Title 33
SECTION 117.925
117.925 Cooper River.
§ 117.925 Cooper River.The draw of the Seaboard System Railroad bridge, mile 42.8 near Cordesville, shall open on signal if at least six hours advance notice is given.
[CGD 7-85-24, 50 FR 37175, Sept. 12, 1985]