Title 40
PART 280 SUBPART C
Subpart C - General Operating Requirements
- 42 U.S.C. 6912, 6991, 6991(a), 6991(b), 6991(c), 6991(d), 6991(e), 6991(f), 6991(g), 6991(h), 6991(i).
- 80 FR 41623, July 15, 2015, unless otherwise noted.
40:29.0.1.1.10.3.47.1 | SECTION 280.30 | 280.30 Spill and overfill control. | |
40:29.0.1.1.10.3.47.2 | SECTION 280.31 | 280.31 Operation and maintenance of corrosion protection. | |
40:29.0.1.1.10.3.47.3 | SECTION 280.32 | 280.32 Compatibility. | |
40:29.0.1.1.10.3.47.4 | SECTION 280.33 | 280.33 Repairs allowed. | |
40:29.0.1.1.10.3.47.5 | SECTION 280.34 | 280.34 Reporting and recordkeeping. | |
40:29.0.1.1.10.3.47.6 | SECTION 280.35 | 280.35 Periodic testing of spill prevention equipment and containment sumps used for interstitial monitoring of piping and periodic inspection of overfill prevention equipment. | |
40:29.0.1.1.10.3.47.7 | SECTION 280.36 | 280.36 Periodic operation and maintenance walkthrough inspections. |