';
Toggle navigation
eCFR
Home
Title 36
PART 9
CFR
›
Title 36
›
Volume 1
›
Chapter I
›
Part 9
Part 9 - Minerals Management
PART 9 - MINERALS MANAGEMENT
36:1.0.1.1.9.1
SUBPART A
Subpart A - Mining and Mining Claims
36:1.0.1.1.9.1.19.1
SECTION 9.1
9.1 Purpose and scope.
36:1.0.1.1.9.1.19.2
SECTION 9.2
9.2 Definitions.
36:1.0.1.1.9.1.19.3
SECTION 9.3
9.3 Access permits.
36:1.0.1.1.9.1.19.4
SECTION 9.4
9.4 Surface disturbance moratorium.
36:1.0.1.1.9.1.19.5
SECTION 9.5
9.5 Recordation.
36:1.0.1.1.9.1.19.6
SECTION 9.6
9.6 Transfers of interest.
36:1.0.1.1.9.1.19.7
SECTION 9.7
9.7 Assessment work.
36:1.0.1.1.9.1.19.8
SECTION 9.8
9.8 Use of water.
36:1.0.1.1.9.1.19.9
SECTION 9.9
9.9 Plan of operations.
36:1.0.1.1.9.1.19.10
SECTION 9.10
9.10 Plan of operations approval.
36:1.0.1.1.9.1.19.11
SECTION 9.11
9.11 Reclamation requirements.
36:1.0.1.1.9.1.19.12
SECTION 9.12
9.12 Supplementation or revision of plan of operations.
36:1.0.1.1.9.1.19.13
SECTION 9.13
9.13 Performance bond.
36:1.0.1.1.9.1.19.14
SECTION 9.14
9.14 Appeals.
36:1.0.1.1.9.1.19.15
SECTION 9.15
9.15 Use of roads by commercial vehicles.
36:1.0.1.1.9.1.19.16
SECTION 9.16
9.16 Penalties.
36:1.0.1.1.9.1.19.17
SECTION 9.17
9.17 Public inspection of documents.
36:1.0.1.1.9.1.19.18
SECTION 9.18
9.18 Surface use and patent restrictions.
36:1.0.1.1.9.2
SUBPART B
Subpart B - Non-Federal Oil and Gas Rights
36:1.0.1.1.9.2.19
SUBJGRP 19
Purpose and Scope
36:1.0.1.1.9.2.19.1
SECTION 9.30
9.30 What is the purpose and scope of this subpart
36:1.0.1.1.9.2.19.2
SECTION 9.31
9.31 When does this subpart apply to me
36:1.0.1.1.9.2.19.3
SECTION 9.32
9.32 What authorization do I need to conduct operations
36:1.0.1.1.9.2.19.4
SECTION 9.33
9.33 If I am already operating under an NPS authorization, what do I need to do
36:1.0.1.1.9.2.20
SUBJGRP 20
Definitions
36:1.0.1.1.9.2.20.5
SECTION 9.40
9.40 What do the terms used in this subpart mean
36:1.0.1.1.9.2.21
SUBJGRP 21
Previously Exempt Operations
36:1.0.1.1.9.2.21.6
SECTION 9.50
9.50 Do I need an operations permit for my previously exempt operations
36:1.0.1.1.9.2.21.7
SECTION 9.51
9.51 How do I apply for my operations permit
36:1.0.1.1.9.2.21.8
SECTION 9.52
9.52 What will the NPS do with my application
36:1.0.1.1.9.2.21.9
SECTION 9.53
9.53 May I continue to operate while the NPS reviews my application
36:1.0.1.1.9.2.22
SUBJGRP 22
Temporary Access Permits
36:1.0.1.1.9.2.22.10
SECTION 9.60
9.60 When do I need a temporary access permit
36:1.0.1.1.9.2.22.11
SECTION 9.61
9.61 How do I apply for a temporary access permit
36:1.0.1.1.9.2.22.12
SECTION 9.62
9.62 When will the NPS grant a temporary access permit
36:1.0.1.1.9.2.22.13
SECTION 9.63
9.63 How long will I have to conduct my reconnaissance surveys
36:1.0.1.1.9.2.23
SUBJGRP 23
Accessing Oil and Gas Rights From a Surface Location Outside the System Unit Boundary
