Title 48
SECTION 252.247-7014
252.247-7014 Demurrage.
252.247-7014 Demurrage.As prescribed in 247.271-3(c), use the following clause:
Demurrage (DEC 1991)The Contractor shall be liable for all demurrage, detention, or other charges as a result of its failure to load or unload trucks, freight cars, freight terminals, vessel piers, or warehouses within the free time allowed under applicable rules and tariffs.
(End of clause) [56 FR 36479, July 31, 1991, as amended at 75 FR 51419, Aug. 20, 2010; 84 FR 25195, May 31, 2019; 84 FR 30952, June 28, 2019]