Title 40

SECTION 52.2381

52.2381 EPA-approved Vermont State regulations.

§ 52.2381 EPA-approved Vermont State regulations.

The following table identifies the state regulations which have been submitted to and adopted by EPA as revisions to the Vermont State Implementation Plan. This table is for informational purposes only and does not have any independent regulatory effect. To determine regulatory requirements for a specific situation consult the plan identified in § 52.2370. To the extent that this table conflicts with §§ 52.2370, 52.2370 governs.

Table 52.2381 - EPA-Approved Regulations

[Vermont SIP regulations 1972 to present]

State citation, title and subject Date adopted by State Date Approved by EPA Federal Register citation Section 52.2370 Comments and unapproved sections
Chapter 5 Air Pollution Control
Subchapter I Definitions
Section 5-101 Definitions 12/10/72 5/31/72 37 FR 10899 (b)
12/10/72 5/14/73 38 FR 12713 (c)(3)
11/19/73 3/22/76 41 FR 11819 (c)(5)
12/16/74 1/21/76 41 FR 3085 (c)(4)
1/25/78 12/21/78 43 FR 59496 (c)(8) All of 5-101 (1-42) approved.
8/12/78 4/16/82 47 FR 16331 (c)(16) Related to wood-fired boilers.
3/24/79 1/30/80 45 FR 6781 (c)(9) Related to PSD.
11/4/79 2/19/80 45 FR 10775 (c)(10) All of 5-101 (1-62) approved.
11/3/81 2/10/82 47 FR 6014 (c)(15)
9/17/86 7/17/87 52 FR 26982 (c)(19) Related to visibility in Class I areas. 5-101(3), (14), (21), (59), and (76) approved.
7/9/93 4/9/97 62 FR 17087 (c)(22) Adds definition of reasonably available control technology (RACT).
10/29/92 7/29/93 4/22/98 63 FR 19828 (c)(25) Add definitions associated with VOC RACT rules.
Subchapter II Prohibitions
Section 5-201 Open burning prohibited 12/10/72 5/31/72 37 FR 10899 (b)
1/25/78 12/21/78 43 FR 59496 (c)(8)
Section 5-202 Permissible open burning 12/10/72
1/25/78
5/31/72
12/21/78
37 FR 10899
43 FR 59496
(b)
(c)(8)
Section 5-203 Procedures for local authorities to burn natural wood 12/10/72
1/25/78
5/31/72
12/21/78
37 FR 10899
43 FR 59496
(b)
(c)(8)
Section 5-211 Prohibition of visible air contaminants 12/10/72
1/25/78
5/31/72
12/21/78
37 FR 10899
43 FR 59496
(b)
(c)(8)

5-211 (1)(2) approved.
8/12/78 4/16/82 47 FR 16331 (c)(16) 5-211 (3) not approved.
Section 5-221 Prohibition of potentially polluting materials in fuel 12/10/72
3/16/75
5/31/72
1/8/82
37 FR 10899
47 FR 948
(b)
(c)(14)

