Appendix A to Subpart B of Part 1730 - Review Rating Summary, RUS Form 300
7:11.1.2.1.14.2.1.12.4 : Appendix A
Appendix A to Subpart B of Part 1730 - Review Rating Summary, RUS
Form 300 Borrower Designation ________ Date Prepared ________
Ratings on form are:
0: Unsatisfactory - no records 1: Unsatisfactory - corrective
action needed 2: Acceptable, but should be improved - see attached
recommendations 3: Satisfactory - no additional action required at
this time N/A: Not applicable PART I - TRANSMISSION and
DISTRIBUTION FACILITIES 1. Substations (Transmission and
Distribution) a. Safety, Clearance, Code Compliance - Rating:
________ b. Physical Condition: Structure, Major Equipment,
Appearance -
Rating: ________
c. Inspection Records Each Substation - Rating: ________ d. Oil
Spill Prevention - Rating: ________ 2. Transmission Lines a.
Right-of-Way: Clearing, Erosion, Appearance, Intrusions -
Rating: ________
b. Physical Condition: Structure, Conductor, Guying - Rating:
________ c. Inspection Program and Records - Rating: ________ 3.
Distribution Lines - Overhead a. Inspection Program and Records -
Rating: ________ b. Compliance with Safety Codes: Clearances -
Rating: ________ Compliance with Safety Codes: Foreign Structures -
Rating: ________ Compliance with Safety Codes: Attachments -
Rating: ________ c. Observed Physical Condition from Field
Checking: Right-of-Way - Rating: ________ Observed Physical
Condition from Field Checking: Other - Rating: ________ 4.
Distribution - Underground Cable a. Grounding and Corrosion Control
- Rating: ________ b. Surface Grading, Appearance -
Rating: ________
c. Riser Poles: Hazards, Guying, Condition - Rating: ________ 5.
Distribution Line Equipment: Conditions and Records a. Voltage
Regulators - Rating: ________ b. Sectionalizing Equipment -
Rating: ________
c. Distribution Transformers -
Rating: ________
d. Pad Mounted Equipment - Safety: Locking, Dead Front, Barriers -
Rating: ________ Pad Mounted Equipment - Appearance: Settlement,
Condition - Rating: ________ e. Kilowatt-hour and Demand Meter
Reading and Testing - Rating: ________ PART II - OPERATION AND
MAINTENANCE 6. Line Maintenance and Work Order Procedures a. Work
Planning and Scheduling -
Rating: ________
b. Work Backlogs: Right-of-Way Maintenance - Rating: ________ Work
Backlogs: Poles - Rating: ________ Work Backlogs: Retirement of
Idle Services - Rating: ________ Work Backlogs: Other - Rating:
________ 7. Service Interruptions a. Average Annual Hours/Consumer
by Cause (Complete for each of the previous 5 years) 1. Power
Supplier ________ 2. Major Storm ________ 3. Scheduled ________ 4.
All Other ________ 5. Total ________ Rating: ________ b. Emergency
Restoration Plan - Rating:________ 8. Power Quality General Freedom
from Complaints - Rating:________ 9. Loading and Load Balance a.
Distribution Transformer Loading - Rating:________ b. Load Control
Apparatus - Rating:________ c. Substation and Feeder Loading -
Rating:________ 10. Maps and Plant Records a. Operating Maps:
Accurate and Up-to-Date - Rating:________ b. Circuit Diagrams -
Rating:________ c. Staking Sheets - Rating:________ PART III -
ENGINEERING 11. System Load Conditions and Losses a. Annual System
Loses, ________% - Rating:________ b. Annual Load Factor, ________%
- Rating:________ c. Power Factor at Monthly Peak, ________% -
Rating:________ d. Ratio of Individual Substation Peak kW to kVA,
________ - Rating:________ 12. Voltage Conditions a. Voltage
Surveys - Rating:________ b. Substation Transformer Output Voltage
Spread - Rating:________ 13. Load Studies and Planning a. Long
Range Engineering Plan - Rating:________ b. Construction Work Plan
- Rating:________ c. Sectionalizing Study - Rating:________ d. Load
Data for Engineering Studies - Rating:________ e. Load Forecasting
Data - Rating:________ f. Energy Efficiency and Conservation
Program quality assurance compliance - Rating:______ PART IV -
OPERATION AND MAINTENANCE BUDGETS
For Previous 2 Years:
Normal Operation - Actual $________ Normal Maintenance - Actual
$________ Total - Actual $________
For Present Year:
Normal Operation - Budget $________ Normal Maintenance - Budget
$________ Total - Budget $________
For Future 3 Years:
Normal Operation - Budget $________ Normal Maintenance - Budget
$________ Additional (Deferred) Maintenance - Budget $________
Total - Budget $________
14. Budgeting:
Adequacy of Budgets For Needed Work - Rating:________
15. Date Budget Discussed with Board of Directors ________
Remarks: ________ EXPLANATORY NOTES Item No. ________ Comments
________ Rated by ________ ________ Title ________ Date ________
Reviewed by ________ Manager ________ Date ________ Reviewed by
________ RUS GFR ________ Date ________ [63 FR 3450, Jan. 23, 1998,
as amended at 78 FR 73371, Dec. 5, 2013; 84 FR 32618, July 9, 2019]