eCFR.io
Daily eCFR

247.270-2 Technical provisions.

48 CFR 247.270-2

Citation48 CFR 247.270-2
CorpusDaily eCFR
Displayed edition2026-09-01
Last updated2026-09-01

247.270-2 Technical provisions.

(a) Because conditions vary at different ports, and sometimes within the same port, it is not practical to develop standard technical provisions covering all phases of stevedoring operations.

(b) When including rail car, truck, or intermodal equipment loading and unloading, or other dock and terminal work under a stevedoring contract, include these requirements as separate items of work.

[65 FR 50144, Aug. 17, 2000. Redesignated at 75 FR 51417, Aug. 20, 2010]