Title 10

PART 52

Part 52 - Licenses, Certifications, And Approvals For Nuclear Power Plants

PART 52 - LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Authority:Atomic Energy Act of 1954, secs. 103, 104, 147, 149, 161, 181, 182, 183, 185, 186, 189, 223, 234 (42 U.S.C. 2133, 2134, 2167, 2169, 2201, 2231, 2232, 2233, 2235, 2236, 2239, 2273, 2282); Energy Reorganization Act of 1974, secs. 201, 202, 206, 211 (42 U.S.C. 5841, 5842, 5846, 5851); 44 U.S.C. 3504 note. Source:72 FR 49517, Aug. 28, 2007, unless otherwise noted.

10:2.0.1.1.2.0.61SUBJGRP 61
   General Provisions
10:2.0.1.1.2.0.61.1SECTION 52.0
   52.0 Scope; applicability of 10 CFR Chapter I provisions.
10:2.0.1.1.2.0.61.2SECTION 52.1
   52.1 Definitions.
10:2.0.1.1.2.0.61.3SECTION 52.2
   52.2 Interpretations.
10:2.0.1.1.2.0.61.4SECTION 52.3
   52.3 Written communications.
10:2.0.1.1.2.0.61.5SECTION 52.4
   52.4 Deliberate misconduct.
10:2.0.1.1.2.0.61.6SECTION 52.5
   52.5 Employee protection.
10:2.0.1.1.2.0.61.7SECTION 52.6
   52.6 Completeness and accuracy of information.
10:2.0.1.1.2.0.61.8SECTION 52.7
   52.7 Specific exemptions.
10:2.0.1.1.2.0.61.9SECTION 52.8
   52.8 Combining licenses; elimination of repetition.
10:2.0.1.1.2.0.61.10SECTION 52.9
   52.9 Jurisdictional limits.
10:2.0.1.1.2.0.61.11SECTION 52.10
   52.10 Attacks and destructive acts.
10:2.0.1.1.2.0.61.12SECTION 52.11
   52.11 Information collection requirements: OMB approval.
10:2.0.1.1.2.1SUBPART A
Subpart A - Early Site Permits
10:2.0.1.1.2.1.62.1SECTION 52.12
   52.12 Scope of subpart.
10:2.0.1.1.2.1.62.2SECTION 52.13
   52.13 Relationship to other subparts.
10:2.0.1.1.2.1.62.3SECTION 52.15
   52.15 Filing of applications.
10:2.0.1.1.2.1.62.4SECTION 52.16
   52.16 Contents of applications; general information.
10:2.0.1.1.2.1.62.5SECTION 52.17
   52.17 Contents of applications; technical information.
10:2.0.1.1.2.1.62.6SECTION 52.18
   52.18 Standards for review of applications.
10:2.0.1.1.2.1.62.7SECTION 52.21
   52.21 Administrative review of applications; hearings.
10:2.0.1.1.2.1.62.8SECTION 52.23
   52.23 Referral to the Advisory Committee on Reactor Safeguards (ACRS).
10:2.0.1.1.2.1.62.9SECTION 52.24
   52.24 Issuance of early site permit.
10:2.0.1.1.2.1.62.10SECTION 52.25
   52.25 Extent of activities permitted.
10:2.0.1.1.2.1.62.11SECTION 52.26
   52.26 Duration of permit.
10:2.0.1.1.2.1.62.12SECTION 52.27
   52.27 Limited work authorization after issuance of early site permit.
10:2.0.1.1.2.1.62.13SECTION 52.28
   52.28 Transfer of early site permit.
10:2.0.1.1.2.1.62.14SECTION 52.29
   52.29 Application for renewal.
10:2.0.1.1.2.1.62.15SECTION 52.31
   52.31 Criteria for renewal.
10:2.0.1.1.2.1.62.16SECTION 52.33
   52.33 Duration of renewal.
10:2.0.1.1.2.1.62.17SECTION 52.35
   52.35 Use of site for other purposes.
10:2.0.1.1.2.1.62.18SECTION 52.39
   52.39 Finality of early site permit determinations.
10:2.0.1.1.2.2SUBPART B
Subpart B - Standard Design Certifications
10:2.0.1.1.2.2.62.1SECTION 52.41
   52.41 Scope of subpart.
