33:2.0.1.5.24.1 | SUBPART A
| Subpart A - General | |
33:2.0.1.5.24.1.179.1 | SECTION 155.100
| 155.100 Applicability. | |
33:2.0.1.5.24.1.179.2 | SECTION 155.110
| 155.110 Definitions. | |
33:2.0.1.5.24.1.179.3 | SECTION 155.120
| 155.120 Equivalents. | |
33:2.0.1.5.24.1.179.4 | SECTION 155.130
| 155.130 Exemptions. | |
33:2.0.1.5.24.1.179.5 | SECTION 155.140
| 155.140 Incorporation by reference. | |
33:2.0.1.5.24.2 | SUBPART B
| Subpart B - Vessel Equipment | |
33:2.0.1.5.24.2.179.1 | SECTION 155.200
| 155.200 Definitions. | |
33:2.0.1.5.24.2.179.2 | SECTION 155.205
| 155.205 Discharge removal equipment for vessels 400 feet or greater in length. | |
33:2.0.1.5.24.2.179.3 | SECTION 155.210
| 155.210 Discharge removal equipment for vessels less than 400 feet in length. | |
33:2.0.1.5.24.2.179.4 | SECTION 155.215
| 155.215 Discharge removal equipment for inland oil barges. | |
33:2.0.1.5.24.2.179.5 | SECTION 155.220
| 155.220 Discharge removal equipment for vessels carrying oil as secondary cargo. | |
33:2.0.1.5.24.2.179.6 | SECTION 155.225
| 155.225 Internal cargo transfer capability. | |
33:2.0.1.5.24.2.179.7 | SECTION 155.230
| 155.230 Emergency control systems for tank barges. | |
33:2.0.1.5.24.2.179.8 | SECTION 155.235
| 155.235 Emergency towing capability for oil tankers. | |
33:2.0.1.5.24.2.179.9 | SECTION 155.240
| 155.240 Damage stability information for oil tankers and offshore oil barges. | |
33:2.0.1.5.24.2.179.10 | SECTION 155.245
| 155.245 Damage stability information for inland oil barges. | |
33:2.0.1.5.24.2.179.11 | SECTION 155.250
| 155.250 Oil fuel tank protection. | |
33:2.0.1.5.24.2.179.12 | SECTION 155.310
| 155.310 Containment of oil and hazardous material cargo discharges. | |
33:2.0.1.5.24.2.179.13 | SECTION 155.320
| 155.320 Fuel oil and bulk lubricating oil discharge containment. | |
33:2.0.1.5.24.2.179.14 | SECTION 155.330
| 155.330 Oily mixture (bilge slops)/fuel oil tank ballast water discharges on U.S. non-oceangoing ships. | |
33:2.0.1.5.24.2.179.15 | SECTION 155.350
| 155.350 Oily mixture (bilge slops)/fuel oil tank ballast water discharges on oceangoing ships of less than 400 gross tons. | |
33:2.0.1.5.24.2.179.16 | SECTION 155.360
| 155.360 Oily mixture (bilge slops) discharges on oceangoing ships of 400 gross tons and above but less than 10,000 gross tons, excluding ships that carry ballast water in their fuel oil tanks. | |
33:2.0.1.5.24.2.179.17 | SECTION 155.370
| 155.370 Oily mixture (bilge slops)/fuel oil tank ballast water discharges on oceangoing ships of 10,000 gross tons and above and oceangoing ships of 400 gross tons and above that carry ballast water in their fuel oil tanks. | |
33:2.0.1.5.24.2.179.18 | SECTION 155.380
| 155.380 Oily water separating equipment and bilge alarm approval standards. | |
33:2.0.1.5.24.2.179.19 | SECTION 155.400
| 155.400 Platform machinery space drainage on oceangoing fixed and floating drilling rigs and other platforms. | |
33:2.0.1.5.24.2.179.20 | SECTION 155.410
| 155.410 Pumping, piping and discharge requirements for non-oceangoing ships of 100 gross tons and above. | |
33:2.0.1.5.24.2.179.21 | SECTION 155.420
| 155.420 Pumping, piping and discharge requirements for oceangoing ships of 100 gross tons and above but less than 400 gross tons. | |
33:2.0.1.5.24.2.179.22 | SECTION 155.430
| 155.430 Standard discharge connections for oceangoing ships of 400 gross tons and above. | |
33:2.0.1.5.24.2.179.23 | SECTION 155.440
| 155.440 Segregation of fuel oil and ballast water on new oceangoing ships of 4,000 gross tons and above, other than oil tankers, and on new oceangoing oil tankers of 150 gross tons and above. | |
33:2.0.1.5.24.2.179.24 | SECTION 155.450
| 155.450 Placard. | |
33:2.0.1.5.24.2.179.25 | SECTION 155.470
| 155.470 Prohibited spaces. | |
33:2.0.1.5.24.2.179.26 | SECTION 155.480
| 155.480 Overfill devices. | |
33:2.0.1.5.24.2.179.27 | SECTION 155.490
| 155.490 [Reserved] | |
33:2.0.1.5.24.3 | SUBPART C
| Subpart C - Transfer Personnel, Procedures, Equipment, and Records | |
33:2.0.1.5.24.3.179.1 | SECTION 155.700
| 155.700 Designation of person in charge. | |
33:2.0.1.5.24.3.179.2 | SECTION 155.710
| 155.710 Qualifications of person in charge. | |
33:2.0.1.5.24.3.179.3 | SECTION 155.715
| 155.715 Contents of letter of designation as a person-in-charge of the transfer of fuel oil. | |
33:2.0.1.5.24.3.179.4 | SECTION 155.720
| 155.720 Transfer procedures. | |
33:2.0.1.5.24.3.179.5 | SECTION 155.730
| 155.730 Compliance with transfer procedures. | |
33:2.0.1.5.24.3.179.6 | SECTION 155.740
| 155.740 Availability of transfer procedures. | |
33:2.0.1.5.24.3.179.7 | SECTION 155.750
| 155.750 Contents of transfer procedures. | |
33:2.0.1.5.24.3.179.8 | SECTION 155.760
| 155.760 Amendment of transfer procedures. | |
33:2.0.1.5.24.3.179.9 | SECTION 155.770
| 155.770 Draining into bilges. | |
33:2.0.1.5.24.3.179.10 | SECTION 155.775
| 155.775 Maximum cargo level of oil. | |
33:2.0.1.5.24.3.179.11 | SECTION 155.780
| 155.780 Emergency shutdown. | |
33:2.0.1.5.24.3.179.12 | SECTION 155.785
| 155.785 Communications. | |
33:2.0.1.5.24.3.179.13 | SECTION 155.790
| 155.790 Deck lighting. | |
33:2.0.1.5.24.3.179.14 | SECTION 155.800
| 155.800 Transfer hose. | |
33:2.0.1.5.24.3.179.15 | SECTION 155.805
| 155.805 Closure devices. | |
33:2.0.1.5.24.3.179.16 | SECTION 155.810
| 155.810 Tank vessel security. | |
33:2.0.1.5.24.3.179.17 | SECTION 155.815
| 155.815 Tank vessel integrity. | |
33:2.0.1.5.24.3.179.18 | SECTION 155.820
| 155.820 Records. | |
33:2.0.1.5.24.4 | SUBPART D
| Subpart D - Tank Vessel Response Plans for Oil | |
33:2.0.1.5.24.4.179.1 | SECTION 155.1010
| 155.1010 Purpose. | |
33:2.0.1.5.24.4.179.2 | SECTION 155.1015
| 155.1015 Applicability. | |
33:2.0.1.5.24.4.179.3 | SECTION 155.1020
| 155.1020 Definitions. | |
33:2.0.1.5.24.4.179.4 | SECTION 155.1025
| 155.1025 Operating restrictions and interim operating authorization. | |
33:2.0.1.5.24.4.179.5 | SECTION 155.1026
| 155.1026 Qualified individual and alternate qualified individual. | |
33:2.0.1.5.24.4.179.6 | SECTION 155.1030
| 155.1030 General response plan requirements. | |
33:2.0.1.5.24.4.179.7 | SECTION 155.1035
| 155.1035 Response plan requirements for manned vessels carrying oil as a primary cargo. | |
33:2.0.1.5.24.4.179.8 | SECTION 155.1040
| 155.1040 Response plan requirements for unmanned tank barges carrying oil as a primary cargo. | |
33:2.0.1.5.24.4.179.9 | SECTION 155.1045
| 155.1045 Response plan requirements for vessels carrying oil as a secondary cargo. | |
33:2.0.1.5.24.4.179.10 | SECTION 155.1050
| 155.1050 Response plan development and evaluation criteria for vessels carrying groups I through IV petroleum oil as a primary cargo. | |
33:2.0.1.5.24.4.179.11 | SECTION 155.1052
| 155.1052 Response plan development and evaluation criteria for vessels carrying group V petroleum oil as a primary cargo. | |
33:2.0.1.5.24.4.179.12 | SECTION 155.1055
| 155.1055 Training. | |
33:2.0.1.5.24.4.179.13 | SECTION 155.1060
| 155.1060 Exercises. | |
33:2.0.1.5.24.4.179.14 | SECTION 155.1062
| 155.1062 Inspection and maintenance of response resources. | |
33:2.0.1.5.24.4.179.15 | SECTION 155.1065
| 155.1065 Procedures for plan submission, approval, requests for acceptance of alternative planning criteria, and appeal. | |
33:2.0.1.5.24.4.179.16 | SECTION 155.1070
| 155.1070 Procedures for plan review, revision, amendment, and appeal. | |
33:2.0.1.5.24.5 | SUBPART E
| Subpart E - Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act | |
33:2.0.1.5.24.5.179.1 | SECTION 155.1110
| 155.1110 Purpose and applicability. | |
33:2.0.1.5.24.5.179.2 | SECTION 155.1115
| 155.1115 Definitions. | |
33:2.0.1.5.24.5.179.3 | SECTION 155.1120
| 155.1120 Operating restrictions and interim operating authorization. | |
33:2.0.1.5.24.5.179.4 | SECTION 155.1125
| 155.1125 Additional response plan requirements. | |
33:2.0.1.5.24.5.179.5 | SECTION 155.1130
| 155.1130 Requirements for prepositioned response equipment. | |
33:2.0.1.5.24.5.179.6 | SECTION 155.1135
| 155.1135 Response plan development and evaluation criteria. | |
33:2.0.1.5.24.5.179.7 | SECTION 155.1145
| 155.1145 Submission and approval procedures. | |
33:2.0.1.5.24.5.179.8 | SECTION 155.1150
| 155.1150 Plan revision and amendment procedures. | |
33:2.0.1.5.24.6 | SUBPART F
| Subpart F - Response plan requirements for vessels carrying animal fats and vegetable oils as a primary cargo | |
33:2.0.1.5.24.6.179.1 | SECTION 155.1210
| 155.1210 Purpose and applicability. | |
33:2.0.1.5.24.6.179.2 | SECTION 155.1225
| 155.1225 Response plan submission requirements. | |
33:2.0.1.5.24.6.179.3 | SECTION 155.1230
| 155.1230 Response plan development and evaluation criteria. | |
33:2.0.1.5.24.7 | SUBPART G
| Subpart G - Response Plan Requirements for Vessels Carrying Other Non-Petroleum Oils as a Primary Cargo | |
33:2.0.1.5.24.7.179.1 | SECTION 155.2210
| 155.2210 Purpose and applicability. | |
33:2.0.1.5.24.7.179.2 | SECTION 155.2225
| 155.2225 Response plan submission requirements. | |
33:2.0.1.5.24.7.179.3 | SECTION 155.2230
| 155.2230 Response plan development and evaluation criteria. | |
33:2.0.1.5.24.8 | SUBPART H
| Subpart H [Reserved] | |
33:2.0.1.5.24.9 | SUBPART I
| Subpart I - Salvage and Marine Firefighting | |
33:2.0.1.5.24.9.179.1 | SECTION 155.4010
| 155.4010 Purpose of this subpart. | |
33:2.0.1.5.24.9.179.2 | SECTION 155.4015
| 155.4015 Vessel owners and operators who must follow this subpart. | |
33:2.0.1.5.24.9.179.3 | SECTION 155.4020
| 155.4020 Complying with this subpart. | |
33:2.0.1.5.24.9.179.4 | SECTION 155.4025
| 155.4025 Definitions. | |
33:2.0.1.5.24.9.179.5 | SECTION 155.4030
| 155.4030 Required salvage and marine firefighting services to list in response plans. | |