Except 5-221(c) (i) and (ii). Includes Moran Sta. Bubble Approval.
7/12/76 2/4/77 42 FR 6811 (c)(6)
1/25/78 12/21/78 43 FR 59496 (c)(8)
Section 5-231 Prohibition of particulate matter 12/10/72
12/10/72
5/31/72
5/14/73
37 FR 10899
38 FR 12713
(b)
(c)(3)
11/19/73 3/22/76 41 FR 11819 (c)(5) Regarding incinerators.
12/16/74 1/21/76 41 FR 3085 (c)(4) Regarding combustion contaminants.
7/12/76 2/4/77 42 FR 6811 (c)(6) Regarding incinerators asphalt plants.
3/14/77 8/2/78 43 FR 33918 (c)(7) Regarding wood processing plants.
1/25/78 12/21/78 43 FR 59496 (c)(8)
8/12/78 4/16/82 47 FR 16331 (c)(16) Except Cersosimo Lumber, Rutland Plywood, Moran Sta.
11/13/81 2/10/82 47 FR 6014 (c)(15) Repealed 5-231 (4).
8/23/83 48 FR 38235 (c)(17) Approved for Cersosimo Lumber.
2/26/85 50 FR 7767 (c)(18) Approved for Rutland Plywood.
Section 5-241 Prohibition of nuisance and odor 12/10/72
11/19/73
5/31/72
3/22/76
37 FR 10899
41 FR 11819
(b)
(c)(5)
1/25/78 12/21/78 43 FR 59496 (c)(8)
Section 5-251 Control of nitrogen oxides emissions 12/10/72
1/25/78
5/31/72
12/21/78
37 FR 10899
43 FR 59496
(b)
(c)(8)
3/25/79 2/19/80 45 FR 10775 (c)(10)
11/4/79 2/19/80 45 FR 10775 (c)(10)
7/9/93 4/9/97 62 FR 17087 (c)(22) Requires RACT for major stationary sources of NOX.
1/4/95 4/9/97 62 FR 17087 (c)(22) NOX RACT for Simpson Paper Company's Gilman facility.
Section 5-252 Control of sulfur dioxide emissions 7/12/76
1/25/78
2/4/77
12/21/78
42 FR 6811
43 FR 59496
(c)(6)
(c)(8)
3/24/79 2/19/80 45 FR 10775 (c)(10)
11/4/79 2/19/80 45 FR 10775 (c)(10)
Section 5-253 Control of volatile organic compounds 7/9/93 4/9/97 62 FR 17087 (c)(22) Requires RACT at non-CTG VOC sources.
1/4/95 4/9/97 62 FR 17087 (c)(22) Non-CTG VOC RACT for U.S. Samaica Corporation's Rutland facility.
Section 5-253.1 Petroleum Liquid Storage in Fixed Roof Tanks. 10/29/92 4/22/98 63 FR 19829 (c)(25)
Section 5-253.2 Bulk Gasoline Terminals 10/29/92 4/22/98 63 FR 19829 (c)(25)
Section 5-253.3 Bulk Gasoline Plants. 10/29/92 4/22/98 63 FR 19829 (c)(25)
Section 5-253.4 Gasoline Tank Trucks. 10/29/92 4/22/98 63 FR 19829 (c)(25)
Section 5-253.5 Stage I vapor recovery controls at gasoline dispensing facilities. 10/29/92 4/22/98 63 FR 19829 (c)(25)
Section 5-253.10 Paper Coating. 10/29/92 4/22/98 63 FR 19829 (c)(25)
Section 5-253.12 Coating of Flatwood Paneling. 10/29/92 4/22/98 63 FR 19829 (c)(25)
Section 5-253.13 Coating of Miscellaneous Metal Parts. 7/29/93 4/22/98 63 FR 19829 (c)(25)
Section 5-253.14 Solvent Metal Cleaning. 7/29/93 4/22/98 63 FR 19829 (c)(25)
Section 5-253.15 Cutback and Emulsified Asphalt. 8/2/94 4/22/98 63 FR 19829 (c)(25)
Section 5-261 Control of hazardous air contaminants 11/3/81 2/10/82 47 FR 6014 (c)(15)
Subchapter III Ambient Air Quality Stds
Section 5-301 Scope 12/10/72 5/31/72 37 FR 10899 (b)
3/24/79 2/19/80 45 FR 10775 (c)(10)
12/15/90 3/5/91 56 FR 9177 (c)(20)
Section 5-302 Sulfur dioxide primary 12/10/72 5/31/72 37 FR 10899 (b)
7/12/76 2/4/77 42 FR 6811 (c)(6)
3/24/79 2/19/80 45 FR 10775 (c)(10)
Section 5-303 Sulfur dioxide (secondary) 12/10/72
7/12/76
5/31/72
2/4/77
37 FR 10899
42 FR 6811
(b)
(c)(6)
3/24/79 2/19/80 45 FR 10775 (c)(10)
Section 5-304: PM10 Primary Standards 11/90 8/1/97 62 FR 41282 (c)(23) Removal of the TSP standard and establishment of the PM10 standard.
Section 5-305: PM10 Secondary Standards 11/90 8/1/97 62 FR 41282 (c)(23) Removal of the TSP standard and establishment of the PM10 standard.
Section 5-306 Carbon monoxide primary/secondary 12/10/72
11/19/73
5/31/72
3/22/76
37 FR 10899
41 FR 11819
(b)
(c)(5)
3/24/79 2/19/80 45 FR 10775 (c)(10)
Section 5-307 Ozone primary/secondary 12/10/72
