenses. | |
10:1.0.1.1.30.0.108.44 | SECTION 50.53
| 50.53 Jurisdictional limitations. | |
10:1.0.1.1.30.0.108.45 | SECTION 50.54
| 50.54 Conditions of licenses. | |
10:1.0.1.1.30.0.108.46 | SECTION 50.55
| 50.55 Conditions of construction permits, early site permits, combined licenses, and manufacturing licenses. | |
10:1.0.1.1.30.0.108.47 | SECTION 50.55a
| 50.55a Codes and standards. | |
10:1.0.1.1.30.0.108.48 | SECTION 50.56
| 50.56 Conversion of construction permit to license; or amendment of license. | |
10:1.0.1.1.30.0.108.49 | SECTION 50.57
| 50.57 Issuance of operating license. 1 | |
10:1.0.1.1.30.0.108.50 | SECTION 50.58
| 50.58 Hearings and report of the Advisory Committee on Reactor Safeguards. | |
10:1.0.1.1.30.0.108.51 | SECTION 50.59
| 50.59 Changes, tests, and experiments. | |
10:1.0.1.1.30.0.108.52 | SECTION 50.60
| 50.60 Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors for normal operation. | |
10:1.0.1.1.30.0.108.53 | SECTION 50.61
| 50.61 Fracture toughness requirements for protection against pressurized thermal shock events. | |
10:1.0.1.1.30.0.108.54 | SECTION 50.61a
| 50.61a Alternate fracture toughness requirements for protection against pressurized thermal shock events. | |
10:1.0.1.1.30.0.108.55 | SECTION 50.62
| 50.62 Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants. | |
10:1.0.1.1.30.0.108.56 | SECTION 50.63
| 50.63 Loss of all alternating current power. | |
10:1.0.1.1.30.0.108.57 | SECTION 50.64
| 50.64 Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors. | |
10:1.0.1.1.30.0.108.58 | SECTION 50.65
| 50.65 Requirements for monitoring the effectiveness of maintenance at nuclear power plants. | |
10:1.0.1.1.30.0.108.59 | SECTION 50.66
| 50.66 Requirements for thermal annealing of the reactor pressure vessel. | |
10:1.0.1.1.30.0.108.60 | SECTION 50.67
| 50.67 Accident source term. | |
10:1.0.1.1.30.0.108.61 | SECTION 50.68
| 50.68 Criticality accident requirements. | |
10:1.0.1.1.30.0.108.62 | SECTION 50.69
| 50.69 Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors. | |
10:1.0.1.1.30.0.109 | SUBJGRP 109
| Inspections, Records, Reports, Notifications | |
10:1.0.1.1.30.0.109.63 | SECTION 50.70
| 50.70 Inspections. | |
10:1.0.1.1.30.0.109.64 | SECTION 50.71
| 50.71 Maintenance of records, making of reports. | |
10:1.0.1.1.30.0.109.65 | SECTION 50.72
| 50.72 Immediate notification requirements for operating nuclear power reactors. | |
10:1.0.1.1.30.0.109.66 | SECTION 50.73
| 50.73 Licensee event report system. | |
10:1.0.1.1.30.0.109.67 | SECTION 50.74
| 50.74 Notification of change in operator or senior operator status. | |
10:1.0.1.1.30.0.109.68 | SECTION 50.75
| 50.75 Reporting and recordkeeping for decommissioning planning. | |
10:1.0.1.1.30.0.109.69 | SECTION 50.76
| 50.76 Licensee's change of status; financial qualifications. | |
10:1.0.1.1.30.0.110 | SUBJGRP 110
| US/IAEA Safeguards Agreement | |
10:1.0.1.1.30.0.110.70 | SECTION 50.78
| 50.78 Facility information and verification. | |
10:1.0.1.1.30.0.111 | SUBJGRP 111
| Transfers of Licenses - Creditors' Rights - Surrender of Licenses | |
10:1.0.1.1.30.0.111.71 | SECTION 50.80
| 50.80 Transfer of licenses. | |
10:1.0.1.1.30.0.111.72 | SECTION 50.81
| 50.81 Creditor regulations. | |
10:1.0.1.1.30.0.111.73 | SECTION 50.82
| 50.82 Termination of license. | |
10:1.0.1.1.30.0.111.74 | SECTION 50.83
| 50.83 Release of part of a power reactor facility or site for unrestricted use. | |
10:1.0.1.1.30.0.112 | SUBJGRP 112
| Amendment of License or Construction Permit at Request of Holder | |
10:1.0.1.1.30.0.112.75 | SECTION 50.90
| 50.90 Application for amendment of license, construction permit, or early site permit. | |
10:1.0.1.1.30.0.112.76 | SECTION 50.91
