Title 40
SECTION 63.2870
63.2870 What parts of the General Provisions apply to me
§ 63.2870 What parts of the General Provisions apply to me?Table 1 of this section shows which parts of the General Provisions in §§ 63.1 through 63.15 apply to you. Table 1 of § 63.2870 follows:
Table 1 to § 63.2870 - Applicability of 40 CFR Part 63, Subpart A, to 40 CFR, Part 63, Subpart GGGG
General provisions citation | Subject of citation | Brief description of requirement | Applies to subpart | Explanation |
---|---|---|---|---|
§ 63.1 | Applicability | Initial applicability determination; applicability after standard established; permit requirements; extensions; notifications | Yes | |
§ 63.2 | Definitions | Definitions for part 63 standards | Yes | Except as specifically provided in this subpart. |
§ 63.3 | Units and abbreviations | Units and abbreviations for part 63 standards | Yes | |
§ 63.4 | Prohibited activities and circumvention | Prohibited activities; compliance date; circumvention; severability | Yes | |
§ 63.5 | Construction/reconstruction | Applicability; applications; approvals | Yes | Except for subsections of § 63.5 as listed below. |
§ 63.5(c) | [Reserved] | |||
§ 63.5(d)(1)(ii)(H) | Application for approval | Type and quantity of HAP, operating parameters | No | All sources emit HAP. Subpart GGGG does not require control from specific emission points. |
§ 63.5(d)(1)(ii)(I) | [Reserved] | |||
§ 63.5(d)(1)(iii), (d)(2), (d)(3)(ii) | Application for approval | No | The requirements of the application for approval for new, reconstructed and significantly modified sources are described in § 63.2860(b) and (c) of subpart GGGG. General provision requirements for identification of HAP emission points or estimates of actual emissions are not required. Descriptions of control and methods, and the estimated and actual control efficiency of such do not apply. Requirements for describing control equipment and the estimated and actual control efficiency of such equipment apply only to control equipment to which the subpart GGGG requirements for quantifying. | |
§ 63.6 | Applicability of General Provisions | Applicability | Yes | Except for subsections of § 63.6 as listed below. |
§ 63.6(b)(1)-(3) | Compliance dates, new and reconstructed sources | No | Section 63.2834 of subpart GGGG specifies the compliance dates for new and reconstructed sources. | |
§ 63.6(b)(6) | [Reserved] | |||
§ 63.6(c)(3)-(4) | [Reserved] | |||
§ 63.6(d) | [Reserved] | |||
§ 63.6(e)(1)(i) | Operation and Maintenance | Yes, before September 15, 2020. No, on or after September 15, 2020 | See § 63.2840(g) for general duty requirement | |
§ 63.6(e)(1)(ii) | Operation and Maintenance | Requirement to correct malfunctions as soon as practicable | Yes, before September 15, 2020]. No, on or after September 15, 2020 | See § 63.2840(g) for general duty requirement. |
§ 63.6(e)(3)(i) through (e)(3)(ii) and § 63.6(e)(3)(v) through (vii) | Operation and maintenance requirements | Yes, before September 15, 2020 | Minimize emissions to the extent practicable. On or after September 15, 2020, see § 63.2840(g) for general duty requirement. | |
§ 63.6(e)(3)(iii) | Operation and maintenance requirements | No | Minimize emissions to the extent practicable. On or after September 15, 2020, see § 63.2840(g) for general duty requirement. | |
§ 63.6(e)(3)(iv) | Operation and maintenance requirements | No | Report SSM and in accordance with § 63.2861(c) and (d). | |
§ 63.6(e)(3)(viii) | Operation and maintenance requirements | Yes, before September 15, 2020. No, on or after September 15, 2020 | Except, before September 15, 2020, report each revision to your SSM plan in accordance with § 63.2861(c) rather than § 63.10(d)(5) as required under § 63.6(e)(3)(viii). | |
§ 63.6(e)(3)(ix) | Title V permit | Yes, before September 15, 2020. No, on or after September 15, 2020 | ||
§ 63.6(f)(1) | Compliance with nonopacity emission standards except during SSM | Comply with emission standards at all times except during SSM | Yes, before September 15, 2020. No, on or after September 15, 2020 | |
§ 63.6(f)(2)-(3) | Methods for Determining Compliance | Yes | ||
§ 63.6(g) | Use of an Alternative Standard | Yes | ||
§ 63.6(h) | Opacity/Visible emission (VE) standards | No | Subpart GGGG has no opacity or VE standards. | |
§ 63.6(i) | Compliance extension | Procedures and criteria for responsible agency to grant compliance extension | Yes. | |
§ 63.6(j) | Presidential compliance exemption | President may exempt source category from requirement to comply with subpart | Yes. | |
§ 63.7(e)(1) | Performance testing requirements | Representative conditions for performance test | Yes, before September 15, 2020. No, on or after September 15, 2020 | See § 63.2853(a)(5)(i)(A) for performance testing requirements. |