10:2.0.1.1.2.2.62.2SECTION 52.43
   52.43 Relationship to other subparts.
10:2.0.1.1.2.2.62.3SECTION 52.45
   52.45 Filing of applications.
10:2.0.1.1.2.2.62.4SECTION 52.46
   52.46 Contents of applications; general information.
10:2.0.1.1.2.2.62.5SECTION 52.47
   52.47 Contents of applications; technical information.
10:2.0.1.1.2.2.62.6SECTION 52.48
   52.48 Standards for review of applications.
10:2.0.1.1.2.2.62.7SECTION 52.51
   52.51 Administrative review of applications.
10:2.0.1.1.2.2.62.8SECTION 52.53
   52.53 Referral to the Advisory Committee on Reactor Safeguards (ACRS).
10:2.0.1.1.2.2.62.9SECTION 52.54
   52.54 Issuance of standard design certification.
10:2.0.1.1.2.2.62.10SECTION 52.55
   52.55 Duration of certification.
10:2.0.1.1.2.2.62.11SECTION 52.57
   52.57 Application for renewal.
10:2.0.1.1.2.2.62.12SECTION 52.59
   52.59 Criteria for renewal.
10:2.0.1.1.2.2.62.13SECTION 52.61
   52.61 Duration of renewal.
10:2.0.1.1.2.2.62.14SECTION 52.63
   52.63 Finality of standard design certifications.
10:2.0.1.1.2.3SUBPART C
Subpart C - Combined Licenses
10:2.0.1.1.2.3.62.1SECTION 52.71
   52.71 Scope of subpart.
10:2.0.1.1.2.3.62.2SECTION 52.73
   52.73 Relationship to other subparts.
10:2.0.1.1.2.3.62.3SECTION 52.75
   52.75 Filing of applications.
10:2.0.1.1.2.3.62.4SECTION 52.77
   52.77 Contents of applications; general information.
10:2.0.1.1.2.3.62.5SECTION 52.79
   52.79 Contents of applications; technical information in final safety analysis report.
10:2.0.1.1.2.3.62.6SECTION 52.80
   52.80 Contents of applications; additional technical information.
10:2.0.1.1.2.3.62.7SECTION 52.81
   52.81 Standards for review of applications.
10:2.0.1.1.2.3.62.8SECTION 52.83
   52.83 Finality of referenced NRC approvals; partial initial decision on site suitability.
10:2.0.1.1.2.3.62.9SECTION 52.85
   52.85 Administrative review of applications; hearings.
10:2.0.1.1.2.3.62.10SECTION 52.87
   52.87 Referral to the Advisory Committee on Reactor Safeguards (ACRS).
10:2.0.1.1.2.3.62.11SECTION 52.89
   52.89 [Reserved]
10:2.0.1.1.2.3.62.12SECTION 52.91
   52.91 Authorization to conduct limited work authorization activities.
10:2.0.1.1.2.3.62.13SECTION 52.93
   52.93 Exemptions and variances.
10:2.0.1.1.2.3.62.14SECTION 52.97
   52.97 Issuance of combined licenses.
10:2.0.1.1.2.3.62.15SECTION 52.98
   52.98 Finality of combined licenses; information requests.
10:2.0.1.1.2.3.62.16SECTION 52.99
   52.99 Inspection during construction; ITAAC schedules and notifications; NRC notices.
10:2.0.1.1.2.3.62.17SECTION 52.103
   52.103 Operation under a combined license.
10:2.0.1.1.2.3.62.18SECTION 52.104
   52.104 Duration of combined license.
10:2.0.1.1.2.3.62.19SECTION 52.105
   52.105 Transfer of combined license.
10:2.0.1.1.2.3.62.20SECTION 52.107
   52.107 Application for renewal.
10:2.0.1.1.2.3.62.21SECTION 52.109
   52.109 Continuation of combined license.
10:2.0.1.1.2.3.62.22SECTION 52.110
   52.110 Termination of license.
10:2.0.1.1.2.4SUBPART D
Subpart D [Reserved]