| 50.91 Notice for public comment; State consultation. | |
10:1.0.1.1.30.0.112.77 | SECTION 50.92
| 50.92 Issuance of amendment. | |
10:1.0.1.1.30.0.113 | SUBJGRP 113
| Revocation, Suspension, Modification, Amendment of Licenses and Construction Permits, Emergency Operations by the Commission | |
10:1.0.1.1.30.0.113.78 | SECTION 50.100
| 50.100 Revocation, suspension, modification of licenses, permits, and approvals for cause. | |
10:1.0.1.1.30.0.113.79 | SECTION 50.101
| 50.101 Retaking possession of special nuclear material. | |
10:1.0.1.1.30.0.113.80 | SECTION 50.102
| 50.102 Commission order for operation after revocation. | |
10:1.0.1.1.30.0.113.81 | SECTION 50.103
| 50.103 Suspension and operation in war or national emergency. | |
10:1.0.1.1.30.0.114 | SUBJGRP 114
| Backfitting | |
10:1.0.1.1.30.0.114.82 | SECTION 50.109
| 50.109 Backfitting. | |
10:1.0.1.1.30.0.115 | SUBJGRP 115
| Enforcement | |
10:1.0.1.1.30.0.115.83 | SECTION 50.110
| 50.110 Violations. | |
10:1.0.1.1.30.0.115.84 | SECTION 50.111
| 50.111 Criminal penalties. | |
10:1.0.1.1.30.0.116 | SUBJGRP 116
| Additional Standards for Licenses, Certifications, and Regulatory Approvals | |
10:1.0.1.1.30.0.116.85 | SECTION 50.120
| 50.120 Training and qualification of nuclear power plant personnel. | |
10:1.0.1.1.30.0.116.86 | SECTION 50.150
| 50.150 Aircraft impact assessment. | |
10:1.0.1.1.30.0.116.87 | SECTION 50.155
| 50.155 Mitigation of beyond-design-basis events. | |
10:1.0.1.1.30.0.117.88.23 | APPENDIX Appendix A
| Appendix A to Part 50 - General Design Criteria for Nuclear Power Plants | |
10:1.0.1.1.30.0.117.88.24 | APPENDIX Appendix B
| Appendix B to Part 50 - Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants | |
10:1.0.1.1.30.0.117.88.25 | APPENDIX Appendix C
| Appendix C to Part 50 - A Guide for the Financial Data and Related Information Required To Establish Financial Qualifications for Construction Permits and Combined Licenses | |
10:1.0.1.1.30.0.117.88.26 | APPENDIX Appendix D
| Appendix D to Part 50 [Reserved] | |
10:1.0.1.1.30.0.117.88.27 | APPENDIX Appendix E
| Appendix E to Part 50 - Emergency Planning and Preparedness for Production and Utilization Facilities | |
10:1.0.1.1.30.0.117.88.28 | APPENDIX Appendix F
| Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities | |
10:1.0.1.1.30.0.117.88.29 | APPENDIX Appendix G
| Appendix G to Part 50 - Fracture Toughness Requirements | |
10:1.0.1.1.30.0.117.88.30 | APPENDIX Appendix H
| Appendix H to Part 50 - Reactor Vessel Material Surveillance Program Requirements | |
10:1.0.1.1.30.0.117.88.31 | APPENDIX Appendix I
| Appendix I to Part 50 - Numerical Guides for Design Objectives and Limiting Conditions for Operation To Meet the Criterion “As Low as is Reasonably Achievable” for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents | |
10:1.0.1.1.30.0.117.88.32 | APPENDIX Appendix J
| Appendix J to Part 50 - Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors | |
10:1.0.1.1.30.0.117.88.33 | APPENDIX Appendix K
| Appendix K to Part 50 - ECCS Evaluation Models | |
10:1.0.1.1.30.0.117.88.34 | APPENDIX
| Appendixes L-M to Part 50 [Reserved] | |
10:1.0.1.1.30.0.117.88.35 | APPENDIX Appendix N
| Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites | |
10:1.0.1.1.30.0.117.88.36 | APPENDIX
| Appendixes O-P to Part 50 [Reserved] | |
10:1.0.1.1.30.0.117.88.37 | APPENDIX Appendix Q
| Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues | |
10:1.0.1.1.30.0.117.88.38 | APPENDIX Appendix R
| Appendix R to Part 50 - Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979 | |
10:1.0.1.1.30.0.117.88.39 | APPENDIX Appendix S
| Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants | |