Title 47

SECTION 25.210

25.210 Technical requirements for space stations.

§ 25.210 Technical requirements for space stations.

(a)-(b) [Reserved]

(c) Space station antennas operating in the Direct Broadcast Satellite Service or operating in the Fixed-Satellite Service for reception of feeder links for Direct Broadcast Satellite Service must be designed to provide a cross-polarization isolation such that the ratio of the on-axis co-polar gain to the cross-polar gain of the antenna in the assigned frequency band is at least 27 dB within the primary coverage area.

(d)-(e) [Reserved]

(f) All space stations in the Fixed-Satellite Service operating in any portion of the 3600-4200 MHz, 5091-5250 MHz, 5850-7025 MHz, 10.7-12.7 GHz, 12.75-13.25 GHz, 13.75-14.5 GHz, 15.43-15.63 GHz, 18.3-20.2 GHz, 24.75-25.25 GHz, or 27.5-30.0 GHz bands, including feeder links for other space services, and in the Broadcasting-Satellite Service in the 17.3-17.8 GHz band (space-to-Earth), shall employ state-of-the-art full frequency reuse, either through the use of orthogonal polarizations within the same beam and/or the use of spatially independent beams. This requirement does not apply to telemetry, tracking, and command operation.

(g)-(h) [Reserved]

(i) 17/24 GHz BSS space station antennas transmitting in the 17.3-17.8 GHz band must be designed to provide a cross-polarization isolation such that the ratio of the on axis co-polar gain to the cross-polar gain of the antenna in the assigned frequency band is at least 25 dB within its primary coverage area.

(j) Space stations operated in the geostationary satellite orbit must be maintained within 0.05° of their assigned orbital longitude in the east/west direction, unless specifically authorized by the Commission to operate with a different longitudinal tolerance, and except as provided in Section 25.283(b) (End-of-life Disposal).

[58 FR 13420, Mar. 11, 1993, as amended at 61 FR 9952, Mar. 12, 1996; 62 FR 5931, Feb. 10, 1997; 62 FR 61457, Nov. 18, 1997; 68 FR 51508, Aug. 27, 2003; 69 FR 54587, Sept. 9, 2004; 70 FR 32256, June 2, 2005; 72 FR 50029, Aug. 29, 2007; 78 FR 8428, Feb. 6, 2013; 79 FR 8323, Feb. 12, 2014; 81 FR 55338, Aug. 18, 2016; 83 FR 34491, July 20, 2018]