CFR›Title 49›Subtitle B›Chapter II›Part 230›Subpart B›Subject Group Inspection and Repair ContainsSections 230.29–230.34CorpusDaily eCFRDisplayed edition2026-04-15Last updated2026-04-15 Sections 230.29 § 230.29 Inspection and repair. 230.30 § 230.30 Lap-joint seam boilers. 230.31 § 230.31 Flues to be removed. 230.32 § 230.32 Time and method of inspection. 230.33 § 230.33 Welded repairs and alterations. 230.34 § 230.34 Riveted repairs and alterations. Previous Injectors, Feedwater Pumps, and Flue Plugs Injectors, Feedwater Pumps, and Flue Plugs Next Pressure Testing of Boilers Pressure Testing of Boilers