40:8.0.1.1.1.38.287 | SUBJGRP 287
| Introduction | |
40:8.0.1.1.1.38.287.1 | SECTION 60.4760
| 60.4760 What does this subpart do | |
40:8.0.1.1.1.38.287.2 | SECTION 60.4765
| 60.4765 When does this subpart become effective | |
40:8.0.1.1.1.38.288 | SUBJGRP 288
| Applicability and Delegation of Authority | |
40:8.0.1.1.1.38.288.3 | SECTION 60.4770
| 60.4770 Does this subpart apply to my sewage sludge incineration unit | |
40:8.0.1.1.1.38.288.4 | SECTION 60.4775
| 60.4775 What is a new sewage sludge incineration unit | |
40:8.0.1.1.1.38.288.5 | SECTION 60.4780
| 60.4780 What sewage sludge incineration units are exempt from this subpart | |
40:8.0.1.1.1.38.288.6 | SECTION 60.4785
| 60.4785 Who implements and enforces this subpart | |
40:8.0.1.1.1.38.288.7 | SECTION 60.4790
| 60.4790 How are these new source performance standards structured | |
40:8.0.1.1.1.38.288.8 | SECTION 60.4795
| 60.4795 Do all nine components of these new source performance standards apply at the same time | |
40:8.0.1.1.1.38.289 | SUBJGRP 289
| Preconstruction Siting Analysis | |
40:8.0.1.1.1.38.289.9 | SECTION 60.4800
| 60.4800 Who must prepare a siting analysis | |
40:8.0.1.1.1.38.289.10 | SECTION 60.4805
| 60.4805 What is a siting analysis | |
40:8.0.1.1.1.38.290 | SUBJGRP 290
| Operator Training and Qualification | |
40:8.0.1.1.1.38.290.11 | SECTION 60.4810
| 60.4810 What are the operator training and qualification requirements | |
40:8.0.1.1.1.38.290.12 | SECTION 60.4815
| 60.4815 When must the operator training course be completed | |
40:8.0.1.1.1.38.290.13 | SECTION 60.4820
| 60.4820 How do I obtain my operator qualification | |
40:8.0.1.1.1.38.290.14 | SECTION 60.4825
| 60.4825 How do I maintain my operator qualification | |
40:8.0.1.1.1.38.290.15 | SECTION 60.4830
| 60.4830 How do I renew my lapsed operator qualification | |
40:8.0.1.1.1.38.290.16 | SECTION 60.4835
| 60.4835 What if all the qualified operators are temporarily not accessible | |
40:8.0.1.1.1.38.290.17 | SECTION 60.4840
| 60.4840 What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel | |
40:8.0.1.1.1.38.291 | SUBJGRP 291
| Emission Limits, Emission Standards, and Operating Limits and Requirements | |
40:8.0.1.1.1.38.291.18 | SECTION 60.4845
| 60.4845 What emission limits and standards must I meet and by when | |
40:8.0.1.1.1.38.291.19 | SECTION 60.4850
| 60.4850 What operating limits and requirements must I meet and by when | |
40:8.0.1.1.1.38.291.20 | SECTION 60.4855
| 60.4855 How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, or activated carbon injection, or if I limit emissions in some other manner, to comply with the emission limits | |
40:8.0.1.1.1.38.291.21 | SECTION 60.4860
| 60.4860 Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction | |
40:8.0.1.1.1.38.291.22 | SECTION 60.4861
| 60.4861 How do I establish an affirmative defense for exceedance of an emission limit or standard during malfunction | |
40:8.0.1.1.1.38.292 | SUBJGRP 292
| Initial Compliance Requirements | |
40:8.0.1.1.1.38.292.23 | SECTION 60.4865
| 60.4865 How and when do I demonstrate initial compliance with the emission limits and standards | |
40:8.0.1.1.1.38.292.24 | SECTION 60.4870
| 60.4870 How do I establish my operating limits | |
40:8.0.1.1.1.38.292.25 | SECTION 60.4875
| 60.4875 By what date must I conduct the initial air pollution control device inspection and make any necessary repairs | |
40:8.0.1.1.1.38.292.26 | SECTION 60.4880
| 60.4880 How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation | |
40:8.0.1.1.1.38.293 | SUBJGRP 293
| Continuous Compliance Requirements | |
40:8.0.1.1.1.38.293.27 | SECTION 60.4885
| 60.4885 How and when do I demonstrate continuous compliance with the emission limits and standards | |
40:8.0.1.1.1.38.293.28 | SECTION 60.4890
| 60.4890 How do I demonstrate continuous compliance with my operating limits | |
40:8.0.1.1.1.38.293.29 | SECTION 60.4895
| 60.4895 By what date must I conduct annual air pollution control device inspections and make any necessary repairs | |
40:8.0.1.1.1.38.294 | SUBJGRP 294
| Performance Testing, Monitoring, and Calibration Requirements | |
40:8.0.1.1.1.38.294.30 | SECTION 60.4900
| 60.4900 What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards | |
40:8.0.1.1.1.38.294.31 | SECTION 60.4905
| 60.4905 What are the monitoring and calibration requirements for compliance with my operating limits | |
40:8.0.1.1.1.38.295 | SUBJGRP 295
| Recordkeeping and Reporting | |
40:8.0.1.1.1.38.295.32 | SECTION 60.4910
| 60.4910 What records must I keep | |
40:8.0.1.1.1.38.295.33 | SECTION 60.4915
| 60.4915 What reports must I submit | |
40:8.0.1.1.1.38.296 | SUBJGRP 296
| Title V Operating Permits | |
40:8.0.1.1.1.38.296.34 | SECTION 60.4920
| 60.4920 Am I required to apply for and obtain a title V operating permit for my unit | |
40:8.0.1.1.1.38.296.35 | SECTION 60.4925
| 60.4925 When must I submit a title V permit application for my new SSI unit | |
40:8.0.1.1.1.38.297 | SUBJGRP 297
| Definitions | |
40:8.0.1.1.1.38.297.36 | SECTION 60.4930
| 60.4930 What definitions must I know | |
40:8.0.1.1.1.38.298.37.56 | APPENDIX
| Table 1 to Subpart LLLL of Part 60 - Emission Limits and Standards for New Fluidized Bed Sewage Sludge Incineration Units | |
40:8.0.1.1.1.38.298.37.57 | APPENDIX
| Table 2 to Subpart LLLL of Part 60 - Emission Limits and Standards for New Multiple Hearth Sewage Sludge Incineration Units | |
40:8.0.1.1.1.38.298.37.58 | APPENDIX
| Table 3 to Subpart LLLL of Part 60 - Operating Parameters for New Sewage Sludge Incineration Units a | |
40:8.0.1.1.1.38.298.37.59 | APPENDIX
| Table 4 to Subpart LLLL of Part 60 - Toxic Equivalency Factors | |
40:8.0.1.1.1.38.298.37.60 | APPENDIX
| Table 5 to Subpart LLLL of Part 60 - Summary of Reporting Requirements for New Sewage Sludge Incineration Units a | |