30:3.0.1.11.45 | PART 810
| PART 810 - PERMANENT PROGRAM PERFORMANCE STANDARDS - GENERAL PROVISIONS | |
30:3.0.1.11.45.0.1.1 | SECTION 810.1
| 810.1 Scope. | |
30:3.0.1.11.45.0.1.2 | SECTION 810.2
| 810.2 Objective. | |
30:3.0.1.11.45.0.1.3 | SECTION 810.3
| 810.3 Authority. | |
30:3.0.1.11.45.0.1.4 | SECTION 810.4
| 810.4 Responsibility. | |
30:3.0.1.11.45.0.1.5 | SECTION 810.11
| 810.11 Applicability. | |
30:3.0.1.11.46 | PART 815
| PART 815 - PERMANENT PROGRAM PERFORMANCE STANDARDS - COAL EXPLORATION | |
30:3.0.1.11.46.0.1.1 | SECTION 815.1
| 815.1 Scope and purpose. | |
30:3.0.1.11.46.0.1.2 | SECTION 815.2
| 815.2 Permitting information. | |
30:3.0.1.11.46.0.1.3 | SECTION 815.13
| 815.13 Required documents. | |
30:3.0.1.11.46.0.1.4 | SECTION 815.15
| 815.15 Performance standards for coal exploration. | |
30:3.0.1.11.47 | PART 816
| PART 816 - PERMANENT PROGRAM PERFORMANCE STANDARDS - SURFACE MINING ACTIVITIES | |
30:3.0.1.11.47.0.1.1 | SECTION 816.1
| 816.1 Scope. | |
30:3.0.1.11.47.0.1.2 | SECTION 816.2
| 816.2 Objectives. | |
30:3.0.1.11.47.0.1.3 | SECTION 816.10
| 816.10 Information collection. | |
30:3.0.1.11.47.0.1.4 | SECTION 816.11
| 816.11 Signs and markers. | |
30:3.0.1.11.47.0.1.5 | SECTION 816.13
| 816.13 Casing and sealing of drilled holes: General requirements. | |
30:3.0.1.11.47.0.1.6 | SECTION 816.14
| 816.14 Casing and sealing of drilled holes: Temporary. | |
30:3.0.1.11.47.0.1.7 | SECTION 816.15
| 816.15 Casing and sealing of drilled holes: Permanent. | |
30:3.0.1.11.47.0.1.8 | SECTION 816.22
| 816.22 Topsoil and subsoil. | |
30:3.0.1.11.47.0.1.9 | SECTION 816.41
| 816.41 Hydrologic-balance protection. | |
30:3.0.1.11.47.0.1.10 | SECTION 816.42
| 816.42 Hydrologic balance: Water quality standards and effluent limitations. | |
30:3.0.1.11.47.0.1.11 | SECTION 816.43
| 816.43 Diversions. | |
30:3.0.1.11.47.0.1.12 | SECTION 816.45
| 816.45 Hydrologic balance: Sediment control measures. | |
30:3.0.1.11.47.0.1.13 | SECTION 816.46
| 816.46 Hydrologic balance: Siltation structures. | |
30:3.0.1.11.47.0.1.14 | SECTION 816.47
| 816.47 Hydrologic balance: Discharge structures. | |
30:3.0.1.11.47.0.1.15 | SECTION 816.49
| 816.49 Impoundments. | |
30:3.0.1.11.47.0.1.16 | SECTION 816.56
| 816.56 Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities. | |
30:3.0.1.11.47.0.1.17 | SECTION 816.57
| 816.57 Hydrologic balance: Stream buffer zones. | |
30:3.0.1.11.47.0.1.18 | SECTION 816.59
| 816.59 Coal recovery. | |
30:3.0.1.11.47.0.1.19 | SECTION 816.61
| 816.61 Use of explosives: General requirements. | |
30:3.0.1.11.47.0.1.20 | SECTION 816.62
| 816.62 Use of explosives: Preblasting survey. | |
30:3.0.1.11.47.0.1.21 | SECTION 816.64
| 816.64 Use of explosives: Blasting schedule. | |
30:3.0.1.11.47.0.1.22 | SECTION 816.66
| 816.66 Use of explosives: Blasting signs, warnings, and access control. | |
30:3.0.1.11.47.0.1.23 | SECTION 816.67
