Title 48

SECTION 3052.203-70

3052.203-70 Instructions for Contractor Disclosure of Violations.

3052.203-70 Instructions for Contractor Disclosure of Violations.

As prescribed in (HSAR) 48 CFR 3003.1004(a), insert the following clause:

Instructions for Contractor Disclosure of Violations (SEP 2012)

When making a written disclosure under the clause at FAR 52.203-13, paragraph (b)(3), the Contractor shall use the Contractor Disclosure Form at http://www.oig.dhs.gov and submit the disclosure electronically to the Department of Homeland Security Office of Inspector General. The Contractor shall provide a copy of the disclosure to the Contracting Officer by email or facsimile on the same business day as the submission to the Office of Inspector General. The Contractor shall provide the Contracting Officer a concurrent copy of any supporting materials submitted to the Office of Inspector General.

[77 FR 54836, Sept. 6, 2012]