36:1.0.1.1.9.2.23.14
SECTION 9.70
9.70 Do I need an operations permit for accessing oil and gas rights from outside the System unit boundary
36:1.0.1.1.9.2.23.15
SECTION 9.71
9.71 What information must I submit to the NPS
36:1.0.1.1.9.2.23.16
SECTION 9.72
9.72 How will the NPS act on my submission
36:1.0.1.1.9.2.23.17
SECTION 9.73
9.73 If I don't need an operations permit, are there still requirements that I must meet
36:1.0.1.1.9.2.24
SUBJGRP 24
Operations Permit: Application Contents
36:1.0.1.1.9.2.24.18
SECTION 9.80
9.80 Who must apply for an operations permit
36:1.0.1.1.9.2.24.19
SECTION 9.81
9.81 May I use previously submitted information
36:1.0.1.1.9.2.24.20
SECTION 9.82
9.82 What must I include in my application
36:1.0.1.1.9.2.24.21
SECTION 9.83
9.83 What information must be included in all applications
36:1.0.1.1.9.2.24.22
SECTION 9.84
9.84 Existing conditions and proposed area of operations.
36:1.0.1.1.9.2.24.23
SECTION 9.85
9.85 Environmental conditions and mitigation actions.
36:1.0.1.1.9.2.24.24
SECTION 9.86
9.86 Spill control and emergency preparedness plan.
36:1.0.1.1.9.2.24.25
SECTION 9.87
9.87 What additional information must be included if I am proposing geophysical exploration
36:1.0.1.1.9.2.24.26
SECTION 9.88
9.88 What additional information must be included if I am proposing drilling operations
36:1.0.1.1.9.2.24.27
SECTION 9.89
9.89 What additional information must be included if I am proposing well stimulation operations, including hydraulic fracturing
36:1.0.1.1.9.2.24.28
SECTION 9.90
9.90 What additional information must be included if I am proposing production operations
36:1.0.1.1.9.2.25
SUBJGRP 25
Operations Permit: Application Review Process
36:1.0.1.1.9.2.25.29
SECTION 9.100
9.100 How will NPS process my application
36:1.0.1.1.9.2.25.30
SECTION 9.101
9.101 How will the NPS conduct initial review
36:1.0.1.1.9.2.25.31
SECTION 9.102
9.102 How will the NPS conduct formal review
36:1.0.1.1.9.2.25.32
SECTION 9.103
9.103 What standards must be met to approve my operations permit
36:1.0.1.1.9.2.25.33
SECTION 9.104
9.104 What final actions may the Regional Director take on my operations permit
36:1.0.1.1.9.2.25.34
SECTION 9.105
9.105 What is the approval process for operations in Big Cypress National Preserve
36:1.0.1.1.9.2.26
SUBJGRP 26
Operating Standards
36:1.0.1.1.9.2.26.35
SECTION 9.110
9.110 What are the purposes and functions of NPS operating standards
36:1.0.1.1.9.2.26.36
SECTION 9.111
9.111 What general facility design and management standards must I meet
36:1.0.1.1.9.2.26.37
SECTION 9.112
9.112 What hydrologic standards must I meet
36:1.0.1.1.9.2.26.38
SECTION 9.113
9.113 What safety standards must I meet
36:1.0.1.1.9.2.26.39
SECTION 9.114
9.114 What lighting and visual standards must I meet
36:1.0.1.1.9.2.26.40
SECTION 9.115
9.115 What noise reduction standards must I meet
36:1.0.1.1.9.2.26.41
SECTION 9.116
9.116 What reclamation and protection standards must I meet
36:1.0.1.1.9.2.26.42
SECTION 9.117
9.117 What additional operating standards apply to geophysical operations
36:1.0.1.1.9.2.26.43
SECTION 9.118
9.118 What additional operating standards apply to drilling, stimulation, and production operations
36:1.0.1.1.9.2.27
SUBJGRP 27
General Terms and Conditions
36:1.0.1.1.9.2.27.44
SECTION 9.120
9.120 What terms and conditions apply to all operators
36:1.0.1.1.9.2.27.45
SECTION 9.121
9.121 What monitoring and reporting is required for all operators
36:1.0.1.1.9.2.27.46
SECTION 9.122
9.122 What additional reports must I submit if my operation includes hydraulic fracturing
