§ 170.095 Data submittal for a vessel equipped to lift.

46 CFR 170.095

Citation46 CFR 170.095
CorpusDaily eCFR
Displayed edition2026-09-25
Last updated2026-09-25

§ 170.095 Data submittal for a vessel equipped to lift.

The following data must be submitted with the plans required by § 170.075 if the vessel is engaged in lifting and is required to comply with subpart B of part 173 of this chapter:

(a) A graph of maximum hook load versus maximum crane radius.

(b) A table of crane radius versus the maximum distance above the main deck to which the hook load can be raised.

(c) A table showing maximum vertical and transverse moments at which the crane is to operate.