Title 30

PART 817

Part 817 - Permanent Program Performance Standards - Underground Mining Activities

PART 817 - PERMANENT PROGRAM PERFORMANCE STANDARDS - UNDERGROUND MINING ACTIVITIES Authority:30 U.S.C. 1201 et seq. Source:44 FR 15422, Mar. 13, 1979, unless otherwise noted. Editorial Note:At 82 FR 54999, Nov. 17, 2017, as required by the Congressional Review Act and Public Law 115-5, the Office of Surface Mining Reclamation and Enforcement removed all amendments to part 817 made effective on Jan. 19, 2017, at 81 FR 93418, Dec. 20, 2016.

30:3.0.1.11.48.0.1.1SECTION 817.1
   817.1 Scope.
30:3.0.1.11.48.0.1.2SECTION 817.2
   817.2 Objectives.
30:3.0.1.11.48.0.1.3SECTION 817.10
   817.10 Information collection.
30:3.0.1.11.48.0.1.4SECTION 817.11
   817.11 Signs and markers.
30:3.0.1.11.48.0.1.5SECTION 817.13
   817.13 Casing and sealing of exposed underground openings: General requirements.
30:3.0.1.11.48.0.1.6SECTION 817.14
   817.14 Casing and sealing of underground openings: Temporary.
30:3.0.1.11.48.0.1.7SECTION 817.15
   817.15 Casing and sealing of underground openings: Permanent.
30:3.0.1.11.48.0.1.8SECTION 817.22
   817.22 Topsoil and subsoil.
30:3.0.1.11.48.0.1.9SECTION 817.41
   817.41 Hydrologic-balance protection.
30:3.0.1.11.48.0.1.10SECTION 817.42
   817.42 Hydrologic balance: Water quality standards and effluent limitations.
30:3.0.1.11.48.0.1.11SECTION 817.43
   817.43 Diversions.
30:3.0.1.11.48.0.1.12SECTION 817.45
   817.45 Hydrologic balance: Sediment control measures.
30:3.0.1.11.48.0.1.13SECTION 817.46
   817.46 Hydrologic balance: Siltation structures.
30:3.0.1.11.48.0.1.14SECTION 817.47
   817.47 Hydrologic balance: Discharge structures.
30:3.0.1.11.48.0.1.15SECTION 817.49
   817.49 Impoundments.
30:3.0.1.11.48.0.1.16SECTION 817.56
   817.56 Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
30:3.0.1.11.48.0.1.17SECTION 817.57
   817.57 Hydrologic balance: Stream buffer zones.
30:3.0.1.11.48.0.1.18SECTION 817.59
   817.59 Coal recovery.
30:3.0.1.11.48.0.1.19SECTION 817.61
   817.61 Use of explosives: General requirements.
30:3.0.1.11.48.0.1.20SECTION 817.62
   817.62 Use of explosives: Preblasting survey.
30:3.0.1.11.48.0.1.21SECTION 817.64
   817.64 Use of explosives: General performance standards.
30:3.0.1.11.48.0.1.22SECTION 817.66
   817.66 Use of explosives: Blasting signs, warnings, and access control.
30:3.0.1.11.48.0.1.23SECTION 817.67
   817.67 Use of explosives: Control of adverse effects.
30:3.0.1.11.48.0.1.24SECTION 817.68
   817.68 Use of explosives: Records of blasting operations.
30:3.0.1.11.48.0.1.25SECTION 817.71
   817.71 Disposal of excess spoil: General requirements.
30:3.0.1.11.48.0.1.26SECTION 817.72
   817.72 Disposal of excess spoil: Valley fill/head-of-hollow fills.
30:3.0.1.11.48.0.1.27SECTION 817.73
   817.73 Disposal of excess spoil: Durable rock fills.
30:3.0.1.11.48.0.1.28SECTION 817.74
   817.74 Disposal of excess spoil: Preexisting benches.
30:3.0.1.11.48.0.1.29SECTION 817.81
   817.81 Coal mine waste: General requirements.
30:3.0.1.11.48.0.1.30SECTION 817.83
   817.83 Coal mine waste: Refuse piles.
30:3.0.1.11.48.0.1.31SECTION 817.84
   817.84 Coal mine waste: Impounding structures.
30:3.0.1.11.48.0.1.32SECTION 817.87
   817.87 Coal mine waste: Burning and burned waste utilization.
30:3.0.1.11.48.0.1.33SECTION 817.89
   817.89 Disposal of noncoal mine wastes.
30:3.0.1.11.48.0.1.34SECTION 817.95
   817.95 Stabilization of surface areas.
30:3.0.1.11.48.0.1.35SECTION 817.97
   817.97 Protection of fish, wildlife, and related environmental values.
30:3.0.1.11.48.0.1.36SECTION 817.99
   817.99 Slides and other damage.
30:3.0.1.11.48.0.1.37SECTION 817.100
   817.100 Contemporaneous reclamation.
30:3.0.1.11.48.0.1.38SECTION 817.102
   817.102 Backfilling and grading: General requirements.
30:3.0.1.11.48.0.1.39SECTION 817.106
   817.106 Backfilling and grading: Previously mined areas.
30:3.0.1.11.48.0.1.40SECTION 817.107
   817.107 Backfilling and grading: Steep slopes.
30:3.0.1.11.48.0.1.41SECTION 817.111
   817.111 Revegetation: General requirements.
30:3.0.1.11.48.0.1.42SECTION 817.113
   817.113 Revegetation: Timing.
30:3.0.1.11.48.0.1.43SECTION 817.114
   817.114 Revegetation: Mulching and other soil stabilizing practices.
30:3.0.1.11.48.0.1.44SECTION 817.116
   817.116 Revegetation: Standards for success.
30:3.0.1.11.48.0.1.45SECTION 817.121
   817.121 Subsidence control.
30:3.0.1.11.48.0.1.46SECTION 817.122
   817.122 Subsidence control: Public notice.
30:3.0.1.11.48.0.1.47SECTION 817.131
   817.131 Cessation of operations: Temporary.
30:3.0.1.11.48.0.1.48SECTION 817.132
   817.132 Cessation of operations: Permanent.
30:3.0.1.11.48.0.1.49SECTION 817.133
   817.133 Postmining land use.
30:3.0.1.11.48.0.1.50SECTION 817.150
   817.150 Roads: General.
30:3.0.1.11.48.0.1.51SECTION 817.151
   817.151 Primary roads.
30:3.0.1.11.48.0.1.52SECTION 817.180
   817.180 Utility installations.
30:3.0.1.11.48.0.1.53SECTION 817.181
   817.181 Support facilities.
30:3.0.1.11.48.0.1.54SECTION 817.200
   817.200 Interpretative rules related to general performance standards.