Title 40

PART 62 SUBPART HHH

Subpart HHH - Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed On Or Before December 1, 2008 Source:65 FR 49881, Aug. 15, 2000, unless otherwise noted.

40:10.0.1.1.2.60.971SUBJGRP 971
Applicability
40:10.0.1.1.2.60.971.1SECTION 62.14400
   62.14400 Am I subject to this subpart
40:10.0.1.1.2.60.971.2SECTION 62.14401
   62.14401 How do I determine if my HMIWI is covered by an approved and effective State or Tribal plan
40:10.0.1.1.2.60.971.3SECTION 62.14402
   62.14402 If my HMIWI is not listed on the Federal plan inventory, am I exempt from this subpart
40:10.0.1.1.2.60.971.4SECTION 62.14403
   62.14403 What happens if I modify an existing HMIWI
40:10.0.1.1.2.60.972SUBJGRP 972
Emission Limits
40:10.0.1.1.2.60.972.5SECTION 62.14410
   62.14410 Are there different emission limits for different locations and sizes of HMIWI
40:10.0.1.1.2.60.972.6SECTION 62.14411
   62.14411 What emission limits apply to my HMIWI
40:10.0.1.1.2.60.972.7SECTION 62.14412
   62.14412 What stack opacity and visible emissions requirements apply
40:10.0.1.1.2.60.972.8SECTION 62.14413
   62.14413 When do the emissions limits and stack opacity and visible emissions requirements apply
40:10.0.1.1.2.60.973SUBJGRP 973
Operator Training and Qualification
40:10.0.1.1.2.60.973.9SECTION 62.14420
   62.14420 Am I required to have a trained and qualified operator
40:10.0.1.1.2.60.973.10SECTION 62.14421
   62.14421 How does an operator become trained and qualified
40:10.0.1.1.2.60.973.11SECTION 62.14422
   62.14422 What are the requirements for a training course that is not part of a State-approved program
40:10.0.1.1.2.60.973.12SECTION 62.14423
   62.14423 What are the qualification requirements for operators who do not participate in a State-approved program
40:10.0.1.1.2.60.973.13SECTION 62.14424
   62.14424 What documentation must I maintain onsite
40:10.0.1.1.2.60.973.14SECTION 62.14425
   62.14425 When must I review the documentation
40:10.0.1.1.2.60.974SUBJGRP 974
Waste Management Plan
40:10.0.1.1.2.60.974.15SECTION 62.14430
   62.14430 Must I prepare a waste management plan
40:10.0.1.1.2.60.974.16SECTION 62.14431
   62.14431 What must my waste management plan include
40:10.0.1.1.2.60.974.17SECTION 62.14432
   62.14432 When must my waste management plan be completed
40:10.0.1.1.2.60.975SUBJGRP 975
Inspection Requirements
40:10.0.1.1.2.60.975.18SECTION 62.14440
   62.14440 Which HMIWI are subject to inspection requirements
40:10.0.1.1.2.60.975.19SECTION 62.14441
   62.14441 When must I inspect my HMIWI equipment and air pollution control devices
40:10.0.1.1.2.60.975.20SECTION 62.14442
   62.14442 What must my inspection include
40:10.0.1.1.2.60.975.21SECTION 62.14443
   62.14443 When must I do repairs
40:10.0.1.1.2.60.976SUBJGRP 976
Performance Testing and Monitoring Requirements
40:10.0.1.1.2.60.976.22SECTION 62.14450
   62.14450 [Reserved]
40:10.0.1.1.2.60.976.23SECTION 62.14451
   62.14451 What are the testing requirements for HMIWI that are not small rural
40:10.0.1.1.2.60.976.24SECTION 62.14452
   62.14452 What test methods and procedures must I use
40:10.0.1.1.2.60.976.25SECTION 62.14453
   62.14453 What must I monitor
40:10.0.1.1.2.60.976.26SECTION 62.14454
   62.14454 How must I monitor the required parameters
40:10.0.1.1.2.60.976.27SECTION 62.14455
   62.14455 What if my HMIWI goes outside of a parameter limit
40:10.0.1.1.2.60.977SUBJGRP 977
Reporting and Recordkeeping Requirements
40:10.0.1.1.2.60.977.28SECTION 62.14460
   62.14460 What records must I maintain
40:10.0.1.1.2.60.977.29SECTION 62.14461
   62.14461 For how long must I maintain records
40:10.0.1.1.2.60.977.30SECTION 62.14462
   62.14462 Where must I keep the records
40:10.0.1.1.2.60.977.31SECTION 62.14463
   62.14463 What reporting requirements must I satisfy
40:10.0.1.1.2.60.977.32SECTION 62.14464
   62.14464 When must I submit reports
40:10.0.1.1.2.60.977.33SECTION 62.14465
   62.14465 Who must sign all submitted reports
40:10.0.1.1.2.60.978SUBJGRP 978
Compliance Schedule
40:10.0.1.1.2.60.978.34SECTION 62.14470
   62.14470 When must I comply with this subpart if I plan to continue operation of my HMIWI
40:10.0.1.1.2.60.978.35SECTION 62.14471
   62.14471 When must I comply with this subpart if I plan to shut down
40:10.0.1.1.2.60.978.36SECTION 62.14472
   62.14472 When must I comply with this subpart if I plan to shut down and later restart
40:10.0.1.1.2.60.979SUBJGRP 979
Permitting Obligation
40:10.0.1.1.2.60.979.37SECTION 62.14480
   62.14480 Does this subpart require me to obtain an operating permit under title V of the Clean Air Act and implementing regulations
40:10.0.1.1.2.60.979.38SECTION 62.14481
   62.14481 When must I submit a title V permit application for my HMIWI
40:10.0.1.1.2.60.980SUBJGRP 980
Definitions
40:10.0.1.1.2.60.980.39SECTION 62.14490
   62.14490 Definitions.
40:10.0.1.1.2.60.981SUBJGRP 981
Delegation of Authority
40:10.0.1.1.2.60.981.40SECTION 62.14495
   62.14495 What authorities will be retained by the EPA Administrator
40:10.0.1.1.2.60.982.41.19APPENDIX
   Table 1 to Subpart HHH of Part 62 - Emission Limits for Small Rural, Small, Medium, and Large HMIWI
40:10.0.1.1.2.60.982.41.20APPENDIX
   Table 2 to Subpart HHH of Part 62 - Toxic Equivalency Factors
40:10.0.1.1.2.60.982.41.21APPENDIX
   Table 3 to Subpart HHH of Part 62 - Operating Parameters To Be Monitored and Minimum Measurement and Recording Frequencies