Title 2

PART 1122 APPENDIX B



Appendix B to Part 1122 - Terms and Conditions for NP Article II, “Environmental National Policy Requirements”

2:1.2.8.5.9.2.64.6.25 : Appendix B

Appendix B to Part 1122 - Terms and Conditions for NP Article II, “Environmental National Policy Requirements”

A DoD Component must use the following wording for NP Article II of its general terms and conditions in accordance with the provisions of Subpart B of this part.

NP Article II. Environmental national policy requirements. (December 2014)

Section A. Cross-cutting environmental requirements. You must:

1. You must comply with all applicable Federal environmental laws and regulations. The laws and regulations identified in this section are not intended to be a complete list.

2. Comply with applicable provisions of the Clean Air Act (42 U.S.C. 7401, et seq.) and Clean Water Act (33 U.S.C. 1251, et seq.).

3. Comply with applicable provisions of the Lead-Based Paint Poisoning Prevention Act (42 U.S.C. 4821-4846), as implemented by the Department of Housing and Urban Development at 24 CFR part 35. The requirements concern lead-based paint in buildings owned by the Federal Government or housing receiving Federal assistance.

4. Immediately identify to us, as the Federal awarding agency, any potential impact that you find this award may have on:

a. The quality of the “human environment”, as defined in 40 CFR 1508.14, including wetlands; and provide any help we may need to comply with the National Environmental Policy Act (NEPA, at 42 U.S.C. 4321 et seq.), the regulations at 40 CFR 1500-1508, and E.O. 12114, if applicable; and assist us to prepare Environmental Impact Statements or other environmental documentation. In such cases, you may take no action that will have an environmental impact (e.g., physical disturbance of a site such as breaking of ground) or limit the choice of reasonable alternatives to the proposed action until we provide written notification of Federal compliance with NEPA or E.O. 12114.

b. Flood-prone areas and provide any help we may need to comply with the National Flood Insurance Act of 1968, as amended by the Flood Disaster Protection Act of 1973 (42 U.S.C. 4001 et seq.), which require flood insurance, when available, for federally assisted construction or acquisition in flood-prone areas.

c. A land or water use or natural resource of a coastal zone that is part of a federally approved State coastal zone management plan and provide any help we may need to comply with the Coastal Zone Management Act of 1972 (16 U.S.C. 1451, et seq.) including preparation of a Federal agency Coastal Consistency Determination.

d. Coastal barriers along the Atlantic and Gulf coasts and Great Lakes' shores and provide help we may need to comply with the Coastal Barrier Resources Act (16 U.S.C. 3501 et seq.), concerning preservation of barrier resources.

e. Any existing or proposed component of the National Wild and Scenic Rivers system and provide any help we may need to comply with the Wild and Scenic Rivers Act of 1968 (16 U.S.C. 1271 et seq.).

f. Underground sources of drinking water in areas that have an aquifer that is the sole or principal drinking water source and in wellhead protection areas, and provide any help we may need to comply with the Safe Drinking Water Act (42 U.S.C. 300f et seq.).

5. You must comply fully with the Endangered Species Act of 1973, as amended (ESA, at 16 U.S.C. 1531 et seq.), and implementing regulations of the Departments of the Interior (50 CFR parts 10-24) and Commerce (50 CFR parts 217-227). You also must provide any help we may need in complying with the consultation requirements of ESA section 7 (16 U.S.C. 1536) applicable to Federal agencies or any regulatory authorization we may need based on the award of this grant. This is not in lieu of responsibilities you have to comply with provisions of the Act that apply directly to you as a U.S. entity, independent of receiving this award.

6. You must fully comply with the Marine Mammal Protection Act of 1972, as amended (MMPA, at 16 U.S.C. 1361 et seq.) and provide any assistance we may need in obtaining any required MMPA permit based on an award of this grant.

Section B. [Reserved]