33:2.0.1.5.24.9.179.6 | SECTION 155.4032
| 155.4032 Other resource provider considerations. | |
33:2.0.1.5.24.9.179.7 | SECTION 155.4035
| 155.4035 Required pre-incident information and arrangements for the salvage and marine firefighting resource providers listed in response plans. | |
33:2.0.1.5.24.9.179.8 | SECTION 155.4040
| 155.4040 Response times for each salvage and marine firefighting service. | |
33:2.0.1.5.24.9.179.9 | SECTION 155.4045
| 155.4045 Required agreements or contracts with the salvage and marine firefighting resource providers. | |
33:2.0.1.5.24.9.179.10 | SECTION 155.4050
| 155.4050 Ensuring that the salvors and marine firefighters are adequate. | |
33:2.0.1.5.24.9.179.11 | SECTION 155.4052
| 155.4052 Drills and exercises. | |
33:2.0.1.5.24.9.179.12 | SECTION 155.4055
| 155.4055 Temporary waivers from meeting one or more of the specified response times. | |
33:2.0.1.5.24.10 | SUBPART J
| Subpart J - Nontank Vessel Response Plans | |
33:2.0.1.5.24.10.179.1 | SECTION 155.5010
| 155.5010 Purpose. | |
33:2.0.1.5.24.10.179.2 | SECTION 155.5012
| 155.5012 Deviation from response plan. | |
33:2.0.1.5.24.10.179.3 | SECTION 155.5015
| 155.5015 Applicability. | |
33:2.0.1.5.24.10.179.4 | SECTION 155.5020
| 155.5020 Definitions. | |
33:2.0.1.5.24.10.179.5 | SECTION 155.5021
| 155.5021 Operating restrictions. | |
33:2.0.1.5.24.10.179.6 | SECTION 155.5023
| 155.5023 Interim operating authorization. | |
33:2.0.1.5.24.10.179.7 | SECTION 155.5025
| 155.5025 One-time port waiver. | |
33:2.0.1.5.24.10.179.8 | SECTION 155.5026
| 155.5026 Qualified individual and alternate qualified individual. | |
33:2.0.1.5.24.10.179.9 | SECTION 155.5030
| 155.5030 Nontank vessel response plan requirements: General content. | |
33:2.0.1.5.24.10.179.10 | SECTION 155.5035
| 155.5035 Nontank vessel response plan requirements: Specific content. | |
33:2.0.1.5.24.10.179.11 | SECTION 155.5050
| 155.5050 Response plan development and evaluation criteria for nontank vessels carrying groups I through IV petroleum oil. | |
33:2.0.1.5.24.10.179.12 | SECTION 155.5052
| 155.5052 Response plan development and evaluation criteria for nontank vessels carrying group V petroleum oil. | |
33:2.0.1.5.24.10.179.13 | SECTION 155.5055
| 155.5055 Training. | |
33:2.0.1.5.24.10.179.14 | SECTION 155.5060
| 155.5060 Exercises. | |
33:2.0.1.5.24.10.179.15 | SECTION 155.5061
| 155.5061 Alternative Training and Exercise Program. | |
33:2.0.1.5.24.10.179.16 | SECTION 155.5062
| 155.5062 Inspection and maintenance of response resources. | |
33:2.0.1.5.24.10.179.17 | SECTION 155.5065
| 155.5065 Procedures for plan submission and approval. | |
33:2.0.1.5.24.10.179.18 | SECTION 155.5067
| 155.5067 Alternative planning criteria. | |
33:2.0.1.5.24.10.179.19 | SECTION 155.5070
| 155.5070 Procedures for plan review, revision, and amendment. | |
33:2.0.1.5.24.10.179.20 | SECTION 155.5075
| 155.5075 Appeal procedures. | |
33:2.0.1.5.24.11 | SUBPART 0
| | |
33:2.0.1.5.24.12.179.1.5 | APPENDIX Appendix A
| Appendix A to Part 155 - Specifications for Shore Connection | |
33:2.0.1.5.24.12.179.1.6 | APPENDIX Appendix B
| Appendix B to Part 155 - Determining and Evaluating Required Response Resources for Vessel Response Plans | |
33:2.0.1.5.24.12.179.1.7 | APPENDIX Appendix C