Title 30

Volume 3 CHAPTER VII SUBCHAP K

Subchapter K - Permanent Program Performance Standards

30:3.0.1.11.45PART 810
PART 810 - PERMANENT PROGRAM PERFORMANCE STANDARDS - GENERAL PROVISIONS
30:3.0.1.11.45.0.1.1SECTION 810.1
     810.1 Scope.
30:3.0.1.11.45.0.1.2SECTION 810.2
     810.2 Objective.
30:3.0.1.11.45.0.1.3SECTION 810.3
     810.3 Authority.
30:3.0.1.11.45.0.1.4SECTION 810.4
     810.4 Responsibility.
30:3.0.1.11.45.0.1.5SECTION 810.11
     810.11 Applicability.
30:3.0.1.11.46PART 815
PART 815 - PERMANENT PROGRAM PERFORMANCE STANDARDS - COAL EXPLORATION
30:3.0.1.11.46.0.1.1SECTION 815.1
     815.1 Scope and purpose.
30:3.0.1.11.46.0.1.2SECTION 815.2
     815.2 Permitting information.
30:3.0.1.11.46.0.1.3SECTION 815.13
     815.13 Required documents.
30:3.0.1.11.46.0.1.4SECTION 815.15
     815.15 Performance standards for coal exploration.
30:3.0.1.11.47PART 816
PART 816 - PERMANENT PROGRAM PERFORMANCE STANDARDS - SURFACE MINING ACTIVITIES
30:3.0.1.11.47.0.1.1SECTION 816.1
     816.1 Scope.
30:3.0.1.11.47.0.1.2SECTION 816.2
     816.2 Objectives.
30:3.0.1.11.47.0.1.3SECTION 816.10
     816.10 Information collection.
30:3.0.1.11.47.0.1.4SECTION 816.11
     816.11 Signs and markers.
30:3.0.1.11.47.0.1.5SECTION 816.13
     816.13 Casing and sealing of drilled holes: General requirements.
30:3.0.1.11.47.0.1.6SECTION 816.14
     816.14 Casing and sealing of drilled holes: Temporary.
30:3.0.1.11.47.0.1.7SECTION 816.15
     816.15 Casing and sealing of drilled holes: Permanent.
30:3.0.1.11.47.0.1.8SECTION 816.22
     816.22 Topsoil and subsoil.
30:3.0.1.11.47.0.1.9SECTION 816.41
     816.41 Hydrologic-balance protection.
30:3.0.1.11.47.0.1.10SECTION 816.42
     816.42 Hydrologic balance: Water quality standards and effluent limitations.
30:3.0.1.11.47.0.1.11SECTION 816.43
     816.43 Diversions.
30:3.0.1.11.47.0.1.12SECTION 816.45
     816.45 Hydrologic balance: Sediment control measures.
30:3.0.1.11.47.0.1.13SECTION 816.46
     816.46 Hydrologic balance: Siltation structures.
30:3.0.1.11.47.0.1.14SECTION 816.47
     816.47 Hydrologic balance: Discharge structures.
30:3.0.1.11.47.0.1.15SECTION 816.49
     816.49 Impoundments.
30:3.0.1.11.47.0.1.16SECTION 816.56
     816.56 Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
30:3.0.1.11.47.0.1.17SECTION 816.57
     816.57 Hydrologic balance: Stream buffer zones.
30:3.0.1.11.47.0.1.18SECTION 816.59
     816.59 Coal recovery.
30:3.0.1.11.47.0.1.19SECTION 816.61
     816.61 Use of explosives: General requirements.
30:3.0.1.11.47.0.1.20SECTION 816.62
     816.62 Use of explosives: Preblasting survey.
30:3.0.1.11.47.0.1.21SECTION 816.64
     816.64 Use of explosives: Blasting schedule.
30:3.0.1.11.47.0.1.22SECTION 816.66
     816.66 Use of explosives: Blasting signs, warnings, and access control.
30:3.0.1.11.47.0.1.23SECTION 816.67
     816.67 Use of explosives: Control of adverse effects.
30:3.0.1.11.47.0.1.24SECTION 816.68
     816.68 Use of explosives: Records of blasting operations.
30:3.0.1.11.47.0.1.25SECTION 816.71
     816.71 Disposal of excess spoil: General requirements.
30:3.0.1.11.47.0.1.26SECTION 816.72
     816.72 Disposal of excess spoil: Valley fills/head-of-hollow fills.
30:3.0.1.11.47.0.1.27SECTION 816.73
     816.73 Disposal of excess spoil: Durable rock fills.
30:3.0.1.11.47.0.1.28SECTION 816.74
     816.74 Disposal of excess spoil: Preexisting benches.
30:3.0.1.11.47.0.1.29SECTION 816.79
     816.79 Protection of underground mining.
30:3.0.1.11.47.0.1.30SECTION 816.81
