Title 49

PART 213 SUBPART G

Subpart G - Train Operations at Track Classes 6 and Higher

49:4.1.1.1.8.7.5.1SECTION 213.301
   213.301 Scope of subpart.
49:4.1.1.1.8.7.5.2SECTION 213.303
   213.303 Responsibility for compliance.
49:4.1.1.1.8.7.5.3SECTION 213.305
   213.305 Designation of qualified individuals; general qualifications.
49:4.1.1.1.8.7.5.4SECTION 213.307
   213.307 Classes of track: operating speed limits.
49:4.1.1.1.8.7.5.5SECTION 213.309
   213.309 Restoration or renewal of track under traffic conditions.
49:4.1.1.1.8.7.5.6SECTION 213.311
   213.311 Measuring track not under load.
49:4.1.1.1.8.7.5.7SECTION 213.313
   213.313 Application of requirements to curved track.
49:4.1.1.1.8.7.5.8SECTION 213.317
   213.317 Waivers.
49:4.1.1.1.8.7.5.9SECTION 213.319
   213.319 Drainage.
49:4.1.1.1.8.7.5.10SECTION 213.321
   213.321 Vegetation.
49:4.1.1.1.8.7.5.11SECTION 213.323
   213.323 Track gage.
49:4.1.1.1.8.7.5.12SECTION 213.327
   213.327 Track alinement.
49:4.1.1.1.8.7.5.13SECTION 213.329
   213.329 Curves; elevation and speed limitations.
49:4.1.1.1.8.7.5.14SECTION 213.331
   213.331 Track surface.
49:4.1.1.1.8.7.5.15SECTION 213.332
   213.332 Combined track alinement and surface deviations.
49:4.1.1.1.8.7.5.16SECTION 213.333
   213.333 Automated vehicle-based inspection systems.
49:4.1.1.1.8.7.5.17SECTION 213.334
   213.334 Ballast; general.
49:4.1.1.1.8.7.5.18SECTION 213.335
   213.335 Crossties.
49:4.1.1.1.8.7.5.19SECTION 213.337
   213.337 Defective rails.
49:4.1.1.1.8.7.5.20SECTION 213.339
   213.339 Inspection of rail in service.
49:4.1.1.1.8.7.5.21SECTION 213.341
   213.341 Initial inspection of new rail and welds.
49:4.1.1.1.8.7.5.22SECTION 213.343
   213.343 Continuous welded rail (CWR).
49:4.1.1.1.8.7.5.23SECTION 213.345
   213.345 Vehicle/track system qualification.
49:4.1.1.1.8.7.5.24SECTION 213.347
   213.347 Automotive or railroad crossings at grade.
49:4.1.1.1.8.7.5.25SECTION 213.349
   213.349 Rail end mismatch.
49:4.1.1.1.8.7.5.26SECTION 213.351
   213.351 Rail joints.
49:4.1.1.1.8.7.5.27SECTION 213.352
   213.352 Torch cut rail.
49:4.1.1.1.8.7.5.28SECTION 213.353
   213.353 Turnouts, crossovers, and lift rail assemblies or other transition devices on moveable bridges.
49:4.1.1.1.8.7.5.29SECTION 213.355
   213.355 Frog guard rails and guard faces; gage.
49:4.1.1.1.8.7.5.30SECTION 213.357
   213.357 Derails.
49:4.1.1.1.8.7.5.31SECTION 213.359
   213.359 Track stiffness.
49:4.1.1.1.8.7.5.32SECTION 213.361
   213.361 Right of way.
49:4.1.1.1.8.7.5.33SECTION 213.365
   213.365 Visual track inspections.
49:4.1.1.1.8.7.5.34SECTION 213.367
   213.367 Special inspections.
49:4.1.1.1.8.7.5.35SECTION 213.369
   213.369 Inspection records.