Title 46

PART 64

Part 64 - Marine Portable Tanks And Cargo Handling Systems

PART 64 - MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS Authority:46 U.S.C. 3306, 3703; 49 U.S.C. App. 1804; Department of Homeland Security Delegation No. 0170.1. Source:CGD 73-172, 39 FR 22950, June 25, 1974, unless otherwise noted.

46:2.0.1.2.21.1SUBPART A
Subpart A - General
46:2.0.1.2.21.1.1.1SECTION 64.1
   64.1 Purpose.
46:2.0.1.2.21.1.1.2SECTION 64.2
   64.2 Incorporation by reference.
46:2.0.1.2.21.1.1.3SECTION 64.3
   64.3 Applicability.
46:2.0.1.2.21.1.1.4SECTION 64.5
   64.5 Definitions.
46:2.0.1.2.21.1.1.5SECTION 64.9
   64.9 Maintenance, repair, and alteration of MPTs.
46:2.0.1.2.21.2SUBPART B
Subpart B - Standards for an MPT
46:2.0.1.2.21.2.1.1SECTION 64.11
   64.11 Design of MPTs.
46:2.0.1.2.21.2.1.2SECTION 64.13
   64.13 Allowable stress; tank.
46:2.0.1.2.21.2.1.3SECTION 64.15
   64.15 Allowable stress; framework.
46:2.0.1.2.21.2.1.4SECTION 64.17
   64.17 Minimum tank thickness.
46:2.0.1.2.21.2.1.5SECTION 64.19
   64.19 External pressure.
46:2.0.1.2.21.2.1.6SECTION 64.21
   64.21 Material.
46:2.0.1.2.21.2.1.7SECTION 64.23
   64.23 Gasket and lining.
46:2.0.1.2.21.2.1.8SECTION 64.25
   64.25 Cross section.
46:2.0.1.2.21.2.1.9SECTION 64.27
   64.27 Base.
46:2.0.1.2.21.2.1.10SECTION 64.29
   64.29 Tank saddles.
46:2.0.1.2.21.2.1.11SECTION 64.31
   64.31 Inspection opening.
46:2.0.1.2.21.2.1.12SECTION 64.33
   64.33 Pipe connection.
46:2.0.1.2.21.2.1.13SECTION 64.35
   64.35 Bottom filling or discharge connection.
46:2.0.1.2.21.2.1.14SECTION 64.37
   64.37 Valve and fitting guard.
46:2.0.1.2.21.2.1.15SECTION 64.39
   64.39 Valve securing device.
46:2.0.1.2.21.2.1.16SECTION 64.41
   64.41 Stop valve closure.
46:2.0.1.2.21.2.1.17SECTION 64.43
   64.43 Lifting fittings.
46:2.0.1.2.21.2.1.18SECTION 64.45
   64.45 Securing devices.
46:2.0.1.2.21.2.1.19SECTION 64.47
   64.47 Type of relief devices.
46:2.0.1.2.21.2.1.20SECTION 64.49
   64.49 Labeling openings.
46:2.0.1.2.21.2.1.21SECTION 64.51
   64.51 Tank parts marking.
46:2.0.1.2.21.2.1.22SECTION 64.53
   64.53 Information plate for MPTs.
46:2.0.1.2.21.2.1.23SECTION 64.55
   64.55 Relief device location.
46:2.0.1.2.21.3SUBPART C
Subpart C - Pressure Relief Devices and Vacuum Relief Devices for MPTs
46:2.0.1.2.21.3.1.1SECTION 64.57
   64.57 Acceptance of pressure relief devices.
46:2.0.1.2.21.3.1.2SECTION 64.59
   64.59 Spring loaded pressure relief valve.
46:2.0.1.2.21.3.1.3SECTION 64.61
   64.61 Rupture disc.
46:2.0.1.2.21.3.1.4SECTION 64.63
   64.63 Minimum emergency venting capacity.
46:2.0.1.2.21.3.1.5SECTION 64.65
   64.65 Vacuum relief device.
46:2.0.1.2.21.3.1.6SECTION 64.67
   64.67 Shutoff valve.
46:2.0.1.2.21.3.1.7SECTION 64.69
   64.69 Location of the pressure relief device.
46:2.0.1.2.21.3.1.8SECTION 64.71
   64.71 Marking of pressure relief devices.
46:2.0.1.2.21.4SUBPART D
Subpart D [Reserved]
46:2.0.1.2.21.5SUBPART E
Subpart E - Periodic Inspections and Tests of MPTs
46:2.0.1.2.21.5.1.1SECTION 64.77
   64.77 Inspection and test.
46:2.0.1.2.21.5.1.2SECTION 64.79
   64.79 Inspection of pressure and vacuum relief device.
46:2.0.1.2.21.5.1.3SECTION 64.81
   64.81 30-month inspection of an MPT.
46:2.0.1.2.21.5.1.4SECTION 64.83
   64.83 Hydrostatic test.
46:2.0.1.2.21.6SUBPART F
Subpart F - Cargo Handling System
46:2.0.1.2.21.6.1.1SECTION 64.87
   64.87 Purpose.
46:2.0.1.2.21.6.1.2SECTION 64.88
   64.88 Plan approval, construction, and inspection of cargo-handling systems.
46:2.0.1.2.21.6.1.3SECTION 64.89
   64.89 Cargo pump unit.
46:2.0.1.2.21.6.1.4SECTION 64.91
   64.91 Relief valve for the cargo pump discharge.
46:2.0.1.2.21.6.1.5SECTION 64.93
   64.93 Pump controls.
46:2.0.1.2.21.6.1.6SECTION 64.95
   64.95 Piping.
46:2.0.1.2.21.6.1.7SECTION 64.97
   64.97 Cargo hose.