12/16/74
5/31/72
1/21/76
37 FR 10899
41 FR 3085
(b)
(c)(4)
3/24/79 2/19/80 45 FR 10775 (c)(10)
Section 5-308 Lead (primary/secondary) 11/3/81 2/10/82 47 FR 6014 (c)(15)
Section 5-309 Nitrogen dioxide primary/secondary 12/15/90 3/5/91 56 FR 9177 (c)(20)
Subchapter IV Operations/Procedures
Section 5-401 Classification of air contaminant sources 3/24/79 2/19/80 45 FR 10775 (c)(10)
Section 5-402 Written reports when requested 12/10/72
12/10/72
5/31/72
5/14/73
37 FR 10899
38 FR 12713
(b)
(c)(3)
11/19/73 3/22/76 41 FR 11819 (c)(5)
3/24/79 2/19/80 45 FR 10775 (c)(10) 5-402(1) only.
Section 5-403 Circumvention 12/10/72 5/31/72 37 FR 10899 (b)
Section 5-404 Methods for sampling and testing of sources 12/10/72
1/25/78
5/31/72
12/21/78
37 FR 10899
43 FR 59496
(b)
(c)(8)
3/24/78 2/19/80 45 FR 10775 (c)(10)
Section 5-405 Required air monitoring 12/10/72 5/31/72 37 FR 10899 (b)
3/24/79 1/30/80 45 FR 6781 (c)(9) For PSD Plan.
3/24/79 2/19/80 45 FR 10775 (c)(10) For NSR Plan.
Section 5-406 Required air modeling 3/24/79 1/30/80 45 FR 6781 (c)(9) For PSD Plan.
3/24/79 2/19/80 45 FR 10775 (c)(10) For NSR Plan.
Subchapter V Review of New Air Contaminant Sources
Section 5-501 Review of construction or modification of air contaminant sources 12/10/72
12/10/72
1/25/78
5/31/72
5/14/73
12/21/78
37 FR 10899
38 FR 12713
43 FR 59496
(b)
(c)(3)
(c)(8)
3/24/79 1/30/80 45 FR 6781 (c)(9) Except 5-501(3).
11/4/79 2/19/80 45 FR 10775 (c)(10) Except 5-501(3).
11/3/81 2/10/82 47 FR 6014 (c)(15)
9/17/86 7/17/87 52 FR 26982 (c)(19) Related to visibility in Class I areas. 5-501(4) approved.
Section 5-502 Major stationary sources and major modifications 3/24/79
11/4/79
1/30/80
2/19/80
45 FR 6781
45 FR 10775
(c)(9)
(c)(10)
Except 5-502(5).
Except 5-502(5).
11/3/81 2/10/82 47 FR 6014 (c)(15)
9/17/86 7/17/87 52 FR 26982 (c)(19) Related to visibility in Class I areas. 5-502 (4)(d) and (4)(e) approved.
7/14/95 8/4/97 62 FR 41870 (c)(24)
Subchapter VII Motor vehicle emissions
Section 5-701 Removal of control devices 12/10/72
3/24/79
5/31/72
2/19/80
37 FR 10899
45 FR 10775
(b)
(c)(10)
Section 5-702 Excessive smoke emissions from motor vehicles 12/10/72
3/24/79
5/31/72
2/19/80
37 FR 10899
45 FR 10775
(b)
(c)(10)
Section 5-801 Effective date 3/24/79 1/30/80 45 FR 6781 (c)(9)
Table 1 - Process weight standards 12/10/72 5/31/72 37 FR 10899 (b)
1/25/78 12/21/78 43 FR 59496 (c)(8)
Figure 1 - Fuel-burning equipment 12/10/72 5/31/72 37 FR 10899 (b)
7/12/76 2/4/77 42 FR 6811 (c)(6)
1/25/78 12/21/78 43 FR 59496 (c)(8)
Table 2 - PSD increments 3/24/79 1/30/80 45 FR 6781 (c)(9)
12/15/90 3/5/91 56 FR 9177 (c)(20) Addition of NO2 increments for Class I, II, and III areas.
Table 3 - Levels of significant impact for nonattainment areas 3/24/79
11/4/79
2/19/80
2/19/80
45 FR 10775
45 FR 10775
(c)(10)
(c)(10)
11/3/81 2/10/82 47 FR 6014 (c)(15)
Definitions 4/20/88 1/10/95 60 FR 2527 (c)(21)
Section 5-802, Requirement for Registration 4/20/88 1/10/95 60 FR 2527 (c)(21)
Section 5-803, Registration Procedure 4/20/88 1/10/95 60 FR 2527 (c)(21)
Section 5-804, False or Misleading Information 4/20/88 1/10/95 60 FR 2527 (c)(21)
Section 5-805, Commencement or Recommencement of Operation 4/20/88 1/10/95 60 FR 2527 (c)(21)
Sections 5-806, Transfer of Operation 4/20/88 1/10/95 60 FR 2527 (c)(21)
[49 FR 46142, Nov. 23, 1984, as amended at 50 FR 7768, Feb. 26, 1985; 50 FR 23810, June 6, 1985; 52 FR 26982, July 17, 1987; 56 FR 9177, Mar. 5, 1991; 60 FR 2527, Jan. 10, 1995; 62 FR 17087, Apr. 9, 1997; 62 FR 41282, Aug. 1, 1997; 62 FR 41870, Aug. 4, 1997; 63 FR 19828, Apr. 22, 1998; 63 FR 23501, Apr. 29, 1998]