40:29.0.1.1.10.1 | SUBPART A
| Subpart A - Program Scope and Installation Requirements for Partially Excluded UST Systems | |
40:29.0.1.1.10.1.47.1 | SECTION 280.10
| 280.10 Applicability. | |
40:29.0.1.1.10.1.47.2 | SECTION 280.11
| 280.11 Installation requirements for partially excluded UST systems. | |
40:29.0.1.1.10.1.47.3 | SECTION 280.12
| 280.12 Definitions. | |
40:29.0.1.1.10.2 | SUBPART B
| Subpart B - UST Systems: Design, Construction, Installation and Notification | |
40:29.0.1.1.10.2.47.1 | SECTION 280.20
| 280.20 Performance standards for new UST systems. | |
40:29.0.1.1.10.2.47.2 | SECTION 280.21
| 280.21 Upgrading of existing UST systems. | |
40:29.0.1.1.10.2.47.3 | SECTION 280.22
| 280.22 Notification requirements. | |
40:29.0.1.1.10.3 | SUBPART C
| Subpart C - General Operating Requirements | |
40:29.0.1.1.10.3.47.1 | SECTION 280.30
| 280.30 Spill and overfill control. | |
40:29.0.1.1.10.3.47.2 | SECTION 280.31
| 280.31 Operation and maintenance of corrosion protection. | |
40:29.0.1.1.10.3.47.3 | SECTION 280.32
| 280.32 Compatibility. | |
40:29.0.1.1.10.3.47.4 | SECTION 280.33
| 280.33 Repairs allowed. | |
40:29.0.1.1.10.3.47.5 | SECTION 280.34
| 280.34 Reporting and recordkeeping. | |
40:29.0.1.1.10.3.47.6 | SECTION 280.35
| 280.35 Periodic testing of spill prevention equipment and containment sumps used for interstitial monitoring of piping and periodic inspection of overfill prevention equipment. | |
40:29.0.1.1.10.3.47.7 | SECTION 280.36
| 280.36 Periodic operation and maintenance walkthrough inspections. | |
40:29.0.1.1.10.4 | SUBPART D
| Subpart D - Release Detection | |
40:29.0.1.1.10.4.47.1 | SECTION 280.40
| 280.40 General requirements for all UST systems. | |
40:29.0.1.1.10.4.47.2 | SECTION 280.41
| 280.41 Requirements for petroleum UST systems. | |
40:29.0.1.1.10.4.47.3 | SECTION 280.42
| 280.42 Requirements for hazardous substance UST systems. | |
40:29.0.1.1.10.4.47.4 | SECTION 280.43
| 280.43 Methods of release detection for tanks. | |
40:29.0.1.1.10.4.47.5 | SECTION 280.44
| 280.44 Methods of release detection for piping. | |
40:29.0.1.1.10.4.47.6 | SECTION 280.45
| 280.45 Release detection recordkeeping. | |
40:29.0.1.1.10.5 | SUBPART E
| Subpart E - Release Reporting, Investigation, and Confirmation | |
40:29.0.1.1.10.5.47.1 | SECTION 280.50
| 280.50 Reporting of suspected releases. | |
40:29.0.1.1.10.5.47.2 | SECTION 280.51
| 280.51 Investigation due to off-site impacts. | |
40:29.0.1.1.10.5.47.3 | SECTION 280.52
| 280.52 Release investigation and confirmation steps. | |
40:29.0.1.1.10.5.47.4 | SECTION 280.53
| 280.53 Reporting and cleanup of spills and overfills. | |
40:29.0.1.1.10.6 | SUBPART F
| Subpart F - Release Response and Corrective Action for UST Systems Containing Petroleum or Hazardous Substances | |
40:29.0.1.1.10.6.47.1 | SECTION 280.60
| 280.60 General. | |
40:29.0.1.1.10.6.47.2 | SECTION 280.61
| 280.61 Initial response. | |
40:29.0.1.1.10.6.47.3 | SECTION 280.62
| 280.62 Initial abatement measures and site check. | |
40:29.0.1.1.10.6.47.4 | SECTION 280.63
| 280.63 Initial site characterization. | |
40:29.0.1.1.10.6.47.5 | SECTION 280.64
| 280.64 Free product removal. | |
40:29.0.1.1.10.6.47.6 | SECTION 280.65
| 280.65 Investigations for soil and groundwater cleanup. | |
40:29.0.1.1.10.6.47.7 | SECTION 280.66
| 280.66 Corrective action plan. | |
40:29.0.1.1.10.6.47.8 | SECTION 280.67
| 280.67 Public participation. | |
40:29.0.1.1.10.7 | SUBPART G
| Subpart G - Out-of-Service UST Systems and Closure | |
40:29.0.1.1.10.7.47.1 | SECTION 280.70
| 280.70 Temporary closure. | |
40:29.0.1.1.10.7.47.2 | SECTION 280.71
| 280.71 Permanent closure and changes-in-service. | |
40:29.0.1.1.10.7.47.3 | SECTION 280.72
| 280.72 Assessing the site at closure or change-in-service. | |
40:29.0.1.1.10.7.47.4 | SECTION 280.73
| 280.73 Applicability to previously closed UST systems. | |
40:29.0.1.1.10.7.47.5 | SECTION 280.74
| 280.74 Closure records. | |
40:29.0.1.1.10.8 | SUBPART H
| Subpart H - Financial Responsibility | |
40:29.0.1.1.10.8.47.1 | SECTION 280.90
| 280.90 Applicability. | |
40:29.0.1.1.10.8.47.2 | SECTION 280.91
| 280.91 Compliance dates. | |
40:29.0.1.1.10.8.47.3 | SECTION 280.92