36:1.0.1.1.9.2.28
SUBJGRP 28
Access to Oil and Gas Rights
36:1.0.1.1.9.2.28.47
SECTION 9.130
9.130 May I cross Federal property to reach the boundary of my oil and gas right
36:1.0.1.1.9.2.28.48
SECTION 9.131
9.131 Will the NPS charge me a fee for access
36:1.0.1.1.9.2.28.49
SECTION 9.132
9.132 Will I be charged a fee for emergency access to my operations
36:1.0.1.1.9.2.29
SUBJGRP 29
Financial Assurance
36:1.0.1.1.9.2.29.50
SECTION 9.140
9.140 Do I have to provide financial assurance to the NPS
36:1.0.1.1.9.2.29.51
SECTION 9.141
9.141 How does the NPS establish the amount of financial assurance
36:1.0.1.1.9.2.29.52
SECTION 9.142
9.142 Will the NPS adjust my financial assurance
36:1.0.1.1.9.2.29.53
SECTION 9.143
9.143 When will the NPS release my financial assurance
36:1.0.1.1.9.2.29.54
SECTION 9.144
9.144 Under what circumstances will the NPS retain my financial assurance
36:1.0.1.1.9.2.30
SUBJGRP 30
Modification to an Operation
36:1.0.1.1.9.2.30.55
SECTION 9.150
9.150 How can an approved permit be modified
36:1.0.1.1.9.2.31
SUBJGRP 31
Change of Operator
36:1.0.1.1.9.2.31.56
SECTION 9.160
9.160 What are my responsibilities if I transfer my operations
36:1.0.1.1.9.2.31.57
SECTION 9.161
9.161 What must I do if operations are transferred to me
36:1.0.1.1.9.2.32
SUBJGRP 32
Well Plugging
36:1.0.1.1.9.2.32.58
SECTION 9.170
9.170 When must I plug my well
36:1.0.1.1.9.2.32.59
SECTION 9.171
9.171 Can I get an extension to the well plugging requirement
36:1.0.1.1.9.2.33
SUBJGRP 33
Prohibitions and Penalties
36:1.0.1.1.9.2.33.60
SECTION 9.180
9.180 What acts are prohibited under this subpart
36:1.0.1.1.9.2.33.61
SECTION 9.181
9.181 What enforcement actions can the NPS take
36:1.0.1.1.9.2.33.62
SECTION 9.182
9.182 How do violations affect my ability to obtain a permit
36:1.0.1.1.9.2.34
SUBJGRP 34
Reconsideration and Appeals
36:1.0.1.1.9.2.34.63
SECTION 9.190
9.190 Can I, as operator, request reconsideration of NPS decisions
36:1.0.1.1.9.2.34.64
SECTION 9.191
9.191 How does the NPS process my request for reconsideration
36:1.0.1.1.9.2.34.65
SECTION 9.192
9.192 Can I appeal the Regional Director's decision
36:1.0.1.1.9.2.34.66
SECTION 9.193
9.193 Will filing a request for reconsideration or appeal stop the NPS from taking action under this subpart
36:1.0.1.1.9.2.34.67
SECTION 9.194
9.194 What if the original decision was made by the Superintendent
36:1.0.1.1.9.2.35
SUBJGRP 35
Public Participation
36:1.0.1.1.9.2.35.68
SECTION 9.200
9.200 How can the public participate in the approval process
36:1.0.1.1.9.2.36
SUBJGRP 36
Information Collection
36:1.0.1.1.9.2.36.69
SECTION 9.210
9.210 Has the Office of Management and Budget approved the information collection requirements
36:1.0.1.1.9.3
SUBPART C
Subpart C - Alaska Mineral Resource Assessment Program
36:1.0.1.1.9.3.37.1
SECTION 9.300
9.300 Purpose.
36:1.0.1.1.9.3.37.2
SECTION 9.301
9.301 Scope and applicability.
36:1.0.1.1.9.3.37.3
SECTION 9.302
9.302 Definitions.
36:1.0.1.1.9.3.37.4
SECTION 9.303
9.303 Coordination of AMRAP activities in National Park System units.
36:1.0.1.1.9.3.37.5
SECTION 9.304
9.304 Application requirements.
36:1.0.1.1.9.3.37.6
SECTION 9.305
9.305 Environmental compliance.
36:1.0.1.1.9.3.37.7
SECTION 9.306
9.306 Application review process and approval standards.
36:1.0.1.1.9.3.37.8
SECTION 9.307
9.307 Permitting requirements and standards.
36:1.0.1.1.9.3.37.9
SECTION 9.308
9.308 Permit modification, suspension, and cancellation.
36:1.0.1.1.9.3.37.10
SECTION 9.309
9.309 Appeals.