| 816.67 Use of explosives: Control of adverse effects. | |
30:3.0.1.11.47.0.1.24 | SECTION 816.68
| 816.68 Use of explosives: Records of blasting operations. | |
30:3.0.1.11.47.0.1.25 | SECTION 816.71
| 816.71 Disposal of excess spoil: General requirements. | |
30:3.0.1.11.47.0.1.26 | SECTION 816.72
| 816.72 Disposal of excess spoil: Valley fills/head-of-hollow fills. | |
30:3.0.1.11.47.0.1.27 | SECTION 816.73
| 816.73 Disposal of excess spoil: Durable rock fills. | |
30:3.0.1.11.47.0.1.28 | SECTION 816.74
| 816.74 Disposal of excess spoil: Preexisting benches. | |
30:3.0.1.11.47.0.1.29 | SECTION 816.79
| 816.79 Protection of underground mining. | |
30:3.0.1.11.47.0.1.30 | SECTION 816.81
| 816.81 Coal mine waste: General requirements. | |
30:3.0.1.11.47.0.1.31 | SECTION 816.83
| 816.83 Coal mine waste: Refuse piles. | |
30:3.0.1.11.47.0.1.32 | SECTION 816.84
| 816.84 Coal mine waste: Impounding structures. | |
30:3.0.1.11.47.0.1.33 | SECTION 816.87
| 816.87 Coal mine waste: Burning and burned waste utilization. | |
30:3.0.1.11.47.0.1.34 | SECTION 816.89
| 816.89 Disposal of noncoal mine wastes. | |
30:3.0.1.11.47.0.1.35 | SECTION 816.95
| 816.95 Stabilization of surface areas. | |
30:3.0.1.11.47.0.1.36 | SECTION 816.97
| 816.97 Protection of fish, wildlife, and related environmental values. | |
30:3.0.1.11.47.0.1.37 | SECTION 816.99
| 816.99 Slides and other damage. | |
30:3.0.1.11.47.0.1.38 | SECTION 816.100
| 816.100 Contemporaneous reclamation. | |
30:3.0.1.11.47.0.1.39 | SECTION 816.101
| 816.101 Backfilling and grading: Time and distance requirements. | |
30:3.0.1.11.47.0.1.40 | SECTION 816.102
| 816.102 Backfilling and grading: General requirements. | |
30:3.0.1.11.47.0.1.41 | SECTION 816.104
| 816.104 Backfilling and grading: Thin overburden. | |
30:3.0.1.11.47.0.1.42 | SECTION 816.105
| 816.105 Backfilling and grading: Thick overburden. | |
30:3.0.1.11.47.0.1.43 | SECTION 816.106
| 816.106 Backfilling and grading: Previously mined areas. | |
30:3.0.1.11.47.0.1.44 | SECTION 816.107
| 816.107 Backfilling and grading: Steep slopes. | |
30:3.0.1.11.47.0.1.45 | SECTION 816.111
| 816.111 Revegetation: General requirements. | |
30:3.0.1.11.47.0.1.46 | SECTION 816.113
| 816.113 Revegetation: Timing. | |
30:3.0.1.11.47.0.1.47 | SECTION 816.114
| 816.114 Revegetation: Mulching and other soil stabilizing practices. | |
30:3.0.1.11.47.0.1.48 | SECTION 816.116
| 816.116 Revegetation: Standards for success. | |
30:3.0.1.11.47.0.1.49 | SECTION 816.131
| 816.131 Cessation of operations: Temporary. | |
30:3.0.1.11.47.0.1.50 | SECTION 816.132
| 816.132 Cessation of operations: Permanent. | |
30:3.0.1.11.47.0.1.51 | SECTION 816.133
| 816.133 Postmining land use. | |
30:3.0.1.11.47.0.1.52 | SECTION 816.150
| 816.150 Roads: general. | |
30:3.0.1.11.47.0.1.53 | SECTION 816.151
| 816.151 Primary roads. | |
30:3.0.1.11.47.0.1.54 | SECTION 816.180
| 816.180 Utility installations. | |
30:3.0.1.11.47.0.1.55 | SECTION 816.181
| 816.181 Support facilities. | |
30:3.0.1.11.47.0.1.56 | SECTION 816.200
| 816.200 Interpretative rules related to general performance standards. | |
30:3.0.1.11.48 | PART 817
| PART 817 - PERMANENT PROGRAM PERFORMANCE STANDARDS - UNDERGROUND MINING ACTIVITIES | |
30:3.0.1.11.48.0.1.1 | SECTION 817.1
| 817.1 Scope. | |
30:3.0.1.11.48.0.1.2 | SECTION 817.2
| 817.2 Objectives. | |
30:3.0.1.11.48.0.1.3 | SECTION 817.10
| 817.10 Information collection. | |
30:3.0.1.11.48.0.1.4 | SECTION 817.11
| 817.11 Signs and markers. | |
30:3.0.1.11.48.0.1.5 | SECTION 817.13
| 817.13 Casing and sealing of exposed underground openings: General requirements. | |
30:3.0.1.11.48.0.1.6 | SECTION 817.14
| 817.14 Casing and sealing of underground openings: Temporary. | |
30:3.0.1.11.48.0.1.7 | SECTION 817.15
| 817.15 Casing and sealing of underground openings: Permanent. | |
30:3.0.1.11.48.0.1.8 | SECTION 817.22
| 817.22 Topsoil and subsoil. | |
30:3.0.1.11.48.0.1.9 | SECTION 817.41
| 817.41 Hydrologic-balance protection. | |
30:3.0.1.11.48.0.1.10 | SECTION 817.42
| 817.42 Hydrologic balance: Water quality standards and effluent limitations. | |
30:3.0.1.11.48.0.1.11 | SECTION 817.43
| 817.43 Diversions. | |
30:3.0.1.11.48.0.1.12 | SECTION 817.45
| 817.45 Hydrologic balance: Sediment control measures. | |
30:3.0.1.11.48.0.1.13 | SECTION 817.46
| 817.46 Hydrologic balance: Siltation structures. | |
30:3.0.1.11.48.0.1.14 | SECTION 817.47
| 817.47 Hydrologic balance: Discharge structures. | |
30:3.0.1.11.48.0.1.15 | SECTION 817.49
| 817.49 Impoundments. | |
30:3.0.1.11.48.0.1.16 | SECTION 817.56
| 817.56 Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities. | |
30:3.0.1.11.48.0.1.17 | SECTION 817.57
| 817.57 Hydrologic balance: Stream buffer zones. | |
30:3.0.1.11.48.0.1.18 | SECTION 817.59
| 817.59 Coal recovery. | |
30:3.0.1.11.48.0.1.19 | SECTION 817.61
| 817.61 Use of explosives: General requirements. | |
30:3.0.1.11.48.0.1.20 | SECTION 817.62
| 817.62 Use of explosives: Preblasting survey. | |
30:3.0.1.11.48.0.1.21 | SECTION 817.64
| 817.64 Use of explosives: General performance standards. | |
30:3.0.1.11.48.0.1.22 | SECTION 817.66
| 817.66 Use of explosives: Blasting signs, warnings, and access control. | |
30:3.0.1.11.48.0.1.23 | SECTION 817.67
| 817.67 Use of explosives: Control of adverse effects. | |
30:3.0.1.11.48.0.1.24 | SECTION 817.68
| 817.68 Use of explosives: Records of blasting operations. | |
30:3.0.1.11.48.0.1.25 | SECTION 817.71
| 817.71 Disposal of excess spoil: General requirements. | |
30:3.0.1.11.48.0.1.26 | SECTION 817.72
| 817.72 Disposal of excess spoil: Valley fill/head-of-hollow fills. | |
30:3.0.1.11.48.0.1.27 | SECTION 817.73
| 817.73 Disposal of excess spoil: Durable rock fills. | |
30:3.0.1.11.48.0.1.28 | SECTION 817.74
| 817.74 Disposal of excess spoil: Preexisting benches. | |
30:3.0.1.11.48.0.1.29 | SECTION 817.81
| 817.81 Coal mine waste: General requirements. | |
30:3.0.1.11.48.0.1.30 | SECTION 817.83
| 817.83 Coal mine waste: Refuse piles. | |
30:3.0.1.11.48.0.1.31 | SECTION 817.84
| 817.84 Coal mine waste: Impounding structures. | |
30:3.0.1.11.48.0.1.32 | SECTION 817.87
| 817.87 Coal mine waste: Burning and burned waste utilization. | |
30:3.0.1.11.48.0.1.33 | SECTION 817.89
| 817.89 Disposal of noncoal mine wastes. | |
30:3.0.1.11.48.0.1.34 | SECTION 817.95
| 817.95 Stabilization of surface areas. | |
30:3.0.1.11.48.0.1.35 | SECTION 817.97
| 817.97 Protection of fish, wildlife, and related environmental values. | |
30:3.0.1.11.48.0.1.36 | SECTION 817.99
| 817.99 Slides and other damage. | |
30:3.0.1.11.48.0.1.37 | SECTION 817.100
| 817.100 Contemporaneous reclamation. | |
30:3.0.1.11.48.0.1.38 | SECTION 817.102
| 817.102 Backfilling and grading: General requirements. | |
30:3.0.1.11.48.0.1.39 | SECTION 817.106
| 817.106 Backfilling and grading: Previously mined areas. | |
30:3.0.1.11.48.0.1.40 | SECTION 817.107
| 817.107 Backfilling and grading: Steep slopes. | |
30:3.0.1.11.48.0.1.41 | SECTION 817.111
| 817.111 Revegetation: General requirements. | |
30:3.0.1.11.48.0.1.42 | SECTION 817.113
| 817.113 Revegetation: Timing. | |
30:3.0.1.11.48.0.1.43 | SECTION 817.114
| 817.114 Revegetation: Mulching and other soil stabilizing practices. | |
30:3.0.1.11.48.0.1.44 | SECTION 817.116
| 817.116 Revegetation: Standards for success. | |
30:3.0.1.11.48.0.1.45 | SECTION 817.121
| 817.121 Subsidence control. | |
30:3.0.1.11.48.0.1.46 | SECTION 817.122
| 817.122 Subsidence control: Public notice. | |
30:3.0.1.11.48.0.1.47 | SECTION 817.131
| 817.131 Cessation of operations: Temporary. | |
30:3.0.1.11.48.0.1.48 | SECTION 817.132
| 817.132 Cessation of operations: Permanent. | |
30:3.0.1.11.48.0.1.49 | SECTION 817.133
| 817.133 Postmining land use. | |
30:3.0.1.11.48.0.1.50 | SECTION 817.150
| 817.150 Roads: General. | |
30:3.0.1.11.48.0.1.51 | SECTION 817.151
| 817.151 Primary roads. | |
30:3.0.1.11.48.0.1.52 | SECTION 817.180
| 817.180 Utility installations. | |
30:3.0.1.11.48.0.1.53 | SECTION 817.181
| 817.181 Support facilities. | |
30:3.0.1.11.48.0.1.54 | SECTION 817.200
| 817.200 Interpretative rules related to general performance standards. | |
30:3.0.1.11.49 | PART 819
| PART 819 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-AUGER MINING | |
30:3.0.1.11.49.0.1.1 | SECTION 819.1
| 819.1 Scope. | |
30:3.0.1.11.49.0.1.2 | SECTION 819.11
| 819.11 Auger mining: General. | |
30:3.0.1.11.49.0.1.3 | SECTION 819.13
| 819.13 Auger mining: Coal recovery. | |
30:3.0.1.11.49.0.1.4 | SECTION 819.15
| 819.15 Auger mining: Hydrologic balance. | |
30:3.0.1.11.49.0.1.5 | SECTION 819.17
| 819.17 Auger mining: Subsidence protection. | |
30:3.0.1.11.49.0.1.6 | SECTION 819.19
| 819.19 Auger mining: Backfilling and grading. | |
30:3.0.1.11.49.0.1.7 | SECTION 819.21
| 819.21 Auger mining: Protection of underground mining. | |
30:3.0.1.11.50 | PART 820
| PART 820 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - ANTHRACITE MINES IN PENNSYLVANIA | |
30:3.0.1.11.50.0.1.1 | SECTION 820.1
| 820.1 Scope. | |
30:3.0.1.11.50.0.1.2 | SECTION 820.2
| 820.2 Objective. | |
30:3.0.1.11.50.0.1.3 | SECTION 820.11
| 820.11 Performance standards: Anthracite mines in Pennsylvania. | |
30:3.0.1.11.51 | PART 822
| PART 822 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - OPERATIONS IN ALLUVIAL VALLEY FLOORS | |
30:3.0.1.11.51.0.1.1 | SECTION 822.1
| 822.1 Scope. | |
30:3.0.1.11.51.0.1.2 | SECTION 822.10
| 822.10 Information collection. | |
30:3.0.1.11.51.0.1.3 | SECTION 822.11
| 822.11 Essential hydrologic functions. | |
30:3.0.1.11.51.0.1.4 | SECTION 822.12
| 822.12 Protection of agricultural activities. | |
30:3.0.1.11.51.0.1.5 | SECTION 822.13
| 822.13 Monitoring. | |
30:3.0.1.11.52 | PART 823
| PART 823 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - OPERATIONS ON PRIME FARMLAND | |
30:3.0.1.11.52.0.1.1 | SECTION 823.1
| 823.1 Scope and purpose. | |
30:3.0.1.11.52.0.1.2 | SECTION 823.4
| 823.4 Responsibilities. | |
30:3.0.1.11.52.0.1.3 | SECTION 823.11
| 823.11 Applicability. | |
30:3.0.1.11.52.0.1.4 | SECTION 823.12
| 823.12 Soil removal and stockpiling. | |
30:3.0.1.11.52.0.1.5 | SECTION 823.14
| 823.14 Soil replacement. | |
30:3.0.1.11.52.0.1.6 | SECTION 823.15
| 823.15 Revegetation and restoration of soil productivity. | |
30:3.0.1.11.53 | PART 824
| PART 824 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - MOUNTAINTOP REMOVAL | |
30:3.0.1.11.53.0.1.1 | SECTION 824.1
| 824.1 Scope. | |
30:3.0.1.11.53.0.1.2 | SECTION 824.2
| 824.2 Objectives. | |
30:3.0.1.11.53.0.1.3 | SECTION 824.11
| 824.11 Mountaintop removal: Performance standards. | |
30:3.0.1.11.54 | PART 825
| PART 825 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - SPECIAL BITUMINOUS COAL MINES IN WYOMING | |
30:3.0.1.11.54.0.1.1 | SECTION 825.1
| 825.1 Scope. | |
30:3.0.1.11.54.0.1.2 | SECTION 825.2
| 825.2 Special bituminous coal mines in Wyoming. | |
30:3.0.1.11.55 | PART 827
| PART 827 - PERMANENT PROGRAM PERFORMANCE STANDARDS - COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE | |
30:3.0.1.11.55.0.1.1 | SECTION 827.1
| 827.1 Scope. | |
30:3.0.1.11.55.0.1.2 | SECTION 827.11
| 827.11 General requirements. | |
30:3.0.1.11.55.0.1.3 | SECTION 827.12
| 827.12 Coal preparation plants: Performance standards. | |
30:3.0.1.11.55.0.1.4 | SECTION 827.13
| 827.13 Coal preparation plants: Interim performance standards. | |
30:3.0.1.11.56 | PART 828
| PART 828 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - IN SITU PROCESSING | |
30:3.0.1.11.56.0.1.1 | SECTION 828.1
| 828.1 Scope. | |
30:3.0.1.11.56.0.1.2 | SECTION 828.2
| 828.2 Objectives. | |
30:3.0.1.11.56.0.1.3 | SECTION 828.11
| 828.11 In situ processing: Performance standards. | |
30:3.0.1.11.56.0.1.4 | SECTION 828.12
| 828.12 In situ processing: Monitoring. | |