     816.81 Coal mine waste: General requirements.
30:3.0.1.11.47.0.1.31SECTION 816.83
     816.83 Coal mine waste: Refuse piles.
30:3.0.1.11.47.0.1.32SECTION 816.84
     816.84 Coal mine waste: Impounding structures.
30:3.0.1.11.47.0.1.33SECTION 816.87
     816.87 Coal mine waste: Burning and burned waste utilization.
30:3.0.1.11.47.0.1.34SECTION 816.89
     816.89 Disposal of noncoal mine wastes.
30:3.0.1.11.47.0.1.35SECTION 816.95
     816.95 Stabilization of surface areas.
30:3.0.1.11.47.0.1.36SECTION 816.97
     816.97 Protection of fish, wildlife, and related environmental values.
30:3.0.1.11.47.0.1.37SECTION 816.99
     816.99 Slides and other damage.
30:3.0.1.11.47.0.1.38SECTION 816.100
     816.100 Contemporaneous reclamation.
30:3.0.1.11.47.0.1.39SECTION 816.101
     816.101 Backfilling and grading: Time and distance requirements.
30:3.0.1.11.47.0.1.40SECTION 816.102
     816.102 Backfilling and grading: General requirements.
30:3.0.1.11.47.0.1.41SECTION 816.104
     816.104 Backfilling and grading: Thin overburden.
30:3.0.1.11.47.0.1.42SECTION 816.105
     816.105 Backfilling and grading: Thick overburden.
30:3.0.1.11.47.0.1.43SECTION 816.106
     816.106 Backfilling and grading: Previously mined areas.
30:3.0.1.11.47.0.1.44SECTION 816.107
     816.107 Backfilling and grading: Steep slopes.
30:3.0.1.11.47.0.1.45SECTION 816.111
     816.111 Revegetation: General requirements.
30:3.0.1.11.47.0.1.46SECTION 816.113
     816.113 Revegetation: Timing.
30:3.0.1.11.47.0.1.47SECTION 816.114
     816.114 Revegetation: Mulching and other soil stabilizing practices.
30:3.0.1.11.47.0.1.48SECTION 816.116
     816.116 Revegetation: Standards for success.
30:3.0.1.11.47.0.1.49SECTION 816.131
     816.131 Cessation of operations: Temporary.
30:3.0.1.11.47.0.1.50SECTION 816.132
     816.132 Cessation of operations: Permanent.
30:3.0.1.11.47.0.1.51SECTION 816.133
     816.133 Postmining land use.
30:3.0.1.11.47.0.1.52SECTION 816.150
     816.150 Roads: general.
30:3.0.1.11.47.0.1.53SECTION 816.151
     816.151 Primary roads.
30:3.0.1.11.47.0.1.54SECTION 816.180
     816.180 Utility installations.
30:3.0.1.11.47.0.1.55SECTION 816.181
     816.181 Support facilities.
30:3.0.1.11.47.0.1.56SECTION 816.200
     816.200 Interpretative rules related to general performance standards.
30:3.0.1.11.48PART 817
PART 817 - PERMANENT PROGRAM PERFORMANCE STANDARDS - UNDERGROUND MINING ACTIVITIES
30:3.0.1.11.48.0.1.1SECTION 817.1
     817.1 Scope.
30:3.0.1.11.48.0.1.2SECTION 817.2
     817.2 Objectives.
30:3.0.1.11.48.0.1.3SECTION 817.10
     817.10 Information collection.
30:3.0.1.11.48.0.1.4SECTION 817.11
     817.11 Signs and markers.
30:3.0.1.11.48.0.1.5SECTION 817.13
     817.13 Casing and sealing of exposed underground openings: General requirements.
30:3.0.1.11.48.0.1.6SECTION 817.14
     817.14 Casing and sealing of underground openings: Temporary.
30:3.0.1.11.48.0.1.7SECTION 817.15
     817.15 Casing and sealing of underground openings: Permanent.
30:3.0.1.11.48.0.1.8SECTION 817.22
     817.22 Topsoil and subsoil.
30:3.0.1.11.48.0.1.9SECTION 817.41
     817.41 Hydrologic-balance protection.
30:3.0.1.11.48.0.1.10SECTION 817.42
     817.42 Hydrologic balance: Water quality standards and effluent limitations.
30:3.0.1.11.48.0.1.11SECTION 817.43
     817.43 Diversions.
30:3.0.1.11.48.0.1.12SECTION 817.45
     817.45 Hydrologic balance: Sediment control measures.
30:3.0.1.11.48.0.1.13SECTION 817.46
     817.46 Hydrologic balance: Siltation structures.
30:3.0.1.11.48.0.1.14SECTION 817.47
     817.47 Hydrologic balance: Discharge structures.
30:3.0.1.11.48.0.1.15SECTION 817.49
     817.49 Impoundments.
30:3.0.1.11.48.0.1.16SECTION 817.56
     817.56 Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
30:3.0.1.11.48.0.1.17SECTION 817.57
     817.57 Hydrologic balance: Stream buffer zones.
30:3.0.1.11.48.0.1.18SECTION 817.59
     817.59 Coal recovery.
30:3.0.1.11.48.0.1.19SECTION 817.61
     817.61 Use of explosives: General requirements.
30:3.0.1.11.48.0.1.20SECTION 817.62
     817.62 Use of explosives: Preblasting survey.
30:3.0.1.11.48.0.1.21SECTION 817.64
     817.64 Use of explosives: General performance standards.
30:3.0.1.11.48.0.1.22SECTION 817.66
     817.66 Use of explosives: Blasting signs, warnings, and access control.
30:3.0.1.11.48.0.1.23SECTION 817.67
     817.67 Use of explosives: Control of adverse effects.
30:3.0.1.11.48.0.1.24SECTION 817.68
     817.68 Use of explosives: Records of blasting operations.
30:3.0.1.11.48.0.1.25SECTION 817.71
     817.71 Disposal of excess spoil: General requirements.
30:3.0.1.11.48.0.1.26SECTION 817.72
     817.72 Disposal of excess spoil: Valley fill/head-of-hollow fills.
30:3.0.1.11.48.0.1.27SECTION 817.73
     817.73 Disposal of excess spoil: Durable rock fills.
30:3.0.1.11.48.0.1.28SECTION 817.74
     817.74 Disposal of excess spoil: Preexisting benches.
30:3.0.1.11.48.0.1.29SECTION 817.81
     817.81 Coal mine waste: General requirements.
30:3.0.1.11.48.0.1.30SECTION 817.83
     817.83 Coal mine waste: Refuse piles.
30:3.0.1.11.48.0.1.31SECTION 817.84
     817.84 Coal mine waste: Impounding structures.
30:3.0.1.11.48.0.1.32SECTION 817.87
     817.87 Coal mine waste: Burning and burned waste utilization.
30:3.0.1.11.48.0.1.33SECTION 817.89
     817.89 Disposal of noncoal mine wastes.
30:3.0.1.11.48.0.1.34SECTION 817.95
     817.95 Stabilization of surface areas.
30:3.0.1.11.48.0.1.35SECTION 817.97
     817.97 Protection of fish, wildlife, and related environmental values.
30:3.0.1.11.48.0.1.36SECTION 817.99
     817.99 Slides and other damage.
30:3.0.1.11.48.0.1.37SECTION 817.100
     817.100 Contemporaneous reclamation.
30:3.0.1.11.48.0.1.38SECTION 817.102
     817.102 Backfilling and grading: General requirements.
30:3.0.1.11.48.0.1.39SECTION 817.106
     817.106 Backfilling and grading: Previously mined areas.
30:3.0.1.11.48.0.1.40SECTION 817.107
     817.107 Backfilling and grading: Steep slopes.
30:3.0.1.11.48.0.1.41SECTION 817.111
     817.111 Revegetation: General requirements.
30:3.0.1.11.48.0.1.42SECTION 817.113
     817.113 Revegetation: Timing.
30:3.0.1.11.48.0.1.43SECTION 817.114
     817.114 Revegetation: Mulching and other soil stabilizing practices.
30:3.0.1.11.48.0.1.44SECTION 817.116
     817.116 Revegetation: Standards for success.
30:3.0.1.11.48.0.1.45SECTION 817.121
     817.121 Subsidence control.
30:3.0.1.11.48.0.1.46SECTION 817.122
     817.122 Subsidence control: Public notice.
30:3.0.1.11.48.0.1.47SECTION 817.131
     817.131 Cessation of operations: Temporary.
30:3.0.1.11.48.0.1.48SECTION 817.132
     817.132 Cessation of operations: Permanent.
30:3.0.1.11.48.0.1.49SECTION 817.133
     817.133 Postmining land use.
30:3.0.1.11.48.0.1.50SECTION 817.150
     817.150 Roads: General.
30:3.0.1.11.48.0.1.51SECTION 817.151
     817.151 Primary roads.
30:3.0.1.11.48.0.1.52SECTION 817.180
     817.180 Utility installations.
30:3.0.1.11.48.0.1.53SECTION 817.181
     817.181 Support facilities.
30:3.0.1.11.48.0.1.54SECTION 817.200