10:2.0.1.1.2.5SUBPART E
Subpart E - Standard Design Approvals
10:2.0.1.1.2.5.62.1SECTION 52.131
   52.131 Scope of subpart.
10:2.0.1.1.2.5.62.2SECTION 52.133
   52.133 Relationship to other subparts.
10:2.0.1.1.2.5.62.3SECTION 52.135
   52.135 Filing of applications.
10:2.0.1.1.2.5.62.4SECTION 52.136
   52.136 Contents of applications; general information.
10:2.0.1.1.2.5.62.5SECTION 52.137
   52.137 Contents of applications; technical information.
10:2.0.1.1.2.5.62.6SECTION 52.139
   52.139 Standards for review of applications.
10:2.0.1.1.2.5.62.7SECTION 52.141
   52.141 Referral to the Advisory Committee on Reactor Safeguards (ACRS).
10:2.0.1.1.2.5.62.8SECTION 52.143
   52.143 Staff approval of design.
10:2.0.1.1.2.5.62.9SECTION 52.145
   52.145 Finality of standard design approvals; information requests.
10:2.0.1.1.2.5.62.10SECTION 52.147
   52.147 Duration of design approval.
10:2.0.1.1.2.6SUBPART F
Subpart F - Manufacturing Licenses
10:2.0.1.1.2.6.62.1SECTION 52.151
   52.151 Scope of subpart.
10:2.0.1.1.2.6.62.2SECTION 52.153
   52.153 Relationship to other subparts.
10:2.0.1.1.2.6.62.3SECTION 52.155
   52.155 Filing of applications.
10:2.0.1.1.2.6.62.4SECTION 52.156
   52.156 Contents of applications; general information.
10:2.0.1.1.2.6.62.5SECTION 52.157
   52.157 Contents of applications; technical information in final safety analysis report.
10:2.0.1.1.2.6.62.6SECTION 52.158
   52.158 Contents of application; additional technical information.
10:2.0.1.1.2.6.62.7SECTION 52.159
   52.159 Standards for review of application.
10:2.0.1.1.2.6.62.8SECTION 52.161
   52.161 [Reserved]
10:2.0.1.1.2.6.62.9SECTION 52.163
   52.163 Administrative review of applications; hearings.
10:2.0.1.1.2.6.62.10SECTION 52.165
   52.165 Referral to the Advisory Committee on Reactor Safeguards (ACRS).
10:2.0.1.1.2.6.62.11SECTION 52.167
   52.167 Issuance of manufacturing license.
10:2.0.1.1.2.6.62.12SECTION 52.169
   52.169 [Reserved]
10:2.0.1.1.2.6.62.13SECTION 52.171
   52.171 Finality of manufacturing licenses; information requests.
10:2.0.1.1.2.6.62.14SECTION 52.173
   52.173 Duration of manufacturing license.
10:2.0.1.1.2.6.62.15SECTION 52.175
   52.175 Transfer of manufacturing license.
10:2.0.1.1.2.6.62.16SECTION 52.177
   52.177 Application for renewal.
10:2.0.1.1.2.6.62.17SECTION 52.179
   52.179 Criteria for renewal.
10:2.0.1.1.2.6.62.18SECTION 52.181
   52.181 Duration of renewal.
10:2.0.1.1.2.7SUBPART G
Subpart G [Reserved]
10:2.0.1.1.2.8SUBPART H
Subpart H - Enforcement
10:2.0.1.1.2.8.62.1SECTION 52.301
   52.301 Violations.
10:2.0.1.1.2.8.62.2SECTION 52.303
   52.303 Criminal penalties.
10:2.0.1.1.2.8.62.3.3APPENDIX Appendix A
   Appendix A to Part 52 - Design Certification Rule for the U.S. Advanced Boiling Water Reactor
10:2.0.1.1.2.8.62.3.4APPENDIX Appendix B
   Appendix B to Part 52 - Design Certification Rule for the System 80 + Design
10:2.0.1.1.2.8.62.3.5APPENDIX Appendix C
   Appendix C to Part 52 - Design Certification Rule for the AP600 Design
10:2.0.1.1.2.8.62.3.6APPENDIX Appendix D
   Appendix D to Part 52 - Design Certification Rule for the AP1000 Design
10:2.0.1.1.2.8.62.3.7APPENDIX Appendix E
   Appendix E to Part 52 - Design Certification Rule for the ESBWR Design
10:2.0.1.1.2.8.62.3.8APPENDIX Appendix F
   Appendix F to Part 52 - Design Certification Rule for the APR1400 Design
10:2.0.1.1.2.8.62.3.9APPENDIX
   Appendixes G-M to Part 52 [Reserved]
10:2.0.1.1.2.8.62.3.10APPENDIX Appendix N
   Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites