Title 46

PART 64 SUBPART B

Subpart B - Standards for an MPT

46:2.0.1.2.21.2.1.1SECTION 64.11
   64.11 Design of MPTs.
46:2.0.1.2.21.2.1.2SECTION 64.13
   64.13 Allowable stress; tank.
46:2.0.1.2.21.2.1.3SECTION 64.15
   64.15 Allowable stress; framework.
46:2.0.1.2.21.2.1.4SECTION 64.17
   64.17 Minimum tank thickness.
46:2.0.1.2.21.2.1.5SECTION 64.19
   64.19 External pressure.
46:2.0.1.2.21.2.1.6SECTION 64.21
   64.21 Material.
46:2.0.1.2.21.2.1.7SECTION 64.23
   64.23 Gasket and lining.
46:2.0.1.2.21.2.1.8SECTION 64.25
   64.25 Cross section.
46:2.0.1.2.21.2.1.9SECTION 64.27
   64.27 Base.
46:2.0.1.2.21.2.1.10SECTION 64.29
   64.29 Tank saddles.
46:2.0.1.2.21.2.1.11SECTION 64.31
   64.31 Inspection opening.
46:2.0.1.2.21.2.1.12SECTION 64.33
   64.33 Pipe connection.
46:2.0.1.2.21.2.1.13SECTION 64.35
   64.35 Bottom filling or discharge connection.
46:2.0.1.2.21.2.1.14SECTION 64.37
   64.37 Valve and fitting guard.
46:2.0.1.2.21.2.1.15SECTION 64.39
   64.39 Valve securing device.
46:2.0.1.2.21.2.1.16SECTION 64.41
   64.41 Stop valve closure.
46:2.0.1.2.21.2.1.17SECTION 64.43
   64.43 Lifting fittings.
46:2.0.1.2.21.2.1.18SECTION 64.45
   64.45 Securing devices.
46:2.0.1.2.21.2.1.19SECTION 64.47
   64.47 Type of relief devices.
46:2.0.1.2.21.2.1.20SECTION 64.49
   64.49 Labeling openings.
46:2.0.1.2.21.2.1.21SECTION 64.51
   64.51 Tank parts marking.
46:2.0.1.2.21.2.1.22SECTION 64.53
   64.53 Information plate for MPTs.
46:2.0.1.2.21.2.1.23SECTION 64.55
   64.55 Relief device location.