     817.200 Interpretative rules related to general performance standards.
30:3.0.1.11.49PART 819
PART 819 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-AUGER MINING
30:3.0.1.11.49.0.1.1SECTION 819.1
     819.1 Scope.
30:3.0.1.11.49.0.1.2SECTION 819.11
     819.11 Auger mining: General.
30:3.0.1.11.49.0.1.3SECTION 819.13
     819.13 Auger mining: Coal recovery.
30:3.0.1.11.49.0.1.4SECTION 819.15
     819.15 Auger mining: Hydrologic balance.
30:3.0.1.11.49.0.1.5SECTION 819.17
     819.17 Auger mining: Subsidence protection.
30:3.0.1.11.49.0.1.6SECTION 819.19
     819.19 Auger mining: Backfilling and grading.
30:3.0.1.11.49.0.1.7SECTION 819.21
     819.21 Auger mining: Protection of underground mining.
30:3.0.1.11.50PART 820
PART 820 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - ANTHRACITE MINES IN PENNSYLVANIA
30:3.0.1.11.50.0.1.1SECTION 820.1
     820.1 Scope.
30:3.0.1.11.50.0.1.2SECTION 820.2
     820.2 Objective.
30:3.0.1.11.50.0.1.3SECTION 820.11
     820.11 Performance standards: Anthracite mines in Pennsylvania.
30:3.0.1.11.51PART 822
PART 822 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - OPERATIONS IN ALLUVIAL VALLEY FLOORS
30:3.0.1.11.51.0.1.1SECTION 822.1
     822.1 Scope.
30:3.0.1.11.51.0.1.2SECTION 822.10
     822.10 Information collection.
30:3.0.1.11.51.0.1.3SECTION 822.11
     822.11 Essential hydrologic functions.
30:3.0.1.11.51.0.1.4SECTION 822.12
     822.12 Protection of agricultural activities.
30:3.0.1.11.51.0.1.5SECTION 822.13
     822.13 Monitoring.
30:3.0.1.11.52PART 823
PART 823 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - OPERATIONS ON PRIME FARMLAND
30:3.0.1.11.52.0.1.1SECTION 823.1
     823.1 Scope and purpose.
30:3.0.1.11.52.0.1.2SECTION 823.4
     823.4 Responsibilities.
30:3.0.1.11.52.0.1.3SECTION 823.11
     823.11 Applicability.
30:3.0.1.11.52.0.1.4SECTION 823.12
     823.12 Soil removal and stockpiling.
30:3.0.1.11.52.0.1.5SECTION 823.14
     823.14 Soil replacement.
30:3.0.1.11.52.0.1.6SECTION 823.15
     823.15 Revegetation and restoration of soil productivity.
30:3.0.1.11.53PART 824
PART 824 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - MOUNTAINTOP REMOVAL
30:3.0.1.11.53.0.1.1SECTION 824.1
     824.1 Scope.
30:3.0.1.11.53.0.1.2SECTION 824.2
     824.2 Objectives.
30:3.0.1.11.53.0.1.3SECTION 824.11
     824.11 Mountaintop removal: Performance standards.
30:3.0.1.11.54PART 825
PART 825 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - SPECIAL BITUMINOUS COAL MINES IN WYOMING
30:3.0.1.11.54.0.1.1SECTION 825.1
     825.1 Scope.
30:3.0.1.11.54.0.1.2SECTION 825.2
     825.2 Special bituminous coal mines in Wyoming.
30:3.0.1.11.55PART 827
PART 827 - PERMANENT PROGRAM PERFORMANCE STANDARDS - COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE
30:3.0.1.11.55.0.1.1SECTION 827.1
     827.1 Scope.
30:3.0.1.11.55.0.1.2SECTION 827.11
     827.11 General requirements.
30:3.0.1.11.55.0.1.3SECTION 827.12
     827.12 Coal preparation plants: Performance standards.
30:3.0.1.11.55.0.1.4SECTION 827.13
     827.13 Coal preparation plants: Interim performance standards.
30:3.0.1.11.56PART 828
PART 828 - SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS - IN SITU PROCESSING
30:3.0.1.11.56.0.1.1SECTION 828.1
     828.1 Scope.
30:3.0.1.11.56.0.1.2SECTION 828.2
     828.2 Objectives.
30:3.0.1.11.56.0.1.3SECTION 828.11
     828.11 In situ processing: Performance standards.
30:3.0.1.11.56.0.1.4SECTION 828.12
     828.12 In situ processing: Monitoring.