Title 40
SECTION 86.1530
86.1530 Test sequence; general requirements.
§ 86.1530 Test sequence; general requirements.(a) The following test sequence lists the major steps encountered during the idle test:
Preparation Warm-up (or Emission Test) Preconditioning, 30 seconds minimum, six minutes maximum Idle Stabilization, 30±5 seconds Idle Emission Sampling, one minute minimum, six minutes maximum These steps are described by subsequent procedures.(b) Ambient test cell conditions during the test shall be those specified in § 86.130-78 or 40 CFR part 1065, subpart F.
[48 FR 52252, Nov. 16, 1983, as amended at 70 FR 40441, July 13, 2005. Redesignated at 73 FR 37194, June 30, 2008]