| 280.92 Definition of terms. | |
40:29.0.1.1.10.8.47.4 | SECTION 280.93
| 280.93 Amount and scope of required financial responsibility. | |
40:29.0.1.1.10.8.47.5 | SECTION 280.94
| 280.94 Allowable mechanisms and combinations of mechanisms. | |
40:29.0.1.1.10.8.47.6 | SECTION 280.95
| 280.95 Financial test of self-insurance. | |
40:29.0.1.1.10.8.47.7 | SECTION 280.96
| 280.96 Guarantee. | |
40:29.0.1.1.10.8.47.8 | SECTION 280.97
| 280.97 Insurance and risk retention group coverage. | |
40:29.0.1.1.10.8.47.9 | SECTION 280.98
| 280.98 Surety bond. | |
40:29.0.1.1.10.8.47.10 | SECTION 280.99
| 280.99 Letter of credit. | |
40:29.0.1.1.10.8.47.11 | SECTION 280.100
| 280.100 Use of state-required mechanism. | |
40:29.0.1.1.10.8.47.12 | SECTION 280.101
| 280.101 State fund or other state assurance. | |
40:29.0.1.1.10.8.47.13 | SECTION 280.102
| 280.102 Trust fund. | |
40:29.0.1.1.10.8.47.14 | SECTION 280.103
| 280.103 Standby trust fund. | |
40:29.0.1.1.10.8.47.15 | SECTION 280.104
| 280.104 Local government bond rating test. | |
40:29.0.1.1.10.8.47.16 | SECTION 280.105
| 280.105 Local government financial test. | |
40:29.0.1.1.10.8.47.17 | SECTION 280.106
| 280.106 Local government guarantee. | |
40:29.0.1.1.10.8.47.18 | SECTION 280.107
| 280.107 Local government fund. | |
40:29.0.1.1.10.8.47.19 | SECTION 280.108
| 280.108 Substitution of financial assurance mechanisms by owner or operator. | |
40:29.0.1.1.10.8.47.20 | SECTION 280.109
| 280.109 Cancellation or nonrenewal by a provider of financial assurance. | |
40:29.0.1.1.10.8.47.21 | SECTION 280.110
| 280.110 Reporting by owner or operator. | |
40:29.0.1.1.10.8.47.22 | SECTION 280.111
| 280.111 Recordkeeping. | |
40:29.0.1.1.10.8.47.23 | SECTION 280.112
| 280.112 Drawing on financial assurance mechanisms. | |
40:29.0.1.1.10.8.47.24 | SECTION 280.113
| 280.113 Release from the requirements. | |
40:29.0.1.1.10.8.47.25 | SECTION 280.114
| 280.114 Bankruptcy or other incapacity of owner or operator or provider of financial assurance. | |
40:29.0.1.1.10.8.47.26 | SECTION 280.115
| 280.115 Replenishment of guarantees, letters of credit, or surety bonds. | |
40:29.0.1.1.10.8.47.27 | SECTION 280.116
| 280.116 Suspension of enforcement. [Reserved] | |
40:29.0.1.1.10.9 | SUBPART I
| Subpart I - Lender Liability | |
40:29.0.1.1.10.9.47.1 | SECTION 280.200
| 280.200 Definitions. | |
40:29.0.1.1.10.9.47.2 | SECTION 280.210
| 280.210 Participation in management. | |
40:29.0.1.1.10.9.47.3 | SECTION 280.220
| 280.220 Ownership of an underground storage tank or underground storage tank system or facility or property on which an underground storage tank or underground storage tank system is located. | |
40:29.0.1.1.10.9.47.4 | SECTION 280.230
| 280.230 Operating an underground storage tank or underground storage tank system. | |
40:29.0.1.1.10.10 | SUBPART J
| Subpart J - Operator Training | |
40:29.0.1.1.10.10.47.1 | SECTION 280.240
| 280.240 General requirement for all UST systems. | |
40:29.0.1.1.10.10.47.2 | SECTION 280.241
| 280.241 Designation of Class A, B, and C operators. | |
40:29.0.1.1.10.10.47.3 | SECTION 280.242
| 280.242 Requirements for operator training. | |
40:29.0.1.1.10.10.47.4 | SECTION 280.243
| 280.243 Timing of operator training. | |
40:29.0.1.1.10.10.47.5 | SECTION 280.244
| 280.244 Retraining. | |
40:29.0.1.1.10.10.47.6 | SECTION 280.245
| 280.245 Documentation. | |
40:29.0.1.1.10.11 | SUBPART K
| Subpart K - UST Systems with Field-Constructed Tanks and Airport Hydrant Fuel Distribution Systems | |
40:29.0.1.1.10.11.47.1 | SECTION 280.250
| 280.250 Definitions. | |
40:29.0.1.1.10.11.47.2 | SECTION 280.251
| 280.251 General requirements. | |
40:29.0.1.1.10.11.47.3 | SECTION 280.252
| 280.252 Additions, exceptions, and alternatives for UST systems with field-constructed tanks and airport hydrant systems. | |
40:29.0.1.1.10.11.47.4.25 | APPENDIX Appendix I
| Appendix I to Part 280 - Notification for Underground Storage Tanks (Forms) | |
40:29.0.1.1.10.11.47.4.26 | APPENDIX Appendix II
| Appendix II to Part 280 - Notification of Ownership for Underground Storage Tanks (Form) | |
40:29.0.1.1.10.11.47.4.27 | APPENDIX Appendix III
| Appendix III to Part 280 - Statement for Shipping Tickets and Invoices | |