PART 2—AGENCY RULES OF PRACTICE AND PROCEDURE
Editorial Note:
Nomenclature changes to part 2 appear at 79 FR 75739, Dec. 19, 2014.
Contents
-
2.1
§ 2.1 Scope. -
2.2
§ 2.2 Subparts. -
2.3
§ 2.3 Resolution of conflict. -
2.4
§ 2.4 Definitions. -
2.8
§ 2.8 Information collection requirements: OMB approval. -
A
Subpart A—Procedure for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval Sections 2.100–2.103; Subject group Hearing on Application—How Initiated -
Appendix A to Part 2
Appendix A to Part 2 [Reserved] -
Appendix B to 10 CFR Part 2
Appendix B to 10 CFR Part 2—Model Milestones To Be Used By a Presiding Officer as a Guideline in Developing a Hearing Schedule for the Conduct of an Adjudicatory Proceeding in Accordance With 10 CFR 2.332. -
Appendix C to Part 2
Appendix C to Part 2 [Reserved] -
Appendix D to Part 2
Appendix D to Part 2—Schedule for the Proceeding on Consideration of Construction Authorization for a High-Level Waste Geologic Repository. -
B
Subpart B—Procedure for Imposing Requirements by Order, or for Modification, Suspension, or Revocation of a License, or for Imposing Civil Penalties Sections 2.200–2.206 -
I
Subpart I—Special Procedures Applicable to Adjudicatory Proceedings Involving Restricted Data and/or National Security Information Sections 2.900–2.913 -
L
Subpart L—Simplified Hearing Procedures for NRC Adjudications Sections 2.1200–2.1213 -
C
Subpart C—Rules of General Applicability: Hearing Requests, Petitions To Intervene, Availability of Documents, Selection of Specific Hearing Procedures, Presiding Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings Sections 2.300–2.390 -
D
Subpart D—Additional Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites Sections 2.400–2.407 -
E
Subpart E—Additional Procedures Applicable to Proceedings for the Issuance of Licenses To Manufacture Nuclear Power Reactors To Be Operated at Sites Not Identified in the License Application and Related Licensing Proceedings Sections 2.500–2.504 -
F
Subpart F—Additional Procedures Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a Construction Permit or Combined License To Construct Certain Utilization Facilities; and Advance Issuance of Limited Work Authorizations Sections 2.600–2.601; Subject groups Early Partial Decisions on Site Suitability—Combined License Under 10 CFR Part 52–Phased Applications Involving Limited Work Authorizations -
G
Subpart G—Rules for Formal Adjudications Sections 2.700–2.713 -
H
Subpart H—Rulemaking Sections 2.800–2.819 -
J
Subpart J—Procedures Applicable to Proceedings for the Issuance of Licenses for the Receipt of High-Level Radioactive Waste at a Geologic Repository Sections 2.1000–2.1027 -
K
Subpart K—Hybrid Hearing Procedures for Expansion of Spent Nuclear Fuel Storage Capacity at Civilian Nuclear Power Reactors Sections 2.1101–2.1119 -
M
Subpart M—Procedures for Hearings on License Transfer Applications Sections 2.1300–2.1331 -
N
Subpart N—Expedited Proceedings with Oral Hearings Sections 2.1400–2.1407 -
O
Subpart O—Legislative Hearings Sections 2.1500–2.1509