§ 63.7(e)(2)-(4), (f), (g), and (h) | Performance testing requirements | Schedule, conditions, notifications and procedures | Yes | Subpart GGGG requires performance testing only if the source applies additional control that destroys solvent. Section 63.2850(a)(6) requires sources to follow the performance testing guidelines of the General Provisions if a control is added. |
§ 63.8 | Monitoring requirements | No | Subpart GGGG does not require monitoring other than as specified therein. | |
§ 63.9 | Notification requirements | Applicability and state delegation | Yes | Except for subsections of § 63.9 as listed below. |
§ 63.9(b)(2) | Notification requirements | Initial notification requirements for existing sources | No | Section 63.2860(a) of subpart GGGG specifies the requirements of the initial notification for existing sources. |
§ 63.9(b)(3)-(5) | Notification requirements | Notification requirement for certain new/reconstructed sources | Yes | Except the information requirements differ as described in § 63.2860(b) of subpart GGGG. |
§ 63.9(e) | Notification of performance test | Notify responsible agency 60 days ahead | Yes | Applies only if performance testing is performed. |
§ 63.9(f) | Notification of VE/opacity observations | Notify responsible agency 30 days ahead | No | Subpart GGGG has no opacity or VE standards. |
§ 63.9(g) | Additional notifications when using a continuous monitoring system (CMS) | Notification of performance evaluation; Notification using COMS data; notification that exceeded criterion for relative accuracy | No | Subpart GGGG has no CMS requirements. |
§ 63.9(h) | Notification of compliance status | Contents | No | Section 63.2860(d) of subpart GGGG specifies requirements for the notification of compliance status. |
§ 63.9(j) | Notification requirements | Change in previous information | Yes | |
§ 63.9(k) | Notification requirements | Electronic reporting procedures | Yes | Only as specified in § 63.9(j). |
§ 63.10 | Recordkeeping/reporting | Schedule for reporting, record storage | Yes | Except for subsections of § 63.10 as listed below. |
§ 63.10(b)(2)(i) | Recordkeeping | Record SSM event | Yes, before September 15, 2020. No, on or after September 15, 2020 | Before September 15, 2020, applicable to periods when sources must implement their SSM plan as specified in subpart GGGG. On or after September 15, 2020, meet the requirements of § 63.2862(f). |
§ 63.10(b)(2)(ii)-(iii) | Recordkeeping | Malfunction of air pollution equipment | No | Before September 15, 2020, applies only if air pollution control equipment has been added to the process and is necessary for the source to meet the emission limit. On or after September 15, 2020, meet the requirements of § 63.2862(g). |
§ 63.10(b)(2)(iv)-(v) | Recordkeeping | SSM recordkeeping | Yes, before September 15, 2020. No, on or after September 15, 2020 | |
§ 63.10(b)(2)(vi) | Recordkeeping | CMS recordkeeping | No | Subpart GGGG has no CMS requirements. |
§ 63.10(b)(2)(viii)-(ix) | Recordkeeping | Conditions of performance test | Yes | Applies only if performance tests are performed. Subpart GGGG does not have any CMS opacity or VE observation requirements. |
§ 63.10(b)(2)(x)-(xii) | Recordkeeping | CMS, performance testing, and opacity and VE observations recordkeeping | No | Subpart GGGG does not require CMS. |
§ 63.10(c) | Recordkeeping | Additional CMS recordkeeping | No | Subpart GGGG does not require CMS. |
§ 63.10(d)(2) | Reporting | Reporting performance test results | Yes | Applies only if performance testing is performed. |
§ 63.10(d)(3) | Reporting | Reporting opacity or VE observations | No | Subpart GGGG has no opacity or VE standards. |
§ 63.10(d)(4) | Reporting | Progress reports | Yes | Applies only if a condition of compliance extension exists. |
§ 63.10(d)(5) | Reporting | SSM reporting | No | Section 63.2861(c) and (d) specify SSM reporting requirements. |
§ 63.10(e) | Reporting | Additional CMS reports | No | Subpart GGGG does not require CMS. |
§ 63.11 | Control device requirements | Requirements for flares | Yes | Applies only if your source uses a flare to control solvent emissions. Subpart GGGG does not require flares. |
§ 63.12 | State authority and delegations | State authority to enforce standards | Yes | |
§ 63.13 | State/regional addresses | Addresses where reports, notifications, and requests are sent | Yes | |
§ 63.14 | Incorporation by reference | Test methods incorporated by reference | Yes | |
§ 63.15 | Availability of information and confidentiality | Public and confidential information | Yes |