- CFR
- ›
- Title 40
- ›
- Chapter I
- ›
- Part 63
- ›
- Subpart GGG
- ›
- Appendix Table 6 to Subpart GGG of Part 63
Table 6 to Subpart GGG of Part 63—Wastewater—Compliance Options for Wastewater Tanks
| Capacity, m3 | Maximum true vapor pressure, kPa | Control requirements |
|---|
| <75 | | § 63.1256(b)(1). |
| >75 and <151 | <13.1 | § 63.1256(b)(1). |
| | >13.1 | § 63.1256(b)(2). |
| >151 | <5.2 | § 63.1256(b)(1). |
| | >5.2 | § 63.1256(b)(2). |