Title 49
SECTION 236.1037
236.1037 Records retention.
§ 236.1037 Records retention.(a) Each railroad with a PTC system required to be installed under this subpart shall maintain at a designated office on the railroad:
(1) A current copy of each FRA approved Type Approval, if any, PTCDP, and PTCSP that it holds;
(2) Adequate documentation to demonstrate that the PTCSP and PTCDP meet the safety requirements of this subpart, including the risk assessment;
(3) An Operations and Maintenance Manual, pursuant to § 236.1039; and
(4) Training and testing records pursuant to § 236.1043(b).
(b) Results of inspections and tests specified in the PTCSP and PTCDP must be recorded pursuant to § 236.110.
(c) Each contractor providing services relating to the testing, maintenance, or operation of a PTC system required to be installed under this subpart shall maintain at a designated office training records required under § 236.1039(b).
(d) After the PTC system is placed in service, the railroad shall maintain a database of all safety-relevant hazards as set forth in the PTCSP and PTCDP and those that had not been previously identified in either document. If the frequency of the safety-relevant hazards exceeds the threshold set forth in either of these documents, then the railroad shall:
(1) Report the inconsistency in writing by mail, facsimile, e-mail, or hand delivery to the Director, Office of Safety Assurance and Compliance, FRA, 1200 New Jersey Ave, SE, Mail Stop 25, Washington, DC 20590, within 15 days of discovery. Documents that are hand delivered must not be enclosed in an envelope;
(2) Take prompt countermeasures to reduce the frequency of each safety-relevant hazard to below the threshold set forth in the PTCSP and PTCDP; and
(3) Provide a final report when the inconsistency is resolved to the FRA Director, Office of Safety Assurance and Compliance, on the results of the analysis and countermeasures taken to reduce the frequency of the safety-relevant hazard(s) below the threshold set forth in the PTCSP and PTCDP.