Title 40
SECTION 63.9610
63.9610 What are my general requirements for complying with this subpart
§ 63.9610 What are my general requirements for complying with this subpart?(a) On or before January 25, 2021, for affected sources that commenced construction or reconstruction on or before September 25, 2019, you must be in compliance with the requirements in paragraphs (a)(1) through (6) of this section at all times, except during periods of startup, shutdown, and malfunction. After January 25, 2021, for affected sources that commenced construction or reconstruction on or before September 25, 2019, and after July 28, 2020, for affected sources that commenced construction or reconstruction after September 25, 2019, you must be in compliance with the emission limitations, standards, and operation and maintenance requirements in this subpart at all times.
(1) The emission limitations in § 63.9590.
(2) The work practice standards in § 63.9591.
(3) The operation and maintenance requirements in § 63.9600.
(4) The notification requirements in § 63.9640.
(5) The reporting requirements in § 63.9641.
(6) The recordkeeping requirements in § 63.9642.
(b) During the period between the compliance date specified for your affected source in § 63.9583 and the date upon which continuous monitoring systems have been installed and certified and any applicable operating limits have been set, you must maintain a log detailing the operation and maintenance of the process and emissions control equipment. This includes the daily monitoring and recordkeeping of air pollution control device operating parameters as specified in § 63.9590(b).
(c) On or before January 25, 2021, for affected sources that commenced construction or reconstruction on or before September 25, 2019, you must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). For affected sources, a startup, shutdown, and malfunction plan is not required after January 25, 2021. No startup, shutdown, and malfunction plan is required for affected sources that commenced construction or reconstruction after September 25, 2019.
[68 FR 61888, Oct. 30, 2003, as amended at 71 FR 20470, Apr. 20, 2006; 85 FR 45492, July 28, 2020]